CN103645392A - Method for realizing device test protection through recording and playback - Google Patents

Method for realizing device test protection through recording and playback Download PDF

Info

Publication number
CN103645392A
CN103645392A CN201310484353.9A CN201310484353A CN103645392A CN 103645392 A CN103645392 A CN 103645392A CN 201310484353 A CN201310484353 A CN 201310484353A CN 103645392 A CN103645392 A CN 103645392A
Authority
CN
China
Prior art keywords
protection
test
action
ied
playback
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310484353.9A
Other languages
Chinese (zh)
Inventor
祝文姬
高立克
吴智丁
薛晨
李珊
吴剑豪
吴丽芳
李克文
俞小勇
钱阳冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guangxi Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guangxi Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangxi Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangxi Power Grid Co Ltd
Priority to CN201310484353.9A priority Critical patent/CN103645392A/en
Publication of CN103645392A publication Critical patent/CN103645392A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

The invention relates to the technical field of transformer substation protection devices, and specifically relates to a method for realizing device test protection through recording and playback. The method comprises the following steps: (1) the typical failure waveform question bank establishment process: 1) protection is classified according to logical functions specified by IEC61850; 2) and a corresponding typical failure waveform is recorded for each type of protection through an IED detect detector, and a test question bank is generated for an anticipated action of the corresponding failure waveform is inputted manually; (2) and the test process: 1) an appropriate test question bank is selected according to the logical function classification of the tested protection; 2) the protection is connected to the IED detect detector, and a synchronous clock is connected; 3) the test question bank is played back by the IED detect detector, and the action output of the tested protection is received by the IED detect detector; 4) and the action of the tested protection is compared with the anticipated action in the test question bank to judge the test result. The method of the invention has advantages of low cost and convenience, the protection device has advantages of small size and easy carry, so the protection device is suitable for the field tests of various transformer substations, so that advantages of easy utilization and easy operation can be realized.

Description

A kind of method of utilizing recording and playback to realize protection equipment test
Technical field
The present invention relates to transforming plant protecting device technique field, be specifically related to a kind of method of utilizing recording and playback to realize protection equipment test.
Background technology
At present, substation operation state is realized monitor and detection by dynamic simulation test, and this dynamic simulation test is realized by recording and playback protective device.Dynamic simulation test is dynamic analog test; by simulate various operating conditions and the malfunction of actual transformer station on RTDS; the function of the protection moving in electric system and control device and performance are examined in real time, to guarantee the test of protection and control device reliability service at the scene.
But there are the following problems for existing RTDS recording and playback protection equipment: there is no fixing testing failure exam pool, comparison difficulty; Equipment volume is large, and buying, operating cost is high; Because volume is large, cannot in transformer station, realize relevant dynamic simulation test.
Summary of the invention
The object of the invention is to defect and deficiency for prior art, a kind of method of utilizing recording and playback to realize protection equipment test is provided.
For achieving the above object, the technical solution used in the present invention is: a kind of method of utilizing recording and playback to realize protection equipment test, comprises the steps:
(1) typical fault waveform exam pool builds
1) protection is pressed to the logic function classification of IEC61850 regulation;
2) with IED equipment Inspection instrument, be that corresponding typical fault waveform is recorded in each type protection, and manually input the expection action generation test exam pool of corresponding failure waveform;
(2) test process
1) the suitable test exam pool of logic function classifying and selecting of the tested protection of foundation;
2) protection is connected to IED equipment Inspection instrument, and accesses synchronous clock;
3) by the playback of IED equipment Inspection instrument, test exam pool, and receive the action output of tested protection;
4) action that contrasts tested protection is judged test result with the expection action in test exam pool.
As preferably, described typical fault waveform is COMTRADE99 wave format shape file.
Adopt after said structure, beneficial effect of the present invention is:
1, can be by automatically detecting, real-time, can monitor the malfunction of substation equipment.
2, cost is low, convenience is strong, and this protective device volume is little, is easy to carry, and is suitable for the site test of all kinds of transformer stations.
3, use simply, only need recall corresponding exam pool and carry out playback and can test, without building its complicated mould shape, easy operating.
Accompanying drawing explanation
In order to be illustrated more clearly in technical scheme of the present invention, below the accompanying drawing of required use during embodiment is described is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skills, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is typical fault waveform exam pool construction framework figure of the present invention;
Fig. 2 is test process frame diagram of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the present invention is further illustrated.
A kind of described method of utilizing recording and playback to realize protection equipment test, comprises the steps: as shown in Figure 1, Figure 2
(1) typical fault waveform exam pool builds
First the typical electric network fault of organizing relay protection expert to face with regard to all kinds of protections carries out taxonomic revision, forms a electric pressure of pressing, the typical electric network fault outline of protection classification of type; Then use RTDS real-timedigital simulation instrument to simulate respectively corresponding fault and record into COMTRADE99 wave format shape file by typical electric network fault outline; Be finally the corresponding action of outputing of the pre-configured protection of each fault waveform, the record of this action is to deposit in exam pool in IEC61850 model mode.
(2) test process
1) according to the suitable test exam pool of logic function classifying and selecting of tested protection, before protection test, should first set the class shape electric pressure of protection, more selected test exercise question is tested;
2) protection is connected to IED equipment Inspection instrument, and accesses synchronous clock, the test macro nominative testing mouth that the fault waveform in exercise question is played back to by test, accesses tested relay protection the test port of this system, receives the fault waveform that this system is sent;
3) by the playback of IED equipment Inspection instrument, test exam pool, and receive the action output of tested protection;
4) action that contrasts tested protection is judged test result with the expection action in test exam pool, the problem existing to evaluate this device, and provide accordingly corresponding test report.
The above, it is only preferred embodiment of the present invention, not the present invention is done to any pro forma restriction, although the present invention discloses as above with preferred embodiment, yet not in order to limit the present invention, any those skilled in the art, do not departing within the scope of technical solution of the present invention, when can utilizing the technology contents of above-mentioned announcement to make a little change or being modified to the equivalent embodiment of equivalent variations, in every case be the content that does not depart from technical solution of the present invention, any simple modification of above embodiment being done according to technical spirit of the present invention, equivalent variations and modification, all still belong in the scope of technical solution of the present invention.

Claims (2)

1. utilize recording and playback to realize a method for protection equipment test, it is characterized in that: comprise the steps:
(1) typical fault waveform exam pool builds
1) protection is pressed to the logic function classification of IEC61850 regulation;
2) with IED equipment Inspection instrument, be that corresponding typical fault waveform is recorded in each type protection, and manually input the expection action generation test exam pool of corresponding failure waveform;
(2) test process
1) the suitable test exam pool of logic function classifying and selecting of the tested protection of foundation;
2) protection is connected to IED equipment Inspection instrument, and accesses synchronous clock;
3) by the playback of IED equipment Inspection instrument, test exam pool, and receive the action output of tested protection;
4) action that contrasts tested protection is judged test result with the expection action in test exam pool.
2. a kind of method of utilizing recording and playback to realize protection equipment test according to claim 1, is characterized in that: described typical fault waveform is COMTRADE99 wave format shape file.
CN201310484353.9A 2013-12-23 2013-12-23 Method for realizing device test protection through recording and playback Pending CN103645392A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310484353.9A CN103645392A (en) 2013-12-23 2013-12-23 Method for realizing device test protection through recording and playback

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310484353.9A CN103645392A (en) 2013-12-23 2013-12-23 Method for realizing device test protection through recording and playback

Publications (1)

Publication Number Publication Date
CN103645392A true CN103645392A (en) 2014-03-19

Family

ID=50250642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310484353.9A Pending CN103645392A (en) 2013-12-23 2013-12-23 Method for realizing device test protection through recording and playback

Country Status (1)

Country Link
CN (1) CN103645392A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106771735A (en) * 2016-12-12 2017-05-31 国网北京市电力公司 The treating method and apparatus of simulated failure
CN108761313A (en) * 2018-06-15 2018-11-06 国网江苏省电力有限公司电力科学研究院 Extra-high voltage direct-current protective device test method and system based on failure inverting
CN108830495A (en) * 2018-06-22 2018-11-16 广东电网有限责任公司 Abnormal working condition testing method and device
CN111638413A (en) * 2020-06-02 2020-09-08 国家电网有限公司 Intelligent substation fault waveform playback analysis system and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106771735A (en) * 2016-12-12 2017-05-31 国网北京市电力公司 The treating method and apparatus of simulated failure
CN108761313A (en) * 2018-06-15 2018-11-06 国网江苏省电力有限公司电力科学研究院 Extra-high voltage direct-current protective device test method and system based on failure inverting
CN108830495A (en) * 2018-06-22 2018-11-16 广东电网有限责任公司 Abnormal working condition testing method and device
CN111638413A (en) * 2020-06-02 2020-09-08 国家电网有限公司 Intelligent substation fault waveform playback analysis system and method

Similar Documents

Publication Publication Date Title
CN103954925B (en) A kind of fault oscillograph dynamic testing method based on RTDS real-time simulation
WO2014108002A1 (en) Detection method and system of intelligent relay protection device
CN103885438B (en) The Auto-Test System of a kind of transformer station measuring and controlling equipment and method
CN103076520A (en) Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation
CN106056896A (en) Intelligent power utilization system and test method based on low-voltage power line carrier
CN108241771A (en) Secondary device modeling method based on electromagnetic transient simulation platform
CN103616660B (en) The testing arrangement of power down process reliability and method under intelligent electric energy meter interference environment
CN103728557A (en) System and method for testing relay protection system in closed loop non-invasively
CN203178388U (en) Micro-grid test platform based on RTDS (Real Time Digital Simulator)
CN103645392A (en) Method for realizing device test protection through recording and playback
CN112711829A (en) Intelligent substation secondary equipment batch production intelligent maintenance system
CN103837785A (en) Feeder automation detection and simulation system
CN106771730A (en) The intelligent substation real-time calibration equipment of protection device analog quantity sampling circuit and method
CN104391498A (en) Non-intrusive testing system for relay protection device and testing method thereof
CN105093042B (en) Intelligent substation telecontrol system test device based on telecontrol system CID
CN103346497B (en) Intelligent substation electrical virtual circuit isolation method and system
CN203324403U (en) Power distribution network feed line protection digital dynamic test system comprising distributed power sources
CN102426309A (en) Method for testing area spare power automatic switching system in engine room environment of master station
CN106990312B (en) Testing device and testing method for digital relay protection device
CN106094495A (en) Intelligent electronic equipment of transformer substation timing tracking accuracy and the method for testing of punctual precision
CN106803671A (en) A kind of photovoltaic plant low voltage ride-through capability appraisal procedure
CN105847076A (en) Signal testing system, method and device for substation control level equipment of transformer substation
CN203519784U (en) Testing device capable of realizing comprehensive testing for optimization board cards
CN104749473B (en) A kind of power information acquisition terminal for simulating scene stops upper electric event testing method
CN104036070A (en) Digitized recording playback method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140319

WD01 Invention patent application deemed withdrawn after publication