CN103730900B - 电力系统多时间尺度的省地县一体化无功优化方法 - Google Patents

电力系统多时间尺度的省地县一体化无功优化方法 Download PDF

Info

Publication number
CN103730900B
CN103730900B CN201310562447.3A CN201310562447A CN103730900B CN 103730900 B CN103730900 B CN 103730900B CN 201310562447 A CN201310562447 A CN 201310562447A CN 103730900 B CN103730900 B CN 103730900B
Authority
CN
China
Prior art keywords
province
node
county
ground
delta
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310562447.3A
Other languages
English (en)
Other versions
CN103730900A (zh
Inventor
黄启哲
李滨
韦景
韦化
邓春明
祝云
徐学勇
李佩杰
刘路
阳育德
覃海志
张弛
周柯
杜孟远
刘鹏飞
杨有慧
梁振成
吴雪颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hechi Power Supply Bureau Of Guangxi Power Grid Corp
Guangxi University
Original Assignee
Hechi Power Supply Bureau Of Guangxi Power Grid Corp
Guangxi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hechi Power Supply Bureau Of Guangxi Power Grid Corp, Guangxi University filed Critical Hechi Power Supply Bureau Of Guangxi Power Grid Corp
Priority to CN201310562447.3A priority Critical patent/CN103730900B/zh
Publication of CN103730900A publication Critical patent/CN103730900A/zh
Application granted granted Critical
Publication of CN103730900B publication Critical patent/CN103730900B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种电力系统多时间尺度的省地县一体化无功优化方法,本发明的多时间尺度的省地县一体化无功优化方法是一种考虑了年规律、季规律、月规律、日规律、超短时固有惯性规律和随机成份的省地县一体化无功优化方法。本发明具有能够实现多时间尺度的省地县一体化无功优化,给出多时间尺度连续的无功电压优化配置策略,实现电力系统长、中、短期各电压等级间的无功电压优化运行,提高全网的电压合格率,保障电网的持续的安全稳定运行,为制定电网的运行方式、合理且优化的利用发电资源提供理论依据,能够有效的确保电网安全稳定持续运行的特点。

