CN107447647A - Assembled bridge pier and its construction method - Google Patents

Assembled bridge pier and its construction method Download PDF

Info

Publication number
CN107447647A
CN107447647A CN201710612317.4A CN201710612317A CN107447647A CN 107447647 A CN107447647 A CN 107447647A CN 201710612317 A CN201710612317 A CN 201710612317A CN 107447647 A CN107447647 A CN 107447647A
Authority
CN
China
Prior art keywords
pile foundation
pier
bellows
reinforcing bar
precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710612317.4A
Other languages
Chinese (zh)
Inventor
胡志坚
周向宇
李扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Technology WUT
Original Assignee
Wuhan University of Technology WUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Technology WUT filed Critical Wuhan University of Technology WUT
Priority to CN201710612317.4A priority Critical patent/CN107447647A/en
Publication of CN107447647A publication Critical patent/CN107447647A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of assembled bridge pier, including pile foundation, Precast Pier Columns and prefabricated bent cap, wherein, the top of pile foundation is reserved with reinforcing bar, the bottom of Precast Pier Columns is reserved with grout sleeve, and the reinforcing bar of pile foundation is contained in grout sleeve and grouting material is perfused with grout sleeve, and the top of Precast Pier Columns is reserved with reinforcing bar, prefabricated bent cap is provided with bellows, and the reinforcing bar of Precast Pier Columns is contained in bellows and is perfused with concrete in bellows.Assembled bridge pier proposed by the present invention, its stress performance is good, and speed of application is fast, the cycle is short and technique is simple.

Description

Assembled bridge pier and its construction method
Technical field
The present invention relates to technical field of bridge engineering, more particularly to a kind of assembled bridge pier and its construction method.
Background technology
The bridge pier of bridge is the supporting construction of spanning, wherein cushion cap of the columnar pier typically on the basis of, pillar pier shaft and Bent cap forms.Advantage is to mitigate pier shaft deadweight, saves masonry material, better appearance, rigidity and intensity are all larger, are there is drift It can be used in the river of thing and floating ice.
Currently, Bridges in Our Country is constructed, and especially Bridge Pier Construction substantially uses cast-in-situ construction method mostly.Cast-in-situ construction Skill falls behind, and long construction period, process are cumbersome, cause traffic congestion, environmental pollution, it is difficult to meet today's society rapid economic development Demand.And corresponding fabricated construction, can be prefabricated in the factory each component in advance, directly assembled after transporting to scene, exempt The processes such as formwork, cast concrete, maintenance.Substantially reduce the site operation cycle, reduce place occupancy, while batch production is pre- System causes construction quality to be easily controlled, and climate limitation is smaller.Remake old bridge, reinforcing especially in heavy traffic section, can To substantially reduce the influence to traffic.Assembled bridge pier is using the connection of pier stud and cushion cap at present, and its resistance to overturning is not It is high.
The content of the invention
It is a primary object of the present invention to provide a kind of assembled bridge pier and its construction method, it is intended to improve its stress Energy.
To achieve the above object, the present invention provides a kind of assembled bridge pier, including pile foundation, Precast Pier Columns and preform lid Beam, wherein,
The top of the pile foundation is reserved with reinforcing bar, and the bottom of the Precast Pier Columns is reserved with grout sleeve, and the reinforcing bar of pile foundation accommodates It is perfused with grouting material in grout sleeve and in grout sleeve, the tops of the Precast Pier Columns is reserved with reinforcing bar, on prefabricated bent cap Provided with bellows, the reinforcing bar of the Precast Pier Columns is contained in bellows and is perfused with concrete in bellows.
Preferably, the concrete layer for leveling is poured between the Precast Pier Columns and prefabricated bent cap.
Preferably, the thickness of the concrete layer is 45mm-60mm.
Preferably, the grout sleeve and bellows are provided with multiple, and the pile foundation and Precast Pier Columns are provided with more Root reinforcing bar, the reinforcing bar are corresponded with grout sleeve or bellows and set.
Preferably, multiple grout sleeves are uniformly distributed in the circumference of Precast Pier Columns, week of multiple bellowss in prefabricated bent cap To being uniformly distributed.
Preferably, the number of the grout sleeve and bellows is equal.
Preferably, reserved steel bar extension elongation is 0.1m-0.3m in the pile foundation, and reserved steel bar is stretched in the Precast Pier Columns It is 0.9m-1.1m to go out length.
Present invention further propose that a kind of construction method based on above-mentioned assembled bridge pier, comprises the following steps:
The prefabricated making of pier stud and bent cap is carried out, and in-site pouring concrete forms pile foundation, and the reserved steel bar at the top of pile foundation Or its reinforcing bar is stretched out;
Precast Pier Columns are installed in handling after pile foundation reaches concrete load age, and the grout sleeve of Precast Pier Columns is inserted in into pile foundation The reinforcing bar of stretching is starched so that pier stud is positioned into perfusion perfusion in backward grout sleeve;
When Precast Pier Columns and pile foundation bonding strength reach design requirement, prefabricated bent cap is installed in handling, and is irrigated into bellows Concrete.
Assembled bridge pier proposed by the present invention has the advantages that:
1st, this assembled bridge pier need not set the devices such as the installation island in existing interconnection technique, can accelerate speed of application, in addition This assembled bridge pier is directly connected with foundation pile, and its resistance to overturning is also better than existing interconnection technique;
2nd, pier stud and pile foundation connection stress is reliable, bridge pier positioning is simple, easy for construction, simple to operate, easily controllable, can effectively subtract Small Site Welding and the workload of concreting, accelerating construction progress;
3rd, speed of application is fast.Assembled can realize batch production, mass production, and scene only needs to install prefabricated components, Reduce live formwork, prick the cumbersome process such as muscle, maintenance, form removal;
4th, construction quality is easy to control.In the present invention, each component shape is relatively regular, along be in precast plant industrialize make. Therefore, prefabricated to in-site installation construction from pier stud, bent cap, quality is easy to ensure and whole-process control;
5th, overall performance is good.In the present invention, the splicing between pile foundation, Precast Pier Columns and prefabricated bent cap has reinforcing bar phase lap Connect, irrigate the cement mortar of high intensity afterwards so that each component has good switching performance, participates in stress jointly;
6th, it is suitable for city remake old bridge.Remake old bridge especially in heavy traffic section, enlarging, due to speed of application is fast, Occupied ground is small, noise is small etc., can substantially reduce the interference to urban transportation, quickly resume traffic;
7th, 53mm thickness concrete layers are poured between bent cap and pier stud, not only facilitate installation positioning and beneficial to ensure installation plane requirement but also It ensure that the stability of the two connection;
8th, Precast Pier Columns and pile foundation, bent cap connecting portion reinforcing bar reduce scene using grout sleeve and bellows grouting connection The quality unstability of welding.
Brief description of the drawings
Fig. 1 is the structural representation of assembled bridge pier of the present invention;
Fig. 2 is the partial structural diagram that assembled bridge pier pile foundation of the present invention is connected with Precast Pier Columns;
Fig. 3 is the cross section structure diagram of Precast Pier Columns in assembled bridge pier of the present invention;
Fig. 4 is the cross section structure diagram of prefabricated bent cap in assembled bridge pier of the present invention;
In figure, 1-pile foundation, 2-Precast Pier Columns, 3-prefabricated bent cap, 4-grout sleeve, 5-bellows, 6-stirrup.
The realization, functional characteristics and advantage of the object of the invention will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
It should be noted that in the description of the invention, term " transverse direction ", " longitudinal direction ", " on ", " under ", "front", "rear", The orientation or position relationship of the instruction such as "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " is based on accompanying drawing institutes The orientation or position relationship shown, it is for only for ease of the description present invention and simplifies description, is not instruction or implies signified dress Put or element there must be specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to limit of the invention System.
Referring to figs. 1 to Fig. 4, in this preferred embodiment, a kind of assembled bridge pier, including pile foundation 1, Precast Pier Columns 2 and pre- Bent cap 3 processed, wherein,
The top of pile foundation 1 is reserved with reinforcing bar(Diameter 36mm, extension elongation about 0.24m), the bottom of Precast Pier Columns 2 is reserved with grouting Sleeve 4(Diameter 85mm), the reinforcing bar of pile foundation 1 is contained in grout sleeve 4 and grouting material, prefabricated pier is perfused with grout sleeve 4 The top of post 2 is reserved with reinforcing bar(Diameter 36mm, extension elongation about 1.0m), prefabricated bent cap 3 is provided with bellows 5(It is a diameter of 100mm), the reinforcing bars of Precast Pier Columns 2 is contained in bellows 5 and is perfused with concrete in bellows 5(High performance concrete).
Specifically, 150mm is reserved on the top of bellows 5,75mm is reserved in bottom.Pile foundation 1 is diameter 1400mm solid coagulation Soil.Precast Pier Columns 2 are diameter 1200mm solid cylinder concrete structure, and prefabricated bent cap 3 is solid concrete structure.In order to full Foot splicing demand, some key components need to carry out special cloth muscle design, as Precast Pier Columns 2 and prefabricated bent cap 3 are respectively provided with There is a circle stirrup 6.
Further, the concrete layer for leveling is poured between Precast Pier Columns 2 and prefabricated bent cap 3.Specifically, coagulation The thickness of the layer is 45mm-60mm(It is thick for 53mm in the present embodiment).
Further, grout sleeve 4 and bellows 5 are provided with multiple, and pile foundation 1 and Precast Pier Columns 2 are provided with more Reinforcing bar, reinforcing bar is corresponded with grout sleeve 4 or bellows 5 and set, so as to further increase the structure of this assembled bridge pier Stabilized soil pavement.
Further, multiple grout sleeves 4 are uniformly distributed in the circumference of Precast Pier Columns 2, and multiple bellowss 5 are in prefabricated bent cap 3 circumference is uniformly distributed, so as to further increase the structural stability of this assembled bridge pier.
Grout sleeve 4 is equal with the number of bellows 5, is 20 in the present embodiment.
Further, reserved steel bar extension elongation is 0.1m-0.3m in pile foundation 1, and reserved steel bar stretches out length in Precast Pier Columns 2 Spend for 0.9m-1.1m.
Procedure below is specifically used in construction this assembled bridge pier.
1st, pier stud is prefabricated.It is first according to require assembling reinforcement, the pre-buried grout sleeve 4 of pier shaft bottom, it should be ensured that its spacing Consistent and with pile foundation stretching reinforcing bar corresponds, and after treating reinforcing bar colligation, lifting reinforcing bar net cage is into punching block.Pour into a mould pier stud Concrete, and fully vibrate to ensure the density of concrete.Heating curing is carried out to concrete using steam.Steam curing must It uniformly, otherwise must may change the contiguity matching precision of pier stud.Component is stripped.It should handle with care, avoid in handling process Side, the angle of damaged in collision component, influence assembly.Pay attention to the intact of the reserved steel bar of guarantee, must not bend or block.
2nd, bent cap is prefabricated.Bent cap is similar to pier stud making when factory makes.The pre-buried bellows 5 of bent cap, it should be ensured that therebetween Away from consistent and corresponded with the stretching reinforcing bar at the top of pier stud.Heating curing is carried out to concrete using steam.Steam curing must It uniformly, otherwise must may change the contiguity matching precision of bent cap.Component is stripped, stacked according to the rules.
3rd, component conveying and lifting.Prefabricated components concrete strength can not carry component, institute before being not up to its standard value 75% There is component to be transported using the iant flat truck of 1000 tons of loading capacity.Consider the factors such as site environment, hoisting height, lift Hung using 300 tons of crane units.
4th, site operation.After the completion of live pile foundation construction, transport Precast Pier Columns 2 to scene, hoisting prefabricated pier stud 2 is simultaneously pressed The installation of stake position, stake top reinforcing bar are stretched in grout sleeve 4, and pier stud irrigates grouting liquid afterwards in place.
5th, bent cap is installed.Prefabricated bent cap 3 is transported to scene and lifted, prefabricated bent cap 3 pre-buried bellows 5 and pier stud Stretching reinforcing bar alignment, transfer prefabricated bent cap 3 make reinforcing bar enter bellows 5 in.After installation is in place, first in prefabricated bent cap 3 and in advance 2 casting concrete layers of pier stud processed pour high performance concrete into bellows again, it is linked to be entirety.
Assembled bridge pier proposed by the present invention has the advantages that:
1st, this assembled bridge pier need not set the devices such as the installation island in existing interconnection technique, can accelerate speed of application, in addition This assembled bridge pier is directly connected with foundation pile, and its resistance to overturning is also better than existing interconnection technique;
2nd, pier stud and pile foundation 1 connect that stress is reliable, bridge pier positioning is simple, easy for construction, simple to operate, easily controllable, can be effective Reduce the workload of Site Welding and concreting, accelerating construction progress;
3rd, speed of application is fast.Assembled can realize batch production, mass production, and scene only needs to install prefabricated components, Reduce live formwork, prick the cumbersome process such as muscle, maintenance, form removal;
4th, construction quality is easy to control.In the present invention, each component shape is relatively regular, along be in precast plant industrialize make. Therefore, prefabricated to in-site installation construction from pier stud, bent cap, quality is easy to ensure and whole-process control;
5th, overall performance is good.In the present invention, the splicing between pile foundation 1, Precast Pier Columns 2 and prefabricated bent cap 3 has reinforcing bar phase Mutually overlap joint, the cement mortar of high intensity is irrigated afterwards so that each component has good switching performance, participates in stress jointly;
6th, it is suitable for city remake old bridge.Remake old bridge especially in heavy traffic section, enlarging, due to speed of application is fast, Occupied ground is small, noise is small etc., can substantially reduce the interference to urban transportation, quickly resume traffic;
7th, 53mm thickness concrete layers are poured between bent cap and pier stud, not only facilitate installation positioning and beneficial to ensure installation plane requirement but also It ensure that the stability of the two connection;
8th, Precast Pier Columns 2 and pile foundation 1, bent cap connecting portion reinforcing bar are reduced using grout sleeve 4 and the grouting connection of bellows 5 The quality unstability of Site Welding.
A kind of present invention further propose that construction method of assembled bridge pier.
In this preferred embodiment, a kind of construction method based on above-mentioned assembled bridge pier, comprise the following steps:
The prefabricated making of pier stud and bent cap is carried out, and in-site pouring concrete forms pile foundation, and the reserved steel bar at the top of pile foundation Or its reinforcing bar is stretched out;
Precast Pier Columns are installed in handling after pile foundation reaches concrete load age, and the grout sleeve of Precast Pier Columns is inserted in into pile foundation The reinforcing bar of stretching is starched so that pier stud is positioned into perfusion perfusion in backward grout sleeve;
When Precast Pier Columns and pile foundation bonding strength reach design requirement, prefabricated bent cap is installed in handling, and is irrigated into bellows Concrete.
The preferred embodiments of the present invention are these are only, are not intended to limit the scope of the invention, it is every to utilize this hair The equivalent structure transformation that bright specification and accompanying drawing content are made, or other related technical areas are directly or indirectly used in, Similarly it is included within the scope of the present invention.

Claims (8)

  1. A kind of 1. assembled bridge pier, it is characterised in that including pile foundation, Precast Pier Columns and prefabricated bent cap, wherein,
    The top of the pile foundation is reserved with reinforcing bar, and the bottom of the Precast Pier Columns is reserved with grout sleeve, and the reinforcing bar of pile foundation accommodates It is perfused with grouting material in grout sleeve and in grout sleeve, the tops of the Precast Pier Columns is reserved with reinforcing bar, on prefabricated bent cap Provided with bellows, the reinforcing bar of the Precast Pier Columns is contained in bellows and is perfused with concrete in bellows.
  2. 2. assembled bridge pier as claimed in claim 1, it is characterised in that poured between the Precast Pier Columns and prefabricated bent cap Concrete layer for leveling.
  3. 3. assembled bridge pier as claimed in claim 2, it is characterised in that the thickness of the concrete layer is 45mm-60mm.
  4. 4. assembled bridge pier as claimed in claim 1, it is characterised in that the grout sleeve and bellows are provided with more Individual, the pile foundation and Precast Pier Columns are provided with more reinforcing bars, and the reinforcing bar is corresponded with grout sleeve or bellows and set.
  5. 5. assembled bridge pier as claimed in claim 4, it is characterised in that multiple grout sleeves are in the circumferential uniform of Precast Pier Columns Distribution, multiple bellowss are uniformly distributed in the circumference of prefabricated bent cap.
  6. 6. assembled bridge pier as claimed in claim 4, it is characterised in that the number of the grout sleeve and bellows is equal.
  7. 7. the assembled bridge pier as described in any one in claim 1 to 6, it is characterised in that reserved steel bar in the pile foundation Extension elongation is 0.1m-0.3m, and reserved steel bar extension elongation is 0.9m-1.1m in the Precast Pier Columns.
  8. 8. a kind of construction method of the assembled bridge pier based on described in claim 1, it is characterised in that comprise the following steps:
    The prefabricated making of pier stud and bent cap is carried out, and in-site pouring concrete forms pile foundation, and the reserved steel bar at the top of pile foundation Or its reinforcing bar is stretched out;
    Precast Pier Columns are installed in handling after pile foundation reaches concrete load age, and the grout sleeve of Precast Pier Columns is inserted in into pile foundation The reinforcing bar of stretching is starched so that pier stud is positioned into perfusion perfusion in backward grout sleeve;
    When Precast Pier Columns and pile foundation bonding strength reach design requirement, prefabricated bent cap is installed in handling, and is irrigated into bellows Concrete.
CN201710612317.4A 2017-07-25 2017-07-25 Assembled bridge pier and its construction method Pending CN107447647A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710612317.4A CN107447647A (en) 2017-07-25 2017-07-25 Assembled bridge pier and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710612317.4A CN107447647A (en) 2017-07-25 2017-07-25 Assembled bridge pier and its construction method

