CN105093042A - Intelligent transformer station telemechanical system test device based on telemechanical system CID - Google Patents

Intelligent transformer station telemechanical system test device based on telemechanical system CID Download PDF

Info

Publication number
CN105093042A
CN105093042A CN201510577669.1A CN201510577669A CN105093042A CN 105093042 A CN105093042 A CN 105093042A CN 201510577669 A CN201510577669 A CN 201510577669A CN 105093042 A CN105093042 A CN 105093042A
Authority
CN
China
Prior art keywords
telecontrol system
test
proving installation
cid
telecontrol
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510577669.1A
Other languages
Chinese (zh)
Other versions
CN105093042B (en
Inventor
曹海鸥
杨毅
刘韶俊
高翔
高磊
袁宇波
管益斌
徐宁
吴奕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI YIHAO AUTOMATION CO Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
SHANGHAI YIHAO AUTOMATION CO Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI YIHAO AUTOMATION CO Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical SHANGHAI YIHAO AUTOMATION CO Ltd
Priority to CN201510577669.1A priority Critical patent/CN105093042B/en
Publication of CN105093042A publication Critical patent/CN105093042A/en
Application granted granted Critical
Publication of CN105093042B publication Critical patent/CN105093042B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Selective Calling Equipment (AREA)

Abstract

The invention discloses an intelligent transformer station telemechanical system test device based on a telemechanical system CID. Test cases are generated by parsing telemechanical CID files generated by a concrete engineering, test case configuration of the test system is automatically accomplished; the formed test cases are utilized to carry out automatic tests on alarm signals of the telemechanical system; further through KVM, frames of a centralized control station is read, artificial auxiliary evaluation on each telemechanical alarm signal test result is carried out, test record files of the telemechanical alarm information are established, and engineering management is realized. The telemechanical system test device can form a real-time artificial auxiliary closed-loop high-efficiency test system, provides necessary conditions for rapid tests on intelligent transformer stations and improves the construction speed of the transformer station.

Description

Based on the intelligent substation telecontrol system proving installation of telecontrol system CID
Technical field
The present invention relates to a kind of intelligent substation telecontrol system proving installation based on telecontrol system CID, belong to technical field of power systems.
Background technology
Along with economic development, social progress, science and technology and the level of IT application improve constantly and the becoming increasingly conspicuous of global resources and environmental problem, power network development faces new problem and new challenge.Rely on present information, communication and control technology, develop actively intelligent grid, adapt to the requirement of Sustainable Development in Future, become the realistic choice of International Power development.As the important support that intelligent grid is built, intelligent substation, based on the mechanism such as information acquisition, transmission, process of IEC61850 system, reduces transformer substation construction maintenance cost, realizes operation of power networks intelligent management, improves Operation of Electric Systems reliability.But the telecontrol system of transformer station adopts traditional stipulations, brings inconvenience to conventional test manner.
Summary of the invention
Object: in order to overcome the deficiencies in the prior art, core in view of intelligent substation telecontrol system is CID file, the invention provides a kind of intelligent substation telecontrol system proving installation based on telecontrol system CID, according to the CID file that concrete engineering generates, by resolving CID file, automatic generation telemechanical warning information test case, reads the inner 61850 and 104 stipulations mapping relations of telecontrol communication machine automatically.Utilize the test case formed to carry out human assistance for telecontrol system automatically to test.Meanwhile, read test result, sets up corresponding test record document for telecontrol system test result, realizes engineering management.Like this, utilize that proving installation (system) can be formed in real time, human assistance closed loop, efficient test system; For the quick test realizing intelligent substation provides necessary condition, improve the construction speed of transformer station.
Technical scheme: for solving the problems of the technologies described above, the technical solution used in the present invention is:
A kind of intelligent substation telecontrol system proving installation based on telecontrol system CID, it is characterized in that, comprise: be arranged at the telecontrol system proving installation of Substation control indoor and be arranged on the telecontrol system of transformer station and concentrator station, wherein: telecontrol system proving installation is by resolving telecontrol system CID file, generating test use case, simulation alarm signal is produced by simulation alarm signal generating unit, through transformer station's LAN (Local Area Network) to telecontrol system test transmission pattern alarm signal and test case, telecontrol system receives test case energizing quantity and teletransmission to concentrator station through network service mouth, concentrator station will be arranged according to Substation Design principle and man-machine interface, response test use-case, and export response results graphic picture to telecontrol system proving installation in KVM mode by Ethernet by tested telecontrol system.
Described telecontrol system proving installation comprises CID resolution unit, simulation alarm signal generating unit, human assistance test comparison control module, test result storage unit, KVM packet parsing unit.
CID resolution unit, by resolving CID file, produces the test case of tested telecontrol system alarm signal.
Simulation alarm signal generating unit produces the MMS needed for test according to test case, and is exported by MMS data interface unit.
Human assistance test comparison control module, the alarm signal that tester exports according to test case, human assistance evaluation is carried out in the concentrator station display frame shown by man-machine interaction mode and proving installation.
Test result storage unit, concludes according to test case test result, and preserves test document, realize the engineering management for tested telecontrol system.
KVM packet parsing unit, by the KVM ethernet channel of transformer station, shows after realizing the KVM packet parsing of concentrator station monitoring host computer figure on the display of telecontrol system proving installation.
Described test case refers to: for the CID of tested telecontrol system, the warning information testing scheme automatically produced.
The present invention also provides the method for testing of the above-mentioned intelligent substation telecontrol system proving installation based on telecontrol system CID, comprises the following steps:
The first step, collection control station monitoring host computer display mouth access concentrator station side figure KVM passage, transformer substation side KVM passage directly accesses telecontrol system proving installation, the MMS port of tested telecontrol system is switched to and leads directly to telecontrol system proving installation, and now tested telecontrol system receives only the message of telecontrol system proving installation; Collect control station monitoring host computer figure simultaneously and be sent to telecontrol system proving installation;
Second step, generates testing scheme and test template by telecontrol system CID resolution unit analytical Calculation, utilizes CID file automatically to complete the configuration of proving installation, and export simulation alarm signal generator unit to; The MMS message of simulation alarm signal generator unit by communications interface transmission to the MMS port of tested telecontrol system;
3rd step, after KVM packet parsing unit is resolved according to the KVM message of concentrator station, transfers to the real-time display graphics warning information of human assistance test comparison control module;
4th step, tested telecontrol system is according to the MMS message of input, carry out remote moving function calculating, be an action cycle terminate after human assistance is determined when obtaining result, then output test result to test result storage unit, test result is concluded according to test case, and preserves test document;
So far, the on-line testing step of a telecontrol system alarm is completed; After circulation completes whole signal testing, test completes.
Beneficial effect: the intelligent substation telecontrol system proving installation based on telecontrol system CID provided by the invention and method of testing; under not needing protective device to coordinate prerequisite; achieve telecontrol system on-line testing human assistance automation function; enormously simplify the test of telecontrol system during capital construction; ensure that the safe operation of telecontrol system, improve the reliability of power system power supply.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is automatic test modular structure schematic diagram of the present invention.
Embodiment
Below in conjunction with specific embodiment, the present invention is further described.
As depicted in figs. 1 and 2, a kind of intelligent substation telecontrol system proving installation based on telecontrol system CID, comprise: be arranged at the telecontrol system proving installation of Substation control indoor and be arranged on the telecontrol system of transformer station and concentrator station, wherein: telecontrol system proving installation is by resolving telecontrol system CID file, generating test use case, simulation alarm signal is produced by simulation alarm signal generating unit, through transformer station's LAN (Local Area Network) to telecontrol system test transmission pattern alarm signal and test case, telecontrol system receives test case energizing quantity and teletransmission to concentrator station through network service mouth, concentrator station will be arranged according to Substation Design principle and man-machine interface, response test use-case, and export response results graphic picture to telecontrol system proving installation in KVM mode by Ethernet by tested telecontrol system.
Described telecontrol system proving installation comprises CID resolution unit, simulation alarm signal generating unit, human assistance test comparison control module, test result storage unit, KVM packet parsing unit.
CID resolution unit, by resolving CID file, produces the test case of tested telecontrol system alarm signal.
Simulation alarm signal generating unit produces the MMS needed for test according to test case, and is exported by MMS data interface unit.
Human assistance test comparison control module, the alarm signal that tester exports according to test case, human assistance evaluation is carried out in the concentrator station display frame shown by man-machine interaction mode and proving installation.
Test result storage unit, concludes according to test case test result, and preserves test document, realize the engineering management for tested telecontrol system.
KVM packet parsing unit, by the KVM ethernet channel of transformer station, shows after realizing the KVM packet parsing of concentrator station monitoring host computer figure on the display of telecontrol system proving installation.
Described test case refers to: for the CID of tested telecontrol system, the warning information testing scheme automatically produced.
Specific works process of the present invention is as follows:
The first step, collection control station monitoring host computer display mouth access concentrator station side figure KVM passage, transformer substation side KVM passage directly accesses telecontrol system proving installation, the MMS port of tested telecontrol system is switched to and leads directly to telecontrol system proving installation, and now tested telecontrol system receives only the message of telecontrol system proving installation; Collect control station monitoring host computer figure simultaneously and be sent to telecontrol system proving installation;
Second step, generates testing scheme and test template by telecontrol system CID resolution unit analytical Calculation, utilizes CID file automatically to complete the configuration of proving installation, and export simulation alarm signal generator unit to; The MMS message of simulation alarm signal generator unit by communications interface transmission to the MMS port of tested telecontrol system;
3rd step, after KVM packet parsing unit is resolved according to the KVM message of concentrator station, transfers to the real-time display graphics warning information of human assistance test comparison control module;
4th step, tested telecontrol system is according to the MMS message of input, carry out remote moving function calculating, be an action cycle terminate after human assistance is determined when obtaining result, then output test result to test result storage unit, test result is concluded according to test case, and preserves test document;
So far, the on-line testing step of a telecontrol system alarm is completed; After circulation completes whole signal testing, test completes.
Like this; on-line testing is passed through according to sequencing pattern in the middle of capital construction and scrap build engineering; under not needing protective device to coordinate prerequisite; achieve telecontrol system on-line testing human assistance automation function; enormously simplify the test of telecontrol system during capital construction; ensure that the safe operation of telecontrol system, improve the reliability of power system power supply.
The above is only the preferred embodiment of the present invention; be noted that for those skilled in the art; under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (9)

1. the intelligent substation telecontrol system proving installation based on telecontrol system CID, it is characterized in that, comprise: be arranged at the telecontrol system proving installation of Substation control indoor and be arranged on the telecontrol system of transformer station and concentrator station, wherein: telecontrol system proving installation is by resolving telecontrol system CID file, generating test use case, simulation alarm signal is produced by simulation alarm signal generating unit, through transformer station's LAN (Local Area Network) to telecontrol system test transmission pattern alarm signal and test case, telecontrol system receives test case energizing quantity and teletransmission to concentrator station through network service mouth, concentrator station will be arranged according to Substation Design principle and man-machine interface, response test use-case, and export response results graphic picture to telecontrol system proving installation in KVM mode by Ethernet by tested telecontrol system.
2. the intelligent substation telecontrol system proving installation based on telecontrol system CID according to claim 1, it is characterized in that: described telecontrol system proving installation comprises CID resolution unit, simulation alarm signal generating unit, human assistance test comparison control module, test result storage unit, KVM packet parsing unit.
3. the intelligent substation telecontrol system proving installation based on telecontrol system CID according to claim 2, is characterized in that: CID resolution unit, by resolving CID file, produces the test case of tested telecontrol system alarm signal.
4. the intelligent substation telecontrol system proving installation based on telecontrol system CID according to claim 2, is characterized in that: simulation alarm signal generating unit produces the MMS needed for test according to test case, and is exported by MMS data interface unit.
5. the intelligent substation telecontrol system proving installation based on telecontrol system CID according to claim 2, it is characterized in that: human assistance test comparison control module, the alarm signal that tester exports according to test case, human assistance evaluation is carried out in the concentrator station display frame shown by man-machine interaction mode and proving installation.
6. the intelligent substation telecontrol system proving installation based on telecontrol system CID according to claim 2, it is characterized in that: test result storage unit, test result is concluded according to test case, and preserves test document, realize the engineering management for tested telecontrol system.
7. the intelligent substation telecontrol system proving installation based on telecontrol system CID according to claim 2, it is characterized in that: KVM packet parsing unit, by the KVM ethernet channel of transformer station, show on the display of telecontrol system proving installation after realizing the KVM packet parsing of concentrator station monitoring host computer figure.
8. the intelligent substation telecontrol system proving installation based on telecontrol system CID according to claim 1, is characterized in that: described test case refers to: for the CID of tested telecontrol system, the warning information testing scheme automatically produced.
9. the method for testing of the intelligent substation telecontrol system proving installation based on telecontrol system CID according to any one of claim 1 to 8, comprises the following steps:
The first step, collection control station monitoring host computer display mouth access concentrator station side figure KVM passage, transformer substation side KVM passage directly accesses telecontrol system proving installation, the MMS port of tested telecontrol system is switched to and leads directly to telecontrol system proving installation, and now tested telecontrol system receives only the message of telecontrol system proving installation; Collect control station monitoring host computer figure simultaneously and be sent to telecontrol system proving installation;
Second step, generates testing scheme and test template by telecontrol system CID resolution unit analytical Calculation, utilizes CID file automatically to complete the configuration of proving installation, and export simulation alarm signal generator unit to; The MMS message of simulation alarm signal generator unit by communications interface transmission to the MMS port of tested telecontrol system;
3rd step, after KVM packet parsing unit is resolved according to the KVM message of concentrator station, transfers to the real-time display graphics warning information of human assistance test comparison control module;
4th step, tested telecontrol system is according to the MMS message of input, carry out remote moving function calculating, be an action cycle terminate after human assistance is determined when obtaining result, then output test result to test result storage unit, test result is concluded according to test case, and preserves test document;
So far, the on-line testing step of a telecontrol system alarm is completed; After circulation completes whole signal testing, test completes.
CN201510577669.1A 2015-09-11 2015-09-11 Intelligent substation telecontrol system test device based on telecontrol system CID Expired - Fee Related CN105093042B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510577669.1A CN105093042B (en) 2015-09-11 2015-09-11 Intelligent substation telecontrol system test device based on telecontrol system CID

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510577669.1A CN105093042B (en) 2015-09-11 2015-09-11 Intelligent substation telecontrol system test device based on telecontrol system CID

Publications (2)

Publication Number Publication Date
CN105093042A true CN105093042A (en) 2015-11-25
CN105093042B CN105093042B (en) 2019-03-29

Family

ID=54573925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510577669.1A Expired - Fee Related CN105093042B (en) 2015-09-11 2015-09-11 Intelligent substation telecontrol system test device based on telecontrol system CID

Country Status (1)

Country Link
CN (1) CN105093042B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106412345A (en) * 2016-12-06 2017-02-15 国网浙江慈溪市供电公司 Dispatching telephone and remote terminal test system
CN106501644A (en) * 2016-10-31 2017-03-15 国网福建省电力有限公司 A kind of transformer station measurement and control device test visualization and test information extracting method
CN108732435A (en) * 2017-04-19 2018-11-02 国网冀北电力有限公司 Intelligent substation fault test system based on protective device CID files and method
CN109521749A (en) * 2017-09-19 2019-03-26 国网河北省电力公司 A kind of intelligent substation monitoring system testing apparatus and method based on SCD
CN111308245A (en) * 2020-03-11 2020-06-19 成都市登禄电力科技有限公司 Automatic testing device and method for remote machine of intelligent substation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5481548A (en) * 1991-04-09 1996-01-02 Hekimian Laboratories, Inc. Technique for diagnosing and locating physical and logical faults in data transmission systems
CN2891133Y (en) * 2005-11-30 2007-04-18 杭州市电力局 Tele-controlled and telemetric online monitoring and diagnostic apparatus
CN201298059Y (en) * 2008-11-28 2009-08-26 江苏省电力公司南京供电公司 Attempering automation system remote control channel on-line detection system
CN201490764U (en) * 2009-04-29 2010-05-26 安徽省电力公司芜湖供电公司 General simulation test system with integrated power grid dispatching and electric quantity acquisition
CN103197200A (en) * 2013-02-05 2013-07-10 广东电网公司佛山供电局 Method and system for rapidly collecting and transmitting fault ranging information of power grid line
CN103412208A (en) * 2013-07-15 2013-11-27 国家电网公司 Intelligent substation electric telecontrol device closed loop test method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5481548A (en) * 1991-04-09 1996-01-02 Hekimian Laboratories, Inc. Technique for diagnosing and locating physical and logical faults in data transmission systems
CN2891133Y (en) * 2005-11-30 2007-04-18 杭州市电力局 Tele-controlled and telemetric online monitoring and diagnostic apparatus
CN201298059Y (en) * 2008-11-28 2009-08-26 江苏省电力公司南京供电公司 Attempering automation system remote control channel on-line detection system
CN201490764U (en) * 2009-04-29 2010-05-26 安徽省电力公司芜湖供电公司 General simulation test system with integrated power grid dispatching and electric quantity acquisition
CN103197200A (en) * 2013-02-05 2013-07-10 广东电网公司佛山供电局 Method and system for rapidly collecting and transmitting fault ranging information of power grid line
CN103412208A (en) * 2013-07-15 2013-11-27 国家电网公司 Intelligent substation electric telecontrol device closed loop test method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
彭志强等: "智能变电站远动功能测试技术分析", 《电力与能源》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106501644A (en) * 2016-10-31 2017-03-15 国网福建省电力有限公司 A kind of transformer station measurement and control device test visualization and test information extracting method
CN106412345A (en) * 2016-12-06 2017-02-15 国网浙江慈溪市供电公司 Dispatching telephone and remote terminal test system
CN108732435A (en) * 2017-04-19 2018-11-02 国网冀北电力有限公司 Intelligent substation fault test system based on protective device CID files and method
CN109521749A (en) * 2017-09-19 2019-03-26 国网河北省电力公司 A kind of intelligent substation monitoring system testing apparatus and method based on SCD
CN111308245A (en) * 2020-03-11 2020-06-19 成都市登禄电力科技有限公司 Automatic testing device and method for remote machine of intelligent substation

Also Published As

Publication number Publication date
CN105093042B (en) 2019-03-29

Similar Documents

Publication Publication Date Title
CN103166323B (en) System for monitoring secondary circuit model on line in real time based on protection device
CN103105550B (en) A kind of intelligent relay protection device detection method and system
CN105093042B (en) Intelligent substation telecontrol system test device based on telecontrol system CID
CN101854078B (en) Monitoring system and method of operation condition of digitalized substation secondary device
WO2016090934A1 (en) Simulation test device for mutual inductor of lte wireless communication intelligent substation
CN104090194A (en) Intelligent substation relay protection noninvasive test system and method
CN103076520A (en) Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation
CN203166515U (en) Large-scale regional inter-power-grid splitting control system
CN104570768A (en) Information physics semi-physical simulation system based on Rt-Lab and OPNET
CN102426309B (en) Method for testing area spare power automatic switching system in engine room environment of master station
CN103544857A (en) Integrated power transformation operation and maintenance training system
CN103366051A (en) Method and system for modeling of primary equipment and secondary equipment
CN105006191A (en) Method and system for training simulation based on PMU device and WAMS main station
CN105958644A (en) Pressing plate information management system for intelligent transformer station
CN110401692A (en) A kind of automatic Acceptance Test System of supervisory control of substation information integral and method
CN103837785A (en) Feeder automation detection and simulation system
CN207304479U (en) A kind of photovoltaic apparatus monitoring system based on Internet of Things
CN118282042A (en) Digital twin system of transformer substation
CN103094986A (en) Distributed detection method of intelligent substation relay protection devices based on digital dynamic real time simulator (DDRTS)
CN110611312A (en) On-line simulation system and method for panoramic data of substation bay level
CN104182818B (en) A kind of method and system of substation information intelligence automatic data collection
CN103645392A (en) Method for realizing device test protection through recording and playback
CN102508052B (en) Test method for field band channel operation of automatic bus transfer system of area network
CN103400514A (en) Simulation training system of digital substation
CN203951261U (en) switchyard fault simulator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Cao Haiou

Inventor after: Yang Yi

Inventor after: Liu Shaojun

Inventor after: Gao Xiang

Inventor after: Gao Lei

Inventor after: Yuan Yubo

Inventor after: Guan Yibin

Inventor after: Xu Ning

Inventor after: Wu Yi

Inventor before: Cao Haiou

Inventor before: Yang Yi

Inventor before: Liu Shaojun

Inventor before: Gao Xiang

Inventor before: Gao Lei

Inventor before: Yuan Yubo

Inventor before: Guan Yibin

Inventor before: Xu Ning

Inventor before: Wu Yi

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190329

Termination date: 20190911