Description

电力系统多时间尺度的省地县一体化无功优化方法
技术领域
本发明涉及电力系统无功分析和优化领域,尤其是涉及一种高效的电力系统多时间尺度的省地县一体化无功优化方法。
背景技术
近十几年来,电力系统安全稳定问题日益成为业界关注的焦点。在现代电网中,由于弱系统和长线路的负荷加重,电网的传输容量越来越接近其极限,使系统的稳定问题更加突出。优化电力系统的运行方式,可大幅度地改善电力系统的安全稳定环境,而电力系统的无功优化是其中的重要环节,它涉及大型、非线性、动态和离散的组合最优化问题。现有的流程是运行人员根据负荷数据、网架结构和经验设定初值,用BPA的潮流计算程序进行校验;然后人工分析BPA的潮流图,由各点电压和潮流方向人为确定各个相关的调整量。所以,即便是非常有经验的运行人员,也只能掌握住大框架,而很多细节问题不能面面俱到,要找到最优的方案是非常困难的事情。随着电力系统分析方法和计算技术的发展,急需解决上述的问题,至今未见有对传统无功优化的多方面不足进行全面解决的方案。
中国专利授权公开号:CN103199544A,授权公开日2013年7月10日,公开了一种电力系统的无功优化方法,包括以下步骤:采用牛顿-拉夫逊潮流计算程序为优化计算提供各状态变量的值和网损值;建立细菌觅食优化算法与粒子群算法结合的所述电力系统无功优化模型,确定优化目标函数;初始化细菌群体,初始化参数包括:细菌种群大小、控制变量个数、细菌位置、趋化算子次数、繁殖算子次数、迁徙算子次数、执行繁殖的比例、执行迁徙算子的概率;对细菌个体中的连续变量和离散变量进行初始化,连续变量为发电机的机端电压,离散变量包括:变压器档位、补偿电容档位;变压器档位对应变压器变比,补偿电容档位对应补偿电容量。该发明的不足之处是没有考虑时间尺度以及各区域之间无功优化局限性。
发明内容
本实用新型的发明目的是为了克服现有技术中没有根据电网电压等级不同进行不同方式无功优化以及没有考虑到不同时间尺度电网的特性进行不同无功优化方式的不足,提供了一种高效的电力系统多时间尺度的省地县一体化无功优化方法。
为了实现上述目的,本实用新型采用以下技术方案:
一种电力系统多时间尺度的省地县一体化无功优化方法,包括下列步骤:
(1-1)选择要优化的电网范围,获得对应的其电网的网架数据和电网的运行数据,计算机中设有若干个时间尺度,用户控制计算机选择至少一个1个时间尺度的网架数据和运行数据进行省地县潮流计算:
(1-1-1)读取网架数据和运行数据,网架数据包括电网网架参数,运行数据包括系统运行的参数,设定Vi=1和δi=0,设定迭代次数k=0,最大迭代次数kmax=M,根据网架参数生成导纳矩阵YB;导纳矩阵YB中包含电网的网架结构关系;
Y B = Y 11 Y 12 Y 13 ... Y 1 n Y 21 Y 22 Y 23 ... Y 2 n Y 31 Y 32 Y 33 ... Y 3 n . . . . . . . . . . . . . . . Y n 1 Y n 2 Y n 3 .. Y n n
式中,节点导纳矩阵的对角元Yii(i=1,2,…,n)称自导纳;节点导纳矩阵的非对角元Yji(i=1,2,…,n;j≠i)称互导纳。
(1-1-2)利用潮流方程 P G i - P D i - Σ j ∈ S N V i Y i j V j cosδ i j = 0 Q G i - Q D i - Σ j ∈ S N V i Y i j V j sinδ i j = 0 , i ∈ S N , 计算功率不平衡量ΔPi和ΔQi
其中:i为电网中的任一个节点,j为电网中节点i之外的任一个节点,PGi:为节点i的发电机有功功率;QGi:节点i的发电机无功功率;PDi:节点i的负荷有功功率;QDi为节点i的负荷无功功率;Vi为节点i的电压幅值;YB是电网各个节点之间的导纳元构成的导纳矩阵,反应了电网的电气结构关系;δij=δijij;δi为节点i的电压的相角;δj为节点j的电压相角;αij为对应导纳矩阵元素Yij的夹角,表示节点i和节点j之间的导纳夹角;SN为电网节点集合;M为最大迭代次数;
(1-1-3)校验功率不平衡量ΔPi和ΔQi的值,若max|(ΔPi,ΔQi)|<ε,则收敛,然后进行网络等值,其中收敛精度ε=10-6
若max|(ΔPi,ΔQi)|≥ε,利用 ∂ Δ P ∂ δ ∂ Δ P ∂ V ∂ Δ Q ∂ δ ∂ Δ Q ∂ V Δ δ Δ V = - Δ P Δ Q 计算不平衡量ΔV和Δδ;
其中,为有功功率偏量对节点电压相角的偏导;为有功功率偏量对电压的偏导;为无功功率偏量对节点电压相角的偏导;为无功功率偏量对电压的偏导;Δδ为节点电压相角增量;ΔV为节点电压增量,ΔP为一维列向量:ΔP=(ΔP1,ΔP2,…ΔPi),i∈SN;ΔQ为一维列向量:ΔQ=(ΔQ1,ΔQ2,…ΔQi),i∈SN
(1-1-4)利用方程 Δ V = V ( k + 1 ) - V ( k ) Δ δ = δ ( k + 1 ) - δ ( k ) 求解V(k+1)和δ(k+1),使k值增加1,当max|(ΔPi,ΔQi)|≥ε时,重复步骤(1-1-2);
其中,V(k+1)为迭代次数k增加1后电网所有节点新的电压迭代值,为δ(k+1)为迭代次数k增加1后电网所有节点新的相角迭代值,为 δ ( k + 1 ) = ( δ 1 ( k + 1 ) , δ 2 ( k + 1 ) , ... δ i ( k + 1 ) ) , i ∈ S N ;
(1-2)若k>M,则通过最优潮流对网架参数、发电机的有功功率PGi、无功功率QGi出力大小进行调整计算:
(1-2-1)重新读取网架数据和运行数据,设定迭代次数k1=0,最大迭代次数限制为k1max=N,设置节点电压Vi=1和节点相角δi=0,设置松弛变量li=1,ui=1,拉格朗日乘子zi=1,wi=-0.5,yi=0;σ∈(0,1)称为中心参数,根据网架参数生成导纳矩阵YB
(1-2-2)
当k1<N时,计算互补间隙Gap=lTz-uTw,如果互补间隙Gap<ε,则最优潮流收敛,然后进行网络等值,其中收敛精度ε=10-6,r为常数;
其中,l为一维列向量,lT是l的转置,l=(l1,l2,…li),i∈r;u为一维列向量,uT是u的转置,u=(u1,u2,…ui),i∈r;z为一维列向量:z=(z1,z2,…zi),i∈r;w为一维列向量:w=(w1,w2,…wi),i∈r;
若Gap≥ε,则利用μ=σ(lTz-uTw)/(2r)计算扰动因子μ,并计算修正方程组 { - [ ▿ x 2 f ( x ) - ▿ x 2 h ( x ) y - ▿ x 2 g ( x ) ( z + w ) ] Δ x + ▿ x h ( x ) Δ y + ▿ x g ( x ) ( Δ z + Δ w ) = L x ▿ x h T ( x ) Δ x = - L y ▿ x g T ( x ) Δ x - Δ x = - L z ▿ x g T ( x ) Δ x + Δ u = - L w Z Δ l + L Δ z = - L l μ W Δ u + U Δ w = - L u μ ,
L x ≡ ▿ x f ( x ) - ▿ x h ( x ) y - ▿ x g ( x ) ( z + w ) = 0 L y ≡ h ( x ) = 0 L z ≡ g ( x ) - l - g ‾ = 0 L w ≡ g ( x ) + u - g ‾ = 0 ;
其中,扰动互补条件为 { L l μ = L Z e - μ e = 0 L u μ = U W e + μ e = 0 ,
目标函数: f ( · ) = Σ i ∈ S G N P G i - Σ i ∈ S D N P D i
变量:x=(PG,QR,δ,V),其中,h(x)为潮流方程(1)式;为潮流方程对状态变量的一阶偏导;为潮流方程对状态变量的二阶偏导;g(x)为不等式方程组;为不等式方程组对状态变量的一阶偏导;为不等式方程组对状态变量的二阶偏导;L表示以li为对角线的矩阵;Z表示以zi为对角线的矩阵;W表示以wi对角线的矩阵;是目标函数对状态变量的一阶导数;目标函数对状态变量的二阶导数;PGi:第i台机组有功出力;PDi:第i节点有功负荷;SGN:发电机集合;SDN:负荷集合;c表示单位1的一维列向量;N为最大迭代次数,根据所运行的省地县电网大小所确定的有限循环次数;x=(PG,QR,δ,V),PG表示发电机节点的控制变量;QR表示PV节点的控制变量;δ表示所有节点的电压相角的状态变量;V表示所有节点的电压幅值状态变量;
(1-2-3)计算得出Δx、Δy、Δl、Δu、Δz、Δw,利用 &alpha; p = 0.9995 min { min i ( - l i &Delta;l i , &Delta;l i < 0 ; - u i &Delta;u i , &Delta;u i < 0 ) , 1 } &alpha; d = 0.9995 min { min i ( - z i &Delta;z i , &Delta;z i < 0 ; - w i &Delta;w i , &Delta;w i > 0 ) , 1 } , i = 1 , 2 , ... , r , 计算迭代步长αp和αd
