CN103850438A - Constructional engineering material delivery device based on construction progress monitoring - Google Patents

Constructional engineering material delivery device based on construction progress monitoring Download PDF

Info

Publication number
CN103850438A
CN103850438A CN201210501893.9A CN201210501893A CN103850438A CN 103850438 A CN103850438 A CN 103850438A CN 201210501893 A CN201210501893 A CN 201210501893A CN 103850438 A CN103850438 A CN 103850438A
Authority
CN
China
Prior art keywords
construction
data
construction speed
material delivery
data processor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210501893.9A
Other languages
Chinese (zh)
Inventor
侯鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Zhongzhi Huize Optical Technology Co Ltd
Original Assignee
Xian Zhongzhi Huize Optical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Zhongzhi Huize Optical Technology Co Ltd filed Critical Xian Zhongzhi Huize Optical Technology Co Ltd
Priority to CN201210501893.9A priority Critical patent/CN103850438A/en
Publication of CN103850438A publication Critical patent/CN103850438A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a constructional engineering material delivery device based on construction progress monitoring. The constructional engineering material delivery device comprises a plurality of construction progress monitoring devices scattered in a plurality of construction projects and a material delivery host arranged in a material delivery department, wherein the plurality of construction progress monitoring devices are all connected with the material delivery host; each construction progress monitoring device comprises a first data processor, a first data memory unit, a first display unit, a parameter input unit, a data transmission module for uploading progress information and a first voice communication device; the material delivery host comprises a data memory device, a data receiving module, a second data processor for analyzing the received progress information and automatically finding out material delivery information corresponding to each piece of progress information, a second display unit as well as a second clock circuit and a second voice communication device. The constructional engineering material delivery device based on construction progress monitoring is rational in design, simple and convenient to operate, high in intelligence degree, good in using effect, and capable of completing the material delivery process for each construction project in time simply and conveniently in the current state.

Description

A kind of construction work material distribution device based on construction speed monitoring
Technical field
The present invention relates to a kind of construction work material distribution device, especially relate to a kind of construction work material distribution device based on construction speed monitoring.
Background technology
Construction work progress monitoring is the control work through building engineering construction overall process, and progress monitoring is one of groundwork of the engineering construction personnel of unit in charge of construction and the project supervision personnel of supervisor.The quality of progress monitoring, directly has influence on duration, the workload of engineering, consumption of resource etc.Therefore, must carry out the progress monitoring work in building construction process.Nowadays, it is that building site is checked to realize that construction work progress monitoring mainly relies on people, and check that rear electronic edition or the paper document of generally all adopting carries out record to looking into perceptible construction speed, also need subsequently recorded construction speed situation to submit to upper supervision department, thereby the manpower and materials of required input are larger, and waste time and energy, especially, in the case of the related need monitoring project of construction work is more, the defect of existing construction progress control method is more obvious.Simultaneously, while carrying out construction work material allocation, upper supervision department needs first the progress situation of each construction project under current state to be gathered, and the progress situation of each construction project is informed to corresponding material allocation department, thereby required time is longer, and when in the more situation of construction project, inevitably there will be material allocation not in time or provide and deliver the phenomenons such as error.To sum up, nowadays lack a kind of reasonable in design, input cost is lower and it is easy and simple to handle to use, result of use is good based on construction speed monitoring construction work material distribution device, it can be according to each monitored item object construction speed monitoring result under current state, easy, to complete in time the required material of each construction project delivery process.
Summary of the invention
Technical problem to be solved by this invention is for above-mentioned deficiency of the prior art, a kind of construction work material distribution device based on construction speed monitoring is provided, it is reasonable in design, easy-to-connect, use is easy and simple to handle and intelligent degree is high, result of use good, can be according to each monitored item object construction speed monitoring result under current state, easy, to complete in time the required material of each construction project delivery process.
For solving the problems of the technologies described above, the technical solution used in the present invention is: a kind of construction work material distribution device based on construction speed monitoring, it is characterized in that: comprise the construction speed monitoring device being laid in the multiple construction projects that need carry out material allocation and the material allocation main frame that is laid in material allocation department, multiple described construction speed monitoring devices all join with material allocation main frame, described construction speed monitoring device comprises data processor one, storage inside has the data storage cell one of this construction project construction speed list pre-establishing, this construction project construction speed list is carried out to the display unit one of simultaneous display, the progress numbering of construction speed and the parameter input unit of the bullets of this construction project are completed for inputting this construction project under current state, the voice call equipment one that the progress msg synchronous driving that parameter input unit is inputted is joined to the data transmission blocks of material allocation main frame with data processor one, described data storage cell, parameter input unit, display unit one and data transmission blocks are all joined with data processor one, described material allocation main frame comprises that storage inside has and need carry out multiple construction project construction speed list of material allocation and the data storage device of the corresponding material allocation information of all construction speeds in each construction speed list, the data reception module that construction speed progress msg that monitoring device sends is received, progress msg that data reception module receives and time of reception thereof are carried out to the data storage cell two of stores synchronized, progress msg that data reception module receives is analyzed and is drawn in conjunction with stored information Auto-matching in data storage device the data processor two of the material allocation information that received each progress msg is corresponding, clock circuit two and voice call equipment two that all progress msgs that data reception module was received the same day and material allocation information corresponding to each progress msg are carried out the display unit two of simultaneous display and joined with data processor two respectively, described data storage device, data reception module, data storage cell two and display unit two all join with data processor two.
Above-mentioned a kind of construction work material distribution device based on construction speed monitoring, it is characterized in that: described construction speed monitoring device also comprises the progress msg transmitting time of data transmission blocks is carried out to self registering clock circuit one, described clock circuit one joins with data processor one.
Above-mentioned a kind of construction work material distribution device based on construction speed monitoring, is characterized in that: described data processor one and data processor two are ARM microprocessor.
The present invention compared with prior art has the following advantages:
1, simple in structure, volume is little, easy to carry and circuit design is reasonable, input cost is low.
2, the simple and easy-to-connect of circuit.
3, use that simple to operate, intelligent degree is high and display effect is directly perceived.
4, result of use is good and practical value is high, can be according to each monitored item object construction speed monitoring result under current state, and easy, to complete in time the required material of each construction project delivery process, time saving and energy saving.
In sum, the present invention is reasonable in design, easy-to-connect, use is easy and simple to handle and intelligent degree is high, result of use good, can be according to each monitored item object construction speed monitoring result under current state, easy, to complete in time the required material of each construction project delivery process.
Below by drawings and Examples, technical scheme of the present invention is described in further detail.
Accompanying drawing explanation
Fig. 1 is schematic block circuit diagram of the present invention.
Description of reference numerals:
1-construction speed monitoring device; 1-1-data storage cell one; 1-2-parameter input unit;
1-3-data processor one; 1-4-display unit one; 1-5-data transmission blocks;
1-6-voice call equipment one; 1-7-clock circuit one; 2-material allocation main frame;
2-1-data storage device; 2-2-data reception module;
2-3-data storage cell two; 2-4-display unit two; 2-5-data processor two;
2-6-clock circuit two; 2-7-voice call equipment two.
The specific embodiment
As shown in Figure 1, the present invention includes the construction speed monitoring device 1 being laid in the multiple construction projects that need carry out material allocation and the material allocation main frame 2 that is laid in material allocation department, multiple described construction speed monitoring devices 1 all join with material allocation main frame 2.Described construction speed monitoring device 1 comprises data processor one 1-3, storage inside has data storage cell one 1-1 of this construction project construction speed list pre-establishing, this construction project construction speed list is carried out to display unit one 1-4 of simultaneous display, the progress numbering of construction speed and the parameter input unit 1-2 of the bullets of this construction project are completed for inputting this construction project under current state, voice call equipment one 1-6 that the progress msg synchronous driving that parameter input unit 1-2 is inputted is joined to the data transmission blocks 1-5 of material allocation main frame 2 with data processor one 1-3, described data storage cell 1-1, parameter input unit 1-2, display unit one 1-4 and data transmission blocks 1-5 all join with data processor one 1-3.Described material allocation main frame 2 comprises that storage inside has and need carry out multiple construction project construction speed list of material allocation and the data storage device 2-1 of the corresponding material allocation information of all construction speeds in each construction speed list, the data reception module 2-2 that construction speed monitoring device 1 progress msg that sends is received, data reception module progress msg that 2-2 receives and time of reception thereof are carried out to data storage cell two 2-3 of stores synchronized, data reception module progress msg that 2-2 receives is analyzed and is drawn in conjunction with stored information Auto-matching in data storage device 2-1 data processor two 2-5 of the material allocation information that received each progress msg is corresponding, clock circuit two 2-6 and voice call equipment two 2-7 that all progress msgs that data reception module 2-2 was received the same day and material allocation information corresponding to each progress msg are carried out the display unit 2-4 of simultaneous display and joined with data processor two 2-5 respectively, described data storage device 2-1, data reception module 2-2, data storage cell two 2-3 and display unit two 2-4 all join with data processor two 2-5.
In the present embodiment, described construction speed monitoring device 1 also comprises the progress msg transmitting time of data transmission blocks 1-5 carried out to self registering clock circuit one 1-7, and described clock circuit one 1-7 and data processor one 1-3 join.
In the present embodiment, described data processor one 1-3 and data processor two 2-5 are ARM microprocessor.
The above; it is only preferred embodiment of the present invention; not the present invention is imposed any restrictions, every any simple modification of above embodiment being done according to the technology of the present invention essence, change and equivalent structure change, and all still belong in the protection domain of technical solution of the present invention.

Claims (3)

1. the construction work material distribution device based on construction speed monitoring, it is characterized in that: comprise the construction speed monitoring device (1) being laid in the multiple construction projects that need carry out material allocation and the material allocation main frame (2) that is laid in material allocation department, multiple described construction speed monitoring devices (1) all join with material allocation main frame (2), described construction speed monitoring device (1) comprises data processor one (1-3), storage inside has the data storage cell one (1-1) of this construction project construction speed list pre-establishing, this construction project construction speed list is carried out to the display unit one (1-4) of simultaneous display, the progress numbering of construction speed and the parameter input unit (1-2) of the bullets of this construction project are completed for inputting this construction project under current state, the voice call equipment one (1-6) that the progress msg synchronous driving that parameter input unit (1-2) is inputted is joined to the data transmission blocks (1-5) of material allocation main frame (2) with data processor one (1-3), described data storage cell (1-1), parameter input unit (1-2), display unit one (1-4) and data transmission blocks (1-5) are all joined with data processor one (1-3), described material allocation main frame (2) comprises that storage inside has and need carry out multiple construction project construction speed list of material allocation and the data storage device (2-1) of the corresponding material allocation information of all construction speeds in each construction speed list, the data reception module (2-2) that construction speed monitoring device (1) progress msg that sends is received, to data reception module (2-2) the progress msg that receives and time of reception thereof carry out the data storage cell two (2-3) of stores synchronized, data reception module (2-2) progress msg that receives is analyzed and is drawn in conjunction with the interior stored information Auto-matching of data storage device (2-1) data processor two (2-5) of the material allocation information that received each progress msg is corresponding, clock circuit two (2-6) and voice call equipment two (2-7) that all progress msgs that data reception module (2-2) was received the same day and material allocation information corresponding to each progress msg are carried out the display unit two (2-4) of simultaneous display and joined with data processor two (2-5) respectively, described data storage device (2-1), data reception module (2-2), data storage cell two (2-3) and display unit two (2-4) all join with data processor two (2-5).
2. according to a kind of construction work material distribution device based on construction speed monitoring claimed in claim 1, it is characterized in that: described construction speed monitoring device (1) also comprises the progress msg transmitting time of data transmission blocks (1-5) is carried out to self registering clock circuit one (1-7), described clock circuit one (1-7) joins with data processor one (1-3).
3. according to a kind of construction work material distribution device based on construction speed monitoring described in claim 1 or 2, it is characterized in that: described data processor one (1-3) and data processor two (2-5) are ARM microprocessor.
CN201210501893.9A 2012-11-29 2012-11-29 Constructional engineering material delivery device based on construction progress monitoring Pending CN103850438A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210501893.9A CN103850438A (en) 2012-11-29 2012-11-29 Constructional engineering material delivery device based on construction progress monitoring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210501893.9A CN103850438A (en) 2012-11-29 2012-11-29 Constructional engineering material delivery device based on construction progress monitoring

Publications (1)

Publication Number Publication Date
CN103850438A true CN103850438A (en) 2014-06-11

Family

ID=50858545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210501893.9A Pending CN103850438A (en) 2012-11-29 2012-11-29 Constructional engineering material delivery device based on construction progress monitoring

Country Status (1)

Country Link
CN (1) CN103850438A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112270522A (en) * 2020-10-14 2021-01-26 广东博智林机器人有限公司 Steel bar operation method and system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112270522A (en) * 2020-10-14 2021-01-26 广东博智林机器人有限公司 Steel bar operation method and system

Similar Documents

Publication Publication Date Title
CN103973885A (en) Data reporting method and mobile terminal
CN202948488U (en) Wireless handheld terminal system for electrical equipment
CN102829774B (en) Hand-held terminal for power distribution polling map navigation and equipment information management
CN202975749U (en) Construction engineering construction progress monitoring system
CN103850438A (en) Constructional engineering material delivery device based on construction progress monitoring
CN202995413U (en) A constructional engineering material delivery device based on construction progress monitoring
CN103853111A (en) Automatic distribution system of constructional engineering material
CN204515030U (en) A kind of lightning protection comprehensive detection system
CN202995339U (en) A constructional engineering material delivery monitor
CN202995412U (en) A constructional engineering material automatic delivery system
CN202197272U (en) Indicating lamp panel device
CN202870801U (en) Wireless control light emitting diode (LED) display screen information release system device
CN103853077A (en) Constructional engineering material delivery monitor
CN202976180U (en) Handheld construction engineering construction progress monitor
CN205246399U (en) Portable dust sampling device
CN204178546U (en) A kind of Allocation transformer energy data acquisition system (DAS) based on Internet of Things
CN205104021U (en) A terminal for network platform scientific instrument equipment information on regular payroll updates
CN203966193U (en) Construction Schedule dynamic management system
CN204423419U (en) A kind of multifunctional information management system
CN202177818U (en) Power bill settlement device of power grid
CN202649368U (en) Network cable detection apparatus
CN203984527U (en) Wireless spherical camera
CN203733121U (en) GIS (geographic information system) data acquisition unit
CN203149337U (en) Hand-held monitor
CN202677368U (en) Displayer with multiple receiving ends

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140611