CN103737235B - 箱梁隔板定位工装及定位方法 - Google Patents

箱梁隔板定位工装及定位方法 Download PDF

Info

Publication number
CN103737235B
CN103737235B CN201310752467.7A CN201310752467A CN103737235B CN 103737235 B CN103737235 B CN 103737235B CN 201310752467 A CN201310752467 A CN 201310752467A CN 103737235 B CN103737235 B CN 103737235B
Authority
CN
China
Prior art keywords
dividing plate
diagonal brace
card trough
fixed
angle steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310752467.7A
Other languages
English (en)
Other versions
CN103737235A (zh
Inventor
管伟伟
王接班
胡文佳
柴松
李甲
吕坚
梅卫东
安文新
魏华清
沈建荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wison Clean Energy Technology Group Co ltd
Original Assignee
Wison Nantong Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wison Nantong Heavy Industry Co Ltd filed Critical Wison Nantong Heavy Industry Co Ltd
Priority to CN201310752467.7A priority Critical patent/CN103737235B/zh
Publication of CN103737235A publication Critical patent/CN103737235A/zh
Application granted granted Critical
Publication of CN103737235B publication Critical patent/CN103737235B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/0408Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work for planar work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/18Sheet panels

Abstract

箱梁隔板定位工装及定位方法,其工装包括斜撑、将斜撑顶端和隔板固定的上端定位件以及将斜撑底部与箱梁面板上部加强角钢固定的下端定位件;上端定位件包括卡设在隔板顶部的上部卡板槽,上部卡板槽固定斜撑的侧面固定有带有螺孔的面板,斜撑通过上部调节螺栓活动固定在带有螺孔的面板上,上部卡板槽另一侧面通过上部固定螺栓和隔板固定;下端定位件包括卡设在箱梁面板上部加强角钢上的下部卡板槽,下部卡板槽固定斜撑的侧面固定有带有螺孔的面板,斜撑通过下部调节螺栓活动固定在带有螺孔的面板上,下部卡板槽另一侧面通过下部固定螺栓和加强角钢固定;本发明还提供该工装的定位方法,采用本发明工装,支撑无需焊接、打磨,隔板的垂直度方便调节。

Description

箱梁隔板定位工装及定位方法
技术领域
本发明涉及箱梁隔板固定技术领域,具体涉及一种箱梁隔板定位工装及定位方法。
背景技术
在制作箱梁时常用角钢与隔板点焊支撑,在点焊过程中容易伤及母材,由于隔板的支撑是固定的,调节隔板的垂直度比较困难,花费时间较长,后续拆除支撑后,还增加点焊位置的修补打磨等工作量,工作效率不高。
在箱梁结构设计时,为了加强箱梁结构,内部设计往往采用隔板来实现;要求在制作过程中,需通过划线装配来保证隔板的相对位置,同时采用挂铅垂线来检验隔板的垂直度,如果有偏差需要及时调整。
发明内容
为了解决上述现有技术存在的问题,本发明的目的在于提供一种箱梁隔板定位工装及定位方法,采用本发明工装,支撑无需焊接、打磨,隔板的垂直度方便调节。
为达到以上目的,本发明采用如下技术方案:
箱梁隔板定位工装,包括斜撑4、将斜撑4顶端和隔板6固定的上端定位件以及将斜撑4底部与箱梁面板7上部加强角钢8固定的下端定位件;
所述上端定位件包括卡设在隔板6顶部的上部卡板槽2-1,上部卡板槽2-1固定斜撑4的侧面固定有带有螺孔的面板,斜撑4通过上部调节螺栓3-1活动固定在带有螺孔的面板上,上部卡板槽2-1另一侧面通过上部固定螺栓1-1和隔板6固定;
所述下端定位件包括卡设在箱梁面板7上部加强角钢8上的下部卡板槽2-2,下部卡板槽2-2固定斜撑4的侧面固定有带有螺孔的面板,斜撑4通过下部调节螺栓3-2活动固定在带有螺孔的面板上,下部卡板槽2-2另一侧面通过下部固定螺栓1-2和加强角钢8固定。
还包括用于微调下部卡板槽2-2左右移动的锲形块5。
上述所述的箱梁隔板定位工装的定位方法,包括如下步骤:
步骤1、吊装隔板6,隔板6下端与箱梁面板7上的安装线重合;
步骤2、在隔板6顶部安装上部卡板槽2-1,用上部固定螺栓1-1固定上部卡板槽2-1与隔板6;
步骤3、安装固定斜撑4,用上部调节螺栓3-1将固定斜撑4与上部卡板槽2-1固定;
步骤4、在箱梁面板7上部加强角钢8上安装下部卡板槽2-2和锲形块5,用下部固定螺栓1-2将下部卡板槽2-2和加强角钢8固定;
步骤5、根据相邻隔板6的距离,通过上部调节螺栓3-1调整固定斜撑4的角度;
步骤6、粗调隔板6的垂直度,拧紧上部固定螺栓1-1、上部调节螺栓3-1、下部固定螺栓1-2和下部调节螺栓3-2;
步骤7、通过移动锲形块5,微调下部卡板槽2-2左右移动,精调隔板6的垂直度;
步骤8、隔板6的垂直度符合要求后,点焊固定隔板6。
本发明采用可调节的支撑结构,通过螺栓的固定与锲型块的调节,保证隔板的垂直度,采用本发明工装,支撑无需焊接、打磨,隔板的垂直度方便调节。
附图说明
图1为本发明定位工装与隔板和箱梁面板的定位简图。
图2为本发明定位工装与隔板和箱梁面板的定位详图。
具体实施方式
以下结合附图及具体实施例,对本发明作进一步的详细描述。
如图1所示,本发明箱梁隔板定位工装,包括斜撑4、将斜撑4顶端和隔板6固定的上端定位件以及将斜撑4底部与箱梁面板7上部加强角钢8固定的下端定位件。
如图2所示,上端定位件包括卡设在隔板6顶部的上部卡板槽2-1,上部卡板槽2-1固定斜撑4的侧面固定有带有螺孔的面板,斜撑4通过上部调节螺栓3-1活动固定在带有螺孔的面板上,上部卡板槽2-1另一侧面通过上部固定螺栓1-1和隔板6固定。下端定位件包括卡设在箱梁面板7上部加强角钢8上的下部卡板槽2-2,下部卡板槽2-2固定斜撑4的侧面固定有带有螺孔的面板,斜撑4通过下部调节螺栓3-2活动固定在带有螺孔的面板上,下部卡板槽2-2另一侧面通过下部固定螺栓1-2和加强角钢8固定。
作为本发明的优选实施方式,还包括用于微调下部卡板槽2-2左右移动的锲形块5。
本发明提供的定位方法如下:
1、吊装隔板6,隔板6下端与箱梁面板7上的安装线重合;
2、在隔板6顶部安装上部卡板槽2-1,用上部固定螺栓1-1固定上部卡板槽2-1与隔板6;
3、安装固定斜撑4,用上部调节螺栓3-1将固定斜撑4与上部卡板槽2-1固定;
4、在箱梁面板7上部加强角钢8上安装下部卡板槽2-2和锲形块5,用下部固定螺栓1-2将下部卡板槽2-2和加强角钢8固定;
5、根据相邻隔板6的距离,通过上部调节螺栓3-1调整固定斜撑4的角度;
6、粗调隔板6的垂直度,拧紧上部固定螺栓1-1、上部调节螺栓3-1、下部固定螺栓1-2和下部调节螺栓3-2;
7、通过移动锲形块5,微调下部卡板槽2-2左右移动,精调隔板6的垂直度;
8、隔板6的垂直度符合要求后,点焊固定隔板6。

Claims (1)

1.箱梁隔板定位工装的定位方法,所述箱梁隔板定位工装包括斜撑(4)、将斜撑(4)顶端和隔板(6)固定的上端定位件以及将斜撑(4)底部与箱梁面板(7)上部加强角钢(8)固定的下端定位件,还包括用于微调下部卡板槽(2-2)左右移动的锲形块(5);
所述上端定位件包括卡设在隔板(6)顶部的上部卡板槽(2-1),上部卡板槽(2-1)固定斜撑(4)的侧面固定有带有螺孔的面板,斜撑(4)通过上部调节螺栓(3-1)活动固定在带有螺孔的面板上,上部卡板槽(2-1)另一侧面通过上部固定螺栓(1-1)和隔板(6)固定;
所述下端定位件包括卡设在箱梁面板(7)上部加强角钢(8)上的下部卡板槽(2-2),下部卡板槽(2-2)固定斜撑(4)的侧面固定有带有螺孔的面板,斜撑(4)通过下部调节螺栓(3-2)活动固定在带有螺孔的面板上,下部卡板槽(2-2)另一侧面通过下部固定螺栓(1-2)和加强角钢(8)固定;
其特征在于:所述定位方法包括如下步骤:
步骤1、吊装隔板(6),隔板(6)下端与箱梁面板(7)上的安装线重合;
步骤2、在隔板(6)顶部安装上部卡板槽(2-1),用上部固定螺栓(1-1)固定上部卡板槽(2-1)与隔板(6);
步骤3、安装固定斜撑(4),用上部调节螺栓(3-1)将固定斜撑(4)与上部卡板槽(2-1)固定;
步骤4、在箱梁面板(7)上部加强角钢(8)上安装下部卡板槽(2-2)和锲形块(5),用下部固定螺栓(1-2)将下部卡板槽(2-2)和加强角钢(8)固定;
步骤5、根据相邻隔板(6)的距离,通过上部调节螺栓(3-1)调整固定斜撑(4)的角度;
步骤6、粗调隔板(6)的垂直度,拧紧上部固定螺栓(1-1)、上部调节螺栓(3-1)、下部固定螺栓(1-2)和下部调节螺栓(3-2);
步骤7、通过移动锲形块(5),微调下部卡板槽(2-2)左右移动,精调隔板(6)的垂直度;
步骤8、隔板(6)的垂直度符合要求后,点焊固定隔板(6)。
CN201310752467.7A 2013-12-31 2013-12-31 箱梁隔板定位工装及定位方法 Active CN103737235B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310752467.7A CN103737235B (zh) 2013-12-31 2013-12-31 箱梁隔板定位工装及定位方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310752467.7A CN103737235B (zh) 2013-12-31 2013-12-31 箱梁隔板定位工装及定位方法

Publications (2)

Publication Number Publication Date
CN103737235A CN103737235A (zh) 2014-04-23
CN103737235B true CN103737235B (zh) 2015-10-28

Family

ID=50494339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310752467.7A Active CN103737235B (zh) 2013-12-31 2013-12-31 箱梁隔板定位工装及定位方法

Country Status (1)

Country Link
CN (1) CN103737235B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104043931A (zh) * 2014-06-09 2014-09-17 江门市南洋船舶工程有限公司 用于辅助船舶上建壁板施工的定位斜撑装置以及使用方法
CN105252175A (zh) * 2015-10-30 2016-01-20 大连志远鹏富船舶科技有限公司 调节潜艇肋骨与壳圈垂直度的无码工装
CN105414841A (zh) * 2015-12-04 2016-03-23 武汉钢铁(集团)公司 一种组装胎具
CN108035260B (zh) * 2017-12-18 2019-08-20 武船重型工程股份有限公司 一种横隔板定位工装
CN110216408B (zh) * 2019-06-21 2021-05-18 石嘴山市凝力机械设备有限公司 一种刮板机中部槽方孔板焊接用点对装置及焊接方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201096602Y (zh) * 2007-10-26 2008-08-06 苏州试验仪器总厂 滚轮大行程动圈上部导向机构
CN201874233U (zh) * 2010-10-29 2011-06-22 中建三局建设工程股份有限公司 低位少支点模块化整体顶升钢平台模架体系
CN202655839U (zh) * 2012-07-20 2013-01-09 河北二十冶工程技术有限公司 活动式管桁架组对胎具
CN202847973U (zh) * 2012-10-11 2013-04-03 大连船舶重工集团有限公司 多用安全立柱
CN103334379A (zh) * 2013-06-27 2013-10-02 中铁四局集团第三建设有限公司 一种用于高速公路防撞护栏悬空部分的施工方法
CN203751586U (zh) * 2013-12-31 2014-08-06 惠生(南通)重工有限公司 箱梁隔板定位工装

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE507170C2 (sv) * 1995-08-11 1998-04-20 Sten Kullberg Förfarande och anordnig vid framställning av en vattenfördämning
AU2012214183B2 (en) * 2011-02-11 2016-09-08 Ergotron, Inc. Bifocal display positioning apparatus and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201096602Y (zh) * 2007-10-26 2008-08-06 苏州试验仪器总厂 滚轮大行程动圈上部导向机构
CN201874233U (zh) * 2010-10-29 2011-06-22 中建三局建设工程股份有限公司 低位少支点模块化整体顶升钢平台模架体系
CN202655839U (zh) * 2012-07-20 2013-01-09 河北二十冶工程技术有限公司 活动式管桁架组对胎具
CN202847973U (zh) * 2012-10-11 2013-04-03 大连船舶重工集团有限公司 多用安全立柱
CN103334379A (zh) * 2013-06-27 2013-10-02 中铁四局集团第三建设有限公司 一种用于高速公路防撞护栏悬空部分的施工方法
CN203751586U (zh) * 2013-12-31 2014-08-06 惠生(南通)重工有限公司 箱梁隔板定位工装

Also Published As

Publication number Publication date
CN103737235A (zh) 2014-04-23

Similar Documents

Publication Publication Date Title
CN103737235B (zh) 箱梁隔板定位工装及定位方法
CN203640309U (zh) 一种大跨度钢结构屋盖主桁架总拼装胎架上用的可调式管托
CN203783165U (zh) 预埋件多方位精确调节装置
CN204785424U (zh) 一种电力角钢塔设备箱安装基座
CN102500979A (zh) 桥式起重机箱型主梁四面成型组装方法
CN203867202U (zh) 专用于大型场馆金属幕墙钢结构竖向龙骨的定位工装
CN203751586U (zh) 箱梁隔板定位工装
CN103758213B (zh) 一种装配式墙板与梁体精准定位安装连接结构
CN103374867A (zh) 一种轨道安装定位调节装置
CN203872113U (zh) 一种光伏支架固定结构
CN103848361B (zh) 塔吊附墙装置的支撑梁
CN103394932A (zh) H型、箱型构件及十字柱端铣固定夹具
CN207840699U (zh) 一种可移动的大型工件加工台
CN203708175U (zh) 多角度调整快速安装太阳能支架
CN203923892U (zh) 一种能够对中调平一体化的橡胶支座
CN104806852A (zh) 一种激光器安装支架
CN204983697U (zh) 带窗框外挂板处梁底专用支撑夹具组件
CN203755170U (zh) 斜拉桥钢塔结合段安装用辅具
CN202543737U (zh) 轨道安装定位调节装置
CN102756981A (zh) 一种塔式起重机预埋固定支脚固定结构
CN204196076U (zh) 一种轮胎硫化机机械手立柱垂直度调整装置
CN203783442U (zh) 一种太阳能路灯安装工具
CN204692971U (zh) 用于在电力角钢塔内侧固定设备箱的固定基座
CN211899499U (zh) 一种旋拧式瓷砖安装支撑装置
CN204689303U (zh) 电梯导轨安装组件

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Box girder diaphragm positioning tooling and positioning method

Effective date of registration: 20220519

Granted publication date: 20151028

Pledgee: Nantong Jiangsu rural commercial bank Limited by Share Ltd.

Pledgor: WISON(NANTONG) HEAVY INDUSTRY Co.,Ltd.

Registration number: Y2022980005940

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221122

Granted publication date: 20151028

Pledgee: Nantong Jiangsu rural commercial bank Limited by Share Ltd.

Pledgor: WISON(NANTONG) HEAVY INDUSTRY Co.,Ltd.

Registration number: Y2022980005940

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Box girder diaphragm positioning tooling and positioning method

Effective date of registration: 20221123

Granted publication date: 20151028

Pledgee: Nantong Jiangsu rural commercial bank Limited by Share Ltd.

Pledgor: WISON(NANTONG) HEAVY INDUSTRY Co.,Ltd.

Registration number: Y2022980023140

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20151028

Pledgee: Nantong Jiangsu rural commercial bank Limited by Share Ltd.

Pledgor: WISON(NANTONG) HEAVY INDUSTRY Co.,Ltd.

Registration number: Y2022980023140

PC01 Cancellation of the registration of the contract for pledge of patent right
CP03 Change of name, title or address

Address after: 226000 port industrial zone 3, Nantong Economic and Technological Development Zone, Jiangsu Province

Patentee after: Wison Clean Energy Technology Group Co.,Ltd.

Country or region after: Zhong Guo

Address before: 226009 Jianghai Road 189, Nantong Economic and Technological Development Zone, Jiangsu Province

Patentee before: WISON(NANTONG) HEAVY INDUSTRY Co.,Ltd.

Country or region before: Zhong Guo