(1-2-4)利用 x ( k + 1 ) = x ( k ) + &alpha; p &Delta; x l ( k + 1 ) = l ( k ) + &alpha; p &Delta; l u ( k + 1 ) = u ( k ) + &alpha; p &Delta; u y ( k + 1 ) = y ( k ) + &alpha; d &Delta; y z l ( k + 1 ) = z ( k ) + &alpha; d &Delta; z w ( k + 1 ) = w ( k ) + &alpha; d &Delta; w 计算x(k+1),l(k+1),u(k+1),y(k +1),zl (k+1)和w(k+1);使k1的值增加1,转入步骤(1-2-1);
(1-3)若max|(ΔPi,ΔQi)|<ε,则将省地县数据文件进行Ward网络等值,得到网架数据和系统运行数据;
(1-4)重复步骤(1-1-1)至(1-1-4)计算网架数据和系统运行数据是否收敛,若k1>N,则用户控制计算机选择其它时间尺度的网架数据和系统运行数据并重复步骤(1-1-1)至(1-3)进行省地县潮流计算;
(1-5)如果潮流计算max|(ΔPi,ΔQi)|<ε,则从生成的等值网络数据文件中解析出多时间尺度的省地县一体化无功优化所需的网架数据及系统运行数据;
(1-6)对解析出的多时间尺度的省地县一体化无功优化所需的网架数据及运行数据进行联合优化:
(1-6-1)读取网架数据和运行数据,设定迭代次数k2=0,最大迭代次数限制为kmax=M2,设定节点电压Vi=1和节点相角δi=0,设定松弛变量li=1,ui=1,拉格朗日乘子zi=1,wi=-0.5,yi=0;其中,中心参数σ∈(0,1),根据网架参数生成导纳矩阵YB
(1-6-2)当k2<M2时,计算互补间隙Gap=lTz-uTw,如果互补间隙Gap<ε,则最优无功计算收敛,生成包含电网各个节点无功功率分布、变电站无功设备投切数量以及变压器分接头位置的结果文件,其中收敛精度ε=10-6;若Gap≥ε,则利用μ=σ(lTz-uTw)/(2r)计算扰动因子μ,并计算修正方程组
{ - &lsqb; &dtri; x 2 f ( x ) - &dtri; x 2 h ( x ) y - &dtri; x 2 g ( x ) ( z + w ) &rsqb; &Delta; x + &dtri; x h ( x ) &Delta; y + &dtri; x g ( x ) ( &Delta; z + &Delta; w ) = L x &dtri; x h T ( x ) &Delta; x = - L y &dtri; x g T ( x ) &Delta; x - &Delta; x = - L z &dtri; x g T ( x ) &Delta; x + &Delta; u = - L w Z &Delta; l + L &Delta; z = - L l &mu; W &Delta; u + U &Delta; w = - L u &mu; ;
L x &equiv; &dtri; x f ( x ) - &dtri; x h ( x ) y - &dtri; x g ( x ) ( z + w ) = 0 L y &equiv; h ( x ) = 0 L z &equiv; g ( x ) - l - g &OverBar; = 0 L w &equiv; g ( x ) + u - g &OverBar; = 0
扰动互补条件 { L l &mu; = L Z e - &mu; e = 0 L u &mu; = U W e + &mu; e = 0 ,
P i j s e t = ( V i s e t ) 2 Y i j s e t cos&alpha; i j s e t - V i s e t Y j s e t cos&delta; i j s e t , ( I i j s e t ) 2 = ( V i s e t ) 2 ( Y i j s e t ) 2 + ( V j s e t ) 2 ( Y i j s e t ) 2 - 2 V i s e t ( Y i j s e t ) 2 V j s e t cos ( &delta; i s e t + &alpha; i j s e t ) cos ( &delta; j s e t + &alpha; i j s e t ) - 2 V i s e t ( Y i j s e t ) 2 V j s e t sin ( &delta; i s e t + &alpha; i j s e t ) sin ( &delta; j s e t + &alpha; i j s e t )
其中,r为不等式约束的个数,
h ( x ) = P G i s e t - P D i s e t - &Sigma; j &Element; S N s e t V i s e t Y i j s e t V j s e t cos&delta; i j s e t = 0 i &Element; S N s e t Q G i s e t - Q D i s e t - &Sigma; j &Element; S N s e t V i s e t Y i j s e t V j s e t sin&delta; i j s e t = 0 i &Element; S N s e t ( k i j s e t 1 - k i j 1 s e t 1 ) ( k i j s e t 1 - k i j 2 s e t 1 ) ... ( k i j s e t 1 - k i j m s e t 1 ) = 0 i , j &Element; S K s e t ( Q C i s e t - Q C i 1 s e t ) ( Q C i s e t - Q C i 2 s e t ) ... ( Q C i s e t - Q C i m s e t ) = 0 i &Element; S T s e t
目标函数: f ( &CenterDot; ) = &Sigma; i &Element; S G N s e t P G i s e t - &Sigma; i &Element; S D N s e t P D i s e t &Sigma; i &Element; S G N s e t Q G i s e t - &Sigma; i &Element; S D N s e t Q D i s e t
变量:x=(PG,QR,δ,V)
其中,h(x)为潮流方程式;为潮流方程对状态变量的一阶偏导;为潮流方程对状态变量的二阶偏导;g(x)为不等式方程组;为不等式方程组对状态变量的一阶偏导;为不等式方程组对状态变量的二阶偏导;L表示以li为对角线的矩阵;Z表示以zi为对角线的矩阵;W表示以wi对角线的矩阵;是目标函数对状态变量的一阶导数;目标函数对状态变量的二阶导数;αij:节点导纳矩阵对应元素的夹角;省地县第i台机组有功出力;省地县第i节点有功负荷;省地县第i台机组无功出力;省地县第i节点无功负荷;省地县发电机集合;省地县负荷集合;为省地该变压器抽头的各档位对应值,m为其总档位,为省地可调变压器组集合;为该可调电容组投切组数的对应无功出力值,m为其总组数,为省地县可调电容组集合;c表示单位1的一维列向量;M2为最大迭代次数,根据所运行的省地县电网大小所确定的有限循环次数;上标set∈{s,x,d}的含义分别为:s为省,d为地,x为县;由于县级变压器不可调,因此调压器分接头调节只针对省地所属的变压器,上标set1∈{s,d}的含义分别为:s为省,d为地;x=(PG,QR,δ,V),PG表示发电机节点的控制变量;QR表示PV节点的控制变量;δ表示所有节点的电压相角的状态变量;V表示所有节点的电压幅值状态变量;
(1-6-3)计算得出Δx、Δy、Δl、Δu、Δz、Δw,利用 &alpha; p = 0.9995 min { min i ( - l i &Delta;l i , &Delta;l i < 0 ; - u i &Delta;u i , &Delta;u i < 0 ) , 1 } &alpha; d = 0.9995 min { min i ( - z i &Delta;z i &Delta;z i < 0 ; - w i &Delta;w i , &Delta;w i > 0 ) , 1 } , i = 1 , 2 , ... , r , 计算迭代步长αp和αd
(1-6-4)利用 x ( k + 1 ) = x ( k ) + &alpha; p &Delta; x l ( k + 1 ) = l ( k ) + &alpha; p &Delta; l u ( k + 1 ) = u ( k ) + &alpha; p &Delta; u y ( k + 1 ) = y ( k ) + &alpha; d &Delta; y z l ( k + 1 ) = z ( k ) + &alpha; d &Delta; z w ( k + 1 ) = w ( k ) + &alpha; d &Delta; w 计算x(k+1),l(k+1),u(k+1),y(k +1),zl(k+1)和w(k+1);使k2值增加1,转入步骤(1-6-2);
