CN105093042B - Intelligent substation telecontrol system test device based on telecontrol system CID - Google Patents

Intelligent substation telecontrol system test device based on telecontrol system CID Download PDF

Info

Publication number
CN105093042B
CN105093042B CN201510577669.1A CN201510577669A CN105093042B CN 105093042 B CN105093042 B CN 105093042B CN 201510577669 A CN201510577669 A CN 201510577669A CN 105093042 B CN105093042 B CN 105093042B
Authority
CN
China
Prior art keywords
test
telecontrol system
test device
cid
telecontrol
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510577669.1A
Other languages
Chinese (zh)
Other versions
CN105093042A (en
Inventor
曹海欧
杨毅
刘韶俊
高翔
高磊
袁宇波
管益斌
徐宁
吴奕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI YIHAO AUTOMATION CO Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
SHANGHAI YIHAO AUTOMATION CO Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI YIHAO AUTOMATION CO Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical SHANGHAI YIHAO AUTOMATION CO Ltd
Priority to CN201510577669.1A priority Critical patent/CN105093042B/en
Publication of CN105093042A publication Critical patent/CN105093042A/en
Application granted granted Critical
Publication of CN105093042B publication Critical patent/CN105093042B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Selective Calling Equipment (AREA)

Abstract

The intelligent substation telecontrol system test device based on telecontrol system CID that the invention discloses a kind of generates test case, is automatically performed the test case configuration of test macro by parsing concrete engineering telemechanical CID file generated;Telecontrol system warning information is tested automatically using test case is formed by;Simultaneously by KVM, the picture of concentrator station is read, the carry out human assistance evaluation for each telemechanical alarm signal test result, and the test record document of telemechanical warning information is established, realize engineering management.It may make up real-time, human assistance closed loop, efficient test system using telecontrol system test device;To realize that the quick test of intelligent substation provides necessary condition, the construction speed of substation is improved.

Description

Intelligent substation telecontrol system test device based on telecontrol system CID
Technical field
The intelligent substation telecontrol system test device based on telecontrol system CID that the present invention relates to a kind of, belongs to power train System technical field.
Background technique
With the continuous improvement of economic development, social progress, science and technology and the level of IT application and global resources and environmental problem Become increasingly conspicuous, power network development faces new issue and new challenge.By present information, communication and control technology, actively develop intelligence Energy power grid, adapts to the requirement of Sustainable Development in Future, it has also become the realistic choice of International Power development.It is built as smart grid Important support, the mechanism such as information collection, transmission, the processing of intelligent substation based on IEC61850 system, reduce substation build If maintenance cost, operation of power networks intelligent management is realized, improve Operation of Electric Systems reliability.But the telecontrol system of substation Using traditional specification, inconvenience is brought to conventional test manner.
Summary of the invention
Purpose: in order to overcome the deficiencies in the prior art, the core in view of intelligent substation telecontrol system is CID text Part, the present invention provide a kind of intelligent substation telecontrol system test device based on telecontrol system CID, are given birth to according to concrete engineering At CID file automatically generate telemechanical warning information test case by parsing CID file, it is automatic to read inside telecontrol device 61850 and 104 specification mapping relations.Telecontrol system progress human assistance is tested automatically using test case is formed by. Meanwhile read test is as a result, establish corresponding test record document, realization engineering management for telecontrol system test result.This Sample may make up real-time, human assistance closed loop, efficient test system using test device (system);To realize intelligent substation Quickly test provides necessary condition, improves the construction speed of substation.
Technical solution: in order to solve the above technical problems, the technical solution adopted by the present invention are as follows:
A kind of intelligent substation telecontrol system test device based on telecontrol system CID characterized by comprising setting In the indoor telecontrol system test device of Substation control and it is mounted on the telecontrol system of substation and concentrator station, in which: remote Dynamic opening machine system test device is generated test case, is generated by simulation alarm signal generating unit by parsing telecontrol system CID file Simulation alarm signal transmits test pattern alarm signal and test case, telecontrol system to telecontrol system through substation's local area network Test case energizing quantity and teletransmission are received to concentrator station through network communication mouth, and concentrator station will be according to Substation Design principle and people The setting of machine interface, response test use-case, and response results graphic picture is passed through into Ethernet in a manner of KVM by tested telecontrol system It exports to telecontrol system test device.
The telecontrol system test device includes CID resolution unit, simulation alarm signal generating unit, human assistance test Compare control unit, test result storage unit, KVM packet parsing unit.
CID resolution unit generates the test case of tested telecontrol system alarm signal by parsing CID file.
MMS needed for simulation alarm signal generating unit generates test according to test case, and pass through MMS data-interface list Member output.
Human assistance test compares control unit, the alarm signal that tester exports according to test case, by man-machine The concentrator station that interactive mode and test device are shown shows that picture carries out human assistance evaluation.
Test result storage unit concludes test result according to test case, and saves test document, realization pair In the engineering management of tested telecontrol system.
KVM packet parsing unit realizes the KVM of concentrator station monitoring host computer figure by the KVM ethernet channel of substation It is shown on the display of telecontrol system test device after packet parsing.
The test case refers to: for the CID of tested telecontrol system, the warning information testing scheme that automatically generates.
The test side for the intelligent substation telecontrol system test device based on telecontrol system CID that the present invention also provides above-mentioned Method, comprising the following steps:
The first step, collection control station monitoring host computer display mouth access the channel concentrator station side figure KVM, and transformer substation side KVM is logical Road is directly accessed telecontrol system test device, and the MMS network mouth of tested telecontrol system is switched to straight with telecontrol system test device It is logical, it is tested the message that telecontrol system only receives telecontrol system test device at this time;Collect the transmission of control station monitoring host computer figure simultaneously To telecontrol system test device;
Second step passes through telecontrol system CID resolution unit analytical Calculation and generates testing scheme and test template, utilizes CID file is automatically performed the configuration of test device, and exports to simulation alarm signal generator unit;Simulation alarm signal occurs The MMS network mouth that the MMS message of device unit passes through communications interface transmission to tested telecontrol system;
Third step after KVM packet parsing unit is parsed according to the KVM message of concentrator station, is transmitted to human assistance survey Examination compares the graphical warning information of control unit real-time display;
4th step is tested telecontrol system according to the MMS message of input, carries out remote moving function calculating, be when obtaining result One action cycle terminates then to output test result after human assistance determines to test result storage unit, ties to test Fruit is concluded according to test case, and saves test document;
So far, the on-line testing step of telecontrol system alarm is completed;After circulation completes whole signal testings, test At.
The utility model has the advantages that provided by the invention based on the intelligent substation telecontrol system test device of telecontrol system CID and survey Method for testing realizes telecontrol system on-line testing human assistance automation function, greatly under the premise of not needing protective device cooperation Greatly when simplifying capital construction telecontrol system test, ensure that the safe operation of telecontrol system, improve power system power supply can By property.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is automatic test modular structure schematic diagram of the present invention.
Specific embodiment
The present invention will be further explained combined with specific embodiments below.
As depicted in figs. 1 and 2, a kind of intelligent substation telecontrol system test device based on telecontrol system CID, comprising: It is set to the indoor telecontrol system test device of Substation control and is mounted on the telecontrol system of substation and concentrator station, In: telecontrol system test device generates test case by parsing telecontrol system CID file, is occurred by simulation alarm signal single Member generates simulation alarm signal, transmits test pattern alarm signal and test case to telecontrol system through substation's local area network, far Dynamic system receives test case energizing quantity through network communication mouth and teletransmission is to concentrator station, and concentrator station will be according to Substation Design original Reason and man-machine interface setting, response test use-case, and passed through response results graphic picture in a manner of KVM by tested telecontrol system Ethernet output is to telecontrol system test device.
The telecontrol system test device includes CID resolution unit, simulation alarm signal generating unit, human assistance test Compare control unit, test result storage unit, KVM packet parsing unit.
CID resolution unit generates the test case of tested telecontrol system alarm signal by parsing CID file.
MMS needed for simulation alarm signal generating unit generates test according to test case, and pass through MMS data-interface list Member output.
Human assistance test compares control unit, the alarm signal that tester exports according to test case, by man-machine The concentrator station that interactive mode and test device are shown shows that picture carries out human assistance evaluation.
Test result storage unit concludes test result according to test case, and saves test document, realization pair In the engineering management of tested telecontrol system.
KVM packet parsing unit realizes the KVM of concentrator station monitoring host computer figure by the KVM ethernet channel of substation It is shown on the display of telecontrol system test device after packet parsing.
The test case refers to: for the CID of tested telecontrol system, the warning information testing scheme that automatically generates.
Specific work process of the present invention is as follows:
The first step, collection control station monitoring host computer display mouth access the channel concentrator station side figure KVM, and transformer substation side KVM is logical Road is directly accessed telecontrol system test device, and the MMS network mouth of tested telecontrol system is switched to straight with telecontrol system test device It is logical, it is tested the message that telecontrol system only receives telecontrol system test device at this time;Collect the transmission of control station monitoring host computer figure simultaneously To telecontrol system test device;
Second step passes through telecontrol system CID resolution unit analytical Calculation and generates testing scheme and test template, utilizes CID file is automatically performed the configuration of test device, and exports to simulation alarm signal generator unit;Simulation alarm signal occurs The MMS network mouth that the MMS message of device unit passes through communications interface transmission to tested telecontrol system;
Third step after KVM packet parsing unit is parsed according to the KVM message of concentrator station, is transmitted to human assistance survey Examination compares the graphical warning information of control unit real-time display;
4th step is tested telecontrol system according to the MMS message of input, carries out remote moving function calculating, be when obtaining result One action cycle terminates then to output test result after human assistance determines to test result storage unit, ties to test Fruit is concluded according to test case, and saves test document;
So far, the on-line testing step of telecontrol system alarm is completed;After circulation completes whole signal testings, test At.
In this way, not needing to protect by on-line testing according to sequencing mode among capital construction and scrap build engineering Under the premise of device cooperation, telecontrol system on-line testing human assistance automation function, telemechanical when enormously simplifying capital construction are realized The test of system ensure that the safe operation of telecontrol system, improve the reliability of power system power supply.
The above is only a preferred embodiment of the present invention, it should be pointed out that: for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (8)

