CN103726617B - Build roofing and plant green three layers of pre-control root thorn method - Google Patents

Build roofing and plant green three layers of pre-control root thorn method Download PDF

Info

Publication number
CN103726617B
CN103726617B CN201310707267.XA CN201310707267A CN103726617B CN 103726617 B CN103726617 B CN 103726617B CN 201310707267 A CN201310707267 A CN 201310707267A CN 103726617 B CN103726617 B CN 103726617B
Authority
CN
China
Prior art keywords
paving
coiled material
root resistance
resistance carbon
root
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310707267.XA
Other languages
Chinese (zh)
Other versions
CN103726617A (en
Inventor
葛加君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pizhou Binhe Sme Management Service Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310707267.XA priority Critical patent/CN103726617B/en
Publication of CN103726617A publication Critical patent/CN103726617A/en
Application granted granted Critical
Publication of CN103726617B publication Critical patent/CN103726617B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/254Roof garden systems; Roof coverings with high solar reflectance
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B80/00Architectural or constructional elements improving the thermal performance of buildings
    • Y02B80/32Roof garden systems

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of roofing of building and plant green three layers of pre-control root thorn method, comprise the step such as base treatment, spraying rubber cement, paving aluminium tin pewter coiled material, the paving of complex copper tire base SBS modified asphalt waterproof coiled material, root resistance carbon place mat.Easy construction of the present invention, root resistance control thorn performance is good.

Description

Build roofing and plant green three layers of pre-control root thorn method
Technical field
The present invention relates to adjustment roofing and plant green technology roofing root-resistant puncturing method.
Background technology
Along with the continuous deterioration of climatic environment, air layer pollutes more and more serious, and the haze frequency of occurrences is more and more higher, carbonization concentration is more and more closeer, land resources is fewer and feweri, and urban heat land effect is more and more obvious, thus advances construction roofing to plant green technology and seems more and more important.The national U.S. of west prosperity, Germany, Britain's roofing are planted green area and are occupied larger specific gravity, and south China roofing is planted and greenly also occupied certain ratio.But plant green technology roofing root-resistant puncturing technology at construction roofing and be still technical difficult point, do not have to solve very well, green construction 2-3 planted by some roofings, its roofing carries out seepage, basic reason roofing root system of plant is through concrete plank layer, have to keep in repair, expend fund, manually, affect using function and effect.
Summary of the invention
Green three layers of pre-control root thorn method planted by the construction roofing that the object of the present invention is to provide a kind of root resistance control to sting performance good.
Technical solution of the present invention is:
Green three layers of pre-control root thorn method planted by a kind of roofing of building, and it is characterized in that: comprise the following steps:
(1) base treatment: after roofing basal plane is formed, sweep off floating dust, cuts redundance, fills up recessed portion, then carries out levelling with mortar, makes roofing smooth, and the degree of deviation is ± 2mm;
(2) spray rubber cement: adopt 325# cement: water: 901 glue=1:0.3:0.2 weight ratio mixing, stir, then even application is on toft face, and thickness is 3mm;
(3) paving aluminium tin pewter coiled material: when after rubber cement spraying, paving aluminium tin pewter coiled material, during paving, paving from top to bottom, sealing overlap joint >=5cm, carries out nip drum 1-2 time from top to bottom with Ф 20mm steel pipe after place mat, is convenient to closely knit; Sealing is welded: adopt electric welding machine to carry out sealing welding;
(4) complex copper tire base SBS modified asphalt waterproof coiled material paving: brush away aluminium tin pewter coiled material surface and float layer, foreign material; Then brushing basal plane agent: bituminous neoprene bonding adhesive is added gasoline and dilutes, stir, evenly brushes on aluminium tin pewter coiled material with round brush, at normal temperatures, brushes and within latter 4 hours, starts to carry out paving complex copper tire base SBS modified asphalt waterproof coiled material;
Complex copper tire base SBS modified asphalt waterproof coiled material adopts hot melt to carry out paving, unreels while heating edge paving during paving; Hot melt edge sealing: heated by complex copper tire base SBS modified asphalt waterproof coiled material lap-joint fired heater, makes both be connected firmly while hot, and overflow pitch for degree with edge, it is tight that end receives head sealing compound pointing;
To calm the anger compacting: after the paving of complex copper tire base SBS modified asphalt waterproof coiled material, carry out nip drum from top to bottom with Ф 20cm steel pipe, air is extruded, bondingly with aluminium tin pewter coiled material become overall;
(5) root resistance carbon place mat:
Root resistance carbon configures: root resistance carbon is made up of charcoal, lime, clay three kinds of materials, and configuration part by weight 3:1:1, proportionally mixes, even mix, form root resistance carbon;
Root resistance carbon place mat, at the root resistance carbon-coating that copper tire base SBS modified asphalt waterproof coiled material surface uniform place mat 0.5cm is thick, sprays water after paving, every m 2water spray 0.3kg, after surface is solid, rolls with hollow steel and carries out compacting from top to bottom;
Root resistance carbon face is protected, root resistance carbon-coating surface, brushing one deck pitch, and covers one deck geotextiles.
Charcoal in root resistance carbon is the powdery of particle diameter <1mm; Lime is pulverized limestone, and sieves with eyelet Ф <1mm steel sieve, removing impurity, and clay dries for passing through or dries, and carries out pulverizing or pulverizing, and sieves with eyelet Ф <1mm steel sieve, removing impurity.
Easy construction of the present invention, root resistance control thorn performance is good.
First floor of the present invention is closed root resistance puncture layer, adopt aluminium tin pewter coiled material, this tensile strength of material >=20Mpa, fracture elongation >=30%, root-resistant puncturing is tested sharp root system and is not punctured for more than 10 years, is up to state standards, low-temperature tenderness-30, Ф 20mm drum, by damaging impact flawless or perforation.By aluminium tin pewter coiled material, root system, on concrete pavement or on plank surface layer and on other surface layer, is directly carried out prevention puncture by place mat, and this one deck is closure root resistance puncture layer.
The second layer is flexible closure, and half initiative resists root resistance puncture layer, when after roofing basal plane place mat aluminium tin pewter coiled material, and place mat complex copper tire base SBS modified asphalt waterproof coiled material, this material soluble content>=2900g/m 2, pulling force>=800 IV/50mm, fracture elongation>=40%, root-resistant puncturing is tested sharp root system and is not punctured for more than 8 years, heat resistance 105 DEG C, low temperature flexibility-25 DEG C, this material has closure root resistance performance, and root resistance dynamics is not as good as aluminium tin pewter coiled material, but this material has a kind of pitch chemicals, when phytem enters this layer, during contact pitch, there is burn phytem function, play root resistance puncture effect.
Third layer is antagonism root resistance puncture layer.When after second layer complex copper tire SBS modified asphalt waterproof coiled material place mat, the root resistance carbon that place mat one deck 0.5cm is thick, root resistance carbon presses 1:1:3 proportional arrangement by lime, clay, charcoal, when root system enters this layer, being forced property grows round about, must not enter lower floor, because charcoal and plant phytem have antagonism, and charcoal has stability, the time, longer root resistance effect was better, was an antagonistic root resistance puncture measure.
Adopt above three layers of root resistance puncture measure, form three layers of root resistance lancing system, carry out and have complementary advantages.
Below in conjunction with embodiment, the invention will be further described.
Detailed description of the invention
Green three layers of pre-control root thorn method planted by a kind of roofing of building, and comprise the following steps:
(1) base treatment: after roofing basal plane is formed, sweep off floating dust, cuts redundance, fills up recessed portion, then carries out levelling with mortar, makes roofing smooth, and the degree of deviation is ± 2mm;
(2) spray rubber cement: adopt 325# cement: water: 901 glue=1:0.3:0.2 weight ratio mixing, stir, then even application is on toft face, and thickness is 3mm;
(3) paving aluminium tin pewter coiled material: when after rubber cement spraying, paving aluminium tin pewter coiled material, during paving, paving from top to bottom, sealing overlap joint >=5cm, carries out nip drum 1-2 time from top to bottom with Ф 20mm steel pipe after place mat, is convenient to closely knit; Sealing is welded: adopt electric welding machine to carry out sealing welding;
(4) complex copper tire base SBS modified asphalt waterproof coiled material paving: brush away aluminium tin pewter coiled material surface and float layer, foreign material; Then brushing basal plane agent: bituminous neoprene bonding adhesive is added gasoline and dilutes, bituminous neoprene bonding adhesive and gasoline weight ratio are 10:2, stir, evenly brush on aluminium tin pewter coiled material with round brush, at normal temperatures, brush and within latter 4 hours, start to carry out paving complex copper tire base SBS modified asphalt waterproof coiled material;
Complex copper tire base SBS modified asphalt waterproof coiled material adopts hot melt to carry out paving, unreels while heating edge paving during paving; Hot melt edge sealing: heated by complex copper tire base SBS modified asphalt waterproof coiled material lap-joint fired heater, makes both be connected firmly while hot, and overflow pitch for degree with edge, it is tight that end receives head sealing compound pointing;
To calm the anger compacting: after the paving of complex copper tire base SBS modified asphalt waterproof coiled material, carry out nip drum from top to bottom with Ф 20cm steel pipe, air is extruded, bondingly with aluminium tin pewter coiled material become overall;
(5) root resistance carbon place mat:
Root resistance carbon configures: root resistance carbon is made up of charcoal, lime, clay three kinds of materials, and configuration part by weight 3:1:1, proportionally mixes, even mix, form root resistance carbon;
Root resistance carbon place mat, at the root resistance carbon-coating that copper tire base SBS modified asphalt waterproof coiled material surface uniform place mat 0.5cm is thick, sprays water after paving, every m 2water spray 0.3kg, after surface is solid, rolls with hollow steel and carries out compacting from top to bottom;
Root resistance carbon face is protected, root resistance carbon-coating surface, brushing one deck pitch, and covers one deck geotextiles.
Charcoal in root resistance carbon is the powdery of particle diameter <1mm; Lime is pulverized limestone, and sieves with eyelet Ф <1mm steel sieve, removing impurity, and clay dries for passing through or dries, and carries out pulverizing or pulverizing, and sieves with eyelet Ф <1mm steel sieve, removing impurity.

Claims (2)

1. green three layers of pre-control root thorn method planted by construction roofing, it is characterized in that: comprise the following steps:
(1) base treatment: after roofing basal plane is formed, sweep off floating dust, cuts redundance, fills up recessed portion, then carries out levelling with mortar, makes roofing smooth, and the degree of deviation is ± 2mm;
(2) spray rubber cement: adopt 325# cement: water: 901 glue=1:0.3:0.2 weight ratio mixing, stir, then even application is on toft face, and thickness is 3mm;
(3) paving aluminium tin pewter coiled material: when after rubber cement spraying, paving aluminium tin pewter coiled material, during paving, paving from top to bottom, sealing overlap joint >=5cm, carries out nip drum 1-2 time from top to bottom with Ф 20mm steel pipe after place mat, is convenient to closely knit; Sealing is welded: adopt electric welding machine to carry out sealing welding;
(4) complex copper tire base SBS modified asphalt waterproof coiled material paving: brush away aluminium tin pewter coiled material surface and float layer, foreign material; Then brushing basal plane agent: bituminous neoprene bonding adhesive is added gasoline and dilutes, stir, evenly brushes on aluminium tin pewter coiled material with round brush, at normal temperatures, brushes and within latter 4 hours, starts to carry out paving complex copper tire base SBS modified asphalt waterproof coiled material;
Complex copper tire base SBS modified asphalt waterproof coiled material adopts hot melt to carry out paving, unreels while heating edge paving during paving; Hot melt edge sealing: heated by complex copper tire base SBS modified asphalt waterproof coiled material lap-joint fired heater, makes both be connected firmly while hot, and overflow pitch for degree with edge, it is tight that end receives head sealing compound pointing;
To calm the anger compacting: after the paving of complex copper tire base SBS modified asphalt waterproof coiled material, carry out nip drum from top to bottom with Ф 20cm steel pipe, air is extruded, bondingly with aluminium tin pewter coiled material become overall;
(5) root resistance carbon place mat:
Root resistance carbon configures: root resistance carbon is made up of charcoal, lime, clay three kinds of materials, and configuration part by weight 3:1:1, proportionally mixes, even mix, form root resistance carbon;
Root resistance carbon place mat, at the root resistance carbon-coating that copper tire base SBS modified asphalt waterproof coiled material surface uniform place mat 0.5cm is thick, sprays water after paving, every m 2water spray 0.3kg, after surface is solid, rolls with hollow steel and carries out compacting from top to bottom;
Root resistance carbon face is protected, root resistance carbon-coating surface, brushing one deck pitch, and covers one deck geotextiles.
2. green three layers of pre-control root thorn method planted by construction roofing according to claim 1, it is characterized in that: the charcoal in root resistance carbon is the powdery of particle diameter <1mm; Lime is pulverized limestone, and sieves with eyelet Ф <1mm steel sieve, removing impurity, and clay dries for passing through or dries, and carries out pulverizing or pulverizing, and sieves with eyelet Ф <1mm steel sieve, removing impurity.
CN201310707267.XA 2013-12-20 2013-12-20 Build roofing and plant green three layers of pre-control root thorn method Expired - Fee Related CN103726617B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310707267.XA CN103726617B (en) 2013-12-20 2013-12-20 Build roofing and plant green three layers of pre-control root thorn method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310707267.XA CN103726617B (en) 2013-12-20 2013-12-20 Build roofing and plant green three layers of pre-control root thorn method

Publications (2)

Publication Number Publication Date
CN103726617A CN103726617A (en) 2014-04-16
CN103726617B true CN103726617B (en) 2015-10-21

Family

ID=50450888

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310707267.XA Expired - Fee Related CN103726617B (en) 2013-12-20 2013-12-20 Build roofing and plant green three layers of pre-control root thorn method

Country Status (1)

Country Link
CN (1) CN103726617B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105165314B (en) * 2015-07-30 2017-07-21 葛加君 Roofing length takes root in plant setting method
CN105603771B (en) * 2015-12-21 2018-04-03 潍坊市宏源防水材料有限公司 A kind of high extension copper tire base root resistant waterproof roll and preparation method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2637987A1 (en) * 1976-08-24 1978-03-02 Andreas Boeck Cover for embankment or roof - with moulded plastic sheets supporting plant roots and sepd. from roof by plastic spacers
US4669246A (en) * 1985-02-15 1987-06-02 The Dow Chemical Company Insulated roofing system with water repellent fabric
KR100659039B1 (en) * 2006-02-28 2006-12-21 중앙방수기업주식회사 Root isolation sheet for roof, roof complex waterproof and root isolation layer structure using root isolation sheet, embossing polyvinyl sheet and rubber-asphalt membrane waterproofing material and method thereof
CN201433516Y (en) * 2009-07-10 2010-03-31 天津市奇才防水材料有限公司 Self-adhesive root penetration resistant waterproof rolling material for planted roof
CN101812901A (en) * 2010-04-09 2010-08-25 葛加君 Root-resistant puncturing method of green vegetation roof alloy dripping surface
CN101942891A (en) * 2010-09-30 2011-01-12 北京立高科技股份有限公司 Roof ecological planting system and construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2637987A1 (en) * 1976-08-24 1978-03-02 Andreas Boeck Cover for embankment or roof - with moulded plastic sheets supporting plant roots and sepd. from roof by plastic spacers
US4669246A (en) * 1985-02-15 1987-06-02 The Dow Chemical Company Insulated roofing system with water repellent fabric
KR100659039B1 (en) * 2006-02-28 2006-12-21 중앙방수기업주식회사 Root isolation sheet for roof, roof complex waterproof and root isolation layer structure using root isolation sheet, embossing polyvinyl sheet and rubber-asphalt membrane waterproofing material and method thereof
CN201433516Y (en) * 2009-07-10 2010-03-31 天津市奇才防水材料有限公司 Self-adhesive root penetration resistant waterproof rolling material for planted roof
CN101812901A (en) * 2010-04-09 2010-08-25 葛加君 Root-resistant puncturing method of green vegetation roof alloy dripping surface
CN101942891A (en) * 2010-09-30 2011-01-12 北京立高科技股份有限公司 Roof ecological planting system and construction method thereof

Also Published As

Publication number Publication date
CN103726617A (en) 2014-04-16

Similar Documents

Publication Publication Date Title
CN101899889B (en) Waterproof roll with plant root impaling resistance and manufacturing method thereof
CN1163567C (en) Double waterproof materials of asphalt mastic spread film and sheet on concrete structure and its working method
KR101434523B1 (en) Seismic Retrofitting of Concrete Structures by using Coating Fiber Mesh Grid and Inorganic Cementitious Matrix Composite
CN105400429B (en) Uncured polymer-modified asphalt water-repellent paint and preparation method thereof
CN103465540A (en) Preparation method and construction method of non-cured rubber asphalt paint and coil composite waterproof layer
CN100999893A (en) Anti-splitting paster and preparation method thereof
CN205077733U (en) Waterproof roof boarding of flat roof deck
CN107905052A (en) A kind of heat in low temperature season mixes temperature and pressure asphalt concrete construction method
CN104927372A (en) Asphalt size used for producing APP plastic body modified asphalt waterproofing material and preparation method and application thereof
CN205077739U (en) Plant roof waterproof roof boarding
CN111119416A (en) Planting roof and construction method
CN103726617B (en) Build roofing and plant green three layers of pre-control root thorn method
CN108086603A (en) A kind of anti-water-stopping system of existing roofing and prevent water roofing
KR100711994B1 (en) The rooftop for recording waterproofing rootproof sheet, and, the manufacturing method
KR101027655B1 (en) Rubberized asphalt pileup layers waterproofing materials with root barrier for the green roof and artificial foundation and its application method
CN102817445B (en) Self-repairing anti-root-penetrating concrete waterproof structure and construction method thereof
CN106589985A (en) Preparation method of root resistant and saline-alkaline tolerant waterproof roll
CN101109207A (en) Water-proof heat-preserving integrated protection layer roofing construction method
CN205617555U (en) Roof root resistance waterproof construction is planted to basement
CN108086490A (en) A kind of anti-water-stopping system and ground in underground, top surface and elevation construction method
CN101586367B (en) Method for preventing decorative surfaces of ceramic tiles in shower room from leaking water
CN204547227U (en) Carry the waterproof thermal-insulated composite sheet material of self-adhesion of welding edge
CN103755296B (en) Roofing plants root resistance carbon and preparation and the cultural method of green root resistance control thorn
CN108558269A (en) A kind of note formula conductive asphalt concrete, deck installation structure and method for paving
CN105862544B (en) A kind of double-layer stress absorption band and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191128

Address after: 221000 No.1, Zhangjiagang East Road, Yitang Town, Pizhou City, Xuzhou City, Jiangsu Province

Patentee after: Pizhou Binhe SME Management Service Co., Ltd.

Address before: 226400, Development Building, east side of Taishan Road, digging Town, Rudong County, Jiangsu, Nantong 1002

Patentee before: Ge Jiajun

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151021

Termination date: 20191220

CF01 Termination of patent right due to non-payment of annual fee