(1-7)若多时间尺度的省地县一体化无功优化计算互补间隙Gap<ε,则无功优化收敛,根据无功优化计算对主变分接开关档位调节、无功补偿器投切量以及部分变电站增加电容器和电抗器详细情况更新初始的数据文件并生成新的省地县数据文件;
(1-8)如果迭代次数k2>M2意味着多时间尺度的省地县一体化无功优化计算不收敛或生成的省地县数据文件校验结果不收敛,则调整节点电压不等式约束的上下限,转入步骤(1-6-1);
(1-9)根据无功优化模块计算收敛后生成的结果文件,结果文件包括整个系统的无功功率分布、各节点的无功补偿量、变压器变比分接头位置、无功补偿装置投切量、节点电压分布、系统的有功损耗、系统的无功损耗、省与地之间的无功功率交换量、地与县之间的无功功率交换量、发电厂的有功出力和无功出力,对数据进行分类形成标准的电网分析报表;
(1-10)计算机根据电网分析报表中的分析结果及运行方式调整策略报告,调节主变分接开关档位,调节电网中每个无功补偿器投切量并调节电网中部分变电站的电容器和\或电抗器的数量,确定每座变电站的变压器抽头档位、电容器投切组数、电网中发电机节点的本地发电机机端电压和功率。
本发明的多时间尺度的省地县一体化无功优化方法是一种考虑了年规律、季规律、月规律、日规律、超短时固有惯性规律和随机成份的省地县一体化无功优化方法。能够实现多时间尺度的省地县一体化无功优化,给出多时间尺度连续的无功电压优化配置策略,实现电力系统长、中、短期各电压等级间的无功电压优化运行,提高全网的电压合格率,保障电网的持续的安全稳定运行,为制定电网的运行方式、合理且优化的利用发电资源提供理论依据,能够有效的确保电网安全稳定持续运行。
作为优选,时间尺度为5个,分别为年度、季度、月度、天、滚动超短期;滚动超短期为15分钟。
作为优选,
所述网架数据包含省地县整个地区或部分区域的网络线路参数,接地支路参数和变压器参数,网络线路参数包括电抗值xlineij、电阻值rlineij和导纳值blineij,接地支路参数包括电导值Gi和电纳值Bi,变压器参数包括电抗值xlineij、电阻值rlineij和变比klineij
系统运行参数模块包含省地县的整个网络或部分区域的运行参数和PV节点参数,运行参数包括发电机节点运行参数PGi、QGi,和负荷节点的运行参数PDi、QDi,PV节点参数包括节点电压Vi和无功功率上下限Qi
作为优选,M为3至20,N为3至20,M2为10至100。
作为优选,结果文件包括整个系统的无功功率分布、各节点的无功补偿量、变压器变比分接头位置、无功补偿装置投切量、节点电压分布、系统的有功损耗、系统的无功损耗、省与地之间的无功功率交换量、地与县之间的无功功率交换量、发电厂的有功出力和无功出力。
与现有技术方案相比,本发明的有益效果是:
针对目前电网无功优化管理分散、繁杂的特点,设计并实现了一种先进的多时间尺度的省地县一体化无功优化计算放法,计算过程可以全网联立计算,也可以通过边界条件并行计算,计算方式灵活。该方法将省地县高中低网络无功优化计算、分析集成于一体,利用科学的无功优化计算、比较、分析手段,为实现生产决策提供技术支持。方法主要分三个等级进行无功优化,主要为:单独无功优化、分级无功优化、全局无功优化。单独无功优化针对某地区的负荷水平以及电压质量进行跟踪补偿,实现就地补偿和就地平衡,降低线损,提高补偿效率。分级无功优化针对不同的网区电压等级以及用户负荷类型的,需要无功补偿的方式不同。全局无功优化是针对单独无功优化以及分级无功优化不合理方案可能导致局部无功供过于求或者整体无功不平衡等问题进行无功优化,再加上该方法还考虑多时段时间尺度,更能够充分性地考虑了电网复杂的电网特性规律进行无功优化,能够使整个地区无功设备最优利用,系统无功达到平衡,无功补偿设备费用减少,同时也减小了电网的网络损耗,保证各电压等级间的电压质量,满足国家有关法律法规相关技术标准。解决了传统无功优化的多方面不足,在国内外均没有先例。
附图说明
图1为本发明的实施例的一种流程图。
具体实施方式
下面参照附图,详细叙述本发明的具体实施方案。
如图1所示实施例是一种联合省地县电力系统多时间尺度的省地县一体化无功优化方法,包括如下步骤:
步骤100选择要优化的电网范围,对应其电网的网架数据和电网的运行数据,计算机中设有2011年年度、2011年夏季、2011年5月、2011年5月15日,用户控制计算机选择时间尺度为2011年年度的网架数据和运行数据进行省地县潮流计算:
步骤101,读取网架数据和运行数据,网架数据包括电网网架参数,运行数据包括系统运行的参数,设定Vi=1和δi=0,设定迭代次数k=0,最大迭代次数kmax=M,根据网架参数生成导纳矩阵YB;导纳矩阵YB中包含电网的网架结构关系;
步骤102,利用潮流方程,计算功率不平衡量ΔPi和ΔQi
步骤103,校验功率不平衡量ΔPi和ΔQi的值,若max|(ΔPi,ΔQi)|<ε,则收敛,然后进行网络等值,其中收敛精度ε=10-6
若max|(ΔPi,ΔQi)|≥ε利用 &part; &Delta; P &part; &delta; &part; &Delta; P &part; V &part; &Delta; Q &part; &delta; &part; &Delta; Q &part; V &Delta; &delta; &Delta; V = - &Delta; P &Delta; Q 计算不平衡量ΔV和Δδ;
步骤104,利用 &Delta; V = V ( k + 1 ) - V ( k ) &Delta; &delta; = &delta; ( k + 1 ) - &delta; ( k ) 求解V(k+1)和δ(k+1),使k值增加1,当max|(ΔPi,ΔQi)|≥ε时,重复步骤102;
步骤200,若k>20,则通过最优潮流对网架参数、发电机的有功功率PGi、无功功率QGi出力大小进行调整计算:
步骤201,重新读取网架数据和运行数据,设定迭代次数k1=0,最大迭代次数限制为k1max=20,设置节点电压Vi=1和节点相角δi=0,设置松弛变量li=1,ui=1,拉格朗日乘子zi=1,wi=-0.5,yi=0;σ∈(0,1)称为中心参数,根据网架参数生成导纳矩阵YB
步骤202,当k1<20时,计算互补间隙Gap=lTz-uTw,如果互补间隙Gap<ε,则最优潮流收敛,然后进行网络等值,其中收敛精度ε=10-6
若Gap≥ε,则利用μ=σ(lTz-uTw)/(2r)计算扰动因子μ,并计算修正方程组 { - &lsqb; &dtri; x 2 f ( x ) - &dtri; x 2 h ( x ) y - &dtri; x 2 g ( x ) ( z + w ) &rsqb; &Delta; x + &dtri; x h ( x ) &Delta; y + &dtri; x g ( x ) ( &Delta; z + &Delta; w ) = L x &dtri; x h T ( x ) &Delta; x = - L y &dtri; x g T ( x ) &Delta; x - &Delta; x = - L z &dtri; x g T ( x ) &Delta; x + &Delta; u = - L w Z &Delta; l + L &Delta; z = - L l &mu; W &Delta; u + U &Delta; w = - L u &mu; ,
L x &equiv; &dtri; x f ( x ) - &dtri; x h ( x ) y - &dtri; x g ( x ) ( z + w ) = 0 L y &equiv; h ( x ) = 0 L z &equiv; g ( x ) - l - g &OverBar; = 0 L w &equiv; g ( x ) + u - g &OverBar; = 0 ;
步骤203,计算得出Δx、Δy、Δl、Δu、Δz、Δw,利用方程 { &alpha; p = 0.9995 min { min i ( - l i &Delta;l i , &Delta;l i < 0 ; - u i &Delta;u i , &Delta;u i < 0 ) , 1 } &alpha; d = 0.9995 min { min i ( - z i &Delta;z i &Delta;z i < 0 ; - w i &Delta;w i , &Delta;w i > 0 ) , 1 } , i = 1 , 2 , ... , r , 计算迭代步长αp和αd