1. a kind of test method of the intelligent substation telecontrol system test device based on telecontrol system CID, which is characterized in that dress Setting includes: the telemechanical system for being set to the indoor telecontrol system test device of Substation control and being mounted on substation and concentrator station System, in which: telecontrol system test device is generated test case, sent out by simulation alarm signal by parsing telecontrol system CID file Raw unit generates simulation alarm signal, transmits test pattern alarm signal to telecontrol system through substation's local area network and test is used Example, telecontrol system receive test case energizing quantity and teletransmission to concentrator station through network communication mouth, and concentrator station will be according to substation Design principle and man-machine interface setting, response test use-case, and by being tested telecontrol system for response results graphic picture with the side KVM Formula passes through Ethernet output to telecontrol system test device;
Method includes:
The first step, collection control station monitoring host computer display mouth access the channel concentrator station side figure KVM, and the channel transformer substation side KVM is straight Telecontrol system test device is accessed, the MMS network mouth of tested telecontrol system is switched to be led directly to telecontrol system test device, this When tested telecontrol system only receive the message of telecontrol system test device;Collecting control station monitoring host computer figure is transmitted to telemechanical simultaneously Opening machine system test device;
Second step passes through telecontrol system CID resolution unit analytical Calculation and generates testing scheme and test template, utilizes CID File is automatically performed the configuration of test device, and exports to simulation alarm signal generator unit;Simulation alarm signal generator The MMS network mouth that the MMS message of unit passes through communications interface transmission to tested telecontrol system;
Third step after KVM packet parsing unit is parsed according to the KVM message of concentrator station, is transmitted to human assistance test ratio To the graphical warning information of control unit real-time display;
4th step is tested telecontrol system according to the MMS message of input, carries out remote moving function calculating, is one when obtaining result Action cycle terminate by human assistance determine after, then output test result to test result storage unit, to test result according to It is concluded according to test case, and saves test document;
So far, the on-line testing step of telecontrol system alarm is completed;After circulation completes whole signal testings, test is completed.
2. the test side of the intelligent substation telecontrol system test device according to claim 1 based on telecontrol system CID Method, it is characterised in that: the telecontrol system test device includes CID resolution unit, simulation alarm signal generating unit, artificial auxiliary Test is helped to compare control unit, test result storage unit, KVM packet parsing unit.
3. the test side of the intelligent substation telecontrol system test device according to claim 2 based on telecontrol system CID Method, it is characterised in that: CID resolution unit generates the test case of tested telecontrol system alarm signal by parsing CID file.
4. the test side of the intelligent substation telecontrol system test device according to claim 2 based on telecontrol system CID Method, it is characterised in that: MMS needed for simulation alarm signal generating unit generates test according to test case, and pass through MMS data Interface unit output.
5. the test side of the intelligent substation telecontrol system test device according to claim 2 based on telecontrol system CID Method, it is characterised in that: human assistance test compares control unit, and the alarm signal that tester exports according to test case is led to It crosses the concentrator station that man-machine interaction mode and test device are shown and shows that picture carries out human assistance evaluation.
6. the test side of the intelligent substation telecontrol system test device according to claim 2 based on telecontrol system CID Method, it is characterised in that: test result storage unit concludes test result according to test case, and saves test document, Realize the engineering management for being tested telecontrol system.
7. the test side of the intelligent substation telecontrol system test device according to claim 2 based on telecontrol system CID Method, it is characterised in that: KVM packet parsing unit realizes concentrator station monitoring host computer figure by the KVM ethernet channel of substation It is shown on the display of telecontrol system test device after the KVM packet parsing of shape.
8. the test side of the intelligent substation telecontrol system test device according to claim 1 based on telecontrol system CID Method, it is characterised in that: the test case refers to: for the CID of tested telecontrol system, the warning information test side that automatically generates Case.
CN201510577669.1A 2015-09-11 2015-09-11 Intelligent substation telecontrol system test device based on telecontrol system CID Expired - Fee Related CN105093042B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510577669.1A CN105093042B (en) 2015-09-11 2015-09-11 Intelligent substation telecontrol system test device based on telecontrol system CID

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510577669.1A CN105093042B (en) 2015-09-11 2015-09-11 Intelligent substation telecontrol system test device based on telecontrol system CID

Publications (2)

Publication Number Publication Date
CN105093042A CN105093042A (en) 2015-11-25
CN105093042B true CN105093042B (en) 2019-03-29

Family

ID=54573925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510577669.1A Expired - Fee Related CN105093042B (en) 2015-09-11 2015-09-11 Intelligent substation telecontrol system test device based on telecontrol system CID

Country Status (1)

Country Link
CN (1) CN105093042B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106501644A (en) * 2016-10-31 2017-03-15 国网福建省电力有限公司 A kind of transformer station measurement and control device test visualization and test information extracting method
CN106412345A (en) * 2016-12-06 2017-02-15 国网浙江慈溪市供电公司 Dispatching telephone and remote terminal test system
CN108732435A (en) * 2017-04-19 2018-11-02 国网冀北电力有限公司 Intelligent substation fault test system based on protective device CID files and method
CN109521749A (en) * 2017-09-19 2019-03-26 国网河北省电力公司 A kind of intelligent substation monitoring system testing apparatus and method based on SCD
CN111308245A (en) * 2020-03-11 2020-06-19 成都市登禄电力科技有限公司 Automatic testing device and method for remote machine of intelligent substation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5481548A (en) * 1991-04-09 1996-01-02 Hekimian Laboratories, Inc. Technique for diagnosing and locating physical and logical faults in data transmission systems
CN2891133Y (en) * 2005-11-30 2007-04-18 杭州市电力局 Tele-controlled and telemetric online monitoring and diagnostic apparatus
CN201298059Y (en) * 2008-11-28 2009-08-26 江苏省电力公司南京供电公司 Attempering automation system remote control channel on-line detection system
CN201490764U (en) * 2009-04-29 2010-05-26 安徽省电力公司芜湖供电公司 General simulation test system with integrated power grid dispatching and electric quantity acquisition
CN103197200A (en) * 2013-02-05 2013-07-10 广东电网公司佛山供电局 Method and system for rapidly collecting and transmitting fault ranging information of power grid line
CN103412208A (en) * 2013-07-15 2013-11-27 国家电网公司 Intelligent substation electric telecontrol device closed loop test method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5481548A (en) * 1991-04-09 1996-01-02 Hekimian Laboratories, Inc. Technique for diagnosing and locating physical and logical faults in data transmission systems
CN2891133Y (en) * 2005-11-30 2007-04-18 杭州市电力局 Tele-controlled and telemetric online monitoring and diagnostic apparatus
CN201298059Y (en) * 2008-11-28 2009-08-26 江苏省电力公司南京供电公司 Attempering automation system remote control channel on-line detection system
CN201490764U (en) * 2009-04-29 2010-05-26 安徽省电力公司芜湖供电公司 General simulation test system with integrated power grid dispatching and electric quantity acquisition
CN103197200A (en) * 2013-02-05 2013-07-10 广东电网公司佛山供电局 Method and system for rapidly collecting and transmitting fault ranging information of power grid line
CN103412208A (en) * 2013-07-15 2013-11-27 国家电网公司 Intelligent substation electric telecontrol device closed loop test method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
智能变电站远动功能测试技术分析;彭志强等;《电力与能源》;20140820;第35卷(第4期);第447页第1栏,第448页第1栏至第2栏,图2-5

Also Published As

Publication number Publication date
CN105093042A (en) 2015-11-25

Similar Documents

Publication Publication Date Title
CN105093042B (en) Intelligent substation telecontrol system test device based on telecontrol system CID
CN103166323B (en) System for monitoring secondary circuit model on line in real time based on protection device
CN103200051B (en) Intelligent substation message emulating is tested and is associated message analysis system and method
CN108322374A (en) A kind of boss station monitoring information check method based on wide-area services bus
CN104090194A (en) Intelligent substation relay protection noninvasive test system and method
CN106532935B (en) For carrying out the method and its system of secondary system of intelligent substation fault diagnosis
CN104113142B (en) Relaying protection maintenance peace based on SCD modeling arranges control system and method
CN202837985U (en) GPRS-communication based remote online monitoring system for sewage treatment equipment
CN103544857A (en) Integrated power transformation operation and maintenance training system
CN109325936A (en) Controller switching equipment defect image identification terminal and method based on neural network deep learning
CN104617672A (en) Online monitoring system for modeling based on physical communication medium of process level
CN207304479U (en) A kind of photovoltaic apparatus monitoring system based on Internet of Things
CN102426309A (en) Method for testing area spare power automatic switching system in engine room environment of master station
CN104535893A (en) Power grid fault processing device and processing method based on fine-grained model
CN104182818B (en) A kind of method and system of substation information intelligence automatic data collection
CN206757872U (en) Photovoltaic application system remote monitoring system
CN202094707U (en) Monitoring device for power grid
CN203951261U (en) switchyard fault simulator
CN204515030U (en) A kind of lightning protection comprehensive detection system
CN106128243A (en) Power failure simulator
CN203326440U (en) Robot inspection tour system based on hierarchical control structure
CN102508052A (en) Test method for field band channel operation of automatic bus transfer system of area network
CN206258715U (en) A kind of equipment of the data acquisition of detection smart city
CN103309302A (en) TD-LET (Time Division-Long Term Evolution) network-based environment monitoring system
CN203259855U (en) TD-LTE network-based environment monitoring system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Cao Haiou

Inventor after: Yang Yi

Inventor after: Liu Shaojun

Inventor after: Gao Xiang

Inventor after: Gao Lei

Inventor after: Yuan Yubo

Inventor after: Guan Yibin

Inventor after: Xu Ning

Inventor after: Wu Yi

Inventor before: Cao Haiou

Inventor before: Yang Yi

Inventor before: Liu Shaojun

Inventor before: Gao Xiang

Inventor before: Gao Lei

Inventor before: Yuan Yubo

Inventor before: Guan Yibin

Inventor before: Xu Ning

Inventor before: Wu Yi

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190329

Termination date: 20190911