CN202975749U - Construction engineering construction progress monitoring system - Google Patents

Construction engineering construction progress monitoring system Download PDF

Info

Publication number
CN202975749U
CN202975749U CN 201220647449 CN201220647449U CN202975749U CN 202975749 U CN202975749 U CN 202975749U CN 201220647449 CN201220647449 CN 201220647449 CN 201220647449 U CN201220647449 U CN 201220647449U CN 202975749 U CN202975749 U CN 202975749U
Authority
CN
China
Prior art keywords
construction
data processor
monitoring
construction progress
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220647449
Other languages
Chinese (zh)
Inventor
邱继生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Science and Technology
Original Assignee
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Science and Technology filed Critical Xian University of Science and Technology
Priority to CN 201220647449 priority Critical patent/CN202975749U/en
Application granted granted Critical
Publication of CN202975749U publication Critical patent/CN202975749U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses a construction engineering construction progress monitoring system. The system comprises upper monitoring machines I which are laid in the construction management office, upper monitoring machines II which are laid in the construction management office, a lower monitoring host which is laid in the monitored construction engineering construction progress management office, and a plurality of handheld construction progress monitors which are carried by construction progress control workers respectively. The lower monitoring host is in bidirectional communication with the upper monitoring machines I and the upper monitoring machines II. The plurality of handheld construction progress monitors are in bidirectional communication with the lower monitoring host in a wireless communication manner. Each handheld construction progress monitor comprises a handheld housing, a control panel, a video acquisition unit and an electronic circuit board. According to the utility model, advantages of reasonable design, convenient wire connection, easy operation, high intelligence and good utilization effects can be realized, effective monitoring can be performed on the construction progress of each of a plurality of monitored projects, and the third party can perform on-line inquiry on the construction progress monitoring result conveniently.

Description

Building engineering construction progress supervisory system
Technical field
The utility model relates to a kind of supervisory system, especially relates to a kind of building engineering construction progress supervisory system.
Background technology
The construction work progress monitoring is the control work through the building engineering construction overall process, and progress monitoring is one of groundwork of the engineering construction personnel of unit in charge of construction and the project supervision personnel of supervisor.The quality of progress monitoring directly has influence on duration, the workload of engineering, consumption of resource etc.Therefore, must carry out progress monitoring work in building construction process.nowadays, it is that the building site is checked to realize that the construction work progress monitoring mainly relies on the people, and check that rear electronic edition or the paper document of generally all adopting carries out record to looking into perceptible construction speed, also need subsequently the construction speed situation that records is submitted to upper supervision department, the title that should comprise the lower construction project of monitoring of current state in the construction speed situation that records, actual checking the time, the Specific construction progress of checking out, the contents such as construction progress control personnel's name and stamped signature thereof, thereby the manpower and materials of required input are larger, and waste time and energy, especially in the situation that the related need of construction work monitoring project is more, the defective of existing construction progress control method is more obvious.To sum up, nowadays lack a kind of reasonable in design, input cost is lower and it is easy and simple to handle to use, result of use is good building engineering construction progress supervisory system, it can complete the monitor task of a plurality of monitoring project of construction work construction speed automatically, and the construction speed monitored results synchronously can be uploaded to upper supervision department.
The utility model content
Technical problem to be solved in the utility model is for above-mentioned deficiency of the prior art, a kind of building engineering construction progress supervisory system is provided, it is reasonable in design, easy-to-connect, use is easy and simple to handle and intelligent degree is high, result of use good, can carry out effective monitoring to a plurality of monitored item purpose construction speeds, and the third party can easyly carry out online query to the construction speed monitored results.
for solving the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of building engineering construction progress supervisory system, it is characterized in that: comprise the upper monitoring machine one that is laid in the building operation management office, be laid in building operation and manage upper monitoring machine two in office, be laid in monitor the next monitoring host computer and a plurality of hand-held construction speed watch-dog of being carried by the construction progress control personnel respectively in building engineering construction progress control office, all carry out two-way communication by LAN (Local Area Network) between described the next monitoring host computer and upper monitoring machine one and upper monitoring machine two, carry out two-way communication with communication between a plurality of described hand-held construction speed watch-dogs and the next monitoring host computer, described hand-held construction speed watch-dog comprises the hand-held housing, be laid in control panel on described hand-held housing, be arranged on the video acquisition unit in described hand-held housing and be arranged on electronic circuit board in described hand-held housing, the information that is provided with on described control panel send button and be used for that the input institute construction project of monitor is numbered and current state under the input key of construction speed language description information, described input key and information send button all joins with key circuit, and described information sends on button and is provided with the finger print information collecting unit, be provided with on described electronic circuit board the video acquisition time of video acquisition unit is carried out self registering timing circuit, with video acquisition unit institute's Information Monitoring and acquisition time autostore to the data processor one in the construction speed monitoring file of monitored construction project numbering name, described construction speed monitoring file is carried out the data storage cell of autostore, storage inside has the finger print information storage unit of a plurality of construction progress control personnel's finger print informations, finger print information finger print information that collecting unit gathers is carried out automatically identifying and reading and will distinguish synchronous driving as a result to the data processor two of data processor one and the alarm indicating member that joins with data processor one respectively, wireless communication module one and display unit, described display unit is arranged on described hand-held housing, described finger print information collecting unit and finger print information storage unit are all joined with data processor two, and described data processor two joins with data processor one, described key circuit, video acquisition unit, timing circuit and data storage cell all join with data processor one, described the next monitoring host computer comprises data processor three, wireless communication module two, reception construction speed monitoring file is carried out the data storage device of stores synchronized, being used for input needs the parameter input unit of inquiry construction project numbering, all construction speeds of the construction project of inquiring about of storing in the data memory device are monitored files carry out the display of simultaneous display and the clock circuit that joins with data processor three according to receiving sequencing, described wireless communication module two, data storage device, parameter input unit and display all join with data processor three, described data processor one carries out two-way communication by wireless communication module one and wireless communication module two with data processor three.
Above-mentioned building engineering construction progress supervisory system, it is characterized in that: also be provided with the audio collection unit on described hand-held housing, described audio collection unit and data processor one join, and be correspondingly provided with audio-frequency information on described hand-held housing and gather button, described audio-frequency information gathers button and key circuit joins.
Above-mentioned building engineering construction progress supervisory system is characterized in that: described data processor one and data processor two are the ARM microprocessor.
Above-mentioned building engineering construction progress supervisory system is characterized in that: described upper monitoring machine one and upper monitoring machine two are PC.
The utility model compared with prior art has the following advantages:
1, simple in structure and circuit design is reasonable, input cost is low.
2, the simple and easy-to-connect of circuit.
3, use that simple to operate, intelligent degree is high and display effect is directly perceived.
4, result of use is good and practical value is high, can automatically complete the monitor task of a plurality of monitoring project of construction work construction speed, and the construction speed monitored results synchronously can be uploaded to upper supervision department, and institute's monitor data facilitates online query.
In sum, the utility model is reasonable in design, easy-to-connect, use is easy and simple to handle and intelligent degree is high, result of use good, can carry out effective monitoring to a plurality of monitored item purpose construction speeds, and the third party can easyly carry out online query to the construction speed monitored results.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Description of drawings
Fig. 1 is schematic block circuit diagram of the present utility model.
Description of reference numerals:
1-the next monitoring host computer; 1-1-wireless communication module two; 1-2-data processor three;
1-3-data storage device; 1-4-parameter input unit; 1-5-display;
1-6-clock circuit; 2-upper monitoring machine one; 3-upper monitoring machine two;
4-hand-held construction speed watch-dog; 4-1-input key;
4-2-key circuit; 4-3-video acquisition unit; 4-4-data processor one;
4-5-timing circuit; 4-6-data storage cell;
4-7-finger print information storage unit; 4-8-information sends button;
4-9-finger print information collecting unit; 4-10-data processor two;
4-11-alarm indicating member; 4-12-display unit;
4-13-wireless communication module one; 4-14-audio collection unit;
4-15-audio-frequency information gathers button.
Embodiment
as shown in Figure 1, the utility model comprises the upper monitoring machine 1 that is laid in the building operation management office, be laid in building operation and manage upper monitoring machine 23 in office, be laid in monitor the next monitoring host computer 1 and a plurality of hand-held construction speed watch-dog 4 of being carried by the construction progress control personnel respectively in building engineering construction progress control office, all carry out two-way communication by LAN (Local Area Network) between described the next monitoring host computer 1 and upper monitoring machine 1 and upper monitoring machine 23, carry out two-way communication with communication between a plurality of described hand-held construction speed watch-dogs 4 and the next monitoring host computer 1, described hand-held construction speed watch-dog 4 comprises the hand-held housing, be laid in the control panel on described hand-held housing, be arranged on the video acquisition unit 4-3 in described hand-held housing and be arranged on the interior electronic circuit board of described hand-held housing, the information that is provided with on described control panel send button 4-8 and be used for that the input institute construction project of monitor is numbered and current state under the input key 4-1 of construction speed language description information, described input key 4-1 and information send button 4-8 and all join with key circuit 4-2, described information sends on button 4-8 and is provided with finger print information collecting unit 4-9, be provided with on described electronic circuit board the video acquisition time of video acquisition unit 4-3 is carried out self registering timing circuit 4-5, with video acquisition unit 4-3 institute's Information Monitoring and acquisition time autostore to data processor one 4-4 in the construction speed monitoring file of monitored construction project numbering name, described construction speed monitoring file is carried out the data storage cell 4-6 of autostore, storage inside has the finger print information storage unit 4-7 of a plurality of construction progress control personnel's finger print informations, finger print information collecting unit finger print information that 4-9 gathers is carried out automatically identifying and reading and will distinguish synchronous driving as a result to data processor two 4-10 of data processor one 4-4 and the alarm indicating member 4-11 that joins with data processor one 4-4 respectively, wireless communication module one 4-13 and display unit 4-12, described display unit 4-12 is arranged on described hand-held housing.Described finger print information collecting unit 4-9 and finger print information storage unit 4-7 all join with data processor two 4-10, and described data processor two 4-10 and data processor one 4-4 join.Described key circuit 4-2, video acquisition unit 4-3, timing circuit 4-5 and data storage cell 4-6 all join with data processor one 4-4.described the next monitoring host computer 1 comprises data processor three 1-2, wireless communication module two 1-1, reception construction speed monitoring file is carried out the data storage device 1-3 of stores synchronized, being used for input needs the parameter input unit 1-4 of inquiry construction project numbering, all construction speeds of the construction project of inquiring about of storing in data memory device 1-3 are monitored files carry out the display 1-5 of simultaneous display and the clock circuit 1-6 that joins with data processor three 1-2 according to receiving sequencing, described wireless communication module two 1-1, data storage device 1-3, parameter input unit 1-4 and display 1-5 all join with data processor three 1-2.Described data processor one 4-4 carries out two-way communication by wireless communication module one 4-13 and wireless communication module two 1-1 and data processor three 1-2.
In the present embodiment, also be provided with audio collection unit 4-14 on described hand-held housing, described audio collection unit 4-14 and data processor one 4-4 join, and be correspondingly provided with audio-frequency information on described hand-held housing and gather button 4-15, described audio-frequency information gathers button 4-15 and key circuit 4-2 joins.
In the present embodiment, described data processor one 4-4 and data processor two 4-10 are the ARM microprocessor.
In the present embodiment, described upper monitoring machine 1 and upper monitoring machine 23 are PC.
The above; it is only preferred embodiment of the present utility model; be not that the utility model is imposed any restrictions; every any simple modification, change and equivalent structure of above embodiment being done according to the utility model technical spirit changes, and all still belongs in the protection domain of technical solutions of the utility model.

Claims (4)

1. building engineering construction progress supervisory system, it is characterized in that: comprise the upper monitoring machine one (2) that is laid in the building operation management office, be laid in building operation and manage upper monitoring machine two (3) in office, be laid in monitor the next monitoring host computer (1) and a plurality of hand-held construction speed watch-dog (4) of being carried by the construction progress control personnel respectively in building engineering construction progress control office, all carry out two-way communication by LAN (Local Area Network) between described the next monitoring host computer (1) and upper monitoring machine one (2) and upper monitoring machine two (3), carry out two-way communication with communication between a plurality of described hand-held construction speed watch-dogs (4) and the next monitoring host computer (1), described hand-held construction speed watch-dog (4) comprises the hand-held housing, be laid in the control panel on described hand-held housing, be arranged on the video acquisition unit (4-3) in described hand-held housing and be arranged on the interior electronic circuit board of described hand-held housing, the information that is provided with on described control panel send button (4-8) and be used for that the input institute construction project of monitor is numbered and current state under the input key (4-1) of construction speed language description information, described input key (4-1) and information send button (4-8) and all join with key circuit (4-2), described information sends on button (4-8) and is provided with finger print information collecting unit (4-9), be provided with on described electronic circuit board the video acquisition time of video acquisition unit (4-3) is carried out self registering timing circuit (4-5), with video acquisition unit (4-3) institute's Information Monitoring and acquisition time autostore to the data processor one (4-4) in the construction speed monitoring file of monitored construction project numbering name, described construction speed monitoring file is carried out the data storage cell (4-6) of autostore, storage inside has the finger print information storage unit (4-7) of a plurality of construction progress control personnel's finger print informations, finger print information collecting unit (4-9) finger print information that gathers is carried out automatically identifying and reading and will distinguish synchronous driving as a result to the data processor two (4-10) of data processor one (4-4) and the alarm indicating member (4-11) that joins with data processor one (4-4) respectively, wireless communication module one (4-13) and display unit (4-12), described display unit (4-12) is arranged on described hand-held housing, described finger print information collecting unit (4-9) and finger print information storage unit (4-7) are all joined with data processor two (4-10), and described data processor two (4-10) joins with data processor one (4-4), described key circuit (4-2), video acquisition unit (4-3), timing circuit (4-5) and data storage cell (4-6) all join with data processor one (4-4), described the next monitoring host computer (1) comprises data processor three (1-2), wireless communication module two (1-1), reception construction speed monitoring file is carried out the data storage device (1-3) of stores synchronized, being used for input needs the parameter input unit (1-4) of inquiry construction project numbering, carry out the display (1-5) of simultaneous display and the clock circuit (1-6) that joins with data processor three (1-2) according to receiving sequencing all construction speeds monitoring files to the interior construction project of inquiring about of storing of data memory device (1-3), described wireless communication module two (1-1), data storage device (1-3), parameter input unit (1-4) and display (1-5) all join with data processor three (1-2), described data processor one (4-4) carries out two-way communication by wireless communication module one (4-13) and wireless communication module two (1-1) with data processor three (1-2).
2. according to building engineering construction progress supervisory system claimed in claim 1, it is characterized in that: also be provided with audio collection unit (4-14) on described hand-held housing, described audio collection unit (4-14) joins with data processor one (4-4), and be correspondingly provided with audio-frequency information on described hand-held housing and gather button (4-15), described audio-frequency information gathers button (4-15) and joins with key circuit (4-2).
3. according to the described building engineering construction progress of claim 1 or 2 supervisory system, it is characterized in that: described data processor one (4-4) and data processor two (4-10) are the ARM microprocessor.
4. according to the described building engineering construction progress of claim 1 or 2 supervisory system, it is characterized in that: described upper monitoring machine one (2) and upper monitoring machine two (3) are PC.
CN 201220647449 2012-11-29 2012-11-29 Construction engineering construction progress monitoring system Expired - Fee Related CN202975749U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220647449 CN202975749U (en) 2012-11-29 2012-11-29 Construction engineering construction progress monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220647449 CN202975749U (en) 2012-11-29 2012-11-29 Construction engineering construction progress monitoring system

Publications (1)

Publication Number Publication Date
CN202975749U true CN202975749U (en) 2013-06-05

Family

ID=48516802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220647449 Expired - Fee Related CN202975749U (en) 2012-11-29 2012-11-29 Construction engineering construction progress monitoring system

Country Status (1)

Country Link
CN (1) CN202975749U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104517168A (en) * 2013-09-30 2015-04-15 宁夏先锋软件有限公司 Engineering project construction cost schedule management system
CN109784853A (en) * 2019-01-14 2019-05-21 中煤航测遥感集团有限公司 NG Pipeline Construction progress control method and system
CN110363876A (en) * 2019-07-16 2019-10-22 安徽求是工程建设咨询有限公司 A kind of intelligent monitor system for project supervision

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104517168A (en) * 2013-09-30 2015-04-15 宁夏先锋软件有限公司 Engineering project construction cost schedule management system
CN109784853A (en) * 2019-01-14 2019-05-21 中煤航测遥感集团有限公司 NG Pipeline Construction progress control method and system
CN110363876A (en) * 2019-07-16 2019-10-22 安徽求是工程建设咨询有限公司 A kind of intelligent monitor system for project supervision

Similar Documents

Publication Publication Date Title
CN203114349U (en) Coal mine safety monitoring system based on mobile GIS
WO2015081788A1 (en) System and method for two-level centralized deployment power supply voltage automatic collection
CN203365585U (en) Photovoltaic panel dust detector
CN202975677U (en) Cachet management system
CN207833300U (en) A kind of building site water power energy-saving monitoring and wireless remote control system
CN202975749U (en) Construction engineering construction progress monitoring system
CN202404129U (en) Electric energy meter data acquisition instrument based on radio frequency identification (RFID) technology
CN202617166U (en) Wireless sensor network-based intelligent counting terminal
CN205176919U (en) Power plant removes operation management system
CN202093569U (en) Safety tool monitoring and managing system
CN204612082U (en) For point inspection device and the air-conditioner system of air-conditioner
CN204515030U (en) A kind of lightning protection comprehensive detection system
CN203054911U (en) Mobile intelligent terminal safety check system
CN202976180U (en) Handheld construction engineering construction progress monitor
CN206164602U (en) Air source heat pump expert remote management cloud service system
CN203673657U (en) Low voltage table area meter reading collection terminal fault diagnosis tester
CN203053482U (en) Wireless multiparameter environmental monitoring system
CN103578254A (en) State monitoring method based on micro-blog release
CN203610182U (en) Device for recording and detecting running state of ball mill
CN105375625A (en) Electric power operation information monitoring system
CN202995413U (en) A constructional engineering material delivery device based on construction progress monitoring
CN203217352U (en) Machine room wireless monitoring system, handheld device and machine room equipment
CN103853111A (en) Automatic distribution system of constructional engineering material
CN207115152U (en) A kind of engineering information management system
CN206497322U (en) A kind of natural forest protection system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130605

Termination date: 20131129