步骤204,利用 x ( k + 1 ) = x ( k ) + &alpha; p &Delta; x l ( k + 1 ) = l ( k ) + &alpha; p &Delta; l u ( k + 1 ) = u ( k ) + &alpha; p &Delta; u y ( k + 1 ) = y ( k ) + &alpha; d &Delta; y z l ( k + 1 ) = z ( k ) + &alpha; d &Delta; z w ( k + 1 ) = w ( k ) + &alpha; d &Delta; w 计算x(k+1),l(k+1),u(k+1),y(k+1),zl (k+1)和w(k+1);使k1的值增加1,转入步骤201;
步骤300,若max|(ΔPi,ΔQi)|<ε,则将省地县数据文件进行Ward网络等值,得到网架数据和系统运行数据;
步骤400,重复步骤101至104计算网架数据和系统运行数据是否收敛,若k1>N,则用户控制计算机选择其它时间尺度的网架数据和系统运行数据并重复步骤101至300进行省地县潮流计算;
步骤500,如果潮流计算max|(ΔPi,ΔQi)|<ε,则从生成的等值网络数据文件中解析出多时间尺度的省地县一体化无功优化所需的网架数据及系统运行数据;
步骤600,对解析出的多时间尺度的省地县一体化无功优化所需的网架数据及运行数据进行联合优化:
步骤601,根据所得的网架结构参数和系统运行参数与数据库给定的变压器、电容器、电抗器参数相结合,生成多时间尺度的省地县一体化无功优化计算模块所需要的数据文件;
步骤602,读取网架数据和运行数据,设定迭代次数k2=0,最大迭代次数限制为kmax=50,设定节点电压Vi=1和节点相角δi=0,设定松弛变量li=1,ui=1,拉格朗日乘子zi=1,wi=-0.5,yi=0;其中,中心参数σ∈(0,1),根据网架参数生成导纳矩阵YB
步骤603,当k2<50时,计算互补间隙Gap=lTz-uTw,如果互补间隙Gap<ε,则最优无功计算收敛,生成包含电网各个节点无功功率分布、变电站无功设备投切数量以及变压器分接头位置的结果文件,其中收敛精度ε=10-6;若Gap≥ε,则利用μ=σ(lTz-uTw)/(2r)计算扰动因子μ,并计算修正方程组
{ - &lsqb; &dtri; x 2 f ( x ) - &dtri; x 2 h ( x ) y - &dtri; x 2 g ( x ) ( z + w ) &rsqb; &Delta; x + &dtri; x h ( x ) &Delta; y + &dtri; x g ( x ) ( &Delta; z + &Delta; w ) = L x &dtri; x h T ( x ) &Delta; x = - L y &dtri; x g T ( x ) &Delta; x - &Delta; x = - L z &dtri; x g T ( x ) &Delta; x + &Delta; u = - L w Z &Delta; l + L &Delta; z = - L l &mu; W &Delta; u + U &Delta; w = - L u &mu; ;
L x &equiv; &dtri; x f ( x ) - &dtri; x h ( x ) y - &dtri; x g ( x ) ( z + w ) = 0 L y &equiv; h ( x ) = 0 L z &equiv; g ( x ) - l - g &OverBar; = 0 L w &equiv; g ( x ) + u - g &OverBar; = 0 ;
步骤604,计算得出Δx、Δy、Δl、Δu、Δz、Δw,利用方程 &alpha; p = 0.9995 min { min i ( - l i &Delta;l i , &Delta;l i < 0 ; - u i &Delta;u i , &Delta;u i < 0 ) , 1 } &alpha; d = 0.9995 min { min i ( - z i &Delta;z i &Delta;z i < 0 ; - w i &Delta;w i , &Delta;w i > 0 ) , 1 } , i = 1 , 2 , ... , r , 计算迭代步长αp和αd
步骤605,利用 x ( k + 1 ) = x ( k ) + &alpha; p &Delta; x l ( k + 1 ) = l ( k ) + &alpha; p &Delta; l u ( k + 1 ) = u ( k ) + &alpha; p &Delta; u y ( k + 1 ) = y ( k ) + &alpha; d &Delta; y z l ( k + 1 ) = z ( k ) + &alpha; d &Delta; z w ( k + 1 ) = w ( k ) + &alpha; d &Delta; w 计算x(k+1),l(k+1),u(k+1),y(k+1),zl (k+1)和w(k+1);使k2值增加1,转入步骤603;
步骤700,若多时间尺度的省地县一体化无功优化计算互补间隙Gap<ε,则无功优化收敛,根据无功优化计算对主变分接开关档位调节、无功补偿器投切量以及部分变电站增加电容器和电抗器详细情况更新初始的数据文件并生成新的省地县数据文件;
步骤800,如果迭代次数k2>50意味着多时间尺度的省地县一体化无功优化计算不收敛或生成的省地县数据文件校验结果不收敛,则调整节点电压不等式约束的上下限,转入步骤602;
步骤900,根据无功优化模块计算收敛后生成的结果文件,对数据进行分类形成标准的电网分析报表;
步骤1000,计算机根据电网分析报表中的分析结果及运行方式调整策略报告,调节主变分接开关档位,调节电网中每个无功补偿器投切量并调节电网中部分变电站的电容器和\或电抗器的数量,确定每座变电站的变压器抽头档位、电容器投切组数、电网中发电机节点的本地发电机机端电压和功率。
步骤1100,将多时间尺度的省地县一体化无功优化计算模块计算前和计算后的无功电压控制设备的状态值进行统计形成无功电压分析报告,包括:500kV变压器抽头位置及对应电压值、500kV变电站无功补偿容量汇总表、220kV变电站无功补偿容量汇总表、电网统调机组出力汇总表、优化前后网损统计情况;110kV变电站无功补偿容量汇总表、电网统调机组出力汇总表、优化前后网损统计情况;35kV变电站无功补偿容量汇总表、优化前后网损统计情况;10kV优化前后网损统计情况;
步骤1200,通过分析多时间尺度的省地县一体化无功优化计算模块的计算结果给出电网省地县无功一体化配置的优化策略,用于指导实际运行方式的调整,包括:变压器各电压等级抽头档位调整、当前无功补偿配置情况下的电容器和电抗器投切量、部分变电站增加电容器和电抗器配置的建议,经过这些策略的调整,会使电网的有功功率损耗以及无功功率损耗降低,电网的电压质量提高,系统的稳定性加强。
本发明的多时间尺度的省地县一体化无功优化计算是在给定系统网络结构和系统负荷的情况下,保证满足用户用电需求的前提下,优化电力系统的静态运行条件,通过调节控制变量使指定的目标函数值达到最小,同时满足系统对控制变量、状态变量及变量函数的物理限制和运行限制。调节控制变量包括发电机的有功无功出力,变压器分接头,电容器组分组投切等。通过无功优化不仅可以保证全网的电压质量,而且能取得可观的经济效益,能实现电能质量、系统运行的安全性和经济性。
本发明中的控制变量参数设置包括:有功出力、无功出力、变压器抽头、电容电抗器投切组数。其中:有功出力设置为按照要求将一些电厂的有功出力设为可调;无功出力要求有功有限制的PV节点、电网外等值节点和电网的所有平衡节点的无功出力均可调;变压器抽头均可调;电网500kV、220kV、110kV、35kV、10kV变电站电容电抗器均可调。所有变电站的电容器最大允许补偿容量为现有配置补偿容量的80%,所有变电站的电抗器最大允许补偿容量均为现有电抗器配置容量。
其约束条件参数设置包括:无功负荷模型、节点电压。其中:无功负荷模型全部加入约束限制;节点电压限制包括500kV、220kV、110kV、35kV、10kV母线电压,发电机端电压,限制范围如表1所示。
表1节点电压限制范围:
表2多时间尺度的省地县一体化无功优化前后某电网500kV主变分接头位置:
本发明实施例的优化前后某电网500kV主变分接头位置如表2所示。通过联合优化,找出满足电网网损最小的各变压器分接头。
表3电网某多时间尺度的省地县一体化无功优化前后大方式网损率:
表4电网某多时间尺度的省地县一体化无功优化前后小方式网损率:
根据多时间尺度省地县运行方式无功优化联调大方式下优化前后的供电量、网损电量,通过网损率计算公式可计算出电网的网损率。某电网多时间尺度的省地县一体化无功优化前后大方式网损率情况如表3所示,优化后有功网损比优化前少5.89MW,网损率降低0.0353%。某电网多时间尺度的省地县一体化无功优化前后小方式网损率情况如表4所示,优化后有功网损比优化前少4.26MW,网损率降低0.0772%。
应理解,本实施例仅用于说明本发明而不用于限制本发明的范围。此外应理解,在阅读了本发明讲授的内容之后,本领域技术人员可以对本发明作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围。

