CN103758568A - Opencast coal mine end slope filling mining method - Google Patents

Opencast coal mine end slope filling mining method Download PDF

Info

Publication number
CN103758568A
CN103758568A CN201410051056.XA CN201410051056A CN103758568A CN 103758568 A CN103758568 A CN 103758568A CN 201410051056 A CN201410051056 A CN 201410051056A CN 103758568 A CN103758568 A CN 103758568A
Authority
CN
China
Prior art keywords
filling
coal
bordroom
mining
coal mine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410051056.XA
Other languages
Chinese (zh)
Inventor
常庆粮
周华强
王光伟
刘长安
刘伟涛
王宁
高少辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201410051056.XA priority Critical patent/CN103758568A/en
Publication of CN103758568A publication Critical patent/CN103758568A/en
Pending legal-status Critical Current

Links

Images

Abstract

Provided is an opencast coal mine end slope filling mining method. The opencast coal mine end slope filling mining method includes the steps that a coal pillar reserved at an opencast coal mine end slope is divided into a plurality of stalls which are equal to an end slope coal mining machine roller in width; a stowboard is tunnelled to the position of an earth surface safety boundary line in the coal seam trend direction, and a stowboard is tunnelled in the coal seam inclination direction; an end slope coal mining machine is used for mining the stalls on the side of the stowboard in the coal seam inclination direction at intervals, after mining of the stalls is completed, the end slope coal mining machine is removed, mining openings in the sides of stall side slopes are sealed, and filling is performed on the stalls which are mined at intervals; then, mining is performed on stalls at intervals, the stalls are not mined, filling is performed on the mined stalls, and the steps are repeated until mining of all the stalls which are not mined is completed. According to the opencast coal mine end slope filling mining method, rock and soil discharged by an opencast coal mine can be effectively used, the discharge amount of the rock and soil of the opencast coal mine is reduced, the stripping ratio is lowered, mines end slope coal resources are mined in a maximization mode, meanwhile the side slope safety is guaranteed, and the efficient environment-friendly production process of the opencast coal mine is achieved.

Description

Open coal mine end side filling mining method
Technical field
The present invention relates to a kind of exploitation method, the exploitation method that especially a kind of open coal mine end that is applicable to use in the exploitation of open coal mine end side is helped.
Background technology
Opencut coal mine mining is the important component part of China's coal-mine production industry, is bearing important coal mining task.For a long time, open coal mine end head of a secret society will rely on spiral drilling machine or end side coal-winning machine to reclaim, and need to stay and establish barrier pillar, so the rate of recovery is very low, serious waste of resources.And stay the barrier pillar of establishing that unstability may occur under the long term of overlying rock, and then cause slope and land slide, crisis open coal mine production safety.Open coal mine is due to condition restriction, the outer dump of sometimes having to set up, and not only direct land occupation, causes water and soil and pollutes, and harm vegetation growth, destroys local ecological natural environment.How guaranteeing under the prerequisite of Safety of Coal Mine Production, recovery end side coal resources are open coal mine difficult problems urgently to be resolved hurrily always to greatest extent.
Summary of the invention
Technical problem: the object of the invention is to overcome the deficiencies in the prior art part, provide a kind of efficiency high, do not need land occupation separately to build refuse dump, to greatest extent the open coal mine end side filling mining method of recovery end side coal resources
Technical scheme: open coal mine end of the present invention is helped filling mining method, comprises following upper step:
A. open coal mine end side is stayed the barrier pillar of establishing to be divided into and a plurality of bordrooms of holding side coal mining machine roller width to equate;
B. along bearing direction, tunnel stowboard to table safety boundary line place, ground, then along seam inclination direction driving stowboard, then in stowboard, lay filling pipeline;
C. apart from seam inclination direction, tunneling side, utilize end side coal-winning machine interval to exploit a plurality of bordrooms, after the bordroom exploitation of each interval exploitation finishes, withdraw out end side coal-winning machine, seal at once bordroom side slope step side and adopt cave mouth, the bordroom of exploiting by filling pipe road direction interval carries out filling;
D. when charges solidify completely, after thering is the ability that supports overlying rock, use side side coal-winning machine is exploited the unquarried a plurality of bordrooms in interval respectively, after each bordroom exploitation finishes, sealing bordroom side slope step side is adopted cave mouth, bordroom after exploitation is carried out to filling, go round and begin again, until complete all exploitations of unminding bordroom.
2. open coal mine end according to claim 1 is helped filling mining method, it is characterized in that: the material that bordroom is carried out to filling is by after the native rock fragmentation of peeling off, with the cementing properties paste slurry of making after flyash, cementitious matter and water mix and blend.
Beneficial effect: owing to having adopted technique scheme, the invention solves as supporting overlying rock, reducing mining damage, thereby end side exploitation of coal resources need stay the problem that barrier pillar causes recovery ratio to reduce of establishing.In being helped, open coal mine end stay the barrier pillar of establishing to carry out back production and filling; not only reduced the waste of resource; and avoided establishing barrier pillar, under the long term of overlying rock, unstability may occurring because staying, and then cause slope and land slide, crisis open coal mine production safety.Tool has the following advantages:
1, the continuous obturation of large area forming after end side filling mining can effectively support overlying rock, reduces coal mining infringement and also can reduce the possibility of slope and land slide;
2, end side filling mining does not need to stay and establishes barrier pillar, can maximize exploitation end side coal resources, reduces production stripping ratio, improves recovery ratio;
3, end side filling mining charges be take Tu Yan as aggregate, and the Tu Yan that can effectively utilize refuse dump to pile up, reduces refuse dump land seizure, reduce refuse dump to the pollution of environment, destruction.
Accompanying drawing explanation
Fig. 1 is bordroom plane of arrangement figure and the mining sequence schematic diagram that open coal mine end of the present invention is helped filling mining method.
Fig. 2 is the A-A place stereochemical structure sectional view of Fig. 1.
In figure: bearing direction driving stowboard 1, seam inclination direction driving stowboard 2, bordroom 3,4,5,6,7,8,9,10.
The specific embodiment
Below in conjunction with accompanying drawing, one embodiment of the present of invention are further described:
Open coal mine end of the present invention is helped filling mining method:
A. open coal mine end side is stayed the barrier pillar of establishing to be divided into and a plurality of bordrooms of holding side coal mining machine roller width to equate, as shown in Figure 1, bordroom 3,4,5,6,7,8,9,10;
B., along bearing direction driving stowboard 1 to table safety boundary line place, ground, then along seam inclination direction driving stowboard 2, high 3.0 m of incline direction driving wide 4.0 m of stowboard 2 then lay filling pipeline in stowboard;
C. apart from seam inclination direction driving stowboard 2, surveying, utilize end side coal-winning machine interval to exploit a plurality of bordrooms, as bordroom 3, 5, 7, 9, bordroom width is end side coal mining machine roller width, after the bordroom exploitation of each interval exploitation finishes, withdraw out end side coal-winning machine, seal at once bordroom side slope step side and adopt cave mouth, bordroom by the exploitation of filling pipe road direction interval carries out filling, to after bordroom 3 exploitations, withdraw end side coal-winning machine, and move to bordroom 5 places exploitations, seal bordroom 3 side slope step sides simultaneously and adopt cave mouth, filling bordroom 3 is adopted cave, because coal seam exists angle of inclination beta, as shown in Figure 2, filling slurries can flow to lower from eminence, guaranteed higher pack completeness, afterwards, repetition is with above-mentioned action, exploit successively and filling bordroom 5, 7, 9,
D. in bordroom, charges solidify completely, after thering is the ability that supports overlying rock, use side side coal-winning machine is exploited the unquarried a plurality of bordrooms in interval respectively, as bordroom 4,6,8,10 is exploited, after each bordroom exploitation finishes, sealing bordroom side slope step side is adopted cave mouth, successively the bordroom 4,6,8,10 after exploitation is carried out to filling, repetitive operation, until complete all exploitations of unminding bordroom.
The material that bordroom is carried out to filling adopts by after the native rock fragmentation of peeling off, with the cementing properties paste slurry of making after flyash, cementitious matter and water mix and blend.

Claims (2)

1. an open coal mine end side filling mining method, is characterized in that comprising the steps:
A. open coal mine end side is stayed the barrier pillar of establishing to be divided into and a plurality of bordrooms of holding side coal mining machine roller width to equate;
B. along bearing direction driving stowboard (1) to table safety boundary line place, ground, then along seam inclination direction, tunnel stowboard (2), then in stowboard, lay filling pipeline;
C. apart from seam inclination direction, tunneling stowboard (2) side, utilize end side coal-winning machine interval to exploit a plurality of bordrooms, after the bordroom exploitation of each interval exploitation finishes, withdraw out end side coal-winning machine, seal at once bordroom side slope step side and adopt cave mouth, the bordroom of exploiting by filling pipe road direction interval carries out filling;
D. when charges solidify completely, after thering is the ability that supports overlying rock, use side side coal-winning machine is exploited the unquarried a plurality of bordrooms in interval respectively, after each bordroom exploitation finishes, sealing bordroom side slope step side is adopted cave mouth, bordroom after exploitation is carried out to filling, go round and begin again, until complete all exploitations of unminding bordroom.
2. open coal mine end according to claim 1 is helped filling mining method, it is characterized in that: the material that bordroom is carried out to filling is by after the native rock fragmentation of peeling off, with the cementing properties paste slurry of making after flyash, cementitious matter and water mix and blend.
CN201410051056.XA 2014-02-14 2014-02-14 Opencast coal mine end slope filling mining method Pending CN103758568A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410051056.XA CN103758568A (en) 2014-02-14 2014-02-14 Opencast coal mine end slope filling mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410051056.XA CN103758568A (en) 2014-02-14 2014-02-14 Opencast coal mine end slope filling mining method

Publications (1)

Publication Number Publication Date
CN103758568A true CN103758568A (en) 2014-04-30

Family

ID=50525867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410051056.XA Pending CN103758568A (en) 2014-02-14 2014-02-14 Opencast coal mine end slope filling mining method

Country Status (1)

Country Link
CN (1) CN103758568A (en)

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074521A (en) * 2014-06-20 2014-10-01 中国矿业大学 End slope coal bed remote control excavating mining method
CN104653224A (en) * 2014-12-12 2015-05-27 河北联合大学 Open pit tailing cemented filling treatment method
CN104832130A (en) * 2015-04-28 2015-08-12 中国矿业大学 Gasification recovery method for residual coal at end slope of strip mine
CN105041319A (en) * 2015-08-25 2015-11-11 袁伟昊 Mine colliery lane manless working face and filling mining method
CN105626068A (en) * 2015-12-30 2016-06-01 中国神华能源股份有限公司 Dismantling method of open-pit coal mine end slope bridge
CN106321105A (en) * 2016-09-30 2017-01-11 中国矿业大学 Paste filling method for end slope of opencut coal mine
CN106321103A (en) * 2016-09-08 2017-01-11 中国矿业大学 Method for recycling room coal pillars by solid filling in synergy with artificial pillars
CN107023296A (en) * 2017-04-20 2017-08-08 山西鸿太旭飞能源科技有限公司 Construction method for filling and excavating roadway
CN107313804A (en) * 2017-06-29 2017-11-03 中国矿业大学 A kind of open coal mine end side pressure coal filling fully mechanized mining recovery method
CN108194084A (en) * 2017-12-13 2018-06-22 中国煤炭科工集团太原研究院有限公司 Outdoor end side ore deposit continuous miner end side recovery method
CN109026006A (en) * 2018-09-20 2018-12-18 内蒙古煤矿设计研究院有限责任公司 Exploitation open pit slope covers the new method of mineral products
CN109882240A (en) * 2019-03-29 2019-06-14 中国矿业大学 A kind of outdoor end side pressure coal filling mining system
CN109882179A (en) * 2019-03-29 2019-06-14 中国矿业大学 A kind of outdoor end side pressure coal filling mining design method
WO2019184257A1 (en) * 2018-03-27 2019-10-03 中煤科工能源投资有限公司 Coal mining method for rotatably mining coal on an open pit slope using fully-mechanized coal mining equipment
CN111236943A (en) * 2020-02-27 2020-06-05 中煤能源研究院有限责任公司 Mining method for advancing, cutting and retreating filling of open-air end slope
CN111364998A (en) * 2020-03-12 2020-07-03 中煤能源研究院有限责任公司 Single-side edge filling and tunneling mining method for open-pit mine end slope coal pressing
CN111364999A (en) * 2020-03-30 2020-07-03 中煤能源研究院有限责任公司 Replacement method for open pit coal mine end slope coal pressing mining and filling integration
CN111364992A (en) * 2020-03-14 2020-07-03 中国煤炭科工集团太原研究院有限公司 Continuous coal cutter drill hole type paste filling mining method for end slope coal
CN111980709A (en) * 2020-09-04 2020-11-24 山西天地煤机装备有限公司 Continuous mining method for high-inclination-angle thick coal seam slope coal
CN112412461A (en) * 2020-12-03 2021-02-26 中国煤炭科工集团太原研究院有限公司 Open-pit mine end slope coal filling mining process method
CN113236254A (en) * 2021-06-25 2021-08-10 中国矿业大学 Filling mining method for end slope thick coal seam with large inclination angle of strip mine
CN113374478A (en) * 2021-07-02 2021-09-10 中国煤炭科工集团太原研究院有限公司 Layered mining and filling method for ultra-thick coal seam with side wall
CN114000883A (en) * 2021-11-02 2022-02-01 中国矿业大学 Open pit coal mine end slope coal pressing, mining and charging integrated recovery device and method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4799738A (en) * 1981-11-03 1989-01-24 Tatabanyai Szenbanyak Mining method for working large-scale mineral deposits by the caving system
RU2371579C1 (en) * 2008-05-21 2009-10-27 Государственное образовательное учреждение высшего профессионального образования Читинский государственный университет (ЧитГУ) Development method of low-capacity steeply dipping lode
CN101660414A (en) * 2008-08-29 2010-03-03 中煤国际工程集团沈阳设计研究院 Method for conveying coal in end slope laneway in open pit coal mine
CN102011588A (en) * 2010-11-30 2011-04-13 淄博市王庄煤矿 House pillar type cutting and filling method of medium coal seam for controlling movement deformation of overlying rock
CN102434163A (en) * 2011-12-01 2012-05-02 山西阳泉盂县东坪煤业有限公司 Method for mining coal through comprehensive mechanized solid filling
CN102644464A (en) * 2012-04-12 2012-08-22 东北大学 Constructing method for mining embedded artificial boundary ore pillar from open-pit to underground mine
CN102865101A (en) * 2012-09-20 2013-01-09 河北煤炭科学研究院 Filling method and system of coal mine goaf
CN103046929A (en) * 2012-12-28 2013-04-17 中国神华能源股份有限公司 Method for stripping rock layer of end slope

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4799738A (en) * 1981-11-03 1989-01-24 Tatabanyai Szenbanyak Mining method for working large-scale mineral deposits by the caving system
RU2371579C1 (en) * 2008-05-21 2009-10-27 Государственное образовательное учреждение высшего профессионального образования Читинский государственный университет (ЧитГУ) Development method of low-capacity steeply dipping lode
CN101660414A (en) * 2008-08-29 2010-03-03 中煤国际工程集团沈阳设计研究院 Method for conveying coal in end slope laneway in open pit coal mine
CN102011588A (en) * 2010-11-30 2011-04-13 淄博市王庄煤矿 House pillar type cutting and filling method of medium coal seam for controlling movement deformation of overlying rock
CN102434163A (en) * 2011-12-01 2012-05-02 山西阳泉盂县东坪煤业有限公司 Method for mining coal through comprehensive mechanized solid filling
CN102644464A (en) * 2012-04-12 2012-08-22 东北大学 Constructing method for mining embedded artificial boundary ore pillar from open-pit to underground mine
CN102865101A (en) * 2012-09-20 2013-01-09 河北煤炭科学研究院 Filling method and system of coal mine goaf
CN103046929A (en) * 2012-12-28 2013-04-17 中国神华能源股份有限公司 Method for stripping rock layer of end slope

Cited By (42)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074521B (en) * 2014-06-20 2016-05-04 中国矿业大学 A kind of end is helped coal seam Long-distance Control driving recovery method
CN104074521A (en) * 2014-06-20 2014-10-01 中国矿业大学 End slope coal bed remote control excavating mining method
CN104653224A (en) * 2014-12-12 2015-05-27 河北联合大学 Open pit tailing cemented filling treatment method
CN104832130A (en) * 2015-04-28 2015-08-12 中国矿业大学 Gasification recovery method for residual coal at end slope of strip mine
CN104832130B (en) * 2015-04-28 2017-06-06 中国矿业大学 Help residual coal gasification recovery method in opencut end
CN105041319A (en) * 2015-08-25 2015-11-11 袁伟昊 Mine colliery lane manless working face and filling mining method
CN105626068B (en) * 2015-12-30 2017-11-28 中国神华能源股份有限公司 Help the method for dismounting of bridge in open coal mine end
CN105626068A (en) * 2015-12-30 2016-06-01 中国神华能源股份有限公司 Dismantling method of open-pit coal mine end slope bridge
CN106321103A (en) * 2016-09-08 2017-01-11 中国矿业大学 Method for recycling room coal pillars by solid filling in synergy with artificial pillars
CN106321105A (en) * 2016-09-30 2017-01-11 中国矿业大学 Paste filling method for end slope of opencut coal mine
CN106321105B (en) * 2016-09-30 2018-11-30 中国矿业大学 A kind of open coal mine end side paste body filling method
CN107023296B (en) * 2017-04-20 2019-03-29 山西鸿太旭飞能源科技有限公司 Construction method for filling and excavating roadway
CN107023296A (en) * 2017-04-20 2017-08-08 山西鸿太旭飞能源科技有限公司 Construction method for filling and excavating roadway
CN107313804A (en) * 2017-06-29 2017-11-03 中国矿业大学 A kind of open coal mine end side pressure coal filling fully mechanized mining recovery method
CN107313804B (en) * 2017-06-29 2019-05-17 中国矿业大学 A kind of open coal mine end side pressure coal filling fully mechanized mining recovery method
CN108194084A (en) * 2017-12-13 2018-06-22 中国煤炭科工集团太原研究院有限公司 Outdoor end side ore deposit continuous miner end side recovery method
CN108194084B (en) * 2017-12-13 2020-06-05 中国煤炭科工集团太原研究院有限公司 End slope mining method of continuous coal mining machine for open-pit end slope mine
WO2019184257A1 (en) * 2018-03-27 2019-10-03 中煤科工能源投资有限公司 Coal mining method for rotatably mining coal on an open pit slope using fully-mechanized coal mining equipment
CN109026006A (en) * 2018-09-20 2018-12-18 内蒙古煤矿设计研究院有限责任公司 Exploitation open pit slope covers the new method of mineral products
CN109026006B (en) * 2018-09-20 2020-07-24 内蒙古煤矿设计研究院有限责任公司 Novel method for mining open-pit mine slope covered mineral products
CN109882240B (en) * 2019-03-29 2020-04-14 中国矿业大学 Open-air end slope coal-pressing filling mining system
CN109882179B (en) * 2019-03-29 2020-04-28 中国矿业大学 Open-air end slope coal-pressing filling mining design method
CN109882179A (en) * 2019-03-29 2019-06-14 中国矿业大学 A kind of outdoor end side pressure coal filling mining design method
RU2756537C1 (en) * 2019-03-29 2021-10-01 Чайна Юниверсити Оф Майнинг Энд Текнолоджи System for development of cemented coal and process of open mining on a longitudinal slope
AU2019439785B2 (en) * 2019-03-29 2021-09-16 China University Of Mining And Technology Pressed coal filling mining system and process for end slope of open pit
CN109882240A (en) * 2019-03-29 2019-06-14 中国矿业大学 A kind of outdoor end side pressure coal filling mining system
WO2020199546A1 (en) * 2019-03-29 2020-10-08 中国矿业大学 Pressed coal filling mining system and process for end slope of open pit
CN111236943A (en) * 2020-02-27 2020-06-05 中煤能源研究院有限责任公司 Mining method for advancing, cutting and retreating filling of open-air end slope
CN111236943B (en) * 2020-02-27 2021-06-08 中煤能源研究院有限责任公司 Mining method for advancing, cutting and retreating filling of open-air end slope
CN111364998B (en) * 2020-03-12 2021-05-25 中煤能源研究院有限责任公司 Single-side edge filling and tunneling mining method for open-pit mine end slope coal pressing
CN111364998A (en) * 2020-03-12 2020-07-03 中煤能源研究院有限责任公司 Single-side edge filling and tunneling mining method for open-pit mine end slope coal pressing
CN111364992A (en) * 2020-03-14 2020-07-03 中国煤炭科工集团太原研究院有限公司 Continuous coal cutter drill hole type paste filling mining method for end slope coal
CN111364992B (en) * 2020-03-14 2022-03-08 中国煤炭科工集团太原研究院有限公司 Continuous coal cutter drill hole type paste filling mining method for end slope coal
CN111364999A (en) * 2020-03-30 2020-07-03 中煤能源研究院有限责任公司 Replacement method for open pit coal mine end slope coal pressing mining and filling integration
CN111980709A (en) * 2020-09-04 2020-11-24 山西天地煤机装备有限公司 Continuous mining method for high-inclination-angle thick coal seam slope coal
CN111980709B (en) * 2020-09-04 2022-04-01 山西天地煤机装备有限公司 Continuous mining method for high-inclination-angle thick coal seam slope coal
CN112412461A (en) * 2020-12-03 2021-02-26 中国煤炭科工集团太原研究院有限公司 Open-pit mine end slope coal filling mining process method
CN113236254A (en) * 2021-06-25 2021-08-10 中国矿业大学 Filling mining method for end slope thick coal seam with large inclination angle of strip mine
CN113236254B (en) * 2021-06-25 2022-06-14 中国矿业大学 Filling mining method for end slope thick coal seam with large inclination angle of strip mine
CN113374478A (en) * 2021-07-02 2021-09-10 中国煤炭科工集团太原研究院有限公司 Layered mining and filling method for ultra-thick coal seam with side wall
CN113374478B (en) * 2021-07-02 2023-12-01 中国煤炭科工集团太原研究院有限公司 Layered mining and filling method for highwall super-thick coal seam
CN114000883A (en) * 2021-11-02 2022-02-01 中国矿业大学 Open pit coal mine end slope coal pressing, mining and charging integrated recovery device and method

Similar Documents

Publication Publication Date Title
CN103758568A (en) Opencast coal mine end slope filling mining method
CN102996131B (en) Solid-filling coal mining method with two pre-excavating tunnels for advancing
CN104251139B (en) Coal-face Collapsed zone filling mining method
AU2014344670B2 (en) Solid cementation backfill roadway type mining method for ultra-thick seam
CN104847355B (en) Continuous mining method for hollow ground of medium-thickness steeply inclined ore body
CN109882239B (en) Open-pit end slope coal-pressing radial filling mining method
WO2014187163A1 (en) Inclined layered solid-filling mining method in ultrathick coal layer
CN108625894B (en) Waste rock filling three-dimensional grouting construction method for horizontal working face of short-wall roadway mining
RU2635927C1 (en) Method of laying open face with eolian sand in shallow coal seam in western desert mining areas
US20220243590A1 (en) Dendritic reverse underground mining method for thin coal seam at end slope of strip mine
CN105421198B (en) A kind of method that open coal mine builds ramp
CN104632236A (en) Construction method of TBM-EPB double-mode shield in composite stratum
CN104564137A (en) Handling method and device for double-medium stacked supporting and hard top plate type mined-out area
CN105041319A (en) Mine colliery lane manless working face and filling mining method
CN105370279A (en) High initial strength filling mining method
CN102733809A (en) Coal mining method for recovering open-pit coal mine end slope coal
JP2020504253A (en) Mineral method of coal-free mining
CN111577378A (en) Gas extraction and filling collaborative mining method for coal and gas outburst coal seam
CN108301833A (en) The full negative pressure shortwall method of collecting coal by the means of filling
CN108331580B (en) Clean and efficient coal mining method
CN105863727A (en) Method for treating pillar goaf
CN104832130B (en) Help residual coal gasification recovery method in opencut end
CN114183140B (en) Mining and filling method for advanced replacement section coal pillar
CN110821559A (en) System for performing pumping gangue goaf treatment by utilizing conventional fully mechanized mining hydraulic support
WO2023272587A1 (en) Fluidized coal mining method for implementing co2 underground storage

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140430