CN202995413U - A constructional engineering material delivery device based on construction progress monitoring - Google Patents
A constructional engineering material delivery device based on construction progress monitoring Download PDFInfo
- Publication number
- CN202995413U CN202995413U CN2012206520665U CN201220652066U CN202995413U CN 202995413 U CN202995413 U CN 202995413U CN 2012206520665 U CN2012206520665 U CN 2012206520665U CN 201220652066 U CN201220652066 U CN 201220652066U CN 202995413 U CN202995413 U CN 202995413U
- Authority
- CN
- China
- Prior art keywords
- construction
- data
- construction speed
- data processor
- material delivery
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Abstract
The utility model discloses a constructional engineering material delivery device based on construction progress monitoring. The constructional engineering material delivery device comprises construction progress monitoring devices disposed in multiple construction projects and a material delivery host computer disposed in a material delivery department. The multiple construction progress monitoring devices are all connected with the material delivery host computer. The construction progress monitoring device comprises a data processor 1, a data storing unit 1, a display unit 1, a parameter input unit 1, a data transmitting module uploading progress information, and a voice communication device 1. The material delivery host computer comprises a data storing device, a data receiving device, a data processor 2, a display unit 2, a clock circuit 2, and a voice communication device 2. The data processor 2 analyzes the received progress information and automatically matches corresponding material delivery information with the progress information. The constructional engineering material delivery device has characteristics of reasonable design, easy manipulation and high degree of intellectualization, a good using effect, and a capability of easily and timely completing material delivery progresses of construction projects according to construction progress in the present state.
Description
Technical field
The utility model relates to a kind of construction work material distribution device, especially relates to a kind of construction work material distribution device based on the construction speed monitoring.
Background technology
The construction work progress monitoring is the control work through the building engineering construction overall process, and progress monitoring is one of groundwork of the engineering construction personnel of unit in charge of construction and the project supervision personnel of supervisor.The quality of progress monitoring directly has influence on duration, the workload of engineering, consumption of resource etc.Therefore, must carry out progress monitoring work in building construction process.Nowadays, it is that the building site is checked to realize that the construction work progress monitoring mainly relies on the people, and check that rear electronic edition or the paper document of generally all adopting carries out record to looking into perceptible construction speed, also need subsequently the construction speed situation that records is submitted to upper supervision department, thereby the manpower and materials of required input are larger, and waste time and energy, especially in the situation that the related need of construction work monitoring project is more, the defective of existing construction progress control method is more obvious.Simultaneously, when carrying out the construction work material allocation, upper supervision department need first gather the progress situation of each construction project under current state, and the progress situation of each construction project is informed corresponding material allocation department, thereby required time is longer, and in the more situation of construction project, the phenomenons such as the untimely or dispensing error of material allocation can appear inevitably.To sum up, nowadays lack a kind of reasonable in design, input cost is lower and it is easy and simple to handle to use, result of use is good based on the construction work material distribution device of construction speed monitoring, it can be according to each monitored item purpose construction speed monitoring result under current state, easy, as in time to complete the required material of each construction project delivery process.
The utility model content
Technical problem to be solved in the utility model is for above-mentioned deficiency of the prior art, a kind of construction work material distribution device based on the construction speed monitoring is provided, it is reasonable in design, easy-to-connect, use is easy and simple to handle and intelligent degree is high, result of use good, can be according to each monitored item purpose construction speed monitoring result under current state, easy, as in time to complete the required material of each construction project delivery process.
for solving the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of construction work material distribution device based on the construction speed monitoring, it is characterized in that: comprise the construction speed monitoring device that is laid on a plurality of construction projects that need carry out material allocation and the material allocation main frame that is laid in material allocation department, a plurality of described construction speed monitoring devices all join with the material allocation main frame, described construction speed monitoring device comprises data processor one, storage inside has the data storage cell one of this construction project construction speed list that pre-establishes, this construction project construction speed list is carried out the display unit one of simultaneous display, the progress numbering of construction speed and the parameter input unit of the bullets of this construction project have been completed for this construction project under the input current state, the progress msg synchronous driving that parameter input unit is inputted is to the data transmission blocks of material allocation main frame and the voice call equipment one that joins with data processor one, described data storage cell, parameter input unit, display unit one and data transmission blocks are all joined with data processor one, described material allocation main frame comprises that storage inside has the data storage device of the corresponding material allocation information of all construction speeds in a plurality of construction project construction speed list that need carry out material allocation and each construction speed list, the data reception module that construction speed progress msg that monitoring device sends is received, data progress msg that receiver module receives and time of reception thereof are carried out the data storage cell two of stores synchronized, data progress msg that receiver module receives is analyzed and is drawn in conjunction with stored information Auto-matching in data storage device the data processor two of material allocation information corresponding to each received progress msg, clock circuit two and voice call equipment two that all progress msgs that the data receiver module was received the same day and material allocation information corresponding to each progress msg are carried out the display unit two of simultaneous display and joined with data processor two respectively, described data storage device, data reception module, data storage cell two and display unit two all join with data processor two.
