CN101777795A - Equipment digitalized management system applied to electric power GIS system - Google Patents

Equipment digitalized management system applied to electric power GIS system Download PDF

Info

Publication number
CN101777795A
CN101777795A CN201010040035A CN201010040035A CN101777795A CN 101777795 A CN101777795 A CN 101777795A CN 201010040035 A CN201010040035 A CN 201010040035A CN 201010040035 A CN201010040035 A CN 201010040035A CN 101777795 A CN101777795 A CN 101777795A
Authority
CN
China
Prior art keywords
gis
design
module
electric power
pdn
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201010040035A
Other languages
Chinese (zh)
Inventor
冯晓科
厉俊
王强
刘周斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaxing Information Technology Co. Ltd.
Original Assignee
Jiaxing Zhongchuang Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaxing Zhongchuang Information Technology Co Ltd filed Critical Jiaxing Zhongchuang Information Technology Co Ltd
Priority to CN201010040035A priority Critical patent/CN101777795A/en
Publication of CN101777795A publication Critical patent/CN101777795A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an equipment digitalized management system applied to an electric power GIS system, which comprises an electric power GIS system, an intelligent distribution network design module PDN is connected to the electric power GIS system so as to establish design tasks on the GIS, designate the scope of a design area and send power network shape and data in the area to the intelligent distribution network design module PDN, the completed design achievements or changed achievements in the intelligent distribution network design module PDN are unloaded to the GIS system via a data communication interface so as to effectively run through the design, the construction and the operation of power network management, avoid maintaining the GIS power network graphics and data repeatedly by the operators, and improve the work efficiency and the accuracy of power network equipment maintenance.

Description

Be applied to the equipment digitalized management system of electric power GIS system
Technical field
The invention belongs to power domain, specifically a kind of equipment digitalized management system that is applied to the electric power GIS system.
Background technology
Lack effective perforation between the design of existing administration of power networks, construction, the operation, cause designer, operations staff to repeat to safeguard GIS electrical network figure and data, reduce that operating efficiency and grid equipment are safeguarded and accuracy.
Summary of the invention
The objective of the invention is to design a kind of equipment digitalized management system that is applied to the electric power GIS system.
What the present invention will solve is to have now in the administration of power networks, lacks effective perforation between design, construction, the operation, causes designer, operations staff to repeat to safeguard GIS electrical network figure and data, reduces the problem of maintenance of operating efficiency and grid equipment and accuracy.
Technical scheme of the present invention is: it comprises the electric power GIS system, in the electric power GIS system, be connected with intelligent distribution design module PDN, create design objective to be implemented in GIS, the specified design regional extent, and electrical network shape in this zone and data passed to intelligent distribution design module PDN, the design achievement of in intelligent distribution design module PDN, finishing or the achievement of change, upload to generalized information system by data communication interface, thereby the design of administration of power networks, construction, operation effectively connects, avoid the designer, the operations staff repeats to safeguard GIS electrical network figure and data, increases work efficiency and accuracy that grid equipment is safeguarded.
The present invention is used for electrical network, can realize that design, construction, the operation to electrical network effectively connects, and avoids designer, operations staff to repeat to safeguard GIS electrical network figure and data, increases work efficiency and accuracy that grid equipment is safeguarded.
Description of drawings
Fig. 1 is a block diagram of the present invention.
Embodiment
The present invention is further illustrated below in conjunction with drawings and Examples.
As shown in the figure, electric power GIS of the present invention system, in the electric power GIS system, be connected with intelligent distribution design module PDN, create design objective to be implemented in GIS, the specified design regional extent, and electrical network shape in this zone and data passed to intelligent distribution design module PDN, the design achievement of in intelligent distribution design module PDN, finishing or the achievement of change, upload to generalized information system by data communication interface, thereby the design of administration of power networks, construction, operation effectively connects, avoid the designer, the operations staff repeats to safeguard GIS electrical network figure and data, increases work efficiency and accuracy that grid equipment is safeguarded.
Described generalized information system comprises Unit account of plant module, SAP PM interactive module, operational management module, query statistic module, lightning information module, anti-filthy statistical module, figure maintenance module.The GIS plateform system adopts Smallworld GIS 4.0 frameworks.
Intelligence distribution design module can be the CAD design module.
Now specify the operating process of this system:
Person in charge of the project personnel create design objective by GIS, the designer uses PDN design module (software) to carry out relevant design, the workmen uses PDN design module (software), according to construction actual modification completion information, and submitting the operations staff to, the operations staff replenishes the relevant device parameter by generalized information system and puts into operation with operational data and the relevant equipment of energising.Other staff can check, present one's view at GIS (outside the system).
As the major repair of track at 10kV, operating process is as follows:
Design objective is created in the circuit work area in GIS, transmit the A designer of company, the designer of A company designs by PDN, to design achievement and upload GIS, after the audit of circuit work area, be transmitted to the construction management personnel of A company by GIS, A company accepts design data and arranges construction by PDN, by uploading GIS after the PDN modification data, and submit the relevant device parameter to circuit work area documenter after finishing, circuit work area documenter safeguards after the related data according to the actual equipment that puts into operation by GIS.
As follows at the technological transformation of 10kV circuit, infrastructure project operating process:
Design objective is created by capital construction section in GIS, transmit the designer of design office, the design office designs by PDN, to design achievement and upload GIS, after the audit of capital construction section, be transmitted to the construction management personnel of B company by GIS, the construction management personnel of B company accept design data and arrange construction by PDN, by uploading GIS after the PDN modification data, and the relevant device parameter transferred circuit work area documenter after finishing, circuit work area documenter safeguards after the related data according to the actual equipment that puts into operation by GIS.
As at platform district, new rural area engineering, operating process is as follows:
Design objective is created by capital construction section in GIS, transmit the C designer of company, the designer of C company designs by PDN, to design achievement and upload GIS, after marketing department's audit, be transmitted to the construction management personnel of C company by GIS, the construction management personnel of C company accept design data and arrange construction by PDN, by uploading GIS after the PDN modification data, and the relevant device parameter transferred circuit work area documenter after finishing, circuit work area documenter safeguards after the related data according to the actual equipment that puts into operation by GIS.
As at the user engineering engineering, operating process is as follows:
Design objective is created by client service center in GIS, transmit the designer of d company (or design office), the designer of d company (or design office) designs by PDN, to design achievement and upload GIS, after client service center's audit, be transmitted to the construction management personnel of d company by GIS, the construction management personnel of d company accept design data and arrange construction by PDN, after finishing by uploading GIS after the PDN modification data, and the relevant device parameter transferred circuit work area documenter, circuit work area documenter safeguards after the related data according to the actual equipment that puts into operation by GIS.
The foregoing description requires timing node:
1, unit in charge of construction must go into operation to revise in PDN the same day and finish all data at circuit, and uploads GIS, and to operations staff is transferred the relevant device parameter in the scene of operation.
2, safeguarded relevant device parameter and operational management desired parameters into system by GIS in the next day of going into operation in the circuit work area, and the state that guarantees relevant device to be put into operation in system in the next day of going into operation.

Claims (4)

1. equipment digitalized management system that is applied to the electric power GIS system, comprise the electric power GIS system, it is characterized in that in the electric power GIS system, being connected with intelligent distribution design module PDN, create design objective to be implemented in GIS, the specified design regional extent, and electrical network shape in this zone and data passed to intelligent distribution design module PDN, the design achievement of in intelligent distribution design module PDN, finishing or the achievement of change, upload to generalized information system by data communication interface, thereby the design of administration of power networks, construction, operation effectively connects, avoid the designer, the operations staff repeats to safeguard GIS electrical network figure and data, increases work efficiency and accuracy that grid equipment is safeguarded.
2. the equipment digitalized management system that is applied to the electric power GIS system according to claim 1 is characterized in that generalized information system comprises Unit account of plant module, SAP PM interactive module, operational management module, query statistic module, lightning information module, anti-filthy statistical module, figure maintenance module.
3. the equipment digitalized management system that is applied to the electric power GIS system according to claim 1 is characterized in that the GIS plateform system adopts Smallworld GIS 4.0 frameworks.
4. the equipment digitalized management system that is applied to the electric power GIS system according to claim 1 is characterized in that intelligent distribution design module comprises the CAD design module.
CN201010040035A 2010-01-19 2010-01-19 Equipment digitalized management system applied to electric power GIS system Pending CN101777795A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010040035A CN101777795A (en) 2010-01-19 2010-01-19 Equipment digitalized management system applied to electric power GIS system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010040035A CN101777795A (en) 2010-01-19 2010-01-19 Equipment digitalized management system applied to electric power GIS system

Publications (1)

Publication Number Publication Date
CN101777795A true CN101777795A (en) 2010-07-14

Family

ID=42514167

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010040035A Pending CN101777795A (en) 2010-01-19 2010-01-19 Equipment digitalized management system applied to electric power GIS system

Country Status (1)

Country Link
CN (1) CN101777795A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101944204A (en) * 2010-09-10 2011-01-12 北京恒华伟业科技股份有限公司 Geographic information system applied to power system and method for improving display efficiency thereof
CN104573208A (en) * 2014-12-30 2015-04-29 国家电网公司 GIS (Geographic Information System)-based distribution network wiring diagram mapping method
CN110570158A (en) * 2019-06-12 2019-12-13 陕西省地方电力(集团)有限公司 power grid standing book electronic transfer method and system and computer readable storage medium

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101944204A (en) * 2010-09-10 2011-01-12 北京恒华伟业科技股份有限公司 Geographic information system applied to power system and method for improving display efficiency thereof
CN104573208A (en) * 2014-12-30 2015-04-29 国家电网公司 GIS (Geographic Information System)-based distribution network wiring diagram mapping method
CN104573208B (en) * 2014-12-30 2018-07-06 国家电网公司 A kind of distribution wiring diagram mapping method based on generalized information system
CN110570158A (en) * 2019-06-12 2019-12-13 陕西省地方电力(集团)有限公司 power grid standing book electronic transfer method and system and computer readable storage medium

Similar Documents

Publication Publication Date Title
CN104881748A (en) Power dispatching automation method and power dispatching automation system based on 'cloud computing' dispatching application
CN102938101A (en) Method for implementing mobile operation of low-voltage distribution region based on intelligent mobile terminal
CN104700192A (en) Aided intelligent management and control system for power transmission and transformation project and management and control method thereof
CN104678962A (en) Safety monitoring system used in power lines repairing operation and operating method based on safety monitoring system
CN103400205A (en) System and method for managing energy efficiency of power distribution network on basis of reactive optimized coordination control
CN106251052A (en) The county's grid power blackout management and control of a kind of ground and analysis decision plateform system
CN107016628A (en) Electromechanical equipment maintenance and management method based on BIM technology
CN104050529A (en) Power grid dispatching intelligent maintenance order and operation order system
CN107093012A (en) Safeguarded and monitoring system with the building electromechanical equipment of BIM technology
CN107368972A (en) It is a kind of that work platform and its application method are sent based on BIM technology
CN109933634A (en) A kind of electric system drawing drawing method based on power supply radiation scope
CN101777795A (en) Equipment digitalized management system applied to electric power GIS system
CN104468586A (en) Photovoltaic power station remote intelligent monitoring communication method based on MODBUS protocol
CN203705920U (en) Concrete precast beam spray maintenance remote monitoring system
CN102645914A (en) Multi-stage looped network control framework of sewage treatment plant and realizing method thereof
CN205788276U (en) A kind of intelligence variation machine and equipment leasing management platform
CN205121640U (en) Distribution fault handling information interaction terminal based on remove operation technology
CN205080423U (en) Distributed control system
CN203465826U (en) Remote intelligent monitoring system for flour mill
CN103872778B (en) The wind-powered electricity generation control centre device that a kind of redundancy is arranged
CN204086960U (en) A kind of Economic Operation in Hydropower Station supervisory system
CN113589770A (en) Production system based on MES
CN202931037U (en) Real-time analysis early warning system of intelligent transformer station operation safety
CN201639360U (en) Equipment digitalizer applied to electric power GIS system
CN202735770U (en) Case filling and sealing equipment data acquisition system based on Siemens PLC control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: JIAXING HUACHUANG INFORMATION TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: JIAXING ZHONGCHUANG INFORMATION TECHNOLOGY CO., LTD.

Effective date: 20120321

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120321

Address after: 813 room 314000, happy business building, Jiaxing, Zhejiang

Applicant after: Jiaxing Information Technology Co. Ltd.

Address before: 314000 No. 99 Chengbei Road, Nanhu District, Zhejiang, Jiaxing

Applicant before: Jiaxing Zhongchuang Information Technology Co., Ltd.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20100714