Claims (5)

1.一种电力系统多时间尺度的省地县一体化无功优化方法,其特征是,包括下列步骤:
(1-1)选择要优化的电网范围,获得对应的电网的网架数据和电网的运行数据,计算机中设有若干个时间尺度,用户控制计算机选择至少一个1个时间尺度的网架数据和运行数据进行省地县潮流计算:
(1-1-1)读取网架数据和运行数据,网架数据包括网架参数,运行数据包括系统运行的参数,设定Vi=1和δi=0,Vi为第i个节点的电压幅值,δi为第i个节点的电压相角,i为系统节点编号,设定迭代次数k=0,最大迭代次数kmax=M,根据网架参数生成导纳矩阵YB;导纳矩阵YB中包含电网的网架结构关系;
(1-1-2)利用潮流方程,计算功率不平衡量ΔPi和ΔQi
(1-1-3)校验功率不平衡量ΔPi和ΔQi的值,若max|(ΔPi,ΔQi)|<ε,则收敛,然后进行网络等值,其中收敛精度ε=10-6
若max|(ΔPi,ΔQi)|≥ε,利用计算不平衡量ΔV和Δδ;
其中,为有功功率偏量对节点电压相角的偏导;为有功功率偏量对电压的偏导;为无功功率偏量对节点电压相角的偏导;为无功功率偏量对电压的偏导;Δδ为节点电压相角增量;ΔV为节点电压幅值增量,ΔP为一维列向量:ΔP=(ΔP1,ΔP2,…ΔPi),i∈SN,ΔPi为第i节点的有功功率偏量;ΔQ为一维列向量:ΔQ=(ΔQ1,ΔQ2,…ΔQi),i∈SN,ΔQi为第i节点的无功功率偏量;SN为电网节点集合;
(1-1-4)利用求解V(k+1)和δ(k+1),V(k+1)为第k+1次迭代的电压幅值,V(k)为第k次迭代的电压幅值,δ(k+1)为第k+1次迭代的电压相角,δ(k)为第k次迭代的电压相角,使k值增加1,当max|(ΔPi,ΔQi)|≥ε时,重复步骤(1-1-2);
(1-2)若k>M,则通过最优潮流对网架参数、发电机的有功功率PGi、无功功率QGi出力大小进行调整计算:
(1-2-1)重新读取网架数据和运行数据,设定迭代次数k1=0,最大迭代次数限制为k1max=N,设置节点电压Vi=1和节点相角δi=0,设置松弛变量ln=1,un=1,拉格朗日乘子zn=1,wn=-0.5,yn=0;σ∈(0,1)称为中心参数,根据网架参数生成导纳矩阵YB
(1-2-2)当k1<N时,计算互补间隙Gap=lTz-uTw,如果互补间隙Gap<ε,则最优潮流收敛,然后进行网络等值,其中收敛精度ε=10-6,r为常数,Sr=1,2,…,r;
其中,l为一维列向量,lT是l的转置,ln∈(l1,l2,…,lr),n∈Sr,ln为第n个下界松弛变量;u为一维列向量,uT是u的转置,un∈(u1,u2,…ur),n∈Sr,un为第n个上界松弛变量;z为一维列向量:zn∈(z1,z2,…zr),n∈Sr,zn为第n个下界不等式约束的拉格朗日乘子;w为一维列向量:wn∈(w1,w2,…wr),n∈Sr,wn为第n个上界不等式约束的拉格朗日乘子;
若Gap≥ε,则利用μ=σ(lTz-uTw)/(2r)计算扰动因子μ,并计算修正方程组
L x &equiv; &dtri; x f ( x ) - &dtri; x h ( x ) y - &dtri; x g ( x ) ( z + w ) = 0 L y &equiv; h ( x ) = 0 L z &equiv; g ( x ) = - g &OverBar; = 0 L w &equiv; g ( x ) + u - g &OverBar; = 0 ;
变量:x=(PG,QR,δ,V);Δx,Δy,Δl,Δu,Δz,Δw分别表示变量x,y,l,u,z,w的修正量;y为等式约束h(x)对应的拉格朗日乘子变量;h(x)为潮流方程式;为潮流方程对状态变量的一阶偏导;为潮流方程对状态变量的一阶偏导的转置;为潮流方程对状态变量的二阶偏导;g(x)为不等式方程组;为不等式方程组对状态变量的一阶偏导;为不等式方程组对状态变量的一阶偏导的转置;为不等式方程组对状态变量的二阶偏导;是目标函数对状态变量的一阶导数;目标函数对状态变量的二阶导数;L表示以l为对角线的矩阵;Z表示以z为对角线的矩阵;W表示以w对角线的矩阵;U表示以u为对角线的矩阵;Lx,Ly,Lz,Lw分别表示对变量x,y,z,w,l,u求偏导后在给定点处的数值;g分别表示不等式约束的下界和上界;
(1-2-3)计算得出Δx、Δy、Δl、Δu、Δz、Δw,利用方程计算迭代步长αp和αd,Δln、Δun、Δzn、Δwn分别表示变量ln、un、zn、wn的增量;
(1-2-4)利用计算 分别表示x,l,u,y,z,w第k1+1次的迭代值,k1表示第k1次迭代;使k1的值增加1,转入步骤(1-2-1);
(1-3)若max|(ΔPi,ΔQi)|<ε,则将省地县数据文件进行Ward网络等值,得到网架数据和系统运行数据;
(1-4)重复步骤(1-1-1)至(1-1-4)计算网架数据和系统运行数据是否收敛,若k1>N,则用户控制计算机选择其它时间尺度的网架数据和系统运行数据并重复步骤(1-1-1)至(1-3)进行省地县潮流计算;
(1-5)如果潮流计算max|(ΔPi,ΔQi)|<ε,则从生成的等值网络数据文件中解析出多时间尺度的省地县一体化无功优化所需的网架数据及系统运行数据;
(1-6)对解析出的多时间尺度的省地县一体化无功优化所需的网架数据及运行数据进行联合优化:
(1-6-1)读取网架数据和运行数据,设定迭代次数k2=0,最大迭代次数限制为k2max=M2,设定节点电压和节点相角 为第i1个节点的电压幅值,为第i1个节点的电压相角,i1为省地县一体化无功优化系统节点编号,设置松弛变量ln=1,un=1,拉格朗日乘子zn=1,wn=-0.5,yn=0;σ∈(0,1)称为中心参数,根据网架参数生成导纳矩阵YB
(1-6-2)当k2<M2时,计算互补间隙Gap=lTz-uTw,如果互补间隙Gap<ε,则最优无功计算收敛,生成包含电网各个节点无功功率分布、变电站无功设备投切数量以及变压器分接头位置的结果文件,其中收敛精度ε=10-6
若Gap≥ε,则利用μ=σ(lTz-uTw)/(2r)计算扰动因子μ,并计算修正方程组
L x &equiv; &dtri; x f ( x ) - &dtri; x h ( x ) y - &dtri; x g ( x ) ( z + w ) = 0 L y &equiv; h ( x ) = 0 L z &equiv; g ( x ) = - g &OverBar; = 0 L w &equiv; g ( x ) + u - g &OverBar; = 0 ;
扰动互补条件
P i 1 j 1 s e t = ( V i 1 s e t ) 2 Y i 1 j 1 s e t cos&alpha; i 1 j 1 s e t - V i 1 s e t Y i 1 j 1 s e t V j 1 s e t cos&delta; i 1 j 1 s e t ,
( I i 1 j 1 s e t ) 2 = ( V i 1 s e t ) 2 ( Y i 1 j 1 s e t ) 2 + ( V j 1 s e t ) 2 ( Y i 1 j 1 s e t ) 2 - 2 V i 1 s e t ( Y i 1 j 1 s e t ) 2 V j 1 s e t cos ( &delta; i 1 s e t + &alpha; i 1 j 1 s e t ) cos ( &delta; j 1 s e t + &alpha; i 1 j 1 s e t ) - 2 V i 1 s e t ( Y i 1 j 1 s e t ) 2 V j 1 s e t sin ( &delta; i 1 s e t + &alpha; i 1 j 1 s e t ) sin ( &delta; j 1 s e t + &alpha; i 1 j 1 s e t )
h ( x ) = P G m s e t - P D m s e t - &Sigma;V i 1 s e t Y i 1 j 1 s e t V j 1 s e t cos&delta; i 1 j 1 s e t = 0 m &Element; S G N s e t ; w &Element; S D s e t ; i 1 , j 1 &Element; S N s e t Q G m s e t - Q D w s e t - &Sigma;V i 1 s e t Y i 1 j 1 s e t V j 1 s e t sin&delta; i 1 j 1 s e t = 0 m &Element; S G N s e t ; w &Element; S D s e t ; i 1 , j 1 &Element; S N s e t ( k u v s e t 1 - k u v 1 s e t 1 ) ( k u v s e t 1 - k u v 2 s e t 1 ) ... ( k u v s e t 1 - k u v q s e t 1 ) = 0 u , v &Element; S K s e t 1 ( Q C t s e t - Q C t 1 s e t ) ( Q C t s e t - Q C t 2 s e t ) ... ( Q C t s e t - Q C t p s e t ) = 0 t &Element; S C s e t
目标函数:
变量:x=(PG,QR,δ,V)
其中,h(x)为潮流方程式;为潮流方程对状态变量的一阶偏导;为潮流方程对状态变量的一阶偏导的转置;为潮流方程对状态变量的二阶偏导;g(x)为不等式方程组;为不等式方程组对状态变量的一阶偏导;为不等式方程组对状态变量的一阶偏导的转置;为不等式方程组对状态变量的二阶偏导;是目标函数对状态变量的一阶导数;目标函数对状态变量的二阶导数;L表示以l为对角线的矩阵;Z表示以z为对角线的矩阵;W表示以w对角线的矩阵;U表示以u为对角线的矩阵;省地县第i1个节点的电压幅值;省地县第j1个节点的电压幅值;省地县电网节点集合;省地县第m台发电机有功功率;省地县第w节点有功负荷;省地县第m台机组无功出力;省地县第w节点无功负荷;省地县发电机集合;省地县负荷集合;为省地变压器分接头的各档位对应值,q为其总档位,为省地可调变压器组集合;为可调电容组投切组数的对应无功出力值,p为其总组数,为省地县可调电容组集合;为省地县支路有功集合;为省地县支路电流集合;为省地县线路i1j1的节点导纳幅值;为省地县线路i1j1的节点导纳角度;为省地县节点i1的电压角度;为省地县节点j1的电压角度;为省地县节点i1和节点j1电压角度之差;e表示单位1的一维列向量;M2为最大迭代次数,根据所运行的省地县电网大小所确定的有限循环次数;上标set∈{s,x,d}的含义分别为:s为省,d为地,x为县;由于县级变压器不可调,因此调压器分接头调节只针对省地所属的变压器,上标set1∈{s,d}的含义分别为:s为省,d为地;x=(PG,QR,δ,V),PG表示发电机节点的控制变量;QR表示PV节点的控制变量;δ表示所有节点的电压相角的状态变量;V表示所有节点的电压幅值状态变量;
(1-6-3)计算得出Δx、Δy、Δl、Δu、Δz、Δw,利用方程计算迭代步长αp和αd
(1-6-4)利用计算 分别表示x,l,u,y,z,w第k2+1次的迭代值,上标k2表示第k2次迭代;使k2值增加1,转入步骤(1-6-2);
(1-7)若多时间尺度的省地县一体化无功优化计算互补间隙Gap<ε,则无功优化收敛,根据无功优化计算对主变分接开关档位调节、无功补偿器投切量以及部分变电站增加电容器和电抗器详细情况更新初始的数据文件并生成新的省地县数据文件;
(1-8)如果迭代次数k2>M2意味着多时间尺度的省地县一体化无功优化计算不收敛或生成的省地县数据文件校验结果不收敛,则调整节点电压不等式约束的上下限,转入步骤(1-6-1);
(1-9)根据无功优化模块计算收敛后生成的结果文件,对数据进行分类形成标准的电网分析报表;
(1-10)计算机根据电网分析报表中的分析结果及运行方式调整策略报告,调节主变分接开关档位,调节电网中每个无功补偿器投切量并调节电网中部分变电站的电容器和\或电抗器的数量,确定每座变电站的变压器分接头档位、电容器投切组数、电网中发电机节点的本地发电机机端电压和功率。
2.根据权利要求1所述的电力系统多时间尺度的省地县一体化无功优化方法,其特征是,时间尺度为5个,分别为年度、季度、月度、天、滚动超短期;滚动超短期为15分钟。
3.根据权利要求1所述的电力系统多时间尺度的省地县一体化无功优化方法,其特征是,所述网架数据包含省地县整个地区或部分区域的网络线路参数,接地支路参数和变压器参数,网络线路参数包括电抗值电阻值和导纳值接地支路参数包括电导值和电纳值变压器参数包括电抗值电阻值和变比
系统运行参数模块包含省地县的整个网络或部分区域的运行参数和PV节点参数,运行参数包括发电机节点运行参数PGm、QGm,和负荷节点的运行参数PDw、QDw,PV节点参数包括节点电压和无功功率上下限
4.根据权利要求1所述的电力系统多时间尺度的省地县一体化无功优化方法,其特征是,M为3至20,N为3至20,M2为10至100。
5.根据权利要求1或2或3或4所述的电力系统多时间尺度的省地县一体化无功优化方法,其特征是,结果文件包括整个系统的无功功率分布、各节点的无功补偿量、变压器分接头位置、无功补偿装置投切量、节点电压分布、系统的有功损耗、系统的无功损耗、省与地之间的无功功率交换量、地与县之间的无功功率交换量、发电厂的有功功率和无功功率。
CN201310562447.3A 2013-11-13 2013-11-13 电力系统多时间尺度的省地县一体化无功优化方法 Active CN103730900B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310562447.3A CN103730900B (zh) 2013-11-13 2013-11-13 电力系统多时间尺度的省地县一体化无功优化方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310562447.3A CN103730900B (zh) 2013-11-13 2013-11-13 电力系统多时间尺度的省地县一体化无功优化方法

Publications (2)

Publication Number Publication Date
CN103730900A CN103730900A (zh) 2014-04-16
CN103730900B true CN103730900B (zh) 2016-08-17

Family

ID=50454878

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310562447.3A Active CN103730900B (zh) 2013-11-13 2013-11-13 电力系统多时间尺度的省地县一体化无功优化方法

Country Status (1)

Country Link
CN (1) CN103730900B (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104037781B (zh) * 2014-05-21 2016-05-25 中国农业大学 电网无功协调控制方法及装置
CN104091291A (zh) * 2014-07-17 2014-10-08 上海交通大学 一种电力系统多尺度柔性评价方法
CN106953359B (zh) * 2017-04-21 2019-08-27 中国农业大学 一种含分布式光伏配电网有功无功协调优化控制方法
CN109191330B (zh) * 2018-09-25 2022-07-19 深圳供电局有限公司 线损电量计算方法、装置、计算机设备和存储介质
CN110867870B (zh) * 2019-12-16 2020-12-29 贵州电网有限责任公司 一种时间尺度电压无功协调控制方法
CN114006379B (zh) * 2021-11-25 2023-08-15 华北电力大学(保定) 基于动-静无功置换机制的双时间尺度电压控制方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3642749B2 (ja) * 2001-07-12 2005-04-27 日本碍子株式会社 無効電力補償装置の運転制御方法
JP2006325380A (ja) * 2005-05-17 2006-11-30 Keiichi Sato 電圧・無効電力制御システム及び電圧・無効電力制御方法
CN101540509A (zh) * 2009-01-12 2009-09-23 杭州德力西集团有限公司 一种变电站的电压无功控制方法
CN102005765A (zh) * 2010-11-18 2011-04-06 西北电网有限公司 一种适用于大型风电场并网运行无功功率可控可调方法
CN203103965U (zh) * 2012-12-21 2013-07-31 辽宁省电力有限公司电力科学研究院 基于实际电网增量式多目标分区动态无功优化系统
JP5575599B2 (ja) * 2010-09-30 2014-08-20 株式会社日立製作所 無効電力補償装置およびその制御方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3642749B2 (ja) * 2001-07-12 2005-04-27 日本碍子株式会社 無効電力補償装置の運転制御方法
JP2006325380A (ja) * 2005-05-17 2006-11-30 Keiichi Sato 電圧・無効電力制御システム及び電圧・無効電力制御方法
CN101540509A (zh) * 2009-01-12 2009-09-23 杭州德力西集团有限公司 一种变电站的电压无功控制方法
JP5575599B2 (ja) * 2010-09-30 2014-08-20 株式会社日立製作所 無効電力補償装置およびその制御方法
CN102005765A (zh) * 2010-11-18 2011-04-06 西北电网有限公司 一种适用于大型风电场并网运行无功功率可控可调方法
CN203103965U (zh) * 2012-12-21 2013-07-31 辽宁省电力有限公司电力科学研究院 基于实际电网增量式多目标分区动态无功优化系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基于Ward等值的多区域无功优化分解协调算法;刘志文等;《电力系统自动化》;20100725;第34卷(第14期);第63页-第69页 *
基于外网等值的多区域电力系统无功优化计算;刘志文;《国博士学位论文全文数据库 工程科技Ⅱ辑 》;20111215(第12期);C042-42 *

Also Published As

Publication number Publication date
CN103730900A (zh) 2014-04-16

Similar Documents

Publication Publication Date Title
CN103730900B (zh) 电力系统多时间尺度的省地县一体化无功优化方法
CN109861202B (zh) 一种柔性互联配电网动态优化调度方法及系统
CN106655207A (zh) 基于多数据分析的配电网无功优化系统及方法
CN107947192A (zh) 一种下垂控制型孤岛微电网的无功优化配置方法
CN106779277B (zh) 一种配电网网损的分类评估方法及装置
CN103441506B (zh) 不同时间尺度下多目标协调分散风电场无功优化控制方法
CN102522756B (zh) 一种避免电压越限风险的电网感性无功补偿方法
CN106208099B (zh) 一种基于二层规划的电力系统无功优化方法及其应用
CN105811433B (zh) 一种大电网无功补偿自动选址及容量优化方法
CN109638873A (zh) 一种分布式光伏集群优化调度方法和系统
CN104362650B (zh) 一种考虑成本因素的电力系统无功优化方法
CN104158199A (zh) 对电力系统实时状态进行无功电压优化控制的系统和方法
CN105529703B (zh) 一种基于供电能力瓶颈分析的城市电网改造规划方法
CN106503915A (zh) 基于模糊综合评价法的无功补偿装置综合效益评价方法
CN105870968A (zh) 一种计及系统负序电压的三相不平衡无功电压控制方法
CN111079972A (zh) 一种主动配电网可靠性规划方法、设备及介质
CN102163845B (zh) 基于功率矩法的分布式电源优化配置方法
CN112134309A (zh) 一种适用于配电网分布式电压控制的新型分区方法
CN103490428A (zh) 微电网无功补偿容量配置方法及系统
CN114676569B (zh) 电网仿真分析算例及其生成方法、生成系统、设备、介质
CN108536917A (zh) 一种输配电网全局电压稳定控制的分布式计算方法
CN103824124B (zh) 一种针对电网公司的节能潜力评估方法
CN102709955A (zh) 一种基于多断面潮流控制的方法
CN102904265B (zh) 一种基于区间潮流的变电站电压无功控制方法和系统
CN104700205B (zh) 一种改变电网网络拓扑结构及选择并联补偿装置的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant