CN103790564A - Hot-dry rock fracturing high-pressure extraction laboratory simulation device - Google Patents

Hot-dry rock fracturing high-pressure extraction laboratory simulation device Download PDF

Info

Publication number
CN103790564A
CN103790564A CN201410012026.8A CN201410012026A CN103790564A CN 103790564 A CN103790564 A CN 103790564A CN 201410012026 A CN201410012026 A CN 201410012026A CN 103790564 A CN103790564 A CN 103790564A
Authority
CN
China
Prior art keywords
pressure
fracturing
proppant
hydraulic
dimensional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410012026.8A
Other languages
Chinese (zh)
Other versions
CN103790564B (en
Inventor
钱卫
张延军
李正伟
郭亮亮
胡忠君
于子望
高平
张庆
许天福
唐生荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Huaxing Petroleum Instrument Co Ltd
Jilin University
Original Assignee
Nantong Huaxing Petroleum Instrument Co Ltd
Jilin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Huaxing Petroleum Instrument Co Ltd, Jilin University filed Critical Nantong Huaxing Petroleum Instrument Co Ltd
Priority to CN201410012026.8A priority Critical patent/CN103790564B/en
Publication of CN103790564A publication Critical patent/CN103790564A/en
Application granted granted Critical
Publication of CN103790564B publication Critical patent/CN103790564B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention provides a hot-dry rock fracturing high-pressure extraction laboratory simulation device. The device comprises a fracturing fluid injection system, a proppant injection system, a high-pressure gas boosting injection system, a fracturing body, an annular pressure applying system and a high-pressure pipe valve. The proppant injection system comprises indirect proppant injection and curing. The high-pressure gas boosting injection system comprises gas boosting and indirect gas injection. The fracturing body comprises a sample fracturing chamber and a sample annular-pressure chamber. The fracturing chamber comprises a three-dimensional fixing support and a three-dimensional hydraulic system. The three-dimensional hydraulic system comprises a hydraulic sliding cavity and a hydraulic moving plug. The sample annular-pressure chamber comprises an annular-pressure chamber steel plate and an inner gum sleeve, a cavity is formed between the gum sleeve and the steel plate, and fluid is injected to realize pressure coating effect. Fracturing fluid injection and annular pressure application are both realized by connection of a high-pressure pipeline with a high-pressure control component. A split module combination structure is adopted, original samples of fracturing samples are ensured to be unchanged, proppant injection is performed accurately, high-pressure gas is injected for displacement and reproduction, and recovery ratio is increased. The device has the advantages of novel structure and safety and durability.

Description

A kind of hot dry rock pressure break high pressure is carried and is adopted laboratory simulation device
Technical field
The present invention relates to a kind of hot dry rock pressure break high pressure and carry and adopt laboratory simulation device, particularly and heat exchange displacement displacement simulation test device post-fracturing about hot dry rock original position, is specifically related to a kind of hot dry rock pressure break high pressure and improves recovery ratio laboratory simulation device.
Background technology
At present, the exploitation dynamics of hot dry rock resource of occupying larger proportion is less, in the face of current energy growing tension, especially in the situation of resource critical shortage, when exploiting huge heat resource, improve the recovery ratio of heat resource, the comprehensive utilization ratio that improves heat resource is even more important.
Hot dry rock resource proved reserves are equivalent to 30 times of left and right of oil, natural gas and coal ability.Therefore, need a kind of pressure break quarrying apparatus can be to reservoir pressure break failure mechanism, prolong raw rule and carry out the motionless research of original position, react more accurately actual conditions, to promote the deep understanding to above problem, to this technology is applied widely.
At present, the equipment of domestic fracturing aspect is more for coal bed fracturing aspect, formation rock pressure break is recovered the oil also to be had, being used for fracturing, fracture system studies, research means is also plotted to coating, fluorescence etc. from range estimation, but biases toward post-fracturing testing research, does not carry out post-fracturing note and adopts and carry and adopt research, heat energy coefficient of mining is not further studied, to reach objective evaluation production efficiency.
Summary of the invention
Goal of the invention: for addressing the above problem, the invention provides a kind of hot dry rock pressure break high pressure and carry and adopt laboratory simulation device.
Technical scheme: for achieving the above object, the present invention adopts following technical scheme:
A kind of hot dry rock pressure break high pressure is carried and is adopted laboratory simulation device, comprises fracturing fluid injected system, proppant injected system, gases at high pressure supercharging injected system, pressure break main body, ring pressure application system, high-voltage tube valve member; Described proppant injected system comprises that proppant indirectly injects and solidifies; Described gases at high pressure supercharging injected system comprises that gas boosting and gas inject indirectly; Described pressure break main body comprises sample pressure break storehouse and sample loop pressure chamber; Described pressure break storehouse comprises three-dimensional fixed support and three-dimensional hydraulic system; Described three-dimensional hydraulic system comprises hydraulic pressure sliding cavity and hydraulic pressure motion stops; Described sample loop presses chamber to comprise ring pressure chamber steel plate and colloid inner sleeve, between gum cover and steel plate, has cavity, and filling liquid is realized pressure package action; Described fracturing fluid injects to press to apply all with ring and is connected to realize with high voltage control assembly by high pressure line.
As preferably, pressure break storehouse adopts three-dimensional fixed support and three-dimensional hydraulic movable supporting.
As preferably, hydraulic piston adopts high-quality PTFE.
As preferably, the foundation that ring is pressed is by be connected with the gum cover cavity of generation of external steel plate.
As preferably, the foundation that ring is pressed is by be connected with the gum cover cavity of generation of external steel plate, by cavity exerted pressure to realize the parcel to model ontology periphery.
As preferably, the operation that fracturing fluid, heat exchange displacement liquid, high pressure injection are adopted liquid, proppant liquid, confined pressure is all connected with pipeline by high pressure valve, and by their common operation, coordinate to open and close, realize pressure break, supercharging injection, high temperature and high pressure environment simulation and be connected with the pressure that is associated, temperature, measuring instrument.
Beneficial effect: when heat note is adopted, gather by the maximum amount of existing techniques in realizing heat energy, and thoroughly multiply function by the brill of gases at high pressure, improve greatly thermal recovery yield, under equal mining conditions, reduce cost of winning.
Accompanying drawing explanation
Fig. 1 is that hot dry rock pressure break high pressure of the present invention is carried and adopted laboratory simulation device flow chart.
The specific embodiment
Embodiment:
A kind of hot dry rock pressure break high pressure is as described in Figure 1 carried and is adopted laboratory simulation device, comprises fracturing fluid injected system, proppant injected system, gases at high pressure supercharging injected system, pressure break main body, ring pressure application system, high-voltage tube valve member; Described proppant injected system comprises that proppant indirectly injects and solidifies; Described gases at high pressure supercharging injected system comprises that gas boosting and gas inject indirectly; Described pressure break main body comprises sample pressure break storehouse and sample loop pressure chamber; Described pressure break storehouse comprises three-dimensional fixed support and three-dimensional hydraulic system; Described three-dimensional hydraulic system comprises hydraulic pressure sliding cavity and hydraulic pressure motion stops; Described sample loop presses chamber to comprise ring pressure chamber steel plate and colloid inner sleeve, between gum cover and steel plate, has cavity, and filling liquid is realized pressure package action; Described fracturing fluid injects to press to apply all with ring and is connected to realize with high voltage control assembly by high pressure line.
As shown in Figure 1,1, high pressure fracture pump 2, fracturing fluid container 3, proppant inject that container 4, gas boosting container 5, gas boosting container 6, gas boosting pump 7, model process data measure 8, hydraulic controller 9, Hydrauservo System 10, model main body 11, ring press application system 12, system pressure control and gather 13, blender.
Hot dry rock pressure break high pressure of the present invention is carried and is adopted laboratory simulation device, comprises the pressure break dynamical system being made up of fracturing pump and exchange system, and fracturing fluid 2, via valve, injects sample by hydraulic pressure through hole beyond the Great Wall.Before this, must be by 8 adjustment 9 applying on sample three-dimensional.Frac pressure obtains by sensor.After pressure break, it is constant that maintenance applies power, overall peripheral encircled to die block and apply, and press by ring press pump 5 injection rings, and ring pressure pressure is 1.1-1.2 times of heat exchange pressure.Meanwhile, by 12 control recovery systems, system is carried out to pressure stability control, after controlled pressure is set, carry out heat exchange and carry and adopt experiment.Heat exchange pilot production fluid (or proppant) injects sample by 3 via pipeline, heater heat exchanging pilot production fluid (or proppant) through model main body 10 carries out High Temperature Simulation (aging action), gases at high pressure are via 4,5, by 6 pressurization, form high pressure, enter sample main body 10 via 13 blenders and carry out fully displacement procreation, form high temperature and high pressure environment, re-inject exploitation liquid by container 2, carry out the quick heat exchange of large flow, realize the heat exploitation to sample and improve thermal recovery yield.
In above-mentioned analog system device, the model three-phase application of force can regulate as required, and carries out selecting of pad according to application of force active face displacement.
While using analog system device of the present invention to carry out heat exchange displacement experiment, after experiment finishes, need slow release pressure, reduce after temperature, can dismantle experiment package.
After experiment, model ontology inner side, valve, container etc. are cleaned, cleaning fluid, by pipeline valve, emptying, repeats 2-3 cleaning, enters next experiment.
The above is only the preferred embodiment of the present invention; be noted that for those skilled in the art; under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (6)

1. hot dry rock pressure break high pressure is carried and is adopted a laboratory simulation device, it is characterized in that: comprise fracturing fluid injected system, proppant injected system, gases at high pressure supercharging injected system, pressure break main body, ring pressure application system, high-voltage tube valve member; Described proppant injected system comprises that proppant indirectly injects and solidifies; Described gases at high pressure supercharging injected system comprises that gas boosting and gas inject indirectly; Described pressure break main body comprises sample pressure break storehouse and sample loop pressure chamber; Described pressure break storehouse comprises three-dimensional fixed support and three-dimensional hydraulic system; Described three-dimensional hydraulic system comprises hydraulic pressure sliding cavity and hydraulic pressure motion stops; Described sample loop presses chamber to comprise ring pressure chamber steel plate and colloid inner sleeve, between gum cover and steel plate, has cavity, and filling liquid is realized pressure package action; Described fracturing fluid injects to press to apply all with ring and is connected to realize with high voltage control assembly by high pressure line.
2. according to the analogue experiment installation described in claims 1, it is characterized in that: pressure break storehouse adopts three-dimensional fixed support and three-dimensional hydraulic movable supporting.
3. according to analogue experiment installation described in claims 1-2, it is characterized in that: hydraulic pressure motion stops 2 is steadily operation by the effect of righting 1, the material of righting 1 is stainless steel lining tetrafluoro.
4. according to arbitrary described analogue experiment installation in claims 1-3, it is characterized in that: ring press foundation by external steel plate be connected with gum cover generation cavity.
5. according to arbitrary described analogue experiment installation in claims 1-4, it is characterized in that: the foundation that ring is pressed is by be connected with the gum cover cavity of generation of external steel plate, by cavity exerted pressure to realize the parcel to model ontology periphery.
6. according to arbitrary described analogue experiment installation in claims 1-5, it is characterized in that: the operation of fracturing fluid, proppant liquid, gases at high pressure, confined pressure is all connected with pipeline by high pressure valve, and by their common operation, coordinate to open and close, realize pressure break, original position heat exchange, and be connected with the manometer that is associated.
CN201410012026.8A 2014-01-11 2014-01-11 Hot-dry rock fracturing high-pressure recovery-ratio-increasing laboratory simulation device Expired - Fee Related CN103790564B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410012026.8A CN103790564B (en) 2014-01-11 2014-01-11 Hot-dry rock fracturing high-pressure recovery-ratio-increasing laboratory simulation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410012026.8A CN103790564B (en) 2014-01-11 2014-01-11 Hot-dry rock fracturing high-pressure recovery-ratio-increasing laboratory simulation device

Publications (2)

Publication Number Publication Date
CN103790564A true CN103790564A (en) 2014-05-14
CN103790564B CN103790564B (en) 2017-04-12

Family

ID=50666576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410012026.8A Expired - Fee Related CN103790564B (en) 2014-01-11 2014-01-11 Hot-dry rock fracturing high-pressure recovery-ratio-increasing laboratory simulation device

Country Status (1)

Country Link
CN (1) CN103790564B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105823795A (en) * 2016-06-07 2016-08-03 吉林大学 Large-size flow guide pool hot dry rock fracture heat exchange device
CN107014974A (en) * 2016-11-28 2017-08-04 中国石油大学(华东) The method that enhanced geothermal system reservoir heat energy recovery rate is tested for the analogue experiment installation of enhanced geothermal system and using it
CN107893652A (en) * 2017-09-30 2018-04-10 中国石油大学(华东) The hydraulic fracturing analogue experiment installation and method of the enhanced geothermal system of hot dry rock
CN107905778A (en) * 2017-10-19 2018-04-13 中国石油大学(华东) Supercritical CO2The enhanced geothermal system experimental provision of fluid fracturing and method
CN110656918A (en) * 2019-10-23 2020-01-07 中国石油集团川庆钻探工程有限公司 Multi-scale crack two-phase flow simulation evaluation method
CN111173485A (en) * 2018-11-12 2020-05-19 中国石油化工股份有限公司 Method for increasing hot dry rock heat storage transformation volume
CN112213253A (en) * 2020-09-17 2021-01-12 中国石油天然气股份有限公司 High-temperature high-pressure multilayer single-particle aging device and method for polymerization proppant

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100032156A1 (en) * 2008-08-08 2010-02-11 Alta Rock Energy, Inc. Method for testing an engineered geothermal system using one stimulated well
CN101864948A (en) * 2010-06-04 2010-10-20 海安县石油科研仪器有限公司 Fracturing acidification working solution dynamic filtration loss instrument
CN103266888A (en) * 2013-05-21 2013-08-28 中国石油大学(华东) System and method for visualization fracturing simulation experiment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100032156A1 (en) * 2008-08-08 2010-02-11 Alta Rock Energy, Inc. Method for testing an engineered geothermal system using one stimulated well
CN101864948A (en) * 2010-06-04 2010-10-20 海安县石油科研仪器有限公司 Fracturing acidification working solution dynamic filtration loss instrument
CN103266888A (en) * 2013-05-21 2013-08-28 中国石油大学(华东) System and method for visualization fracturing simulation experiment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
宋阳等: "二氧化碳在干热岩中换热及固化的数值模拟", 《工程热物理学报》, vol. 34, no. 10, 31 October 2013 (2013-10-31) *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105823795A (en) * 2016-06-07 2016-08-03 吉林大学 Large-size flow guide pool hot dry rock fracture heat exchange device
CN107014974A (en) * 2016-11-28 2017-08-04 中国石油大学(华东) The method that enhanced geothermal system reservoir heat energy recovery rate is tested for the analogue experiment installation of enhanced geothermal system and using it
CN107014974B (en) * 2016-11-28 2019-05-21 中国石油大学(华东) Imitative experimental appliance for enhanced geothermal system and the method for testing enhanced geothermal system reservoir thermal energy recovery rate using it
CN107893652A (en) * 2017-09-30 2018-04-10 中国石油大学(华东) The hydraulic fracturing analogue experiment installation and method of the enhanced geothermal system of hot dry rock
CN107905778A (en) * 2017-10-19 2018-04-13 中国石油大学(华东) Supercritical CO2The enhanced geothermal system experimental provision of fluid fracturing and method
CN111173485A (en) * 2018-11-12 2020-05-19 中国石油化工股份有限公司 Method for increasing hot dry rock heat storage transformation volume
CN111173485B (en) * 2018-11-12 2021-09-21 中国石油化工股份有限公司 Method for increasing hot dry rock heat storage transformation volume
CN110656918A (en) * 2019-10-23 2020-01-07 中国石油集团川庆钻探工程有限公司 Multi-scale crack two-phase flow simulation evaluation method
CN112213253A (en) * 2020-09-17 2021-01-12 中国石油天然气股份有限公司 High-temperature high-pressure multilayer single-particle aging device and method for polymerization proppant
CN112213253B (en) * 2020-09-17 2023-06-23 中国石油天然气股份有限公司 High-temperature high-pressure multilayer single-particle aging device and method for polymeric propping agent

Also Published As

Publication number Publication date
CN103790564B (en) 2017-04-12

Similar Documents

Publication Publication Date Title
CN103790564A (en) Hot-dry rock fracturing high-pressure extraction laboratory simulation device
CN103790580B (en) A kind of hot dry rock pressure break original position local heat transfer chamber analog system device
CN110487697B (en) Supercritical carbon dioxide injection coal rock mechanical property test and fracturing experiment device
CN101985875B (en) Hydraulic pulse-assisted reservoir chemical remedial treatment experiment device and method
CN103293087B (en) Test device of high pressure and high temperature pyrolytic reaction
CN103344537B (en) A kind of test method of High Temperature High Pressure pyrolytic reaction
CN203191260U (en) Rock single fracture chemical solution seepage test device
CN102031955B (en) Ultrasonic-assisted reservoir stratum chemical blockage removal experimental facility and experimental method
CN105510144A (en) Parallel-type rock temperature, seepage and stress coupling triaxial rheometer
CN104007013A (en) Test device for chemical solution seepage in rock single fracture at different temperatures
WO2019170044A1 (en) Pressure-control temperature-control hypergravity experimental device for simulating deep sea seabed responses
CN107462472B (en) Experimental simulation device and simulation method for temperature-pressure pulse composite fracturing coal body
CN2884196Y (en) High-temp. and high-pressure drilling fluid density testing device
CN102778554A (en) Experimental device for improving permeability of shale gas storage layer in supercritical CO2 fracturing process
CN107202736B (en) Multifunctional hydrate characteristic test experimental device
CN106482924B (en) Rock hydrocarbon generation flow simulation device
CN102979510B (en) Coal seam water injection displacement gas effect simulated experiment system
CN202451142U (en) Subsurface environment simulator
CN112414882A (en) High-temperature crystalline rock cold impact cracking experiment system and method
CN111894550B (en) Simulation test system and method for fracturing of upward drilling hole low-temperature fluid
CN204855316U (en) Triaxial seepage stress temperature creep coupling experimental apparatus based on digital image
CN202421099U (en) Measuring device for steam distillation rate of thickened oil in porous media
CN207816756U (en) A kind of experimental provision of high temperature and high pressure steam pyrolytic reaction
CN106483268B (en) Oil shale hot pressing converted in-situ experimental rig
CN204113183U (en) A kind of sealing device of high temperature resistant compression test under super high pit shaft

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: NANTONG HUAXING PETROLEUM INSTRUMENT CO., LTD.

Free format text: FORMER OWNER: JILIN UNIVERSITY

Effective date: 20140716

Owner name: JILIN UNIVERSITY

Free format text: FORMER OWNER: NANTONG HUAXING PETROLEUM INSTRUMENT CO., LTD.

Effective date: 20140716

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 226000 NANTONG, JIANGSU PROVINCE TO: 130012 CHANGCHUN, JILIN PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20140716

Address after: 130012 Changchun Qianjin Street, Jilin, No. 2699

Applicant after: Jilin University

Applicant after: Nantong Huaxing Petroleum Instrument Co., Ltd.

Address before: 226000, No. 18, new road, Haian Development Zone, Haian County, Nantong, Jiangsu

Applicant before: Nantong Huaxing Petroleum Instrument Co., Ltd.

Applicant before: Jilin University

C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Yanjun

Inventor after: Li Zhengwei

Inventor after: Guo Liangliang

Inventor after: Hu Zhongjun

Inventor after: Yu Ziwang

Inventor after: Gao Ping

Inventor after: Zhang Qing

Inventor after: Xu Tianfu

Inventor after: Tang Shengrong

Inventor before: Qian Wei

Inventor before: Tang Shengrong

Inventor before: Zhang Yanjun

Inventor before: Li Zhengwei

Inventor before: Guo Liangliang

Inventor before: Hu Zhongjun

Inventor before: Yu Ziwang

Inventor before: Gao Ping

Inventor before: Zhang Qing

Inventor before: Xu Tianfu

CB03 Change of inventor or designer information

Inventor after: Zhang Yanjun

Inventor after: Tang Shengrong

Inventor after: Li Jianming

Inventor after: Li Zhengwei

Inventor after: Guo Liangliang

Inventor after: Hu Zhongjun

Inventor after: Yu Ziwang

Inventor after: Gao Ping

Inventor after: Zhang Qing

Inventor after: Xu Tianfu

Inventor before: Zhang Yanjun

Inventor before: Li Zhengwei

Inventor before: Guo Liangliang

Inventor before: Hu Zhongjun

Inventor before: Yu Ziwang

Inventor before: Gao Ping

Inventor before: Zhang Qing

Inventor before: Xu Tianfu

Inventor before: Tang Shengrong

COR Change of bibliographic data
CB03 Change of inventor or designer information

Inventor after: Zhang Yanjun

Inventor after: Tang Shengrong

Inventor after: Zhang Jianing

Inventor after: Li Zhengwei

Inventor after: Guo Liangliang

Inventor after: Hu Zhongjun

Inventor after: Yu Ziwang

Inventor after: Gao Ping

Inventor after: Zhang Qing

Inventor after: Xu Tianfu

Inventor before: Zhang Yanjun

Inventor before: Tang Shengrong

Inventor before: Li Jianming

Inventor before: Li Zhengwei

Inventor before: Guo Liangliang

Inventor before: Hu Zhongjun

Inventor before: Yu Ziwang

Inventor before: Gao Ping

Inventor before: Zhang Qing

Inventor before: Xu Tianfu

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170412

Termination date: 20190111