CN103696370A - Quick bridge construction method and structure - Google Patents

Quick bridge construction method and structure Download PDF

Info

Publication number
CN103696370A
CN103696370A CN201310698429.8A CN201310698429A CN103696370A CN 103696370 A CN103696370 A CN 103696370A CN 201310698429 A CN201310698429 A CN 201310698429A CN 103696370 A CN103696370 A CN 103696370A
Authority
CN
China
Prior art keywords
bridge
post
pier
rapid construction
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310698429.8A
Other languages
Chinese (zh)
Other versions
CN103696370B (en
Inventor
李荣生
霍恒玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Dafang Special Vehicle Co Ltd
Original Assignee
Suzhou Dafang Special Vehicle Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Dafang Special Vehicle Co Ltd filed Critical Suzhou Dafang Special Vehicle Co Ltd
Priority to CN201310698429.8A priority Critical patent/CN103696370B/en
Publication of CN103696370A publication Critical patent/CN103696370A/en
Application granted granted Critical
Publication of CN103696370B publication Critical patent/CN103696370B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a quick bridge construction method. The quick bridge construction method comprises the steps of prefabricating bridge piles, bridge columns and connecting beams; arranging holes/grooves in the lower-end portions of the bridge columns, manufacturing pier caps at the upper-end portions of the bridge columns, and prefabricating a connecting seat/head on one side of each bridge column; vertically hitting the bridge piles into the ground and vertically hoisting the bridge columns to enable the holes/grooves in the lower-end portions to be in sleeved connection with the upper portions of the bridge piles and fixed; using the connecting beams to enable every two adjacent bridge columns to be connected through the connecting seats/heads; installing girders on the pier caps to be fixed. The bridge piles, the bridge columns and the connecting beams are prefabricated and connection and installation are performed in fields in the method. A bridge is simple in structure, convenient to install and short in construction period and has small influence on existing roads.

Description

A kind of bridge rapid construction engineering method and structure
Technical field
the present invention relates to a kind of bridge rapid construction engineering method and structure.
Background technology
be accompanied by the high speed development of China's economic, domestic each big and medium-sized cities population, vehicle rapid growth, cause road traffic flow to increase severely, and road imbalance between supply and demand is more sharp-pointed.Increase city existing road autos only ability and mainly by existing road widening upgrading, level crossing, change the measures such as grade separation, overhead and tunnel multilevel traffic, construction method routinely, all there is long construction period in the civil engineering of various measures above, floor space is large, cause traffic not smooth, affect the current of pedestrian and vehicle, larger on traffic and surrounding enviroment impact.Therefore need to be a kind of efficient, quick, and do not affect access bridge beam construction method.
Summary of the invention
an object of the present invention is to provide a kind of bridge rapid construction engineering method.
for achieving the above object, the technical solution used in the present invention is:
a bridge rapid construction engineering method, comprising:
(1), prefabricated bridge pier, bridge post and tie-beam: hole/groove is offered in the bottom at bridge post, manufactures pier cap, at prefabricated the first Connection Block/head of a side of bridge post in the upper end of bridge post;
(2), bridge pier is vertically driven underground, bridge post is vertically sling, made the hole/groove of bridge post bottom be socketed in the top of bridge pier fixing;
(3), use tie-beam by first Connection Block/head, two bridge posts adjacent on width to be connected;
(4), that install crossbeam is also fixing on pier cap.
preferably, squeeze into the position of bridge pier carry out milling ground slots on ground, the socket part of bridge pier and bridge post is connected in this ground slots.
further preferably, after the socket part of bridge pier and bridge post is connected in ground slots, with filler, fill, bridge post is fixed.
preferably, on the top of pier cap, cushion block is installed, crossbeam is fixed on cushion block.
another object of the present invention is to provide a kind of bridge rapid construction structure.
for achieving the above object, the technical solution used in the present invention is:
a kind of bridge rapid construction structure, comprise a plurality of bridges unit, described bridge unit comprises bridge pier, the bridge post that is fixed on described bridge pier top being embedded in ground, the crossbeam that is fixed on described bridge post top, porose/groove is offered in the bottom of described bridge post, the upper end of described bridge post is provided with pier cap, and a side of described bridge post is provided with the first Connection Block/head; When described bridge pier, bridge post connect, the hole/groove of described bridge post bottom is socketed in the top of described bridge pier, and a tie-beam is connected between first Connection Block/head of the bridge post described in adjacent two on width.
preferably, a plurality of described bridge unit set gradually, and the crossbeam of a plurality of described bridge unit is in turn connected to form track.
preferably, the position of burying described bridge pier on ground underground offers ground slots, and the socket part of described bridge pier and bridge post is positioned at described ground slots.
further preferably, in described ground slots, being provided with filler fills.
preferably, on described pier cap, be provided with cushion block, described crossbeam is fixed on described cushion block.
preferably, the two ends of described tie-beam are provided with the second Connection Block/head, and described tie-beam, bridge post are connected by first described Connection Block/head, second Connection Block/head.
because technique scheme is used, the present invention compared with prior art has following advantages and effect:
the present invention is by prefabricated bridge pier, bridge post and tie-beam, and the installation connecting at the scene, and it is simple in structure, easy for installation, and short construction period is little on the impact of existing road.
Accompanying drawing explanation
accompanying drawing 1 is structural representation of the present invention;
accompanying drawing 2 is the fractionation schematic diagram of Bridge of the present invention unit.
wherein: 1, bridge unit; 10, bridge pier; 11, bridge post; 110, hole/groove; 12, crossbeam; 13, pier cap; 14, tie-beam; 2, ground slots; 3, cushion block; 4, ground; 5, filler.
The specific embodiment
below in conjunction with accompanying drawing and case study on implementation, the invention will be further described:
a kind of bridge rapid construction structure as shown in Figure 1, 2, comprises a plurality of bridges unit 1, and bridge unit 1 comprises the bridge pier 10 being embedded in ground 4, the crossbeam 12 that is fixed on the bridge post 11 on bridge pier 10 tops and is fixed on bridge post 11 tops.Wherein:
the bottom of bridge post 11 is offered porose/groove 110, the upper end of bridge post 11 is provided with pier cap 13, and a side on bridge post 11 tops is provided with the first Connection Block/head; When bridge pier 10, bridge post 11 connect, hole/the groove 110 of bridge post 11 bottoms is socketed in the top of bridge pier 10, one tie-beam 14 is connected between first Connection Block/head of adjacent two bridge posts 11 on the width of crossbeam 12, on length direction between adjacent bridge post 11 owing to having fixed crossbeam 12 without connecting tie-beam 14.Two ends at tie-beam 14 also can be provided with the second Connection Block/head, and tie-beam 14, bridge post 11 are connected by first Connection Block/head, second Connection Block/head.The position of burying bridge pier 11 on ground 4 underground offers ground slots 2, and the socket part of bridge pier 10 and bridge post 11 is positioned at ground slots 2, and in ground slots 2, is provided with filler 5 fillings.
in addition, on pier cap 13 tops, be provided with cushion block 3, crossbeam 12 is fixed on cushion block 3.
the following specifically describes down the Fast Installation engineering method of this bridge construction:
bridge pier 10, bridge post 11 and the tie-beam 14 of said structure are prefabricated in the factory; On ground, milling ground slots 2 is carried out in 4 positions of squeezing into bridge pier 10, bridge pier 10 is vertically driven underground ground slots 2 is interior, bridge post 11 is vertically sling, made the hole/groove 110 of bridge post 11 bottoms be socketed in the top of bridge pier 11, and at the interior filling filler 5 of ground slots 2, it is fixed;
use tie-beam 14 two adjacent bridge posts 11 to be connected on the width of crossbeam 12 by first Connection Block/head; Cushion block 3 is installed on top at pier cap 13, and crossbeam 12 is fixed on cushion block 3.
when a plurality of bridges unit 1 sets gradually, the crossbeam 12 of a plurality of bridges unit 1 is in turn connected to form track.
above-described embodiment is only explanation technical conceive of the present invention and feature, and its object is to allow person skilled in the art can understand content of the present invention and implement according to this, can not limit the scope of the invention with this.All equivalences that Spirit Essence is done according to the present invention change or modify, within all should being encompassed in protection scope of the present invention.

Claims (10)

1. a bridge rapid construction engineering method, is characterized in that: comprising:
(1), prefabricated bridge pier, bridge post and tie-beam: hole/groove is offered in the bottom at bridge post, manufactures pier cap, at prefabricated the first Connection Block/head of a side of bridge post in the upper end of bridge post;
(2), bridge pier is vertically driven underground, bridge post is vertically sling, made the hole/groove of bridge post bottom be socketed in the top of bridge pier fixing;
(3), use tie-beam by first Connection Block/head, two bridge posts adjacent on width to be connected;
(4), that install crossbeam is also fixing on pier cap.
2. a kind of bridge rapid construction engineering method according to claim 1, is characterized in that: milling ground slots is carried out in the position of squeezing into bridge pier on ground, and the socket part of bridge pier and bridge post is connected in this ground slots.
3. a kind of bridge rapid construction engineering method according to claim 2, is characterized in that: after the socket part of bridge pier and bridge post is connected in ground slots, with filler, fill, bridge post is fixed.
4. a kind of bridge rapid construction engineering method according to claim 1, is characterized in that: cushion block is installed on the top at pier cap, and crossbeam is fixed on cushion block.
5. a bridge rapid construction structure, comprise a plurality of bridges unit, described bridge unit comprises bridge pier, the bridge post that is fixed on described bridge pier top being embedded in ground, the crossbeam that is fixed on described bridge post top, it is characterized in that: porose/groove is offered in the bottom of described bridge post, the upper end of described bridge post is provided with pier cap, and a side of described bridge post is provided with the first Connection Block/head; When described bridge pier, bridge post connect, the hole/groove of described bridge post bottom is socketed in the top of described bridge pier, and a tie-beam is connected between first Connection Block/head of the bridge post described in adjacent two on width.
6. bridge rapid construction structure according to claim 5, is characterized in that: a plurality of described bridge unit set gradually, and the crossbeam of a plurality of described bridge unit is in turn connected to form track.
7. bridge rapid construction structure according to claim 5, is characterized in that: the position of burying described bridge pier on ground underground offers ground slots, and the socket part of described bridge pier and bridge post is positioned at described ground slots.
8. bridge rapid construction structure according to claim 7, is characterized in that: in described ground slots, be provided with filler and fill.
9. bridge rapid construction structure according to claim 5, is characterized in that: on described pier cap, be provided with cushion block, described crossbeam is fixed on described cushion block.
10. bridge rapid construction structure according to claim 5, is characterized in that: the two ends of described tie-beam are provided with the second Connection Block/head, and described tie-beam, bridge post are connected by first described Connection Block/head, second Connection Block/head.
CN201310698429.8A 2013-12-18 2013-12-18 A kind of Quick bridge construction method and structure Active CN103696370B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310698429.8A CN103696370B (en) 2013-12-18 2013-12-18 A kind of Quick bridge construction method and structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310698429.8A CN103696370B (en) 2013-12-18 2013-12-18 A kind of Quick bridge construction method and structure

Publications (2)

Publication Number Publication Date
CN103696370A true CN103696370A (en) 2014-04-02
CN103696370B CN103696370B (en) 2015-09-02

Family

ID=50358020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310698429.8A Active CN103696370B (en) 2013-12-18 2013-12-18 A kind of Quick bridge construction method and structure

Country Status (1)

Country Link
CN (1) CN103696370B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447647A (en) * 2017-07-25 2017-12-08 武汉理工大学 Assembled bridge pier and its construction method
CN112281621A (en) * 2020-10-26 2021-01-29 天津鑫路桥建设工程有限公司 Steel construction concatenation bridge

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09203011A (en) * 1996-01-25 1997-08-05 East Japan Railway Co Reconstruction work of short-span over-road bridge or overbridge into long-span bridge
JP4066256B2 (en) * 2003-06-23 2008-03-26 新日鉄エンジニアリング株式会社 How to install the jacket
JP4328114B2 (en) * 2003-03-17 2009-09-09 三井住友建設株式会社 Bridge construction method
CN102747677A (en) * 2012-07-27 2012-10-24 中铁三局集团有限公司 Bridge and construction method thereof
CN203654193U (en) * 2013-12-18 2014-06-18 苏州大方特种车股份有限公司 Quick bridge construction structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09203011A (en) * 1996-01-25 1997-08-05 East Japan Railway Co Reconstruction work of short-span over-road bridge or overbridge into long-span bridge
JP4328114B2 (en) * 2003-03-17 2009-09-09 三井住友建設株式会社 Bridge construction method
JP4066256B2 (en) * 2003-06-23 2008-03-26 新日鉄エンジニアリング株式会社 How to install the jacket
CN102747677A (en) * 2012-07-27 2012-10-24 中铁三局集团有限公司 Bridge and construction method thereof
CN203654193U (en) * 2013-12-18 2014-06-18 苏州大方特种车股份有限公司 Quick bridge construction structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447647A (en) * 2017-07-25 2017-12-08 武汉理工大学 Assembled bridge pier and its construction method
CN112281621A (en) * 2020-10-26 2021-01-29 天津鑫路桥建设工程有限公司 Steel construction concatenation bridge

Also Published As

Publication number Publication date
CN103696370B (en) 2015-09-02

Similar Documents

Publication Publication Date Title
CN204530433U (en) Steel pipe pile foundation combination steel trestle
CN109457599B (en) Splicing structure of hollow pier and bearing platform and construction method
CN106168053A (en) Y shape pillar is used to be combined the structure at design large span deep buried metro station with uplift pile
CN103774544A (en) Assembled temporary steel bridge
CN104727235A (en) Bridge overall strengthening device
CN202543953U (en) Supporting structure for shallow tunnel in overpass operation
CN203654194U (en) Quick construction structure for bridge
CN202298440U (en) Steel trestle structure used on cliff terrains
CN203654193U (en) Quick bridge construction structure
CN103966947A (en) Beam-falling-resistant device based on bridge beam shock absorption
CN203768785U (en) Corrugated steel web combined bridge allowing passing through on double layers
CN103696370B (en) A kind of Quick bridge construction method and structure
CN102912701B (en) Multi-functional left-turn directional interchange overpass
CN103669221A (en) Bridge rapid construction method and structure
CN2913433Y (en) Tridimensional traffic lines and elevated track utilizing road middle and edge space
CN206070724U (en) The structure at design large span deep buried metro station is combined using Y shape pillar with uplift pile
CN202440730U (en) Crossroad building structure requiring no traffic light
CN202369930U (en) Door opening type bearing framed bent device for multiplayer concrete box girder
CN202181504U (en) Box beam
CN204151675U (en) The bogie of earth anchored suspension bridge cat road track cable
CN103967332A (en) Construction method of building site barrier
CN205115984U (en) Reinforced concrete has just constructed continuous bridge
CN103147386A (en) Approach bridge vehicle
CN216739203U (en) Semi-sinking self-balancing reinforced concrete shuttle-shaped double-arch assembly type overpass
CN103147387A (en) Double-spliced type combining bridge structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant