CN103790184B - A kind of construction elevator strengthening of foundation device and method - Google Patents

A kind of construction elevator strengthening of foundation device and method Download PDF

Info

Publication number
CN103790184B
CN103790184B CN201410055430.3A CN201410055430A CN103790184B CN 103790184 B CN103790184 B CN 103790184B CN 201410055430 A CN201410055430 A CN 201410055430A CN 103790184 B CN103790184 B CN 103790184B
Authority
CN
China
Prior art keywords
support
steel tubing
construction
adjustable
structure roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410055430.3A
Other languages
Chinese (zh)
Other versions
CN103790184A (en
Inventor
陈俊杰
曹海良
李艳伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201410055430.3A priority Critical patent/CN103790184B/en
Publication of CN103790184A publication Critical patent/CN103790184A/en
Application granted granted Critical
Publication of CN103790184B publication Critical patent/CN103790184B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of construction elevator strengthening of foundation device and method, described reinforcement means comprises the following steps: installation elevator basis in structure roof; The installation site on corresponding described construction elevator basis is successively installed supporting construction from top to bottom below described structure roof, and between the lower end of described supporting construction and understructure, support with adjustable is installed; Regulate described support with adjustable to make the upper end of described supporting construction support the lower surface of described structure roof. Between structure roof below construction elevator basis and understructure, carry out roof reinforcement by installing supporting steel tubing string, and adopt the height of support with adjustable control supporting steel tubing string in the lower end of supporting steel tubing string, make the upper end of supporting steel tubing string hold out against top board, simplicity of design, easy to operate, not be used in and on floor, punch or reserved opening, also need not set up full hall scaffold, and can reuse, save a large amount of financial resources, material resources, the reduction of erection time.

Description

A kind of construction elevator strengthening of foundation device and method
Technical field
The present invention relates to engineering construction field, relate in particular to one and be applied to construction elevator foundation base and drop on structureConstruction elevator strengthening of foundation device and method on top board.
Background technology
Adopt original construction elevator basis mode, need on structural slab, punch or reserved opening, or adoptBelow elevator basis, set up the mode of full hall frame, structure roof is reinforced, construction inconvenience, and expendA large amount of financial resources, material resources, and bring inconvenience to structure construction.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of simplicity of design, easy to operate, not be used in floorOn punch or reserved opening, also need not set up full hall scaffold, and can reuse, save a large amount of financial resources,Material resources, the construction elevator strengthening of foundation device and method of reduction of erection time.
For realizing above-mentioned technique effect, the invention discloses a kind of construction elevator strengthening of foundation method, comprise withLower step:
Installation elevator basis in structure roof;
From top to bottom successively pacify below described structure roof the installation site on corresponding described construction elevator basisBe filled to few 2 layers of supporting construction, described supporting construction comprises many supporting steel tubing strings, described supporting steel tubing stringBe supported between described structure roof and understructure, and the supporting steel tubing string of every layer of described supporting constructionCenter up and down on a vertical line, and between the lower end of described supporting construction and understructure, install adjustableJoint bearing, described support with adjustable is located at the upper of the lower end of described supporting steel tubing string and described understructureBetween surface, described support with adjustable is provided with adjusting screw(rod), and the lower end of described supporting steel tubing string respectivelyBe provided with an adjustable plate, on described adjustable plate, offer the screwed hole mutually screwing togather with described adjusting screw(rod);
Regulate described support with adjustable to make the upper end of described supporting construction support the lower surface of described structure roof.
The invention also discloses a kind of construction elevator strengthening of foundation device, described construction elevator basis is positioned at structureOn top board, described bracing means comprises the supporting construction being supported between described structure roof and understructure,Between the lower end of described supporting construction and described understructure, be further provided with support with adjustable;
Described supporting construction comprises many supporting steel tubing strings, and the lower end of described supporting steel tubing string is respectively equipped withOne adjustable plate, offers screwed hole on described adjustable plate, corresponding described screw thread on described support with adjustableHole is provided with the adjusting screw(rod) screwing togather with it, by regulating described support with adjustable to make described supporting steel tubing stringUpper end support the lower surface of described structure roof;
Described structure roof below is at least provided with 2 layers of described bracing means, and every layer of described bracing meansThe center of supporting steel tubing string up and down on a vertical line.
Described construction elevator strengthening of foundation device further improves and is, between described supporting steel tubing string, is provided withHorizontal brace and diagonal brace.
The present invention has been owing to having adopted above technical scheme, makes it have following beneficial effect to be: at construction elevatorBetween the structure roof of below, basis and understructure, carry out roof reinforcement by installing supporting steel tubing string, andThe lower end of supporting steel tubing string adopts the height of support with adjustable control supporting steel tubing string, makes the upper of supporting steel tubing stringEnd holds out against top board, and simplicity of design is easy to operate, not be used in and on floor, punches or reserved opening, also need not takeIf full hall scaffold, and can reuse, a large amount of financial resources, material resources saved, the reduction of erection time.
Brief description of the drawings
Fig. 1 is the facade structures schematic diagram of construction elevator strengthening of foundation device of the present invention.
Fig. 2 is the plan structure schematic diagram of construction elevator strengthening of foundation device of the present invention.
Fig. 3 is the embodiment schematic diagram of construction elevator strengthening of foundation method of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing and detailed description of the invention, the present invention is further detailed explanation.
Consult shown in Fig. 1 and Fig. 2, construction elevator basis 21 is positioned in structure roof 22, and of the present invention oneKind construction elevator strengthening of foundation device 1 is supported between structure roof 22 and understructure 23 reinforces this structureTop board 22. Bracing means 1 of the present invention comprises what four support with adjustables 11 and four diameters were 110mmSupporting steel tubing string 12, supporting steel tubing string 12 is supported between structure roof 22 and understructure 23, adjustableBearing 11 is located between the lower end of supporting steel tubing string 12 and the upper surface of understructure 23. Support with adjustable 11Upper end be provided with adjusting screw(rod) 112 and form, the lower end of supporting steel tubing string 12 is respectively equipped with an adjustable plate 113,On adjustable plate 113, offer the screwed hole mutually screwing togather with adjusting screw(rod) 112, by regulating support with adjustable11 regulate the height of supporting steel tubing string 12, thereby make the upper end abutting structure top board 22 of supporting steel tubing string 12Lower surface. Between the upper end of supporting steel tubing string 12 and the lower surface of structure roof 22, be further welded withThe steel plate cushion block 16 of thick 20mm, it is of a size of 250mm × 250mm. Between four supporting steel tubing strings 12Horizontal brace 14 and diagonal brace 15 its support reinforcements are set. Four supporting steel tubing strings 12 are all placed on construction elevatorUnder shaped steel foundation beam. Shown in Fig. 3, it is new that structure roof below is at least provided with 2 layers of this practicality from top to bottomThe bracing means 1 of type, and the bracing means 1 arranging on every floor will ensure in supporting steel tubing string 12 in the heartUnder on a vertical line. The reinforcement measure that adopts construction elevator strengthening of foundation device 1 of the present invention, has reached guarantorCard construction quality, shortens the construction period, saves the effect of financial cost.
Now with set up full hall scaffold reinforce and apply construction elevator strengthening of foundation device of the present invention carry out throughJi performance analysis.
If 1 adopts the mode of setting up full hall scaffold, structure roof is reinforced: Area of bearing 6.0m× 6.0m, adopts Φ 48, the steel pipe of wall thickness 3.0. Use altogether 16# channel-section steel, 6m × 4 (root) × 19.752 (kg/ m) × 3 (layer)=1422kg; Full hall scaffold vertical pole ' s span 0.6m, every layer uses vertical rod is 121,Liftoff 10cm arranges the bar of sweeping the floor together, and steel pipe length is 6 × 11=66m; The vertical cross-tie of twice is set, steelLength of tube is 66 × 2 × 2=264m; The vertical bridging of twice is set, and using steel pipe length is 24m, every layerUse 121 of jackings;-3 layers use the long vertical rod of 5m, use altogether steel pipe length to be: 121 × 5=605m;-2Layer uses the long vertical rod of 5m, uses altogether steel pipe length for 605m;-1 layer uses the long vertical rod of 4.5m, uses altogetherSteel pipe length is: 121 × 4.5=544.5m.
To sum up, adopt full hall scaffold to support structural slab, need material as follows:
(1) 16# channel-section steel, 1.422t; 4500 yuan × 1.422t=6400 unit;
(2) use altogether steel pipe: 605+605+544.5+24+264+66=2108.5m, with the calculating of 18 months rental periods,Need hire charge: 2108.5 × 0.02 × 30 × 18=22771.8 unit; Need altogether fastener hire charge: 121 × 3 × 3 ×0.012 × 30 × 18=7056.72 unit; Jacking hire charge: 121 × 3 × 0.03 × 30 × 18=5880.6 unit; Freight charges3000 yuan
Amount to: 22771.8+7056.72+5880.6+3000=38709.12 unit.
(3) set up, remove (containing having bad luck material) and need altogether labour cost:
5 work day × 4 day × 2 (take, tear open) × 200=8000 units.
Above three totals: 6400+38709.12+8000=53109.12 unit, needs 8 days durations.
If 2 adopt construction elevator strengthening of foundation device of the present invention, structural slab is reinforced: need altogether materialAs follows:
(1), the steel pipe of diameter 110mm: 4 × 5+4 × 5+4 × 4.5=58m; Diagonal brace, cross bar amount to 45Rice. 20 × (58+45) × 4.5=9270 unit.
(2), 50 jacking 4 × 3=12. Keep in mind with each 150 yuan, need altogether: 150 × 12=1800 unit.
(3), set up, remove labour cost: 2 × 0.5 × 200 × 2=400 unit, it is 300 yuan that freight charges are kept in mind.
Need altogether expense: 9270+1800+700=11770 unit.
Reduce expenses: 53109.12-11770=41339.12 unit, 7 days reductions of erection time.
Indulge the above: adopt construction elevator strengthening of foundation unit engineering of the present invention to save altogether more than 40,000 yuan, improveOperating efficiency, shortened the duration.
Below embodiment has been described in detail the present invention by reference to the accompanying drawings, and those skilled in the art canAccording to the above description the present invention is made to many variations example. Thereby some details in embodiment should not formLimitation of the invention, the present invention by the scope defining using appended claims as protection model of the present inventionEnclose.

Claims (3)

1. a construction elevator strengthening of foundation method, is characterized in that described reinforcement means comprises following stepRapid:
Installation elevator basis in structure roof;
The installation site on corresponding described construction elevator basis below described structure roof from top to bottom byLayer is installed at least 2 layers of supporting construction, and described supporting construction comprises many supporting steel tubing strings, described supportSteel pipe column is supported between described structure roof and understructure, and the support of every layer of described supporting constructionThe center of steel pipe column up and down on a vertical line, and in the lower end of described supporting construction and understructure itBetween support with adjustable is installed, described support with adjustable be located at described supporting steel tubing string lower end and described underBetween the upper surface of layer structure, described support with adjustable is provided with adjusting screw(rod), described supporting steel tubing stringLower end be respectively equipped with an adjustable plate, on described adjustable plate, offer with described adjusting screw(rod) and mutually screw togatherScrewed hole; Regulate described support with adjustable to make the upper end of described supporting construction support described structure roofLower surface.
2. a construction elevator strengthening of foundation device, described construction elevator basis is positioned in structure roof,It is characterized in that: described bracing means comprise be supported between described structure roof and understructureSupport structure, is further provided with support with adjustable between the lower end of described supporting construction and described understructure;
Described supporting construction comprises many supporting steel tubing strings, and the lower end of described supporting steel tubing string is respectively equipped withOne adjustable plate, offers screwed hole on described adjustable plate, corresponding described screw thread on described support with adjustableHole is provided with the adjusting screw(rod) screwing togather with it, by regulating described support with adjustable to make described supporting steel tubing stringUpper end support the lower surface of described structure roof;
Described structure roof below is at least provided with 2 layers of described bracing means, and adds and be fixedly mounted with described in every layerThe center of the supporting steel tubing string of putting is up and down on a vertical line.
3. construction elevator strengthening of foundation device as claimed in claim 2, is characterized in that: describedBetween support steel pipe column, be provided with horizontal brace and diagonal brace.
CN201410055430.3A 2014-02-19 2014-02-19 A kind of construction elevator strengthening of foundation device and method Active CN103790184B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410055430.3A CN103790184B (en) 2014-02-19 2014-02-19 A kind of construction elevator strengthening of foundation device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410055430.3A CN103790184B (en) 2014-02-19 2014-02-19 A kind of construction elevator strengthening of foundation device and method

Publications (2)

Publication Number Publication Date
CN103790184A CN103790184A (en) 2014-05-14
CN103790184B true CN103790184B (en) 2016-05-11

Family

ID=50666204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410055430.3A Active CN103790184B (en) 2014-02-19 2014-02-19 A kind of construction elevator strengthening of foundation device and method

Country Status (1)

Country Link
CN (1) CN103790184B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201050194Y (en) * 2007-06-01 2008-04-23 林光明 Adjustable stripping carriage
KR20090044195A (en) * 2007-10-31 2009-05-07 대림산업 주식회사 Core and construction method thereof for extension of elevator operation floor and elevation of seismic resistant performance in remodeling of structure
CN202440833U (en) * 2012-03-06 2012-09-19 中天建设集团有限公司 Structure for supporting construction elevator base on top plate of basement
CN103103994A (en) * 2013-03-08 2013-05-15 中天建设集团有限公司 Detachable top plate reinforcing support device and application thereof
CN203782759U (en) * 2014-02-19 2014-08-20 中国建筑第八工程局有限公司 Construction elevator foundation reinforcing device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201050194Y (en) * 2007-06-01 2008-04-23 林光明 Adjustable stripping carriage
KR20090044195A (en) * 2007-10-31 2009-05-07 대림산업 주식회사 Core and construction method thereof for extension of elevator operation floor and elevation of seismic resistant performance in remodeling of structure
CN202440833U (en) * 2012-03-06 2012-09-19 中天建设集团有限公司 Structure for supporting construction elevator base on top plate of basement
CN103103994A (en) * 2013-03-08 2013-05-15 中天建设集团有限公司 Detachable top plate reinforcing support device and application thereof
CN203782759U (en) * 2014-02-19 2014-08-20 中国建筑第八工程局有限公司 Construction elevator foundation reinforcing device

Also Published As

Publication number Publication date
CN103790184A (en) 2014-05-14

Similar Documents

Publication Publication Date Title
CN103485283B (en) Hanging bracket supporting system of side-span cast-in-place section and implementation method thereof
CN105649325B (en) The adjustable tripod support system of assembly concrete shear wall structure and method
CN101824800B (en) Method for construction of bridge cast-in-situ pre-stressed concrete continuous beam
CN206607863U (en) A kind of post-cast strip temporary support structure
CN206971268U (en) The working top plate mobile formwork body of underground pipe gallery
CN204059955U (en) In-situ reinforced concrete slab template integral type braced structures
CN106065681A (en) Superimposed sheet hoard strip construction method in a kind of overall assembled architecture based on BIM technology
CN107476583A (en) A kind of concrete assembled building builds construction method
CN106758846A (en) Cast-in-place box beam bracket and construction method
CN102425186B (en) Foundation bolt stock and manufacture method thereof
CN201103247Y (en) Adjustable steel support
CN202117074U (en) Foundation bed steel structure for positioning and mounting base of tower crane
CN105780922B (en) Large span steel reinforced concrete transfer truss segmental hoisting formwork system construction method
CN207775935U (en) City piping lane pre-buried channel flow mounting device
CN213710299U (en) Modular two-layer elevartor shaft integral lifting bracing operation platform
CN203782759U (en) Construction elevator foundation reinforcing device
CN103790184B (en) A kind of construction elevator strengthening of foundation device and method
CN204715764U (en) The structure that a kind of constructional column and agent structure are constructed simultaneously
CN209779676U (en) Fixing structure for inserting section steel column into super high-rise bottom plate
CN207122313U (en) Constructing middle partition wall in tunnel template and its constructing device
CN107191201A (en) Constructing middle partition wall in tunnel template and its constructing device
CN213174742U (en) Top bracing steel stand structure
CN209162880U (en) A kind of photovoltaic bracket basis for heavy grade landform
CN103938877B (en) The installation method of crab-bolt stock
CN103669566A (en) Steel-reinforced concrete base of large-span net rack roof and construction method of steel-reinforced concrete base

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant