CN202177818U - Power bill settlement device of power grid - Google Patents
Power bill settlement device of power grid Download PDFInfo
- Publication number
- CN202177818U CN202177818U CN2011202863695U CN201120286369U CN202177818U CN 202177818 U CN202177818 U CN 202177818U CN 2011202863695 U CN2011202863695 U CN 2011202863695U CN 201120286369 U CN201120286369 U CN 201120286369U CN 202177818 U CN202177818 U CN 202177818U
- Authority
- CN
- China
- Prior art keywords
- data
- control circuit
- control chip
- input port
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A power bill settlement device of a power grid comprises an input port for receiving data input from the outside, a control circuit and a display device for displaying data processed by the control circuit. The control circuit is in coupling connection with the input port. The data is collected in real time, displayed on a display screen so as to facilitate concentrated monitoring of operators and meanwhile is transmitted into a data base for concentrated management. Accordingly, the fact that crucial data are restricted in some 'information isolated island' is avoided, and labor production rates are greatly improved through the concentrated monitoring of the power volume data. On the other hand, weak links in production can be found in actual operation so as to perform scientific, accurate and real-time management on devices.
Description
Technical field
The utility model relates to a kind of checkout apparatus, particularly a kind of electrical network charge calculation device.
Background technology
Get into 21 century, power industry has been carried out the separate reform of generating with transmission of electricity.In commercialization, power grid enterprises begin to move towards the modern enterprise management mode from traditional plan management mode in the face of complicated internal and external environment.One side hopes to adopt advanced technology and equipment to improve the safe reliability of electrical network, expects also that on the other hand controlling production cost with more rational business process promotes Enterprises'Competitiveness.But be to see on seeing technically or managing all to have certain problem that these problems are embodied at present:
1. subject consciousness is vacant relatively; The idea of this stickization directly causes separating of assets investment (planning) and production run; Assets protection separates with production run, and return on asset separates with production run, can't satisfy deeper management and decision-making needs.
2. the relative separation of management and control system; The reason that management and control separates is except above-mentioned " product of living again, light management " idea; Be that also electric system has real-time equilibrium response, thus production control system from data acquisition to the data pre-service to data analysis, all based on real-time technique.And MIS is quite different, and a little less than the requirement relatively to real-time characteristic, therefore the technical system that both adopted is not quite similar.
3. relatively lagging behind of management innovation, the awakening of competition, service, cost consciousness must bring informationalized tortuous the development with the contradiction between each professional stick management mode for a long time.Management mode is informationalized basis; Do not have good management mode, promptly use same technology and platform, the system that is realized also is different; The reason of at present a lot of ERP failures just is that it just mechanically solidifies original flow process, fails effectively to set up business collaboration.Management change is the basis that two big systems merge, and grid company also lacks the administrative mechanism of the flattening that adapts with the asset life cycle management at present, lacks professional overall situation planning such as planning, capital construction, operation, maintenance, and management innovation remains further to be promoted.
The utility model content
For solving the problems of the technologies described above, the purpose of the utility model is to provide a kind of and obtains electric quantity data quickly and accurately and handle and preserve, and improves the electrical network charge calculation device of the efficiency of management.
The utility model electrical network charge calculation device comprises: input port is used to accept the data from the outside input; Control circuit, said control circuit and said input port are of coupled connections; And display device, be used for showing through the control circuit data processed.
Said control circuit comprises: filtrator, said filtrator are used for the data filter from said input port input; Control chip, said control chip will obtain filtered data from said filtrator; Storage unit, said storage unit will store from the data that said control chip obtains; Communication unit, said communication unit is transferred to server database with said control chip data processed; And the power supply of WV is provided for said filtrator, said control chip, said storage unit and said communication unit.Said control circuit also further comprises clock module, and said module all the time and said storage unit, said communication unit, said control chip and said power supply are of coupled connections.
The utility model electrical network charge calculation device is with real time data acquisition and be presented on the display screen; Be convenient to the dispatcher and concentrate monitoring; And simultaneously data transmission is managed concentratedly in database; Not only can avoid in the critical data limitation certain " information island ", and, can increase substantially labour productivity through electric quantity data is concentrated monitoring.On the other hand, link in the weakness in actual mechanical process, can also finding to produce can device, science, manage accurately and real-time.
Description of drawings
Fig. 1 is the utility model electrical network charge calculation device work structuring figure.
Fig. 2 is the utility model electrical network charge calculation apparatus structure block diagram.
1-electrical network charge calculation device 2-server database
Embodiment
Below in conjunction with accompanying drawing the utility model electrical network charge calculation device is done further explain.
Like Fig. 1, shown in Figure 2, the utility model electrical network charge calculation device 1 comprises: input port is used to accept the data from the outside input; Control circuit, control circuit and input port are of coupled connections; And display device, be used for showing through the control circuit data processed.
Control circuit comprises: filtrator, filtrator are used for the data filter from the input port input; Control chip, control chip will obtain filtered data from filtrator; Storage unit, storage unit will store from the data that control chip obtains; Communication unit, communication unit is transferred to server database 2 with the control chip data processed; And give filtrator, control chip,, storage unit and communication unit provide the power supply of WV.Control circuit also further comprises clock module, and module and storage unit, communication unit, control chip and power supply are of coupled connections all the time.
The utility model electrical network charge calculation device is with real time data acquisition and be presented on the display screen, is convenient to the dispatcher and concentrates monitoring, and simultaneously, a plurality of electrical network charge calculation devices can be got in touch through communication unit wherein each other, carry out data sharing.And simultaneously data transmission is managed concentratedly in database, not only can avoid in the critical data limitation certain " information island ", and, can increase substantially labour productivity through electric quantity data is concentrated monitoring.On the other hand, link in the weakness in actual mechanical process, can also finding to produce can device, science, manage accurately and real-time.
The preferred embodiment of below the utility model having been created specifies; But the utility model is created and is not limited to embodiment; Those of ordinary skill in the art also can make all modification that is equal to or replacement under the prerequisite of the invention spirit, modification that these are equal to or replacement all are included in the application's claim institute restricted portion.
Claims (3)
1. electrical network charge calculation device is characterized in that, comprising:
Input port is used to accept the data from the outside input;
Control circuit, said control circuit and said input port are of coupled connections; And
Display device is used for showing through the control circuit data processed.
2. electrical network charge calculation device according to claim 1 is characterized in that said control circuit comprises:
Filtrator, said filtrator are used for the data filter from said input port input;
Control chip, said control chip will obtain filtered data from said filtrator;
Storage unit, said storage unit will store from the data that said control chip obtains;
Communication unit, said communication unit is transferred to server database with said control chip data processed; And
The power supply of WV is provided for said filtrator, said control chip, said storage unit and said communication unit.
3. electrical network charge calculation device according to claim 2 is characterized in that said control circuit also further comprises clock module, and said module all the time and said storage unit, said communication unit, said control chip and said power supply are of coupled connections.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202863695U CN202177818U (en) | 2011-08-08 | 2011-08-08 | Power bill settlement device of power grid |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202863695U CN202177818U (en) | 2011-08-08 | 2011-08-08 | Power bill settlement device of power grid |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202177818U true CN202177818U (en) | 2012-03-28 |
Family
ID=45867690
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011202863695U Expired - Fee Related CN202177818U (en) | 2011-08-08 | 2011-08-08 | Power bill settlement device of power grid |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202177818U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112346328A (en) * | 2020-11-24 | 2021-02-09 | 江苏方天电力技术有限公司 | Wireless synchronous acquisition system based on satellite synchronization technology |
-
2011
- 2011-08-08 CN CN2011202863695U patent/CN202177818U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112346328A (en) * | 2020-11-24 | 2021-02-09 | 江苏方天电力技术有限公司 | Wireless synchronous acquisition system based on satellite synchronization technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103150618B (en) | Power transmission network work plan generates system and method | |
CN103618382A (en) | Transformer substation operation and maintenance integration field work data collection and field work instruction system | |
CN110995859A (en) | Intelligent transformer substation supporting platform system based on ubiquitous Internet of things | |
JP6927557B2 (en) | Management system | |
CN106651299A (en) | Work order intelligent settlement system and implementation method | |
CN105023117A (en) | Electrified detection standardized operation management system based on mobile and cloud computing technologies | |
CN110335102A (en) | A kind of system that service platform configures order to clothes processing factory | |
CN105388876A (en) | Method and device for obtaining team-based intermittent-type chemical production process conformity | |
CN102609773A (en) | Digital pre-plan-based emergency dispatching processing system | |
CN202177818U (en) | Power bill settlement device of power grid | |
CN102591289A (en) | Cement plant managing and controlling integrated system | |
CN204833355U (en) | Evaluation service system based on a quick -witted double screen | |
CN102438040B (en) | Multi-source real-time data calibration method of with provincial and local integration | |
CN102685446A (en) | Centralized monitoring management system for chain stores | |
CN205028332U (en) | Billboard system for NULL | |
CN103413197A (en) | Method and system for monitoring electric power marketing work plan | |
CN203728940U (en) | Online automatic aluminum discharging device | |
CN203259854U (en) | Novel internet of things control platform | |
CN103414785B (en) | A kind of application architecture for electric power monitoring operation center | |
CN202282643U (en) | Power grid electric quantity acquisition platform | |
CN107291766A (en) | Laterally specialty fusion, longitudinal province ground power network panoramic information display systems for running through of county | |
CN201797371U (en) | Recording management device for transformer inspection | |
Wedanage et al. | Fog assisted industrial iot module for cycle time capturing in apparel industry | |
CN202424777U (en) | Water conservancy supervising device | |
CN202305661U (en) | Electric quantity metering system of wireless public network |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120328 Termination date: 20170808 |