Above-mentioned a kind of construction work material distribution device based on the construction speed monitoring, it is characterized in that: described construction speed monitoring device also comprises the progress msg transmitting time of data sending module carried out self registering clock circuit one, and described clock circuit one joins with data processor one.
Above-mentioned a kind of construction work material distribution device based on the construction speed monitoring, it is characterized in that: described data processor one and data processor two are the ARM microprocessor.
The utility model compared with prior art has the following advantages:
1, simple in structure, volume is little, easy to carry and circuit design is reasonable, input cost is low.
2, the simple and easy-to-connect of circuit.
3, use that simple to operate, intelligent degree is high and display effect is directly perceived.
4, result of use is good and practical value is high, can be according to each monitored item purpose construction speed monitoring result under current state, and easy, as in time to complete the required material of each construction project delivery process, time saving and energy saving.
In sum, the utility model is reasonable in design, easy-to-connect, use is easy and simple to handle and intelligent degree is high, result of use good, can be according to each monitored item purpose construction speed monitoring result under current state, easy, as in time to complete the required material of each construction project delivery process.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Description of drawings
Fig. 1 is schematic block circuit diagram of the present utility model.
Description of reference numerals:
1-construction speed monitoring device; 1-1-data storage cell one; 1-2-parameter input unit;
1-3-data processor one; 1-4-display unit one; 1-5-data transmission blocks;
1-6-voice call equipment one; 1-7-clock circuit one; 2-material allocation main frame;
2-1-data storage device; 2-2-data reception module;
2-3-data storage cell two; 2-4-display unit two; 2-5-data processor two;
2-6-clock circuit two; 2-7-voice call equipment two.
Embodiment
As shown in Figure 1, the utility model comprises the construction speed monitoring device 1 that is laid on a plurality of construction projects that need carry out material allocation and the material allocation main frame 2 that is laid in material allocation department, and a plurality of described construction speed monitoring devices 1 all join with material allocation main frame 2.described construction speed monitoring device 1 comprises data processor one 1-3, storage inside has data storage cell one 1-1 of this construction project construction speed list that pre-establishes, this construction project construction speed list is carried out display unit one 1-4 of simultaneous display, the progress numbering of construction speed and the parameter input unit 1-2 of the bullets of this construction project have been completed for this construction project under the input current state, the progress msg synchronous driving that parameter input unit 1-2 is inputted is to the data transmission blocks 1-5 of material allocation main frame 2 and voice call equipment one 1-6 that joins with data processor one 1-3, described data storage cell 1-1, parameter input unit 1-2, display unit one 1-4 and data transmission blocks 1-5 all join with data processor one 1-3.described material allocation main frame 2 comprises that storage inside has the data storage device 2-1 of the corresponding material allocation information of all construction speeds in a plurality of construction project construction speed list that need carry out material allocation and each construction speed list, the data reception module 2-2 that construction speed monitoring device 1 progress msg that sends is received, data receiver module progress msg that 2-2 receives and time of reception thereof are carried out data storage cell two 2-3 of stores synchronized, data receiver module progress msg that 2-2 receives is analyzed and is drawn in conjunction with stored information Auto-matching in data storage device 2-1 data processor two 2-5 of material allocation information corresponding to each received progress msg, clock circuit two 2-6 and voice call equipment two 2-7 that all progress msgs that data receiver module 2-2 was received the same day and material allocation information corresponding to each progress msg are carried out display unit two 2-4 of simultaneous display and joined with data processor two 2-5 respectively, described data storage device 2-1, data reception module 2-2, data storage cell two 2-3 and display unit two 2-4 all join with data processor two 2-5.
In the present embodiment, described construction speed monitoring device 1 also comprises the progress msg transmitting time of data sending module 1-5 carried out self registering clock circuit one 1-7, and described clock circuit one 1-7 and data processor one 1-3 join.
In the present embodiment, described data processor one 1-3 and data processor two 2-5 are the ARM microprocessor.
The above; it is only preferred embodiment of the present utility model; be not that the utility model is imposed any restrictions; every any simple modification, change and equivalent structure of above embodiment being done according to the utility model technical spirit changes, and all still belongs in the protection domain of technical solutions of the utility model.
Claims (3)
1. construction work material distribution device based on construction speed monitoring, it is characterized in that: comprise the construction speed monitoring device (1) that is laid on a plurality of construction projects that need carry out material allocation and be laid in the material allocation main frame (2) of material allocation department, a plurality of described construction speed monitoring devices (1) all join with material allocation main frame (2), described construction speed monitoring device (1) comprises data processor one (1-3), storage inside has the data storage cell one (1-1) of this construction project construction speed list that pre-establishes, this construction project construction speed list is carried out the display unit one (1-4) of simultaneous display, the progress numbering of construction speed and the parameter input unit (1-2) of the bullets of this construction project have been completed for this construction project under the input current state, the progress msg synchronous driving that parameter input unit (1-2) is inputted is to the data transmission blocks (1-5) of material allocation main frame (2) and the voice call equipment one (1-6) that joins with data processor one (1-3), described data storage cell (1-1), parameter input unit (1-2), display unit one (1-4) and data transmission blocks (1-5) are all joined with data processor one (1-3), described material allocation main frame (2) comprises that storage inside has the data storage device (2-1) of the corresponding material allocation information of all construction speeds in a plurality of construction project construction speed list that need carry out material allocation and each construction speed list, the data reception module (2-2) that construction speed monitoring device (1) progress msg that sends is received, to data receiver module (2-2) the progress msg that receives and time of reception thereof carry out the data storage cell two (2-3) of stores synchronized, data receiver module (2-2) progress msg that receives is analyzed and is drawn in conjunction with the interior stored information Auto-matching of data storage device (2-1) data processor two (2-5) of material allocation information corresponding to each received progress msg, clock circuit two (2-6) and voice call equipment two (2-7) that all progress msgs that data receiver module (2-2) was received the same day and material allocation information corresponding to each progress msg are carried out the display unit two (2-4) of simultaneous display and joined with data processor two (2-5) respectively, described data storage device (2-1), data reception module (2-2), data storage cell two (2-3) and display unit two (2-4) all join with data processor two (2-5).
2. according to a kind of construction work material distribution device based on the construction speed monitoring claimed in claim 1, it is characterized in that: described construction speed monitoring device (1) also comprises the progress msg transmitting time of data sending module (1-5) carried out self registering clock circuit one (1-7), and described clock circuit one (1-7) joins with data processor one (1-3).
3. according to the described a kind of construction work material distribution device based on the construction speed monitoring of claim 1 or 2, it is characterized in that: described data processor one (1-3) and data processor two (2-5) are the ARM microprocessor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012206520665U CN202995413U (en) | 2012-11-29 | 2012-11-29 | A constructional engineering material delivery device based on construction progress monitoring |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012206520665U CN202995413U (en) | 2012-11-29 | 2012-11-29 | A constructional engineering material delivery device based on construction progress monitoring |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202995413U true CN202995413U (en) | 2013-06-12 |
Family
ID=48566571
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012206520665U Expired - Fee Related CN202995413U (en) | 2012-11-29 | 2012-11-29 | A constructional engineering material delivery device based on construction progress monitoring |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202995413U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108153219A (en) * | 2018-02-12 | 2018-06-12 | 北京新能正源环境科技有限公司 | Construction speed monitoring system, server and terminal device |
-
2012
- 2012-11-29 CN CN2012206520665U patent/CN202995413U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108153219A (en) * | 2018-02-12 | 2018-06-12 | 北京新能正源环境科技有限公司 | Construction speed monitoring system, server and terminal device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104852836A (en) | Comprehensive data acquisition substation for underground coal mine | |
CN103956834A (en) | User side load control method and system | |
CN202995413U (en) | A constructional engineering material delivery device based on construction progress monitoring | |
CN206584410U (en) | electronic billboard system for workshop | |
CN202975749U (en) | Construction engineering construction progress monitoring system | |
CN202886890U (en) | Wireless touch liquid crystal screen switch panel | |
CN103850438A (en) | Constructional engineering material delivery device based on construction progress monitoring | |
CN201749346U (en) | Wireless electronic signage control system in production | |
CN103853111A (en) | Automatic distribution system of constructional engineering material | |
CN204759518U (en) | Five prevent shutting checks and accepts device | |
CN202995412U (en) | A constructional engineering material automatic delivery system | |
CN202939482U (en) | Rail-transit automatic fare collection system station control center system | |
CN203616818U (en) | Prepaid control terminal of load management | |
CN203186365U (en) | Station control center communication state monitoring system | |
CN202995339U (en) | A constructional engineering material delivery monitor | |
CN207352400U (en) | A kind of charging pile monitoring system based on configuration screen human-computer interaction device | |
CN202197272U (en) | Indicating lamp panel device | |
CN202976180U (en) | Handheld construction engineering construction progress monitor | |
CN203966193U (en) | Construction Schedule dynamic management system | |
CN203149337U (en) | Hand-held monitor | |
CN204423419U (en) | A kind of multifunctional information management system | |
CN203689686U (en) | Collector with communication self-checking function | |
CN202177818U (en) | Power bill settlement device of power grid | |
CN202677368U (en) | Displayer with multiple receiving ends | |
CN202035021U (en) | Agricultural product information collector |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |