CN103821538B - J-type horizontal assistant branched hole surface advance grouting paste-making method - Google Patents

J-type horizontal assistant branched hole surface advance grouting paste-making method Download PDF

Info

Publication number
CN103821538B
CN103821538B CN201310727968.XA CN201310727968A CN103821538B CN 103821538 B CN103821538 B CN 103821538B CN 201310727968 A CN201310727968 A CN 201310727968A CN 103821538 B CN103821538 B CN 103821538B
Authority
CN
China
Prior art keywords
type
hole
grouting
horizontal
assistant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310727968.XA
Other languages
Chinese (zh)
Other versions
CN103821538A (en
Inventor
荣传新
程桦
唐永志
姚直书
蔡海兵
宋海清
王晓健
郑腾龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Huainan Mining Group Co Ltd
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201310727968.XA priority Critical patent/CN103821538B/en
Publication of CN103821538A publication Critical patent/CN103821538A/en
Application granted granted Critical
Publication of CN103821538B publication Critical patent/CN103821538B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of J-type horizontal assistant branched hole surface advance grouting paste-making method, step 1: first, according to weak coal-face overlying wind oxidation basement rock band position and size need to be reinforced, determine J-type main injected hole position, quantity and adjacent J-type main injected hole spacing thereof;Step 2: secondly, drills the main injected hole of J-type, and the main injected hole of this J-type includes straight hole section, inclination section and horizontal segment;Step 3: according to horizontal grouting segment length, is arranged around 2~4 assistant branched holes at the main injected hole of each J-type;Step 4: assistant branched hole horizontal to J-type uses protrusive grouting mode to carry out slip casting.The J-type horizontal assistant branched hole surface advance grouting paste-making method of the present invention, has and can be effectively improved the pre-pouring grout consolidation effect on coal-face overlying wind oxidation basement rock band stratum, prevent the accident such as coal-face pressure rack from occurring, improve the advantage such as security reliability of coal work.

Description

J-type horizontal assistant branched hole surface advance grouting paste-making method
Technical field
The invention belongs to mine construction field, relate to a kind of J-type horizontal assistant branched hole pre grouting from the surface side Method.
Background technology
Slurry injection technique, generally with grouting pump as power source, utilizes the pressure that grouting pump provides, by prepare, tool There are the slurries filling bonding capacity, are injected into aqueous or weak loose rock (native) by grout pipe line and injected hole In Ceng, make slurries be diffused in the crack on above-mentioned stratum, hole or cavity with the form such as filling or infiltration, wait to starch Liquid blocks crack, isolation water route, consolidation loose rock (native) body, filling cavity after condensing, thus plays water blockoff Or reinforcement effect.Slurry injection technique in construction of coal mine by slip casting purpose classify, can be divided into vertical pre grouting from the surface, Vertical shaft working surface pre-pouring grout and inclined shaft (lane), roadhead pre-pouring grout.
Under the conditions of wind oxidized zone thin bedrock is without key stratum, during this type of coal-face back production, along with working face Continuing back production, after top board 3-4 the minor cycle of experience, rock movement has influence on top high position rock movement, can go out The most disrumpent feelings, move integrally (large period), circulation law so and general overlying strata condition Working face movement rule is different.When the minor cycle presses, working surface hydraulic support is the most permissible Bear, but when generation large period is pressed, the most disrumpent feelings rock stratum globality moves produced load will be by cash Stone and hydraulic support shared, when the excessive bearing capacity beyond hydraulic support of overlying rock load, seriously Meeting cause pressure rack accident.
In order to when alleviating working face extraction to greatest extent overlying rock large period to press ore deposit pressure manifest severe degree, Avoid pressure rack accident, can use grouting method that working face overlying wind oxidation basement rock band is carried out slip casting and add Gu, in face roof rock stratum, i.e. manually construct one layer of main key stratum, to prevent coal-face pressure rack accident Occur.Conventional grouting method is to use tunnel pre grouting from the working face, when driving is to water-bearing layer or fault belt (reserved certain thickness), stops driving, by the reserved rock plug of design requirement or construction wall for grouting, then From working face bored grouting, after carrying out water blockoff or reinforcing, sinking and drifting can be recovered again.But tunnel grouting is executed Work slip casting section is less, takies tunnel duration, limited space.And working face overlying wind oxidation basement rock band scope is relatively big, The inapplicable this geological state of tunnel pre grouting from the working face.
Vertical pre grouting from the surface is generally before Shaft Excavation, from ground drilling hole to aqueous and broken rock in advance Carrying out slip casting, pre grouting from the surface can be carried out at construction preparatory stage, and operating condition is good, safety.
Basement rock band is aoxidized for the overlying wind above coal-face with larger area, and in order to take full advantage of The advantage of pre grouting from the surface, just reinforces wind oxidized zone thin bedrock on ground, and the present invention proposes a kind of J The injected hole arrangement of type horizontal assistant branched hole, in conjunction with directional drilling technique and horizontal pre-pouring grout technology, enters The pre grouting from the surface construction of row coal-face top board wind oxidation basement rock band.Appearance due to helicoid hydraulic motor, it is ensured that J-type horizontal assistant branched hole hole quality, is effectively improved coal-face overlying wind oxidation basement rock band stratum Pre-pouring grout consolidation effect.After boring arrives predetermined hole depth, holing in the horizontal direction, it vertically cuts open Face is J-type, and level is distributed in assistant shape to boring.This is a kind of relatively new pre grouting from the surface hole layout side Formula, the advantage combining pre grouting from the surface, it is effectively improved coal-face overlying wind oxidation basement rock band stratum Pre-pouring grout consolidation effect.
The present invention uses J-type horizontal assistant branched hole pattern, and coal-face overlying wind is aoxidized basement rock band Stratum carries out pre grouting from the surface, and straight hole section boring amount can be greatly decreased, and grouting pressure is high, slurries diffusion away from Away from from, it is effectively improved coal-face overlying wind oxidation basement rock band stratum pre-pouring grout consolidation effect.
It addition, along with the continuous increase of mine Exploitation Depth, complex geologic conditions, the weakness such as tomography, crushed zone Bad ground connects the security threat of chamber group and main haulage roadway surrounding rock stability and support system all the more to deep-well Seriously, in order to improve mechanical character of surrounding rock, use J-type horizontal assistant branched hole surface advance grouting paste-making method to shaft bottom Parking lot large section roadway, such as ingate and relevant chamber group, central pump house, central substation and crosspoint At V-belt, weak broken wall rock carries out pre grouting from the surface reinforcing, it can be ensured that deep-well connects chamber group and main haulage roadway Construction safety.
Summary of the invention
The present invention is for avoiding weak point present in above-mentioned prior art, it is provided that a kind of horizontal assistant of J-type Branched hole surface advance grouting paste-making method, with improve coal-face overlying wind oxidation basement rock band pre-pouring grout consolidation effect, Improve the security reliability of coal work.
Before the present invention implements, being first sampled coal-face overlying wind oxidation basement rock band stratum, test is each The physical and mechanical parameter of layer rock sample, specifically includes that porosity, moisture content, density, resistance to compression and tensile strength etc., To determine grouting parameter and injecting paste material.After the present invention implements, at coal-face air return way 8, adhesive tape Machine crossheading 10 and cut at eye, upwards core-drilling, rock physics mechanical property after test slip casting, evaluate and mine Working face 9 overlying wind oxidation basement rock band stratum slip casting effect and stability thereof.
J-type of the present invention horizontal assistant branched hole surface advance grouting paste-making method, comprises the following steps:
Step 1: first, foundation need to reinforce weak coal-face overlying wind oxidation basement rock band position and area is big Little, determine the position of the main injected hole of J-type, quantity and the pitch of holes of adjacent main slip casting thereof;The main slip casting of described J-type Hole position of opening and distance L of flat spot of hole take 200~300m, and quantity 2~3, spacing a are generally 20~30m;
Step 2: secondly, drills the main injected hole of J-type at earth's surface, the main injected hole of this J-type include straight hole section, Inclination section and horizontal segment;
Step 3: according to horizontal grouting segment length, 2~4 plumages are set in the both sides of the main injected hole of each J-type Wing branched hole;
Step 4: assistant branched hole horizontal to J-type uses protrusive grouting mode to carry out slip casting.
The feature of J-type of the present invention horizontal assistant branched hole surface advance grouting paste-making method lies also in:
In described step 1, distance L of described J-type main injected hole position of opening and flat spot of having holed is 200~300m, quantity 2~3, spacing a are generally 20~30m.
In described step 1, spacing c of the assistant branched hole that each two is adjacent is about 40m.
In described step 4, the straight hole section (3) of the main injected hole of J-type and inclination section (4) setting of casing knot of cementing the well Shu Hou, construction 30m horizontal drilling is as open-hole slip casting horizontal segment (5), and at the deflecting of the main injected hole of J-type Stop grouting plug is installed in section (4) bottom, carries out pre grouting from the surface, after reaching grouting design requirement, takes out inclination section (4) bottom stop grouting plug, carries out cleaning bottom of hole to aforementioned 30m open-hole slip casting section horizontal drilling, and construct 30m further along Horizontal drilling is as open-hole slip casting section, and installs stop grouting plug bottom aforementioned inclination section, carries out pre grouting from the surface, So the most repeatedly, until whole needing slip casting region to reach predetermined requirement.
Compared with the prior art, the present invention has the beneficial effect that:
The J-type horizontal assistant branched hole surface advance grouting paste-making method of the present invention, utilizes directional drilling technique, in combination The advantage of face pre-pouring grout carries out pre-pouring grout to horizontal direction weathered rocks band, solves tunnel pre grouting from the working face note Slurry section is less, takies the tunnel duration, the problem of limited space.
The present invention can be additionally used in shaft station large section roadway, such as ingate and relevant chamber group, central authorities' water pump At room, central substation and V-belt, crosspoint, weak broken wall rock pre grouting from the surface is reinforced.
The J-type horizontal assistant branched hole surface advance grouting paste-making method of the present invention, has and can be effectively improved coal work The pre-pouring grout consolidation effect on face overlying wind oxidation basement rock band stratum, prevent the accidents such as coal-face pressure rack from occurring, The advantages such as the security reliability of raising coal work.
Accompanying drawing explanation
Fig. 1 is the vertical cross section schematic diagram of the main injected hole of J-type horizontal assistant branched hole;
Fig. 2 is the horizontal layout schematic diagram of the main injected hole of J-type horizontal assistant branched hole;
Fig. 3 is detailed description of the invention vertical cross section schematic diagram;
Fig. 4 is detailed description of the invention horizontal layout schematic diagram;
In figure, label is described as follows:
1 first main injected hole, 2 second main injected holes, 3 straight hole sections, 4 inclination sections, 5 horizontal segments, 6 earth's surfaces, 7 weathered rocks sections, 8 air return way, 9 working faces, 10 sealing-tape machine crossheadings.
Figure marks implication as follows:
The spacing of a adjacent main injected hole, b wind oxidation basement rock bandwidth, c assistant branched hole spacing, d The axial length of branched hole, the h injected hole straight hole degree of depth, s wind oxidized zone basement rock length, the main slip casting of L Hole (1,2) position of opening and the distance of flat spot of having holed
Detailed description of the invention
For a certain exploiting field, certain ore deposit, use J-type horizontal assistant branched hole surface advance grouting paste-making method, see accompanying drawing 1~ Fig. 2, it comprises the following steps:
1, first, according to reinforcing weak coal-face overlying wind oxidation basement rock band position and area b ' s, Determine J-type main injected hole position, quantity and adjacent main injected hole spacing;Described J-type main injected hole position of opening Being 240m with distance L of flat spot of having holed, quantity 2, spacing a are 30m
2, drilling the main injected hole of J-type at earth's surface 6, the main injected hole of this J-type includes straight hole section 200m, deflecting Section 240m and horizontal segment 200m;As it is shown on figure 3, the main injected hole of J-type includes the first main injected hole 1 and Two main injected holes 2, utilize Technology of Directional Drilling to construct, and lateral aperture is positioned at needs slip casting region;
Step 3: according to horizontal grouting segment length, 3 assistants that are arranged around at the main injected hole of each J-type divide Zhi Kong;As it is shown on figure 3, the interval c between the adjacent assistant branched hole of each two is 40m;
Step 4: assistant branched hole horizontal to J-type uses protrusive grouting mode to carry out slip casting.Injecting paste material and Parameter determines according to physical-mechanical properties of rock.Here single liquid cement mortar, ratio of mud 1:1 are used.The main note of J-type After the straight hole section 3 in slurry hole and inclination section 4 setting of casing well cementation terminate, construction 30m horizontal drilling is as open-hole Slip casting horizontal segment 5, and stop grouting plug is installed bottom the inclination section 4 of the main injected hole of J-type, carry out pre grouting from the surface, After reaching grouting design requirement, take out stop grouting plug bottom inclination section 4, to aforementioned 30m open-hole slip casting section level Boring carries out cleaning bottom of hole, and construction 30m horizontal drilling is as open-hole slip casting section further along, and at the bottom of aforementioned inclination section Stop grouting plug is installed in portion, carries out pre grouting from the surface, the most repeatedly, needs slip casting region to reach predetermined wanting until whole Ask.
Embodiment described above is only to be described the preferred embodiment of the present invention, not to the present invention Scope be defined, on the premise of designing spirit without departing from the present invention, those of ordinary skill in the art to this The various deformation made of technical scheme of invention and improvement, all should fall into the protection that claims of the present invention determines In the range of.

Claims (5)

1.J type horizontal assistant branched hole surface advance grouting paste-making method, is characterized in that, comprise the following steps:
Step 1: first, foundation need to reinforce weak coal-face overlying wind oxidation basement rock band position and area is big Little, determine J-type main injected hole (1,2) position, quantity and adjacent J-type main injected hole spacing thereof;
Step 2: secondly, at earth's surface (6) the place probing main injected hole of J-type (1,2), the main injected hole of this J-type (1,2) includes straight hole section (3), inclination section (4) and horizontal segment (5);The main injected hole of described J-type includes First main injected hole (1) and the second main injected hole (2), utilize Technology of Directional Drilling to construct, described J The described horizontal segment of the main injected hole of type is positioned at and needs slip casting region;
Step 3: according to horizontal grouting segment length, is arranged around 2~4 plumages at the main injected hole of each J-type Wing branched hole;
Step 4: assistant branched hole horizontal to J-type uses protrusive grouting mode to carry out slip casting;Injecting paste material and Parameter determines according to physical-mechanical properties of rock;The physical and mechanical parameter of each layer rock sample, specifically include that porosity, Moisture content, density, resistance to compression and tensile strength;Using single liquid cement mortar at bedrock weathering zone, the ratio of mud exists 1:0.8~1:1.2.
J-type the most according to claim 1 horizontal assistant branched hole surface advance grouting paste-making method, is characterized in that, In described step 1, distance L of described J-type main injected hole (1,2) position of opening and flat spot of having holed is 200~300m, quantity 2~3, spacing a are 20~30m.
J-type the most according to claim 1 horizontal assistant branched hole surface advance grouting paste-making method, is characterized in that, In described step 3, the interval c between the assistant branched hole that each two is adjacent is about 40m.
J-type the most according to claim 1 horizontal assistant branched hole surface advance grouting paste-making method, is characterized in that, In described step 4, after the straight hole section (3) of the main injected hole of J-type and inclination section (4) setting of casing well cementation terminate, Construction 30m horizontal drilling is as open-hole slip casting horizontal segment (5), and at the inclination section (4) of the main injected hole of J-type Stop grouting plug is installed in bottom, carries out pre grouting from the surface, after reaching grouting design requirement, takes out inclination section (4) end Portion's stop grouting plug, carries out cleaning bottom of hole to aforementioned 30m open-hole slip casting section horizontal drilling, and construction 30m level is bored further along Hole is as open-hole slip casting section, and installs stop grouting plug bottom aforementioned inclination section, carries out pre grouting from the surface, the most instead Multiple, need slip casting region to reach predetermined requirement until whole.
J-type the most according to claim 1 horizontal assistant branched hole surface advance grouting paste-making method, is characterized in that, Before described J-type horizontal assistant branched hole surface advance grouting paste-making method is implemented, first to needing slip casting stratum to take Sample, tests the physical and mechanical parameter of each layer rock sample, specifically include that porosity, moisture content, density, resistance to compression and Tensile strength, in order to determine grouting parameter and injecting paste material;Described J-type horizontal assistant branched hole surface advance grouting After paste-making method is implemented, rock physics mechanical property after the upwards core-drilling of slip casting stratum, test slip casting, evaluate Stratum slip casting effect and stability thereof.
CN201310727968.XA 2013-12-26 2013-12-26 J-type horizontal assistant branched hole surface advance grouting paste-making method Active CN103821538B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310727968.XA CN103821538B (en) 2013-12-26 2013-12-26 J-type horizontal assistant branched hole surface advance grouting paste-making method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310727968.XA CN103821538B (en) 2013-12-26 2013-12-26 J-type horizontal assistant branched hole surface advance grouting paste-making method

Publications (2)

Publication Number Publication Date
CN103821538A CN103821538A (en) 2014-05-28
CN103821538B true CN103821538B (en) 2016-09-07

Family

ID=50756800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310727968.XA Active CN103821538B (en) 2013-12-26 2013-12-26 J-type horizontal assistant branched hole surface advance grouting paste-making method

Country Status (1)

Country Link
CN (1) CN103821538B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179511A (en) * 2014-08-13 2014-12-03 淮南矿业(集团)有限责任公司 Novel hole arrangement grouting method for enabling ground pre-grouting reinforcing roadway to penetrate through surrounding rocks at fault fracture zone
CN105888549B (en) * 2015-06-26 2018-01-19 山东科技大学 A kind of boring BHA of km depth L-type pre grouting from the surface and bore process
CN106014419B (en) * 2016-07-11 2018-10-19 唐山开滦建设(集团)有限责任公司 Multiple-limb hole pre grouting from the surface water-blocking construction method
CN106703692A (en) * 2016-12-02 2017-05-24 淮北矿业股份有限公司 Method using surface orientation bedding drilling grouting to reinforce laminar limestone
CN106837382B (en) * 2016-12-20 2019-09-24 北京中煤矿山工程有限公司 A kind of subway tunnel country rock pre grouting from the surface reinforcement process
CN106948843B (en) * 2017-03-21 2018-11-23 山东省邱集煤矿 A kind of bilayer multiple-limb concordant bored grouting transformation dual limestone aquifer method of roof and floor
CN106869934B (en) * 2017-04-06 2018-08-31 安徽理工大学 A kind of slip casting recovery method suitable for inclined seam
CN108798717A (en) * 2018-07-09 2018-11-13 山东省煤田地质局第四勘探队 A kind of borehole design method that tunnel vault wall rock grouting under urban road is reinforced
CN109899089A (en) * 2019-03-07 2019-06-18 中煤科工集团西安研究院有限公司 Goaf grouting method based on pinniform horizontal branch directional drilling technique
CN110645002A (en) * 2019-09-29 2020-01-03 淮北工业建筑设计院有限责任公司 Support method for coal mine tunnel
CN110671148B (en) * 2019-11-12 2020-10-27 中煤能源研究院有限责任公司 One-hole multi-open ground grouting filling method above coal pillar

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101718173A (en) * 2009-12-25 2010-06-02 刘文西 Petroleum multilateral well solid expandable tubular (SET) bifurcation structure and construction method
CN101929340A (en) * 2009-12-31 2010-12-29 平煤建工集团有限公司 Coal mine underground flat inclined tunnel pipe shed pre-grouting advance support construction process
CN102704933A (en) * 2012-05-25 2012-10-03 中国矿业大学 Isolated-section grouting filling coal-mining method for mining overburden rock
CN102808636A (en) * 2012-08-09 2012-12-05 大同煤矿集团有限责任公司 Supporting method of large-section tunnel in water-rich complicated geological mass
CN102877858A (en) * 2012-09-26 2013-01-16 安徽理工大学 Reinforcing method for crushed top plate of coal face

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101718173A (en) * 2009-12-25 2010-06-02 刘文西 Petroleum multilateral well solid expandable tubular (SET) bifurcation structure and construction method
CN101929340A (en) * 2009-12-31 2010-12-29 平煤建工集团有限公司 Coal mine underground flat inclined tunnel pipe shed pre-grouting advance support construction process
CN102704933A (en) * 2012-05-25 2012-10-03 中国矿业大学 Isolated-section grouting filling coal-mining method for mining overburden rock
CN102808636A (en) * 2012-08-09 2012-12-05 大同煤矿集团有限责任公司 Supporting method of large-section tunnel in water-rich complicated geological mass
CN102877858A (en) * 2012-09-26 2013-01-16 安徽理工大学 Reinforcing method for crushed top plate of coal face

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
采煤工作面注浆加固断层技术及实践;周文韬 等;《黑龙江科技信息》;20111231;第38页至第39页 *

Also Published As

Publication number Publication date
CN103821538A (en) 2014-05-28

Similar Documents

Publication Publication Date Title
CN103821538B (en) J-type horizontal assistant branched hole surface advance grouting paste-making method
CN110242301B (en) Two-step grouting modification water-retention coal mining method for roof aquifer
CN101575983B (en) Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof.
CN102493822B (en) Method for performing curtain grouting construction on tunnel by water rich fault influence zone
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN102877858B (en) Reinforcing method for crushed top plate of coal face
CN103306713B (en) A kind of high prominent coal seam layer-through drilling networking reinforcement means
CN111594258A (en) Technical method for quickly extracting gas to reach standard by using broken soft low-permeability outburst coal seam instead of roadway through holes
CN104863629A (en) Method for extracting gas from separation layer below overlying strata, draining water and grouting through combined drill hole
CN102926770A (en) Underground draining and grouting process in thin bedrock and thick loose sand layer rich water areas
CN105240047A (en) Filling reinforcement method for managing underground mined area of open-pit mine
CN103924975A (en) Water retaining method for coal mining process
CN102877857B (en) Deep hole pre-grouting top plate reinforcement method for large-mining height working face under special geological conditions
CN103835729A (en) Ground pre-grouting strengthening technology for deep long-distance roadway surrounding rock
CN108868776B (en) The high pressure-bearing broken rock of deep-well induces pre-pouring grout reinforcement means in advance
CN105804786B (en) A kind of weak seam bottom plate layer-through drilling pressure rushes anti-reflection method
CN108397227A (en) A kind of progressive extinction roadway layout method of tendency
CN106837382B (en) A kind of subway tunnel country rock pre grouting from the surface reinforcement process
CN102777185A (en) Inclined well shaft construction technology
CN102966359A (en) Working face ventilation oxidization zone roof control method
CN104763466A (en) Method for detecting active diffusion radius of covered rock separation grouting filling slurry
CN108915690B (en) Novel method for preventing water gushing of vertical shaft well wall in vertical shaft aquifer tunneling
CN105804754A (en) Coal uncovering method for mining shaft with coal seam as main water-bearing layer
CN109681269A (en) Soft rocks are lauched-and husky mixing is prominent gushes Prevention Technique method
CN107217987A (en) Colliery flood administers well boring method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Tang Yongzhi

Inventor after: Li Shihui

Inventor after: Cai Haibing

Inventor after: Song Haiqing

Inventor after: Wang Xiaojian

Inventor after: Zheng Tenglong

Inventor after: Cheng Hua

Inventor after: Cao Haishan

Inventor after: Rong Chuanxin

Inventor after: Zhang Dunxi

Inventor after: Li Mingjing

Inventor after: Qian Tongao

Inventor after: Yao Zhishu

Inventor after: Tang Bin

Inventor before: Rong Chuanxin

Inventor before: Cheng Hua

Inventor before: Tang Yongzhi

Inventor before: Yao Zhishu

Inventor before: Cai Haibing

Inventor before: Song Haiqing

Inventor before: Wang Xiaojian

Inventor before: Zheng Tenglong

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180227

Address after: 232001 Anhui Province, Huainan city tianjia'an district Mountain Road No. 1

Co-patentee after: Anhui University Of Science And Technology

Patentee after: Huainan Mining (Group) Co., Ltd.

Address before: 232001 Anhui Province, Huainan city Shungeng Road No. 168

Patentee before: Anhui University Of Science And Technology