Publications (1)

Publication Number Publication Date
CN107447647A true CN107447647A (en) 2017-12-08

Family

ID=60487528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710612317.4A Pending CN107447647A (en) 2017-07-25 2017-07-25 Assembled bridge pier and its construction method

Country Status (1)

Country Link
CN (1) CN107447647A (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532621A (en) * 2018-04-19 2018-09-14 浙江大学城市学院 A kind of assembled drilledpier foundation and its construction method
CN108547216A (en) * 2018-06-12 2018-09-18 北京市市政工程设计研究总院有限公司 Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame and construction method
CN108560544A (en) * 2018-06-22 2018-09-21 湘潭大学 A kind of sleeve connection assembled pile foundation and its construction method
CN108677731A (en) * 2018-06-19 2018-10-19 上海应用技术大学 A kind of the rotary splicing structure and joining method of bent cap and bridge pier
CN108755730A (en) * 2018-06-12 2018-11-06 中交第三航务工程勘察设计院有限公司 A kind of assembled pile foundation wharfs node and its construction method
CN108756933A (en) * 2018-04-27 2018-11-06 同济大学 A kind of bellows-type quick connecting method of double layer tunnel inside prefabricated components
CN108774947A (en) * 2018-08-01 2018-11-09 宁波交通工程建设集团有限公司 Packaged type bridges pier stud super high strength concrete connection structure and construction method
CN108867323A (en) * 2018-08-01 2018-11-23 中铁四局集团有限公司 A kind of grout sleeve connection Precast Concrete Segmental Bridges pier construction method
CN109457599A (en) * 2018-11-29 2019-03-12 福州大学 Hollow pier and cushion cap splicing construction and construction method
CN109537465A (en) * 2018-12-11 2019-03-29 中交公局土木工程建筑研究院有限公司 A kind of assembled cushion cap pier stud joint model and the cementation of fissures construction technology using it
CN109989346A (en) * 2019-01-10 2019-07-09 中交第二航务工程局有限公司 Bridge major diameter precast concrete tubular column basis and its construction method
CN110331656A (en) * 2018-07-16 2019-10-15 健研检测集团有限公司 A kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure and its construction method
WO2020001156A1 (en) * 2018-06-29 2020-01-02 比亚迪股份有限公司 Bridge and bridge pier thereof
CN110725475A (en) * 2019-11-20 2020-01-24 中国建筑标准设计研究院有限公司 Prefabricated column with built-in high-corrugated pipe, frame structure of prefabricated column and construction method of prefabricated column
CN110804944A (en) * 2019-11-26 2020-02-18 北京工业大学 Pier column-bent cap node pouring connection mode and structure in prefabricated assembled bridge in high-intensity area
CN111691310A (en) * 2020-07-07 2020-09-22 郑琼华 Bridge construction method
CN111996906A (en) * 2020-09-21 2020-11-27 山东鲁桥建设有限公司 Efficient construction method of assembled pier
CN112095441A (en) * 2020-08-13 2020-12-18 盐城工学院 Construction process for connecting assembled reinforced concrete bridge pier column and capping beam
CN113585052A (en) * 2021-07-23 2021-11-02 中铁上海工程局集团有限公司 Pier for assembled bridge convenient to hoist and mount
CN113981810A (en) * 2021-11-01 2022-01-28 华汇工程设计集团股份有限公司 Prefabricated bridge pier for jacking slope-adjusting bridge and construction method of prefabricated bridge pier

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202247711U (en) * 2011-09-14 2012-05-30 广东省公路勘察规划设计院股份有限公司 Adjustable and controllable reinforced type bridge
CN103696370A (en) * 2013-12-18 2014-04-02 苏州大方特种车股份有限公司 Quick bridge construction method and structure
CN203684108U (en) * 2014-01-21 2014-07-02 张利铨 Fully-precast assembly type reinforced concrete bridge assembling structure
CN104018422A (en) * 2014-06-18 2014-09-03 上海市城市建设设计研究总院 Wet joint structure for prefabrication and splicing of joint part between bridge pier column and cover beam
KR20150005301A (en) * 2013-07-05 2015-01-14 지에스건설 주식회사 Permanent form and construction method for coping
CN106049259A (en) * 2016-06-16 2016-10-26 安徽省交通规划设计研究总院股份有限公司 Bridge integrally-assembled pier and construction method
CN106400692A (en) * 2016-10-28 2017-02-15 上海市政工程设计研究总院(集团)有限公司 Construction method for stand column and cover beam assembled structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202247711U (en) * 2011-09-14 2012-05-30 广东省公路勘察规划设计院股份有限公司 Adjustable and controllable reinforced type bridge
KR20150005301A (en) * 2013-07-05 2015-01-14 지에스건설 주식회사 Permanent form and construction method for coping
CN103696370A (en) * 2013-12-18 2014-04-02 苏州大方特种车股份有限公司 Quick bridge construction method and structure
CN203684108U (en) * 2014-01-21 2014-07-02 张利铨 Fully-precast assembly type reinforced concrete bridge assembling structure
CN104018422A (en) * 2014-06-18 2014-09-03 上海市城市建设设计研究总院 Wet joint structure for prefabrication and splicing of joint part between bridge pier column and cover beam
CN106049259A (en) * 2016-06-16 2016-10-26 安徽省交通规划设计研究总院股份有限公司 Bridge integrally-assembled pier and construction method
CN106400692A (en) * 2016-10-28 2017-02-15 上海市政工程设计研究总院(集团)有限公司 Construction method for stand column and cover beam assembled structure

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532621A (en) * 2018-04-19 2018-09-14 浙江大学城市学院 A kind of assembled drilledpier foundation and its construction method
CN108756933A (en) * 2018-04-27 2018-11-06 同济大学 A kind of bellows-type quick connecting method of double layer tunnel inside prefabricated components
CN108547216A (en) * 2018-06-12 2018-09-18 北京市市政工程设计研究总院有限公司 Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame and construction method
CN108547216B (en) * 2018-06-12 2023-07-11 北京市市政工程设计研究总院有限公司 Bridge precast concrete pier column and bridge foundation tooth key socket structure and construction method
CN108755730A (en) * 2018-06-12 2018-11-06 中交第三航务工程勘察设计院有限公司 A kind of assembled pile foundation wharfs node and its construction method
CN108677731A (en) * 2018-06-19 2018-10-19 上海应用技术大学 A kind of the rotary splicing structure and joining method of bent cap and bridge pier
CN108560544B (en) * 2018-06-22 2024-01-26 湘潭大学 Sleeve connection assembled pile foundation and construction method thereof
CN108560544A (en) * 2018-06-22 2018-09-21 湘潭大学 A kind of sleeve connection assembled pile foundation and its construction method
WO2020001156A1 (en) * 2018-06-29 2020-01-02 比亚迪股份有限公司 Bridge and bridge pier thereof
CN110656575A (en) * 2018-06-29 2020-01-07 比亚迪股份有限公司 Bridge and pier thereof
CN110331656A (en) * 2018-07-16 2019-10-15 健研检测集团有限公司 A kind of soap-free emulsion polymeization post-tensioned prestressing assembled pier connection structure and its construction method
CN108867323A (en) * 2018-08-01 2018-11-23 中铁四局集团有限公司 A kind of grout sleeve connection Precast Concrete Segmental Bridges pier construction method
CN108774947B (en) * 2018-08-01 2024-04-02 宁波交通工程建设集团有限公司 Ultra-high-strength concrete connection structure of assembled bridge pier column and construction method
CN108774947A (en) * 2018-08-01 2018-11-09 宁波交通工程建设集团有限公司 Packaged type bridges pier stud super high strength concrete connection structure and construction method
CN109457599B (en) * 2018-11-29 2023-07-07 福州大学 Splicing structure of hollow pier and bearing platform and construction method
CN109457599A (en) * 2018-11-29 2019-03-12 福州大学 Hollow pier and cushion cap splicing construction and construction method
CN109537465B (en) * 2018-12-11 2024-04-30 中交一公局土木工程建筑研究院有限公司 Assembled bearing platform pier column joint model and joint filling construction process using same
CN109537465A (en) * 2018-12-11 2019-03-29 中交公局土木工程建筑研究院有限公司 A kind of assembled cushion cap pier stud joint model and the cementation of fissures construction technology using it
CN109989346B (en) * 2019-01-10 2023-11-10 中交第二航务工程局有限公司 Bridge large-diameter precast concrete tubular column foundation and construction method thereof
CN109989346A (en) * 2019-01-10 2019-07-09 中交第二航务工程局有限公司 Bridge major diameter precast concrete tubular column basis and its construction method
CN110725475A (en) * 2019-11-20 2020-01-24 中国建筑标准设计研究院有限公司 Prefabricated column with built-in high-corrugated pipe, frame structure of prefabricated column and construction method of prefabricated column
CN110804944B (en) * 2019-11-26 2024-06-04 北京工业大学 Pier column-capping beam node pouring connection mode and structure in prefabricated assembled bridge in high-intensity area
CN110804944A (en) * 2019-11-26 2020-02-18 北京工业大学 Pier column-bent cap node pouring connection mode and structure in prefabricated assembled bridge in high-intensity area
CN111691310B (en) * 2020-07-07 2021-10-22 倪水木 Bridge construction method
CN111691310A (en) * 2020-07-07 2020-09-22 郑琼华 Bridge construction method
CN112095441B (en) * 2020-08-13 2022-01-28 盐城工学院 Construction process for connecting assembled reinforced concrete bridge pier column and capping beam
CN112095441A (en) * 2020-08-13 2020-12-18 盐城工学院 Construction process for connecting assembled reinforced concrete bridge pier column and capping beam
CN111996906A (en) * 2020-09-21 2020-11-27 山东鲁桥建设有限公司 Efficient construction method of assembled pier
CN113585052B (en) * 2021-07-23 2022-11-18 中铁上海工程局集团有限公司 Pier for assembled bridge convenient to hoist and mount
CN113585052A (en) * 2021-07-23 2021-11-02 中铁上海工程局集团有限公司 Pier for assembled bridge convenient to hoist and mount
CN113981810A (en) * 2021-11-01 2022-01-28 华汇工程设计集团股份有限公司 Prefabricated bridge pier for jacking slope-adjusting bridge and construction method of prefabricated bridge pier
CN113981810B (en) * 2021-11-01 2024-01-26 华汇工程设计集团股份有限公司 Prefabricated assembled bridge pier for jacking slope-adjusting bridge and construction method thereof

Similar Documents

Publication Publication Date Title
CN107447647A (en) Assembled bridge pier and its construction method
CN109837831A (en) A kind of centrifugation prefabricated assembled concrete bridge pier and construction method
CN107313339B (en) Assembled abutment and its construction method
CN107476470A (en) Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls and its construction method
CN207537870U (en) A kind of precast beam unit of cantilevered shape of a hoof bent cap
CN208267093U (en) A kind of Precast Concrete Frame
CN220301359U (en) Superposed assembled slope protection structure
CN219710515U (en) Drain cover
CN217711776U (en) Funnel type shunt suitable for lifting is pour simultaneously to many silos
CN208545882U (en) Exempt from demoulding precast beam system
CN102061760B (en) Cavity member for concrete hollow slab
CN102041863B (en) Cavity member for concrete hollow slabs
CN102041858B (en) Cavity member for concrete hollow slab
CN102011451B (en) Cavity component for concrete hollow slabs
CN102021964B (en) Cavity member for concrete hollow core slab
CN102021961B (en) Cavity member for concrete hollow slab
CN207109840U (en) A kind of prefabricated notch isolated footing
CN102061765B (en) Cavity member for concrete hollow slab
CN102061764B (en) Cavity member for concrete hollow slab
CN102061761B (en) Cavity member for concrete hollow slab
CN102011447B (en) Cavity structural member for concrete hollow core slab
CN102003011B (en) Cavity member for concrete hollow plate
CN102011448B (en) Cavity member for concrete hollow plate
CN102003012B (en) Cavity member for concrete hollow plate
CN102041860B (en) Cavity member for hollow concrete slabs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171208

RJ01 Rejection of invention patent application after publication