CN202282643U - Power grid electric quantity acquisition platform - Google Patents

Power grid electric quantity acquisition platform Download PDF

Info

Publication number
CN202282643U
CN202282643U CN2011203144181U CN201120314418U CN202282643U CN 202282643 U CN202282643 U CN 202282643U CN 2011203144181 U CN2011203144181 U CN 2011203144181U CN 201120314418 U CN201120314418 U CN 201120314418U CN 202282643 U CN202282643 U CN 202282643U
Authority
CN
China
Prior art keywords
electric quantity
acquisition platform
quantity acquisition
power grid
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203144181U
Other languages
Chinese (zh)
Inventor
周建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoscape Information Technology Co Ltd
Original Assignee
Shanghai Baoscape Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoscape Information Technology Co Ltd filed Critical Shanghai Baoscape Information Technology Co Ltd
Priority to CN2011203144181U priority Critical patent/CN202282643U/en
Application granted granted Critical
Publication of CN202282643U publication Critical patent/CN202282643U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Landscapes

  • General Factory Administration (AREA)

Abstract

The utility model provides a power grid electric quantity acquisition platform comprising an acquisition terminal, a storage module, a clock module and a communication module which are in coupling connection with each other; wherein the electric quantity acquisition platform wirelessly communicates with an upper server through the communication module; the communication module is provided with an MOXA serial port card, the communication module is connected with a communication server through the MOXA serial port card; and the clock module sends data in the storage module to the upper server at a preset time interval. The power grid electric quantity acquisition platform of the utility model acquires data in real time and simultaneously transmits the data to the upper server to perform a centralized management, therefore, the power grid electric quantity acquisition platform not only can avoid key data from being limited in some 'information island', but also can greatly raise labor productivity through a centralized monitoring of the electric quantity data. In addition, by adopting the power grid electric quantity acquisition platform of the utility model, weak links in the production also can be discovered in an actual operation process, thus the management can be performed scientifically, accurately and in real time.

Description

Electrical network electric quantity acquisition platform
Technical field
The utility model belongs to the managing electric quantity system field of power supply dispatching, particularly a kind of electrical network electric quantity acquisition platform.
Background technology
Get into 21 century, power industry has been carried out the separate reform of generating with transmission of electricity.In commercialization, power grid enterprises begin to move towards the modern enterprise management mode from traditional plan management mode in the face of complicated internal and external environment.One side hopes to adopt advanced technology and equipment to improve the security reliability of electrical network, expects also that on the other hand controlling production cost with more rational business process promotes Enterprises'Competitiveness.But be to see on seeing technically or managing all to have certain problem that these problems are embodied at present:
1. subject consciousness is vacant relatively; The idea of this stickization directly causes separating of assets investment (planning) and production run; Assets protection separates with production run, and return on asset separates with production run, can't satisfy deeper management and decision-making needs.
2. the relative separation of management and control system; The reason that management and control separates is except above-mentioned " product of living again, light management " idea; Be that also electric power system has real-time equilibrium response, thus production control system from data acquisition to the data preliminary treatment to data analysis, all based on real-time technique.And management information system is quite different, and a little less than the requirement relatively to real-time characteristic, therefore the technical system that both adopted is not quite similar.
3. relatively lagging behind of management innovation, the awakening of competition, service, cost consciousness must bring informationalized tortuous the development with the contradiction between each professional stick management mode for a long time.Management mode is informationalized basis; Do not have good management mode, promptly use same technology and platform, the system that is realized also is different; The reason of at present a lot of ERP failures just is that it just mechanically solidifies original flow process, fails effectively to set up business collaboration.Management change is the basis that two big systems merge, and grid company also lacks the administrative mechanism of the flattening that adapts with the asset life cycle management at present, lacks professional overall situation planning such as planning, capital construction, operation, maintenance, and management innovation remains further to be promoted.
The utility model content
For solving the problems of the technologies described above, the purpose of the utility model is to provide a kind of electrical network electric quantity acquisition platform that obtains electric quantity data quickly and accurately and gather and preserve.
The utility model electrical network electric quantity acquisition platform comprises: the acquisition terminal, memory module, clock module and the communication module that intercouple and connect; Said electric quantity acquisition platform is through said communication module and upper server wireless telecommunications.
Said communication module is provided with the MOXA serial port board, and said communication module is connected with the communication server through the MOXA serial port board.Said clock module sends to said upper server through the pre-set time interval with the data in the said memory module.
The utility model electrical network electric quantity acquisition platform also transfer of data is managed concentratedly real time data acquisition in upper server simultaneously; Not only can avoid in the critical data limitation certain " information island "; And, can increase substantially labor productivity through electric quantity data is concentrated monitoring.On the other hand, link in the weakness in actual mechanical process, can also finding to produce can device, science, manage accurately and real-time.
Description of drawings
Fig. 1 is the utility model electrical network electric quantity acquisition platform work structuring figure.
Fig. 2 is the utility model electrical network electric quantity acquisition platform structure block diagram.
The upper server of 1-electrical network electric quantity acquisition platform 2-
Embodiment
Below in conjunction with accompanying drawing the utility model electrical network electric quantity acquisition platform is done further explain.
Like Fig. 1, shown in Figure 2, the utility model electrical network electric quantity acquisition platform 1 comprises: the acquisition terminal, memory module, clock module and the communication module that intercouple and connect; The electric quantity acquisition platform is through communication module and 2 wireless telecommunications of upper server.
Communication module is provided with the MOXA serial port board, and communication module is connected with the communication server through the MOXA serial port board.Clock module sends to upper server 2 through the pre-set time interval with the data in the memory module.
The utility model electrical network electric quantity acquisition platform 1 also transfer of data is managed concentratedly real time data acquisition in upper server 2 simultaneously; Not only can avoid in the critical data limitation certain " information island "; And, can increase substantially labor productivity through electric quantity data is concentrated monitoring.On the other hand, link in the weakness in actual mechanical process, can also finding to produce can device, science, manage accurately and real-time.
The preferred embodiment of below the utility model having been created specifies; But the utility model is created and is not limited to embodiment; Those of ordinary skill in the art also can make all modification that is equal to or replacement under the prerequisite of the invention spirit, modification that these are equal to or replacement all are included in the application's claim institute restricted portion.

Claims (3)

1. electrical network electric quantity acquisition platform is characterized in that, comprising: the acquisition terminal, memory module, clock module and the communication module that intercouple and connect;
Said electric quantity acquisition platform is through said communication module and upper server wireless telecommunications.
2. electrical network electric quantity acquisition platform according to claim 1 is characterized in that said communication module is provided with the MOXA serial port board, and said communication module is connected with the communication server through the MOXA serial port board.
3. electrical network electric quantity acquisition platform according to claim 1 is characterized in that, said clock module sends to said upper server through the pre-set time interval with the data in the said memory module.
CN2011203144181U 2011-08-26 2011-08-26 Power grid electric quantity acquisition platform Expired - Fee Related CN202282643U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203144181U CN202282643U (en) 2011-08-26 2011-08-26 Power grid electric quantity acquisition platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203144181U CN202282643U (en) 2011-08-26 2011-08-26 Power grid electric quantity acquisition platform

Publications (1)

Publication Number Publication Date
CN202282643U true CN202282643U (en) 2012-06-20

Family

ID=46228794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203144181U Expired - Fee Related CN202282643U (en) 2011-08-26 2011-08-26 Power grid electric quantity acquisition platform

Country Status (1)

Country Link
CN (1) CN202282643U (en)

Similar Documents

Publication Publication Date Title
CN109086895A (en) A kind of operation management system and method for heating ventilation air-conditioning system
CN111047257A (en) Production order management system based on 5G network
CN102637027A (en) Overhaul control system and method for railway signaling device
CN104076767B (en) Railway signal equipment overhauling control system and method
CN106378436A (en) Die casting production information monitoring system based on mobile internet
CN104504483B (en) Method for realizing province and local integration of anti-misoperation tickets
CN109934425A (en) A kind of intelligent plant customization planning system and its method
CN102621969A (en) Factory production management system
CN202282643U (en) Power grid electric quantity acquisition platform
CN201039206Y (en) Telecommunication distribution management system
CN102938113A (en) Power grid failure recovery method and system based on power failure management system platform
CN208257863U (en) Weft-knitting machine real-time monitoring system
CN205353708U (en) Two real -time monitoring system that live of application data
CN202177818U (en) Power bill settlement device of power grid
CN207380539U (en) Board production Status Reporting system
CN202305661U (en) Electric quantity metering system of wireless public network
CN209805862U (en) Production management terminal data acquisition system
CN202735770U (en) Case filling and sealing equipment data acquisition system based on Siemens PLC control system
CN207198578U (en) A kind of MES terminal systems
CN203179990U (en) Maintenance system for new energy fuel cell equipment
CN102833104A (en) Intelligent management system for electric power distribution patrol inspection
CN101777795A (en) Equipment digitalized management system applied to electric power GIS system
CN207074372U (en) A kind of supervising device
CN105894216A (en) Power grid dispatching operation duty shifting aiding device
CN108566438A (en) Weft-knitting machine real-time monitoring system and its method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120620

Termination date: 20170826