CN103806657B - 一种框架结构建筑物的类砖混结构施工方法 - Google Patents
一种框架结构建筑物的类砖混结构施工方法 Download PDFInfo
- Publication number
- CN103806657B CN103806657B CN201210441997.5A CN201210441997A CN103806657B CN 103806657 B CN103806657 B CN 103806657B CN 201210441997 A CN201210441997 A CN 201210441997A CN 103806657 B CN103806657 B CN 103806657B
- Authority
- CN
- China
- Prior art keywords
- construction
- frame
- scaffold
- wall
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明涉及一种框架结构建筑的施工方法。一种框架结构建筑物的类砖混结构施工方法,它包括:步骤一,设计框架柱和填充墙共用的脚手架支撑体系;步骤二,搭设脚手架、砌筑填充墙,确保砌筑与脚手架体系搭设同时完成;步骤三,绑扎框架柱构造钢筋,安装结构层梁、板构造模板,再绑扎梁、板构造钢筋、安装预埋件;步骤四,安装框架柱模板体系;步骤五,验收后,浇筑混凝土,梁、板结构混凝土按要求养生;步骤六,按步骤二-五施工其上一层框架结构;步骤七,在步骤五填充墙体充分干燥后,即可开始抹灰装饰施工;步骤八,按步骤六、七循环作业,直至完成全部结构层的施工。本发明从优化工序衔接关系的思路出发,有效地压缩了整体工程的施工周期。
Description
技术领域
本发明涉及建筑物的施工方法,尤其涉及一种框架结构建筑的施工方法。
背景技术
框架结构建筑物常用的施工方法是先施工框架结构,然后再砌筑填充墙。这种方法通常会占用较多的施工时间,对于抢工期的项目而言,无法压缩其关键线路上的作业时间,也就无法有效加快施工进度。有些建筑单位为了抢工期,随意改变施工顺序,这就导致施工中的承重体系情况发生改变,偏离预定计划,会为建筑物带来安全隐患。
发明内容
本发明旨在解决上述缺陷,提供一种框架结构建筑物的类砖混结构施工方法。本发明从优化工序衔接关系的思路出发,有效地压缩了整体工程的施工周期。
为解决上述问题,本发明是这样实现的:一种框架结构建筑物的类砖混结构施工方法,它包括下列步骤:
步骤一,设计脚手架支撑体系:根据框架-填充墙的空间组成关系,核算框架结构与填充墙同时施工的空间布置,设计出合二为一的脚手架支撑体系;该合二为一的脚手架支撑体系包括逐层搭建的外墙脚手架、内墙脚手架和水平连接杆,所述水平连接杆将外墙脚手架和内墙脚手架逐层对应连接。
步骤二,搭设脚手架、砌筑填充墙;首层建筑物基础或地下室施工完成后,按设计方案开始搭设框架结构施工用承重支撑体系,与此同时,按设计位置开始砌筑填充墙,按设计要求放置框架柱处拉结筋、施工构造柱和圈梁,砌筑到梁底时留置梁底模支撑架的空间,调整施工力量和节奏,确保砌筑与脚手架体系搭设同时完成;
步骤三,绑扎框架柱构造钢筋,安装结构层梁、板构造模板,再绑扎梁、板构造钢筋、安装预埋件;
步骤四,安装框架柱模板体系,使框架柱周边填充墙与其模板共同构成完整的模板体系;
步骤五,经隐蔽检查验收后,浇筑混凝土。梁、板结构混凝土按规范要求养生;
步骤六,按步骤二-五施工其上一层框架结构;
步骤七,在步骤五的梁、板混凝土养生期间,填充墙体充分干燥后,即可开始抹灰装饰施工;
步骤八,按步骤六、七循环作业,直至完成全部结构层的施工。
所述的一种框架结构建筑物的类砖混结构施工方法,所述步骤二中,所述填充墙砌筑到到梁底时留置梁底模支撑架的空间,待梁模板拆除后再封闭,期间作为室内外通风孔使用。
本发明在框架施工的同时,开始砌筑填充墙,使施工框架结构的受力支撑体系与施工填充墙的脚手架合二为一,充分利用了两个体系的统一,并将传统施工工序的组织由串行做法改为并行做法,就可以在结构层梁、板混凝土强度达到可拆模强度时,即可拆除模板和部分支撑体系,仅保留可用作装饰施工的脚手架,即可开始房间的装饰施工。本发明从优化工序衔接关系的思路出发,将填充墙与框架结构同步施工,共享支撑体系,充分利用了框架结构养生达到一定强度后再拆除其支撑体系的技术间隙时间,在框架-填充墙结构体系完成后,只需待填充墙结构具备抹灰条件即可开始装饰施工,有效地压缩了整体工程的施工周期。
附图说明
下面结合附图对本发明作进一步的说明:
图1为所述二合一脚手架的示意图;
图2-图5为所述框架柱浇筑模板体系示意图。
具体实施方式
请参见图1,本发明一种框架结构建筑物的类砖混结构施工方法,它包括下列步骤:
步骤一,设计脚手架支撑体系:根据框架-填充墙的空间组成关系,核算框架结构与填充墙同时施工的空间布置,设计出合二为一的脚手架支撑体系:它包括逐层搭建的外墙脚手架2、内墙脚手架1和水平连接杆3,所述水平连接杆将外墙脚手架和内墙脚手架逐层对应连接。
步骤二,搭设脚手架、砌筑填充墙;首层建筑物基础或地下室施工完成后,按设计方案开始搭设框架结构施工用承重支撑体系,与此同时,按设计位置开始砌筑填充墙,按设计要求放置框架柱处拉结筋、施工构造柱和圈梁,砌筑到梁底时留置梁底模支撑架的空间,此空间需待梁模板拆除后再封闭,该位置也可以作为室内外通风孔使用,以加快墙体干燥速度,调整施工力量和节奏,确保砌筑与脚手架体系搭设同时完成;
步骤三,绑扎框架柱构造钢筋,安装结构层梁、板构造模板,再绑扎梁、板构造钢筋、安装预埋件;
步骤四,安装框架柱模板体系,使框架柱周边填充墙与其模板共同构成完整的模板体系;图2为填充墙和框架柱同宽时的模板体系,图3填充墙和框架柱同宽时的中间柱模板体系,图4为填充墙宽度较框架柱宽度小时的模板体系,图5为填充墙宽度较框架柱宽度小时中间柱模板体系。
各图中,8为填充墙、9为框架柱。
步骤五,经隐蔽检查验收后,浇筑混凝土:梁、板结构混凝土按规范要求养生;
步骤六,按步骤二-五施工其上一层框架结构;
步骤七,在步骤五的梁、板混凝土养生期间,填充墙体充分干燥后,即可开始抹灰装饰施工;
步骤八,按步骤六、七循环作业,直至完成全部结构层的施工。
所述的一种框架结构建筑物的类砖混结构施工方法,所述步骤一的二合一脚手架是一种区别于常规方法的脚手架搭设组织方式,常规施工中先搭设结构支撑体系的脚手架,施工结构层钢筋混凝土结构,等其达到拆模强度后,全部拆除结构支撑体系的脚手架,然后再按砌砖装饰的需要重新搭设装饰用脚手架。两者在时间上先后衔接,不存在两者同时存在的空间衔接关系。本发明旨在将这两种不同功能、不同时期使用的脚手架进行整合,使其满足钢筋混凝土结构施工和砌砖装饰两种功能需求,同时免除了两次搭拆脚手架的麻烦。
所述的一种框架结构建筑物的类砖混结构施工方法,所述步骤二中,所述填充墙砌筑到梁底时留置梁底模支撑架的空间,待梁模板拆除后再封闭,期间作为室内外通风孔使用。
Claims (2)
1.一种框架结构建筑物的类砖混结构施工方法,其特征在于,它包括下列步骤:
步骤一,设计脚手架支撑体系:根据框架-填充墙的空间组成关系,核算框架结构与填充墙同时施工的空间布置,设计出将施工框架结构的受力支撑体系与施工填充墙的脚手架体系合二为一的脚手架支撑体系;它包括逐层搭建的外墙脚手架、内墙脚手架和水平连接杆,所述水平连接杆将外墙脚手架和内墙脚手架逐层对应连接;
步骤二,搭设脚手架、砌筑填充墙;首层建筑物基础或地下室施工完成后,按设计方案开始搭设框架结构施工用承重支撑体系,与此同时,按设计位置开始砌筑填充墙,按设计要求放置框架柱处拉结筋、施工构造柱和圈梁,砌筑到梁底时留置梁底模支撑架的空间,调整施工力量和节奏,确保砌筑与脚手架支承体系搭设同时完成;
步骤三,绑扎框架柱构造钢筋,安装结构层梁、板构造模板,再绑扎梁、板构造钢筋、安装预埋件;
步骤四,安装框架柱模板体系,使框架柱周边填充墙与其模板共同构成完整的模板体系;
步骤五,经隐蔽检查验收后,浇筑混凝土;梁、板结构混凝土按规范要求养生;
步骤六,按步骤二-五施工其上一层框架结构;
步骤七,在步骤五的梁、板混凝土养生期间,填充墙体充分干燥后,即可开始抹灰装饰施工;
步骤八,按步骤六、七循环作业,直至完成全部结构层的施工。
2.根据权利要求1所述的一种框架结构建筑物的类砖混结构施工方法,其特征在于,所述步骤二中,所述填充墙砌筑到梁底时留置梁底模支撑架的空间,待梁模板拆除后再封闭,期间作为室内外通风孔使用。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210441997.5A CN103806657B (zh) | 2012-11-08 | 2012-11-08 | 一种框架结构建筑物的类砖混结构施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210441997.5A CN103806657B (zh) | 2012-11-08 | 2012-11-08 | 一种框架结构建筑物的类砖混结构施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103806657A CN103806657A (zh) | 2014-05-21 |
CN103806657B true CN103806657B (zh) | 2016-02-03 |
Family
ID=50704001
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210441997.5A Active CN103806657B (zh) | 2012-11-08 | 2012-11-08 | 一种框架结构建筑物的类砖混结构施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103806657B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104963509B (zh) * | 2015-07-17 | 2017-12-12 | 扬州大学 | 砖砌模壳抗震构造柱与圈梁一体化建造方法 |
CN108149921A (zh) * | 2016-06-08 | 2018-06-12 | 叶香雄 | 地下室等高梁施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB424266A (en) * | 1933-08-15 | 1935-02-15 | Reinforced Concrete Buildings | A new or improved method of constructing buildings and structures and pre-cast concrete building blocks for use therewith |
CN101139849A (zh) * | 2006-09-07 | 2008-03-12 | 张兴汉 | 一种组装式建筑物构件及现场吊装的建筑方法 |
EP2233656A1 (de) * | 2009-03-13 | 2010-09-29 | Holasel GmbH | Wandelelement und Verfahren sowie Vorrichtung zu dessen Herstellung |
CN102433929A (zh) * | 2010-09-29 | 2012-05-02 | 史世英 | 一种建造房屋的新方法 |
-
2012
- 2012-11-08 CN CN201210441997.5A patent/CN103806657B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB424266A (en) * | 1933-08-15 | 1935-02-15 | Reinforced Concrete Buildings | A new or improved method of constructing buildings and structures and pre-cast concrete building blocks for use therewith |
CN101139849A (zh) * | 2006-09-07 | 2008-03-12 | 张兴汉 | 一种组装式建筑物构件及现场吊装的建筑方法 |
EP2233656A1 (de) * | 2009-03-13 | 2010-09-29 | Holasel GmbH | Wandelelement und Verfahren sowie Vorrichtung zu dessen Herstellung |
CN102433929A (zh) * | 2010-09-29 | 2012-05-02 | 史世英 | 一种建造房屋的新方法 |
Non-Patent Citations (2)
Title |
---|
框架结构填充墙与柱梁建造顺序;姚秉臣,姚远;《建筑工人》;20120831(第8期);第293页 * |
框架结构填充墙施工顺序;杜萌等;《科技信息》;20101231(第15期);第30-31页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103806657A (zh) | 2014-05-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101538897B (zh) | 钢筋混凝土建筑物的主体工程施工方法 | |
CN104100122B (zh) | 大型筒仓圆锥形仓顶结构的施工方法 | |
CN103741846A (zh) | 一种砼剪力墙的施工方法 | |
CN109083272A (zh) | 一种装配式建筑框架结构及其施工方法 | |
CN104652815A (zh) | 一种厨卫间止水反梁浇筑的施工方法 | |
CN105133755A (zh) | 一种钢筋焊接网架复合剪力墙的施工方法及剪力墙结构 | |
CN102433958A (zh) | 一种预制墙板施工构件 | |
CN108797790A (zh) | 一种插接式装配工房及建筑方法 | |
CN103806657B (zh) | 一种框架结构建筑物的类砖混结构施工方法 | |
CN201627587U (zh) | 固接于全断面液压台车上的悬挑操作平台 | |
CN105201204B (zh) | 一种防止浇筑钢筋混凝土柱柱脚时烂根的方法及结构 | |
CN103485574A (zh) | 一种造粒塔塔顶钢筋混凝土结构施工方法 | |
CN103097621A (zh) | 建筑用紧凑型模块的制作方法 | |
CN201546323U (zh) | 角钢混凝土柱钢箱组合梁框架 | |
CN103061509A (zh) | 以后浇带劲性钢管支撑体系实现后浇带浇筑的施工工艺 | |
CN204715764U (zh) | 一种构造柱与主体结构同时施工的结构 | |
CN110869568A (zh) | 通用和专用工业化建筑系统中用于建筑通风的钢筋混凝土墙模块的改进 | |
CN101624841A (zh) | 一次性浇注钢筋混凝土房屋的建造方法 | |
CN209025199U (zh) | 一种装配式建筑框架结构 | |
CN108979205A (zh) | 超高层住宅结构错层流水施工方法 | |
CN203891229U (zh) | 带饰面内外墙一体侧拉保温模板 | |
CN202831587U (zh) | 一体式脚手架 | |
CN202559727U (zh) | 建筑物的高空大跨度楼板的模板的承重支撑结构 | |
WO2016081989A1 (en) | Method of constructing a concrete wall in a multi-storey building | |
CN104727617B (zh) | 连体筒仓库顶板降模法施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |