CN103696516A - 一种点式拉结现浇复合混凝土剪力墙及其施工方法 - Google Patents

一种点式拉结现浇复合混凝土剪力墙及其施工方法 Download PDF

Info

Publication number
CN103696516A
CN103696516A CN201410015142.5A CN201410015142A CN103696516A CN 103696516 A CN103696516 A CN 103696516A CN 201410015142 A CN201410015142 A CN 201410015142A CN 103696516 A CN103696516 A CN 103696516A
Authority
CN
China
Prior art keywords
shear wall
drawknot
cast
concrete
sandwich board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410015142.5A
Other languages
English (en)
Other versions
CN103696516B (zh
Inventor
张晶廷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHIJIAZHUANG JINGDA BUILDING SYSTEM CO Ltd
Original Assignee
SHIJIAZHUANG JINGDA BUILDING SYSTEM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHIJIAZHUANG JINGDA BUILDING SYSTEM CO Ltd filed Critical SHIJIAZHUANG JINGDA BUILDING SYSTEM CO Ltd
Priority to CN201410015142.5A priority Critical patent/CN103696516B/zh
Publication of CN103696516A publication Critical patent/CN103696516A/zh
Application granted granted Critical
Publication of CN103696516B publication Critical patent/CN103696516B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及一种点式拉结现浇复合混凝土剪力墙,包括保温夹芯板和浇筑在保温夹芯板两侧的室内混凝土层、室外混凝土层,在室内混凝土层中铺设有由剪力墙内箍筋捆扎的剪力墙内主筋,保温夹芯板与剪力墙内主筋通过连接件相固定,其特征在于:所述的保温夹芯板由保温板、设置在保温板室外侧的钢丝网架和将保温板与钢丝网架相固定的拉结杆组成,拉结杆的室外侧端与钢丝网架相固定,拉结杆的室内侧端穿过保温板并与连接件相固定。本发明的有益效果是:由于保温夹芯板去除了斜插钢筋和一侧的钢丝网架,使得生产成本大幅下降,以及使用单肢箍钢筋作为连接件,使得安装更为方便、快捷,使得产品的总体造价大幅减低、提高了工作效率。

