CN110570158A - power grid standing book electronic transfer method and system and computer readable storage medium - Google Patents
power grid standing book electronic transfer method and system and computer readable storage medium Download PDFInfo
- Publication number
- CN110570158A CN110570158A CN201910505062.0A CN201910505062A CN110570158A CN 110570158 A CN110570158 A CN 110570158A CN 201910505062 A CN201910505062 A CN 201910505062A CN 110570158 A CN110570158 A CN 110570158A
- Authority
- CN
- China
- Prior art keywords
- link
- unit
- power supply
- management system
- processing system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012546 transfer Methods 0.000 title claims abstract description 77
- 238000000034 method Methods 0.000 title claims abstract description 39
- 238000003860 storage Methods 0.000 title claims abstract description 10
- 238000012545 processing Methods 0.000 claims abstract description 157
- 238000007726 management method Methods 0.000 claims description 99
- 238000010276 construction Methods 0.000 claims description 59
- 238000013461 design Methods 0.000 claims description 47
- 238000004519 manufacturing process Methods 0.000 claims description 40
- 238000012550 audit Methods 0.000 claims description 20
- 238000012423 maintenance Methods 0.000 claims description 11
- 238000004590 computer program Methods 0.000 claims description 10
- 238000010586 diagram Methods 0.000 claims description 7
- 238000009826 distribution Methods 0.000 claims description 7
- 230000008439 repair process Effects 0.000 claims description 7
- 230000000977 initiatory effect Effects 0.000 claims description 6
- 230000008569 process Effects 0.000 description 6
- 230000006872 improvement Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Abstract
the invention discloses an electronic transfer method, a system and a computer readable storage medium for a power grid account, wherein the electronic transfer system starts a first link when acquiring a transfer starting instruction input by a department authorized by the first transfer link in a transfer sequence, sends information to be processed corresponding to the latest started link to a corresponding processing system when starting the first link, starts the next link based on the transfer sequence and then carries out the processing steps again until the processing system of the last link feeds back a processing result when acquiring the processing result fed back by the processing system, so that the electronic transfer system can automatically connect the corresponding system, automatically control the connection of each link and realize the quick and accurate transfer of the account.
Description
Technical Field
the invention relates to the field of power grids, in particular to a power grid standing book electronic transfer method, a power grid standing book electronic transfer system and a computer readable storage medium.
background
the electronic transfer of the standing book refers to defining the responsibility of a participating unit in the process of forming the equipment, and collecting the drawing file data and the equipment standing book which need to be transferred to a running unit in a staged and continuous manner. At present, the standing book has no clear standing book electronic transfer method for defining the flow, responsibility and requirement of electronic transfer. Lack unified equipment standing book standard, the bore, structure and the technical parameter requirement of equipment standing book management are not unified for the condition such as data quality is not high, account card thing is inconsistent.
disclosure of Invention
The present invention is directed to a method, a system, and a computer-readable storage medium for electronically handing over a grid ledger, which are provided to overcome the above-mentioned drawbacks of the prior art.
the technical scheme adopted by the invention for solving the technical problems is as follows: constructing a power grid standing book electronic transfer method, wherein the method comprises the following steps:
Initiating: the electronic transfer system acquires a transfer starting instruction input by a department authorized by a first transfer link in a transfer sequence, and starts the first link;
The processing steps are as follows: the electronic transfer system sends the information to be processed corresponding to the newly started link to the corresponding processing system, wherein each processing system can feed back the relevant processing result of each link to the electronic transfer system according to the operation of the department authorized by each link;
and a link switching step: and the electronic handover system acquires the processing result fed back by the processing system, starts the next link based on the handover sequence and then executes the processing steps again until the processing result is fed back by the processing system of the last link.
Preferably, the processing step specifically includes:
the electronic transfer system preferentially checks whether a processing result corresponding to the latest started link exists, if so, the electronic transfer system directly calls the latest started link and then starts the next link, and if not, the electronic transfer system sends the information to be processed corresponding to the latest started link to the corresponding processing system.
preferably, the power grid standing book is a main grid standing book, the processing system comprises a safety production system, a project management system and a financial management system, and the transfer sequence comprises the following eight links:
The method comprises the following steps that in the first step, an authorized department is a construction unit, a corresponding processing system is a project management system, and the project management system can initiate an electronic transfer form in the first step according to the operation of the construction unit;
in the second to sixth links, the authorized departments are: the system comprises a design unit, a construction unit and an operation unit, wherein the corresponding processing systems are all safety production systems, the safety production systems can input the structure, the functional position and the design parameters of the equipment ledger in a second link according to the operation of the design unit, audit the structure and the design parameters of the equipment ledger in a third link according to the operation of the construction unit, input the technical parameters of sub-equipment and equipment in a fourth link according to the operation of the construction unit, audit the equipment parameters in a fifth link according to the operation of the construction unit and release the equipment ledger in a sixth link according to the operation of the operation unit;
In the seventh link, the authorized department is an operation unit, the corresponding processing system is a financial management system, and the financial management system can create an asset card in the seventh link according to the operation of the operation unit;
in the eighth link, the authorized department is an operation unit, the corresponding processing system is a project management system, and the project management system can execute project settlement in the eighth link according to the operation of the operation unit.
preferably, the power grid account is a distribution network infrastructure and major repair engineering account, the processing system comprises a safety production system, a project management system, a financial management system and a GIS platform, and the transfer sequence comprises the following ten links:
in the first link, an authorized department is a power supply project management unit, a corresponding processing system is a project management system, and the project management system can initiate an electronic transfer bill in the first link according to the operation of a construction unit;
In the second link, the authorized department is a design unit/construction unit, the corresponding processing system is a GIS platform, and the GIS platform can draw graphs and topology in the second link according to the operation of the design unit/construction unit to generate functional positions;
In the third to sixth links, the authorized departments are: the system comprises a design unit/construction unit, a power supply scheduling group and a power supply operation and maintenance team, wherein corresponding processing systems are all safety production systems, the safety production systems can input equipment asset information in a third link according to the operation of the design unit/construction unit, audit equipment account structures and technical parameters in a fourth link according to the operation of the power supply scheduling unit, audit edge layout and in-station logic wiring diagrams in a fifth link according to the operation of the power supply scheduling group, and check whether field wiring is consistent with a design drawing or not in a sixth link according to the operation of the power supply operation and maintenance team;
in the seventh link, the authorized department is a power supply scheduling group, the corresponding processing system is a GIS platform, and the GIS platform can release an edge layout chart and an in-station logic wiring chart in the seventh link according to the operation of the power supply scheduling group;
in the eighth link, the authorized department is a power supply scheduling group, the corresponding processing system is a safety production system, and the safety production system can hand over the equipment account in the eighth link according to the operation of the power supply scheduling group;
in the ninth link, the authorized department is a power supply scheduling group, the corresponding processing system is a financial management system, and the financial management system can create an asset card in the ninth link according to the operation of the power supply scheduling group;
in the tenth link, the authorized department is a power supply project management unit, and the corresponding processing system is a project management system, and the project management system can create and execute project settlement in the tenth link according to the operation of the power supply project management unit.
in another aspect of the present invention, an electronic transfer system for a power grid ledger is further configured, including:
The initiating module is used for acquiring a handover starting instruction input by a department authorized by a first handover link in a handover sequence and starting the first link;
a processing module: the system comprises a plurality of processing systems, an electronic transfer system and a control system, wherein the processing systems are used for sending information to be processed corresponding to a newly started link to the corresponding processing system, and can feed back related processing results of each link to the electronic transfer system according to operation of a department authorized by each link;
and the link switching module is used for calling the processing module again after starting the next link based on the handover sequence until the processing system of the last link feeds back the processing result when the processing result fed back by the processing system is obtained.
preferably, the processing module is specifically configured to preferentially check whether a processing result corresponding to the latest started link already exists, if so, directly invoke the next link to be started, and if not, send information to be processed corresponding to the latest started link to the corresponding processing system.
Preferably, the power grid standing book is a main grid standing book, the processing system comprises a safety production system, a project management system and a financial management system, and the transfer sequence comprises the following eight links:
The method comprises the following steps that in the first step, an authorized department is a construction unit, a corresponding processing system is a project management system, and the project management system can initiate an electronic transfer form in the first step according to the operation of the construction unit;
in the second to sixth links, the authorized departments are: the system comprises a design unit, a construction unit and an operation unit, wherein the corresponding processing systems are all safety production systems, the safety production systems can input the structure, the functional position and the design parameters of the equipment ledger in a second link according to the operation of the design unit, audit the structure and the design parameters of the equipment ledger in a third link according to the operation of the construction unit, input the technical parameters of sub-equipment and equipment in a fourth link according to the operation of the construction unit, audit the equipment parameters in a fifth link according to the operation of the construction unit and release the equipment ledger in a sixth link according to the operation of the operation unit;
in the seventh link, the authorized department is an operation unit, the corresponding processing system is a financial management system, and the financial management system can create an asset card in the seventh link according to the operation of the operation unit;
In the eighth link, the authorized department is an operation unit, the corresponding processing system is a project management system, and the project management system can execute project settlement in the eighth link according to the operation of the operation unit.
preferably, the power grid account is a distribution network infrastructure and major repair engineering account, the processing system comprises a safety production system, a project management system, a financial management system and a GIS platform, and the transfer sequence comprises the following ten links:
In the first link, an authorized department is a power supply project management unit, a corresponding processing system is a project management system, and the project management system can initiate an electronic transfer bill in the first link according to the operation of a construction unit;
In the second link, the authorized department is a design unit/construction unit, the corresponding processing system is a GIS platform, and the GIS platform can draw graphs and topology in the second link according to the operation of the design unit/construction unit to generate functional positions;
in the third to sixth links, the authorized departments are: the system comprises a design unit/construction unit, a power supply scheduling group and a power supply operation and maintenance team, wherein corresponding processing systems are all safety production systems, the safety production systems can input equipment asset information in a third link according to the operation of the design unit/construction unit, audit equipment account structures and technical parameters in a fourth link according to the operation of the power supply scheduling unit, audit edge layout and in-station logic wiring diagrams in a fifth link according to the operation of the power supply scheduling group, and check whether field wiring is consistent with a design drawing or not in a sixth link according to the operation of the power supply operation and maintenance team;
in the seventh link, the authorized department is a power supply scheduling group, the corresponding processing system is a GIS platform, and the GIS platform can release an edge layout chart and an in-station logic wiring chart in the seventh link according to the operation of the power supply scheduling group;
in the eighth link, the authorized department is a power supply scheduling group, the corresponding processing system is a safety production system, and the safety production system can hand over the equipment account in the eighth link according to the operation of the power supply scheduling group;
in the ninth link, the authorized department is a power supply scheduling group, the corresponding processing system is a financial management system, and the financial management system can create an asset card in the ninth link according to the operation of the power supply scheduling group;
In the tenth link, the authorized department is a power supply project management unit, and the corresponding processing system is a project management system, and the project management system can create and execute project settlement in the tenth link according to the operation of the power supply project management unit.
In another aspect, the present invention also provides a power grid standing electronic handover system, which is characterized by comprising a processor and a memory, wherein the memory stores a computer program, and the computer program can be executed by the processor to implement the steps of the method according to any one of the preceding claims.
Yet another aspect of the invention also constitutes a computer-readable storage medium, characterized in that it comprises a computer program executable by a processor for implementing the steps of the method as described in any of the previous claims.
The electronic transfer method, the electronic transfer system and the computer-readable storage medium of the power grid standing book have the following beneficial effects: the electronic transfer system starts the first link when acquiring a transfer starting instruction input by a department authorized by the first transfer link in a transfer sequence, sends information to be processed corresponding to the latest started link to the corresponding processing system when starting the first link, starts the next link based on the transfer sequence when acquiring a processing result fed back by the processing system, and feeds back the processing result until the processing system of the last link feeds back the processing result.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the provided drawings without creative efforts:
FIG. 1 is a flow chart of a power grid ledger electronic handover method of the present invention;
FIG. 2 is a flow diagram of a primary network ledger handoff;
FIG. 3 is a flow chart of transfer of net capital construction and major repair engineering ledger;
fig. 4 is a schematic diagram of the power grid ledger electronization handover system of the present invention.
Detailed Description
To facilitate an understanding of the invention, the invention will now be described more fully with reference to the accompanying drawings. Exemplary embodiments of the invention are shown in the drawings. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete. It should be understood that the embodiments and specific features in the embodiments of the present invention are described in detail in the present application, but not limited to the present application, and the technical features in the embodiments and specific features in the embodiments of the present invention can be combined with each other without conflict
unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention.
Referring to fig. 1, the power grid standing book electronic transfer method of the present invention includes:
initiating step S101: the electronic transfer system acquires a transfer starting instruction input by a department authorized by a first transfer link in a transfer sequence, and starts the first link;
processing step S102: the electronic transfer system sends the information to be processed corresponding to the newly started link to the corresponding processing system, wherein each processing system can feed back the relevant processing result of each link to the electronic transfer system according to the operation of the department authorized by each link;
a link switching step S103: the electronic handover system obtains the processing result fed back by the processing system, starts the next link based on the handover sequence, and then executes the processing step S102 again until the processing result is fed back by the processing system of the last link.
It should be noted that each department may not perform related operations in the processing system after the link is started, or may perform related operations in advance, such as entering data in advance. In order to avoid repeated entry of data, preferably, the processing step specifically includes: the electronic handover system preferentially checks whether a processing result corresponding to the latest started link exists, if so, the electronic handover system directly calls the latest started link and then starts the next link, and if not, the electronic handover system sends the information to be processed corresponding to the latest started link to the corresponding processing system, so that the repeated input of data can be avoided.
In the invention, a user can log in the electronic transfer system through an account, and the electronic transfer system can identify whether the user is an authorized department, particularly an authorized part of which link through the account logged in by the user. Only authorized departments are qualified to perform the operation of the corresponding link.
Two specific examples are presented below.
(1) the power grid standing book is a main grid standing book
The main network ledger handover relates to the following departments: design units, construction units and operation units.
the processing system related to the transfer of the main network ledger comprises: a safety production system, a project management system and a financial management system.
the transfer sequence related to the transfer of the main network ledger includes eight links in total, and the authorized department of each link, the corresponding processing system, and the operation of the corresponding processing system are shown in table 1:
TABLE 1
referring to fig. 2, in eight links in the handover sequence:
the method comprises the following steps that in the first step, an authorized department is a construction unit, a corresponding processing system is a project management system, and the project management system can initiate an electronic transfer form in the first step according to the operation of the construction unit;
In the second to sixth links, the authorized departments are: the system comprises a design unit, a construction unit and an operation unit, wherein the corresponding processing systems are all safety production systems, the safety production systems can input the structure, the functional position and the design parameters of the equipment ledger in a second link according to the operation of the design unit, audit the structure and the design parameters of the equipment ledger in a third link according to the operation of the construction unit, input the technical parameters of sub-equipment and equipment in a fourth link according to the operation of the construction unit, audit the equipment parameters in a fifth link according to the operation of the construction unit and release the equipment ledger in a sixth link according to the operation of the operation unit;
In the seventh link, the authorized department is an operation unit, the corresponding processing system is a financial management system, and the financial management system can create an asset card in the seventh link according to the operation of the operation unit;
In the eighth link, the authorized department is an operation unit, the corresponding processing system is a project management system, and the project management system can execute project settlement in the eighth link according to the operation of the operation unit.
(2) the power grid account is a distribution network infrastructure and major repair technical improvement project account;
distribution network capital construction and major repair technical improvement engineering ledger handover related departments have: the power supply project management unit (i.e. the power supply bureau/project management unit of the place), the power supply scheduling group (i.e. the power supply bureau/project scheduling group of the place), the power supply operation and maintenance team group (i.e. the power supply bureau/project management team of the place), and the design unit/construction unit.
the processing system related to the transfer of the distribution network infrastructure and the overhaul technical improvement project machine account comprises: the system comprises a safety production system, a project management system, a financial management system and a GIS platform.
the handover sequence related to the handover of the main ledger includes ten links in total, and the authorized departments of each link, the corresponding processing system, and the operation of the corresponding processing system are as shown in table 2:
TABLE 2
Referring to fig. 3, in ten links in the handover sequence:
in the first link, an authorized department is a power supply project management unit, a corresponding processing system is a project management system, and the project management system can initiate an electronic transfer bill in the first link according to the operation of a construction unit;
in the second link, the authorized department is a design unit/construction unit, the corresponding processing system is a GIS platform, and the GIS platform can draw graphs and topology in the second link according to the operation of the design unit/construction unit to generate functional positions;
in the third to sixth links, the authorized departments are: the system comprises a design unit/construction unit, a power supply scheduling group and a power supply operation and maintenance team, wherein corresponding processing systems are all safety production systems, the safety production systems can input equipment asset information in a third link according to the operation of the design unit/construction unit, audit equipment account structures and technical parameters in a fourth link according to the operation of the power supply scheduling unit, audit edge layout and in-station logic wiring diagrams in a fifth link according to the operation of the power supply scheduling group, and check whether field wiring is consistent with a design drawing or not in a sixth link according to the operation of the power supply operation and maintenance team;
In the seventh link, the authorized department is a power supply scheduling group, the corresponding processing system is a GIS platform, and the GIS platform can release an edge layout chart and an in-station logic wiring chart in the seventh link according to the operation of the power supply scheduling group;
in the eighth link, the authorized department is a power supply scheduling group, the corresponding processing system is a safety production system, and the safety production system can hand over the equipment account in the eighth link according to the operation of the power supply scheduling group;
In the ninth link, the authorized department is a power supply scheduling group, the corresponding processing system is a financial management system, and the financial management system can create an asset card in the ninth link according to the operation of the power supply scheduling group;
In the tenth link, the authorized department is a power supply project management unit, and the corresponding processing system is a project management system, and the project management system can create and execute project settlement in the tenth link according to the operation of the power supply project management unit.
it will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by a computer program, which can be stored in a computer-readable storage medium, and when executed, can include the processes of the embodiments of the methods described above.
Referring to fig. 4, based on the same inventive concept, the present invention also discloses a power grid ledger electronization handover system, including:
An initiating module 401, configured to obtain a handover start instruction input by a department authorized to perform a first handover link in a handover sequence, and start the first link;
the processing module 402: the system comprises a plurality of processing systems, an electronic transfer system and a control system, wherein the processing systems are used for sending information to be processed corresponding to a newly started link to the corresponding processing system, and can feed back related processing results of each link to the electronic transfer system according to operation of a department authorized by each link;
The link switching module 403 is configured to, when a processing result fed back by the processing system is obtained, start the next link based on the handover sequence and then call the processing module again until the processing result is fed back by the processing system of the last link.
preferably, the processing module is specifically configured to preferentially check whether a processing result corresponding to the latest started link already exists, if so, directly invoke the next link to be started, and if not, send information to be processed corresponding to the latest started link to the corresponding processing system.
the functions of the functional modules of the apparatus according to the embodiment of the present invention may be specifically implemented according to the method in the foregoing method embodiment, and the specific implementation process may refer to the description related to the foregoing method embodiment, which is not described herein again.
the above description relates to various modules, and it should be noted that the above description of various modules is divided into these modules for clarity of illustration. However, in actual implementation, the boundaries of the various modules may be fuzzy. For example, any or all of the functional modules herein may share various hardware and/or software elements. Also for example, any and/or all of the functional modules herein may be implemented in whole or in part by a common processor executing software instructions. Additionally, various software sub-modules executed by one or more processors may be shared among the various software modules. Accordingly, the scope of the present invention is not limited by the mandatory boundaries between the various hardware and/or software elements, unless explicitly claimed otherwise.
The embodiment of the present invention further provides a power grid standing book electronic handover system, which includes a processor and a memory, where the memory stores a computer program, and the computer program, when executed by the processor, implements the steps of the method according to the above embodiment, and the specific implementation process may refer to the description of the above method embodiment, and is not described herein again.
the embodiment of the present invention further provides a computer-readable storage medium, which stores a computer program, and when the computer program is executed by a processor, the steps of the method according to the above embodiment are implemented, and the specific implementation process may refer to the description of the above method embodiment, which is not described herein again.
while the present invention has been described with reference to the embodiments shown in the drawings, the present invention is not limited to the embodiments, which are illustrative and not restrictive, and it will be apparent to those skilled in the art that various changes and modifications can be made therein without departing from the spirit and scope of the invention as defined in the appended claims.
Claims (10)
1. a power grid standing book electronic transfer method is characterized by comprising the following steps:
Initiating: the electronic transfer system acquires a transfer starting instruction input by a department authorized by a first transfer link in a transfer sequence, and starts the first link;
the processing steps are as follows: the electronic transfer system sends the information to be processed corresponding to the newly started link to the corresponding processing system, wherein each processing system can feed back the relevant processing result of each link to the electronic transfer system according to the operation of the department authorized by each link;
and a link switching step: and the electronic handover system acquires the processing result fed back by the processing system, starts the next link based on the handover sequence and then executes the processing steps again until the processing result is fed back by the processing system of the last link.
2. The method according to claim 1, characterized in that said processing step comprises in particular:
the electronic transfer system preferentially checks whether a processing result corresponding to the latest started link exists, if so, the electronic transfer system directly calls the latest started link and then starts the next link, and if not, the electronic transfer system sends the information to be processed corresponding to the latest started link to the corresponding processing system.
3. the method of claim 1, wherein the grid ledger is a master grid ledger, the processing system comprises a safety production system, a project management system and a financial management system, and the handover sequence comprises the following eight links:
The method comprises the following steps that in the first step, an authorized department is a construction unit, a corresponding processing system is a project management system, and the project management system can initiate an electronic transfer form in the first step according to the operation of the construction unit;
in the second to sixth links, the authorized departments are: the system comprises a design unit, a construction unit and an operation unit, wherein the corresponding processing systems are all safety production systems, the safety production systems can input the structure, the functional position and the design parameters of the equipment ledger in a second link according to the operation of the design unit, audit the structure and the design parameters of the equipment ledger in a third link according to the operation of the construction unit, input the technical parameters of sub-equipment and equipment in a fourth link according to the operation of the construction unit, audit the equipment parameters in a fifth link according to the operation of the construction unit and release the equipment ledger in a sixth link according to the operation of the operation unit;
in the seventh link, the authorized department is an operation unit, the corresponding processing system is a financial management system, and the financial management system can create an asset card in the seventh link according to the operation of the operation unit;
in the eighth link, the authorized department is an operation unit, the corresponding processing system is a project management system, and the project management system can execute project settlement in the eighth link according to the operation of the operation unit.
4. The method of claim 1, wherein the grid account is a distribution network infrastructure and major repair engineering account, the processing system comprises a safety production system, a project management system, a financial management system and a GIS platform, and the handover sequence comprises the following ten steps:
in the first link, an authorized department is a power supply project management unit, a corresponding processing system is a project management system, and the project management system can initiate an electronic transfer bill in the first link according to the operation of a construction unit;
In the second link, the authorized department is a design unit/construction unit, the corresponding processing system is a GIS platform, and the GIS platform can draw graphs and topology in the second link according to the operation of the design unit/construction unit to generate functional positions;
In the third to sixth links, the authorized departments are: the system comprises a design unit/construction unit, a power supply scheduling group and a power supply operation and maintenance team, wherein corresponding processing systems are all safety production systems, the safety production systems can input equipment asset information in a third link according to the operation of the design unit/construction unit, audit equipment account structures and technical parameters in a fourth link according to the operation of the power supply scheduling unit, audit edge layout and in-station logic wiring diagrams in a fifth link according to the operation of the power supply scheduling group, and check whether field wiring is consistent with a design drawing or not in a sixth link according to the operation of the power supply operation and maintenance team;
in the seventh link, the authorized department is a power supply scheduling group, the corresponding processing system is a GIS platform, and the GIS platform can release an edge layout chart and an in-station logic wiring chart in the seventh link according to the operation of the power supply scheduling group;
in the eighth link, the authorized department is a power supply scheduling group, the corresponding processing system is a safety production system, and the safety production system can hand over the equipment account in the eighth link according to the operation of the power supply scheduling group;
In the ninth link, the authorized department is a power supply scheduling group, the corresponding processing system is a financial management system, and the financial management system can create an asset card in the ninth link according to the operation of the power supply scheduling group;
in the tenth link, the authorized department is a power supply project management unit, and the corresponding processing system is a project management system, and the project management system can create and execute project settlement in the tenth link according to the operation of the power supply project management unit.
5. A power grid standing book electronization handover system is characterized by comprising:
the initiating module is used for acquiring a handover starting instruction input by a department authorized by a first handover link in a handover sequence and starting the first link;
a processing module: the system comprises a plurality of processing systems, an electronic transfer system and a control system, wherein the processing systems are used for sending information to be processed corresponding to a newly started link to the corresponding processing system, and can feed back related processing results of each link to the electronic transfer system according to operation of a department authorized by each link;
And the link switching module is used for calling the processing module again after starting the next link based on the handover sequence until the processing system of the last link feeds back the processing result when the processing result fed back by the processing system is obtained.
6. the system according to claim 5, wherein the processing module is specifically configured to preferentially check whether a processing result corresponding to a newly started link already exists, if so, directly invoke the next link to be started, and if not, send information to be processed corresponding to the newly started link to the corresponding processing system.
7. The system of claim 5, wherein the grid ledger is a master grid ledger, the processing system comprises a safety production system, a project management system and a financial management system, and the handover sequence comprises the following eight links:
The method comprises the following steps that in the first step, an authorized department is a construction unit, a corresponding processing system is a project management system, and the project management system can initiate an electronic transfer form in the first step according to the operation of the construction unit;
in the second to sixth links, the authorized departments are: the system comprises a design unit, a construction unit and an operation unit, wherein the corresponding processing systems are all safety production systems, the safety production systems can input the structure, the functional position and the design parameters of the equipment ledger in a second link according to the operation of the design unit, audit the structure and the design parameters of the equipment ledger in a third link according to the operation of the construction unit, input the technical parameters of sub-equipment and equipment in a fourth link according to the operation of the construction unit, audit the equipment parameters in a fifth link according to the operation of the construction unit and release the equipment ledger in a sixth link according to the operation of the operation unit;
in the seventh link, the authorized department is an operation unit, the corresponding processing system is a financial management system, and the financial management system can create an asset card in the seventh link according to the operation of the operation unit;
in the eighth link, the authorized department is an operation unit, the corresponding processing system is a project management system, and the project management system can execute project settlement in the eighth link according to the operation of the operation unit.
8. the system of claim 5, wherein the grid account is a distribution network infrastructure and major repair engineering account, the processing system comprises a safety production system, a project management system, a financial management system and a GIS platform, and the handover sequence comprises the following ten steps:
in the first link, an authorized department is a power supply project management unit, a corresponding processing system is a project management system, and the project management system can initiate an electronic transfer bill in the first link according to the operation of a construction unit;
In the second link, the authorized department is a design unit/construction unit, the corresponding processing system is a GIS platform, and the GIS platform can draw graphs and topology in the second link according to the operation of the design unit/construction unit to generate functional positions;
in the third to sixth links, the authorized departments are: the system comprises a design unit/construction unit, a power supply scheduling group and a power supply operation and maintenance team, wherein corresponding processing systems are all safety production systems, the safety production systems can input equipment asset information in a third link according to the operation of the design unit/construction unit, audit equipment account structures and technical parameters in a fourth link according to the operation of the power supply scheduling unit, audit edge layout and in-station logic wiring diagrams in a fifth link according to the operation of the power supply scheduling group, and check whether field wiring is consistent with a design drawing or not in a sixth link according to the operation of the power supply operation and maintenance team;
in the seventh link, the authorized department is a power supply scheduling group, the corresponding processing system is a GIS platform, and the GIS platform can release an edge layout chart and an in-station logic wiring chart in the seventh link according to the operation of the power supply scheduling group;
In the eighth link, the authorized department is a power supply scheduling group, the corresponding processing system is a safety production system, and the safety production system can hand over the equipment account in the eighth link according to the operation of the power supply scheduling group;
in the ninth link, the authorized department is a power supply scheduling group, the corresponding processing system is a financial management system, and the financial management system can create an asset card in the ninth link according to the operation of the power supply scheduling group;
in the tenth link, the authorized department is a power supply project management unit, and the corresponding processing system is a project management system, and the project management system can create and execute project settlement in the tenth link according to the operation of the power supply project management unit.
9. A grid standing electronic handover system, comprising a processor and a memory, the memory storing a computer program executable by the processor for implementing the steps of the method as claimed in any one of claims 1 to 4.
10. A computer-readable storage medium, comprising a computer program which is executable by a processor to implement the steps of the method according to any one of claims 1 to 4.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910505062.0A CN110570158A (en) | 2019-06-12 | 2019-06-12 | power grid standing book electronic transfer method and system and computer readable storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910505062.0A CN110570158A (en) | 2019-06-12 | 2019-06-12 | power grid standing book electronic transfer method and system and computer readable storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110570158A true CN110570158A (en) | 2019-12-13 |
Family
ID=68772884
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910505062.0A Pending CN110570158A (en) | 2019-06-12 | 2019-06-12 | power grid standing book electronic transfer method and system and computer readable storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110570158A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111950977A (en) * | 2020-07-28 | 2020-11-17 | 中国南方电网有限责任公司 | Data interaction system and method from power transmission machine account of information system to scheduling master station |
CN112612842A (en) * | 2020-12-30 | 2021-04-06 | 南方电网深圳数字电网研究院有限公司 | Standing book information input method and device, electronic equipment and storage medium |
CN113095784A (en) * | 2021-04-15 | 2021-07-09 | 广东电网有限责任公司 | Automatic issuing method, device and storage medium for electronic handover list |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008084051A (en) * | 2006-09-28 | 2008-04-10 | Toshiba Corp | Plant multidiscipline engineering support system |
CN101777795A (en) * | 2010-01-19 | 2010-07-14 | 嘉兴市中创信息技术有限公司 | Equipment digitalized management system applied to electric power GIS system |
CN102254251A (en) * | 2011-07-18 | 2011-11-23 | 广东省电力设计研究院 | Power grid three-dimensional design result data management system and digital management method thereof |
CN105160458A (en) * | 2015-08-12 | 2015-12-16 | 中国南方电网有限责任公司 | Information processing system and method supporting seven-dimensional ledger equipment management |
US20170053244A1 (en) * | 2015-08-22 | 2017-02-23 | Salim B. KHALIL | Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods |
CN106779489A (en) * | 2017-01-19 | 2017-05-31 | 北京恒华伟业科技股份有限公司 | A kind of power engineering project management system |
CN109767186A (en) * | 2018-12-29 | 2019-05-17 | 福建华闽通达信息技术有限公司 | A kind of project Whole Course Management method and system |
CN109816336A (en) * | 2018-12-29 | 2019-05-28 | 中国神华能源股份有限公司 | Information management system based on Life cycle |
-
2019
- 2019-06-12 CN CN201910505062.0A patent/CN110570158A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008084051A (en) * | 2006-09-28 | 2008-04-10 | Toshiba Corp | Plant multidiscipline engineering support system |
CN101777795A (en) * | 2010-01-19 | 2010-07-14 | 嘉兴市中创信息技术有限公司 | Equipment digitalized management system applied to electric power GIS system |
CN102254251A (en) * | 2011-07-18 | 2011-11-23 | 广东省电力设计研究院 | Power grid three-dimensional design result data management system and digital management method thereof |
CN105160458A (en) * | 2015-08-12 | 2015-12-16 | 中国南方电网有限责任公司 | Information processing system and method supporting seven-dimensional ledger equipment management |
US20170053244A1 (en) * | 2015-08-22 | 2017-02-23 | Salim B. KHALIL | Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods |
CN106779489A (en) * | 2017-01-19 | 2017-05-31 | 北京恒华伟业科技股份有限公司 | A kind of power engineering project management system |
CN109767186A (en) * | 2018-12-29 | 2019-05-17 | 福建华闽通达信息技术有限公司 | A kind of project Whole Course Management method and system |
CN109816336A (en) * | 2018-12-29 | 2019-05-28 | 中国神华能源股份有限公司 | Information management system based on Life cycle |
Non-Patent Citations (1)
Title |
---|
宋志坚: "基于GIS营配一体化系统的配电网工程管理的研究及其应用", 《工程科技Ⅱ辑》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111950977A (en) * | 2020-07-28 | 2020-11-17 | 中国南方电网有限责任公司 | Data interaction system and method from power transmission machine account of information system to scheduling master station |
CN111950977B (en) * | 2020-07-28 | 2023-11-21 | 中国南方电网有限责任公司 | Data interaction system and method for information system radio station account to dispatching master station |
CN112612842A (en) * | 2020-12-30 | 2021-04-06 | 南方电网深圳数字电网研究院有限公司 | Standing book information input method and device, electronic equipment and storage medium |
CN113095784A (en) * | 2021-04-15 | 2021-07-09 | 广东电网有限责任公司 | Automatic issuing method, device and storage medium for electronic handover list |
CN113095784B (en) * | 2021-04-15 | 2024-02-13 | 广东电网有限责任公司 | Electronic handover list automatic issuing method, device and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20200374288A1 (en) | Block chain-based multi-chain management method and system, electronic device, and storage medium | |
CN110570158A (en) | power grid standing book electronic transfer method and system and computer readable storage medium | |
CN110162388A (en) | A kind of method for scheduling task, system and terminal device | |
CN110611707B (en) | Task scheduling method and device | |
CN103197952A (en) | Management system and method aiming at maintenance and deployment of application system based on cloud infrastructure | |
CN107391243A (en) | Thread task processing equipment, device and method | |
CN106445506A (en) | Business flow chart generation method, device and system | |
CN110069353A (en) | Business asynchronous processing method and device | |
CN105956481A (en) | Data processing method and device | |
CN104657150A (en) | Automatic operation and maintenance method under cluster environment | |
CN111208992A (en) | System scheduling workflow generation method and system | |
CN105740085A (en) | Fault tolerance processing method and device | |
CN107832125A (en) | Method for processing business and device under a kind of distributed environment | |
CN111158800B (en) | Method and device for constructing task DAG based on mapping relation | |
CN106776074A (en) | A kind of web plug-in units call method and system based on http | |
CN108182281A (en) | Data processing control method, device, server and medium based on streaming computing | |
CN105005481A (en) | Method and system for processing workflow to-do task | |
CN103178974A (en) | Fault processing system and method | |
CN104410511A (en) | Server management method and system | |
CN113658351A (en) | Product production method and device, electronic equipment and storage medium | |
CN114499824A (en) | Node system of block chain and cooperation method thereof | |
CN107563871A (en) | The management method and system of hotel's job order of OTA websites | |
CN103777593A (en) | Automatic product control and production system and realizing method thereof | |
CN109634749B (en) | Distributed unified scheduling method and device | |
CN108876157B (en) | Deploy the method and its management system of resources of production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191213 |
|
RJ01 | Rejection of invention patent application after publication |