Description

一种点式拉结现浇复合混凝土剪力墙及其施工方法
技术领域
本发明涉及建筑构件、剪力墙技术领域,尤其是一种点式拉结现浇复合混凝土剪力墙及其施工方法。
背景技术
CL建筑结构体系,也称为复合保温钢筋焊接网架混凝土剪力墙,它是将一种永恒的节能技术措施融入墙体中,构成新型复合钢筋混凝土剪力墙结构体系,其原理是将隔热的聚苯泡沫板夹在墙体中间,两侧用钢丝与聚苯泡沫板固定,形成隔热的网架板,在工厂制作成受力钢筋与隔热保温材料融为一体的墙体骨架,即CL网架板,也叫钢丝网架保温夹芯板,在施工现场两侧浇筑混凝土后发挥受力和保温的双重作用。该结构的保温层耐久性好、耐火极限高;建筑保温与结构同寿命,该结构是解决目前建筑保温材料使用年限远小于建筑结构使用年限的一种方法。
但是在推广CL建筑结构体系的过程中,仍有一些不足之处阻碍了它的大力推广,比如:CL建筑结构体系的每单位一次性材料投资因为高出传统工艺几十元而不被开发商接受,还有因其采用的时自密实混凝土,对浇筑要求高,不能振捣,施工操作有些繁琐,这都是影响其广泛使用的重要原因。
发明内容
本发明的目的是提供一种减少成本、施工便捷的点式拉结现浇复合混凝土剪力墙及其施工方法。
为了完成上述目的,本发明采用的技术方案是:
一种点式拉结现浇复合混凝土剪力墙,包括保温夹芯板和浇筑在保温夹芯板两侧的室内混凝土层、室外混凝土层,在室内混凝土层中铺设有由剪力墙内箍筋捆扎的剪力墙内主筋,保温夹芯板与剪力墙内主筋通过连接件相固定,所述的保温夹芯板由保温板、设置在保温板室外侧的钢丝网架和将保温板与钢丝网架相固定的拉结杆组成,拉结杆的室外侧端与钢丝网架相固定,拉结杆的室内侧端穿过保温板并与连接件相固定。
所述的连接件为单肢箍钢筋,连接件的两端设有拉结钩,连接件两端的拉结钩开口方向相对或相反设置,连接件一端的拉结钩与剪力墙内主筋互相钩挂固定,连接件另一端的拉结钩与拉结杆的室内侧端互相钩挂固定。
所述的拉结杆包括贯穿保温板的螺杆,在螺杆上套装有设置在保温板室内侧和室外侧的固定垫片,螺杆的室内侧一端固定有圆环形的连接环,螺杆的室外侧一端固定有模板垫块,在螺杆上的室外侧固定垫片与模板垫块之间设有紧固螺母。
所述的模板垫块为圆形或方形的钢板,模板垫块的直径或边长大于螺杆的直径。
所述的螺杆直径与模板垫块的直径或边长的比值为1:3~1:5。
所述的拉结杆固定在钢丝网架的经线焊接筋与纬线焊接筋的交叉点处。
所述的拉结杆在保温夹芯板内呈矩阵分布且其分布密度为0.16m2/个。
一种点式拉结现浇复合混凝土剪力墙的施工方法,包括以下步骤:
A、预制保温夹芯板,根据施工尺寸需求,在工厂将保温夹芯板生产出来,保温夹芯板的尺寸为剪力墙的尺寸;
B、绑扎剪力墙内主筋,用剪力墙内箍筋将剪力墙内主筋绑扎呈网格状;
C、固定保温夹芯板,用连接件将保温夹芯板与剪力墙内主筋固定在一起,将用连接件将两端的拉结钩分别挂入拉结杆的连接环和网格状的剪力墙内主筋内,即完成固定保温夹芯板的工作;
D、模板支架,先在剪力墙内主筋的室内侧加装模板垫块,再将模板绑扎固定在剪力墙的两个侧壁上;
E、混凝土浇筑,在固定好的模板内浇筑混凝土,待混凝土凝土后即形成室内混凝土层和室外混凝土层;
F、拆除板模,待混凝土凝固后,将剪力墙两侧的板模拆除。
所述的步骤A中,在工厂生产保温夹芯板中,使用焊接固定将钢丝网架与拉结杆固定在一起,拉结杆与钢丝网架的经线焊接筋与纬线焊接筋的交叉点之间共两个焊接点。
所述的步骤E中,浇筑的混凝土采用的为普通混凝土,在浇筑的过程中还有混凝土振捣器进行振捣的操作。
本发明的有益效果是:由于保温夹芯板去除了斜插钢筋和一侧的钢丝网架,使得生产成本大幅下降,而且拉结杆一端固定的模板垫块和另一端固定的连接环,以及使用单肢箍钢筋作为连接件,使得保温夹芯板的安装更为方便、快捷,使得产品的总体造价大幅减低、提高了工作效率。
附图说明
图1是本发明的结构示意图。
图2是图1中保温夹芯板的结构示意图。
图3是图1中拉结杆的装配示意图。
图4是本发明中螺杆的焊接点位置示意图。
图中,1、剪力墙内箍筋,2、剪力墙内主筋,3、连接件,4、保温板,5、钢丝网架,6、拉结杆,7、螺杆,8、固定垫片,9、连接环,10、模板垫块,11、紧固螺母,12、经线焊接筋,13、纬线焊接筋,14、模板,15、焊接点。
具体实施方式
本发明为一种点式拉结现浇复合混凝土剪力墙及其施工方法,由于保温夹芯板去除了斜插钢筋和一侧的钢丝网架,使得生产成本大幅下降,而且拉结杆一端固定的模板垫块和另一端固定的连接环,以及使用单肢箍钢筋作为连接件,使得保温夹芯板的安装更为方便、快捷,使得产品的总体造价大幅减低、提高了工作效率。
下面结合附图对本发明做进一步说明。
具体实施例,如图1至图4所示,一种点式拉结现浇复合混凝土剪力墙,包括保温夹芯板和浇筑在保温夹芯板两侧的室内混凝土层、室外混凝土层,在室内混凝土层中铺设有由剪力墙内箍筋1捆扎的剪力墙内主筋2,保温夹芯板与剪力墙内主筋2通过连接件3相固定,为了降低生产成本,去除了原有保温夹芯板结构中的斜插钢筋和一侧的钢丝网架,将保温夹芯板设计为只由保温板4、设置在保温板4室外侧的钢丝网架5和将保温板4与钢丝网架5相固定的拉结杆6三部分组成,拉结杆6的室外侧端与钢丝网架5相固定,拉结杆6的室内侧端穿过保温板4并与连接件3相固定。为了保证拉结杆6在墙体内受力均匀且不超出其最大受力范围,将拉结杆6设计为在保温夹芯板内呈矩阵分布且其分布密度为0.16m2/个。
连接件3为单肢箍钢筋,连接件3的两端设有拉结钩,连接件3两端的拉结钩开口方向相对或相反设置,连接件3一端的拉结钩与剪力墙内主筋2互相钩挂固定,连接件3另一端的拉结钩与拉结杆6的室内侧端的连接环9互相钩挂固定。
拉结杆6包括贯穿保温板的螺杆7,在螺杆7上套装有设置在保温板4室内侧和室外侧的固定垫片8,螺杆7的室内侧一端固定有圆环形的连接环9,螺杆7的室外侧一端固定有模板垫块10,在螺杆7上的室外侧固定垫片8与模板垫块10之间设有紧固螺母11,模板垫块10为圆形或方形的钢板,模板垫块10的直径或边长大于螺杆7的直径,螺杆7直径与模板垫块10的直径或边长的比值为1:3~1:5,拉结杆6固定在钢丝网架5的经线焊接筋12与纬线焊接筋13的交叉点处。
一种点式拉结现浇复合混凝土剪力墙的施工方法,包括以下步骤:
A、预制保温夹芯板,根据施工尺寸需求,在工厂将保温夹芯板生产出来,保温夹芯板的尺寸为剪力墙的尺寸,在工厂生产保温夹芯板中,使用焊接固定将钢丝网架5与拉结杆6固定在一起,钢丝网架5的经线焊接筋12与纬线焊接筋13的交叉点和拉结杆6之间共两个焊接点;
B、绑扎剪力墙内主筋2,用剪力墙内箍筋1将剪力墙内主筋2绑扎呈网格状;
C、固定保温夹芯板,用连接件3将保温夹芯板与剪力墙内主筋2固定在一起,将用连接件3将两端的拉结钩分别挂入拉结杆6的连接环9和网格状的剪力墙内主筋2内,即完成固定保温夹芯板的工作;
D、模板14支架,先在剪力墙内主筋2的室内侧加装模板垫块,再将模板14绑扎固定在剪力墙的两个侧壁上;
E、混凝土浇筑,在固定好的模板14内浇筑混凝土,待混凝土凝土后即形成室内混凝土层和室外混凝土层,为了降低生产成本且不降低墙体强度以确保浇筑质量,浇筑的混凝土采用的为普通混凝土,在浇筑的过程中还有混凝土振捣器进行振捣的操作;
F、拆除板模14,待混凝土凝固后,将剪力墙两侧的板模14拆除。
由于本发明保温夹芯板去除了斜插钢筋和一侧的钢丝网架,使得生产成本大幅下降,而且拉结杆一端固定的模板垫块和另一端固定的连接环,以及使用单肢箍钢筋作为连接件,使得保温夹芯板的安装更为方便、快捷,使得产品的总体造价大幅减低、提高了工作效率。

Claims (10)

1.一种点式拉结现浇复合混凝土剪力墙,包括保温夹芯板和浇筑在保温夹芯板两侧的室内混凝土层、室外混凝土层,在室内混凝土层中铺设有由剪力墙内箍筋(1)捆扎的剪力墙内主筋(2),保温夹芯板与剪力墙内主筋(2)通过连接件(3)相固定,其特征在于:所述的保温夹芯板由保温板(4)、设置在保温板(4)室外侧的钢丝网架(5)和将保温板(4)与钢丝网架(5)相固定的拉结杆(6)组成,拉结杆(6)的室外侧端与钢丝网架(5)相固定,拉结杆(6)的室内侧端穿过保温板(4)并与连接件(3)相固定。
2.根据权利要求1所述的一种点式拉结现浇复合混凝土剪力墙,其特征在于:所述的连接件(3)为单肢箍钢筋,连接件(3)的两端设有拉结钩,连接件(3)两端的拉结钩开口方向相对或相反设置,连接件(3)一端的拉结钩与剪力墙内主筋(2)互相钩挂固定,连接件(3)另一端的拉结钩与拉结杆(6)的室内侧端互相钩挂固定。
3.根据权利要求1所述的一种点式拉结现浇复合混凝土剪力墙,其特征在于:所述的拉结杆(6)包括贯穿保温板的螺杆(7),在螺杆(7)上套装有设置在保温板(4)室内侧和室外侧的固定垫片(8),螺杆(7)的室内侧一端固定有圆环形的连接环(9),螺杆(7)的室外侧一端固定有模板垫块(10),在螺杆(7)上的室外侧固定垫片(8)与模板垫块(10)之间设有紧固螺母(11)。
4.根据权利要求3所述的一种点式拉结现浇复合混凝土剪力墙,其特征在于:所述的模板垫块(10)为圆形或方形的钢板,模板垫块(10)的直径或边长大于螺杆(7)的直径。
5.根据权利要求4所述的一种点式拉结现浇复合混凝土剪力墙,其特征在于:所述的螺杆(7)直径与模板垫块(10)的直径或边长的比值为1:3~1:5。
6.根据权利要求1所述的一种点式拉结现浇复合混凝土剪力墙,其特征在于:所述的拉结杆(6)固定在钢丝网架(5)的经线焊接筋(12)与纬线焊接筋(13)的交叉点处。
7.根据权利要求1所述的一种点式拉结现浇复合混凝土剪力墙,其特征在于:所述的拉结杆(6)在保温夹芯板内呈矩阵分布且其分布密度为0.16m2/个。
8.一种如权利要求1所述的点式拉结现浇复合混凝土剪力墙的施工方法,其特征在于包括以下步骤:
A、预制保温夹芯板,根据施工尺寸需求,在工厂将保温夹芯板生产出来,保温夹芯板的尺寸为剪力墙的尺寸;
B、绑扎剪力墙内主筋(2),用剪力墙内箍筋(1)将剪力墙内主筋(2)绑扎呈网格状;
C、固定保温夹芯板,用连接件(3)将保温夹芯板与剪力墙内主筋(2)固定在一起,将用连接件(3)将两端的拉结钩分别挂入拉结杆(6)的连接环(9)和网格状的剪力墙内主筋(2)内,即完成固定保温夹芯板的工作;
D、模板(14)支架,先在剪力墙内主筋(2)的室内侧加装模板垫块,再将模板(14)绑扎固定在剪力墙的两个侧壁上;
E、混凝土浇筑,在固定好的模板(14)内浇筑混凝土,待混凝土凝土后即形成室内混凝土层和室外混凝土层;
F、拆除板模(14),待混凝土凝固后,将剪力墙两侧的板模(14)拆除。
9.根据权利要求8所述的点式拉结现浇复合混凝土剪力墙的施工方法,其特征在于:所述的步骤A中,在工厂生产保温夹芯板中,使用焊接固定将钢丝网架(5)与拉结杆(6)固定在一起,钢丝网架(5)的经线焊接筋(12)与纬线焊接筋(13)的交叉点和拉结杆(6)之间共两个焊接点。
10.根据权利要求8所述的点式拉结现浇复合混凝土剪力墙的施工方法,其特征在于:所述的步骤E中,浇筑的混凝土采用的为普通混凝土,在浇筑的过程中还有混凝土振捣器进行振捣的操作。
CN201410015142.5A 2014-01-14 2014-01-14 一种点式拉结现浇复合混凝土剪力墙及其施工方法 Active CN103696516B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410015142.5A CN103696516B (zh) 2014-01-14 2014-01-14 一种点式拉结现浇复合混凝土剪力墙及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410015142.5A CN103696516B (zh) 2014-01-14 2014-01-14 一种点式拉结现浇复合混凝土剪力墙及其施工方法

Publications (2)

Publication Number Publication Date
CN103696516A true CN103696516A (zh) 2014-04-02
CN103696516B CN103696516B (zh) 2015-10-07

Family

ID=50358166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410015142.5A Active CN103696516B (zh) 2014-01-14 2014-01-14 一种点式拉结现浇复合混凝土剪力墙及其施工方法

Country Status (1)

Country Link
CN (1) CN103696516B (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064538A (zh) * 2015-07-31 2015-11-18 王惠滨 现浇混凝土剪力墙自保温系统及其制作方法
CN106284899A (zh) * 2016-09-20 2017-01-04 周述文 保温一体化超薄面板固定结构及其制作安装方法
CN107304579A (zh) * 2016-04-25 2017-10-31 天津武铄科技有限公司 一种建筑用外墙保温结构及其施工方法
CN107989238A (zh) * 2017-12-13 2018-05-04 刘家宇 一种现浇夹心保温剪力墙结构、装配式建筑及工法
CN108005263A (zh) * 2018-01-15 2018-05-08 安徽建筑大学 新型预制保温墙体螺栓式连接件
CN108487552A (zh) * 2018-05-22 2018-09-04 李凤东 一种免拆模板系统的挑件
CN108547393A (zh) * 2018-04-26 2018-09-18 尤书建 一种点拉式拉结现浇复合混凝土填充墙
CN109972752A (zh) * 2019-05-14 2019-07-05 承德建元科技有限公司 一种带拉结栓轻质防火复合保温板材及其装配方法
CN110029757A (zh) * 2019-05-14 2019-07-19 承德建元科技有限公司 一种内置保温现浇混凝土复合剪力墙及其施工方法
CN110219387A (zh) * 2019-06-17 2019-09-10 濮阳恒瑞建材科技有限公司 一种焊接装配式网架板
CN111502083A (zh) * 2020-01-21 2020-08-07 北京首钢建设集团有限公司 一种防止cl板移位的方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2243818A1 (en) * 1997-07-24 1999-01-24 Eco-Block, Llc Concrete form system
CN101294423A (zh) * 2008-05-30 2008-10-29 河南省第一建筑工程集团有限责任公司 混凝土结构外墙面内置保温层的施工方法
FR2924139A1 (fr) * 2007-11-28 2009-05-29 Saint Gobain Isover Sa Systeme d'isolation de batiments par l'exterieur
CN102926469A (zh) * 2012-10-29 2013-02-13 吴方伯 一种现浇保温隔热梁、柱、剪力墙及施工方法
CN103243837A (zh) * 2013-05-23 2013-08-14 石家庄晶达建筑体系有限公司 一种专用于复合剪力墙结构填充墙的构造及施工方法
CN203669156U (zh) * 2014-01-14 2014-06-25 石家庄晶达建筑体系有限公司 一种点式拉结现浇复合混凝土剪力墙

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2243818A1 (en) * 1997-07-24 1999-01-24 Eco-Block, Llc Concrete form system
FR2924139A1 (fr) * 2007-11-28 2009-05-29 Saint Gobain Isover Sa Systeme d'isolation de batiments par l'exterieur
CN101294423A (zh) * 2008-05-30 2008-10-29 河南省第一建筑工程集团有限责任公司 混凝土结构外墙面内置保温层的施工方法
CN102926469A (zh) * 2012-10-29 2013-02-13 吴方伯 一种现浇保温隔热梁、柱、剪力墙及施工方法
CN103243837A (zh) * 2013-05-23 2013-08-14 石家庄晶达建筑体系有限公司 一种专用于复合剪力墙结构填充墙的构造及施工方法
CN203669156U (zh) * 2014-01-14 2014-06-25 石家庄晶达建筑体系有限公司 一种点式拉结现浇复合混凝土剪力墙

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
夏光辉等: "《新型夹芯保温复合墙体的技术与发展》", 《工程与建设》, vol. 26, no. 4, 31 August 2012 (2012-08-31) *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064538B (zh) * 2015-07-31 2017-07-28 王惠滨 现浇混凝土剪力墙自保温系统及其制作方法
CN105064538A (zh) * 2015-07-31 2015-11-18 王惠滨 现浇混凝土剪力墙自保温系统及其制作方法
CN107304579A (zh) * 2016-04-25 2017-10-31 天津武铄科技有限公司 一种建筑用外墙保温结构及其施工方法
CN106284899A (zh) * 2016-09-20 2017-01-04 周述文 保温一体化超薄面板固定结构及其制作安装方法
CN107989238A (zh) * 2017-12-13 2018-05-04 刘家宇 一种现浇夹心保温剪力墙结构、装配式建筑及工法
CN108005263A (zh) * 2018-01-15 2018-05-08 安徽建筑大学 新型预制保温墙体螺栓式连接件
CN108547393A (zh) * 2018-04-26 2018-09-18 尤书建 一种点拉式拉结现浇复合混凝土填充墙
CN108487552A (zh) * 2018-05-22 2018-09-04 李凤东 一种免拆模板系统的挑件
CN109972752A (zh) * 2019-05-14 2019-07-05 承德建元科技有限公司 一种带拉结栓轻质防火复合保温板材及其装配方法
CN110029757A (zh) * 2019-05-14 2019-07-19 承德建元科技有限公司 一种内置保温现浇混凝土复合剪力墙及其施工方法
CN110219387A (zh) * 2019-06-17 2019-09-10 濮阳恒瑞建材科技有限公司 一种焊接装配式网架板
CN110219387B (zh) * 2019-06-17 2024-02-06 中鼎(河南)建筑研究院有限公司 一种焊接装配式网架板
CN111502083A (zh) * 2020-01-21 2020-08-07 北京首钢建设集团有限公司 一种防止cl板移位的方法
CN111502083B (zh) * 2020-01-21 2023-06-30 北京首钢建设集团有限公司 一种防止cl板移位的方法

Also Published As

Publication number Publication date
CN103696516B (zh) 2015-10-07

Similar Documents

Publication Publication Date Title
CN103696516B (zh) 一种点式拉结现浇复合混凝土剪力墙及其施工方法
CN203669156U (zh) 一种点式拉结现浇复合混凝土剪力墙
CN206382480U (zh) 一种小型矩形钢筋笼成型支撑工具
CN106836566A (zh) 自密实混凝土eps保温板外墙的施工方法及外墙结构
CN109629403B (zh) 一种混凝土支撑柱结构及其制作方法
CN105442864A (zh) 一种圆形钢筋混凝土柱的局部加固方法
CN103046465B (zh) 一种泡沫芯模预制空心板梁的加固施工方法
CN208884783U (zh) 装配式建筑pcf板和连接组件
CN204386018U (zh) 蒸压加气混凝土板薄钢板配筋
CN109457872B (zh) 一种现浇框架柱钢筋笼预制装配式施工装置及施工方法
CN201746979U (zh) 一种混凝土施工中梁柱核心区的柱箍装置
CN110130534A (zh) 一种新型耗能预制剪力墙及其加工安装方法
CN103669875A (zh) 一种混凝土浇筑的助捣器及制作方法
CN109667427A (zh) 一种梁钢筋绑扎施工结构及施工方法
CN217353122U (zh) 一种装配式免支模楼承板
CN210031723U (zh) 一种引水隧洞仰拱模板抗浮装置
CN104863283A (zh) 钢管纤维混凝土支撑
CN216475804U (zh) 一种钢筋桁架楼承板
CN101545283A (zh) 型钢混凝土柱与现浇钢筋混凝土梁节点及其施工方法
CN102900195A (zh) 内墙板及其制作方法
CN107882262A (zh) 轻钢结构墙板
CN110805141B (zh) 一种建筑物顶升后钢管柱与隔震支座的连接装置及方法
CN205242270U (zh) 连续梁预应力孔道探孔器
CN202910233U (zh) 一种制作环形钢筋箍的装置
CN201420400Y (zh) 高耸网壳结构的支撑结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant