CN103628399A - Method for treating pitted surface, transverse and longitudinal cracks, pot holes and edge and angle failure of white pavement - Google Patents

Method for treating pitted surface, transverse and longitudinal cracks, pot holes and edge and angle failure of white pavement Download PDF

Info

Publication number
CN103628399A
CN103628399A CN201210296113.1A CN201210296113A CN103628399A CN 103628399 A CN103628399 A CN 103628399A CN 201210296113 A CN201210296113 A CN 201210296113A CN 103628399 A CN103628399 A CN 103628399A
Authority
CN
China
Prior art keywords
groove
plucking
pavement
cement
depth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210296113.1A
Other languages
Chinese (zh)
Inventor
刘世俊
张萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210296113.1A priority Critical patent/CN103628399A/en
Publication of CN103628399A publication Critical patent/CN103628399A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Repair (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to a method for treating a pitted surface, transverse and longitudinal cracks, pot holes and edge and angle failure of a white pavement. The method comprises the following steps of cutting cross-shaped grooves on the surface of a pitted surface of a white pavement by a grooving machine, cutting grooves at transverse and longitudinal crack broken plates along a crack growth direction, cutting square or rectangular grooves at pot hole and edge and angle failure positions, cleaning the interiors of the grooves, feeding stirred mortar concrete into the grooves, carrying out tamping, screeding, compacting and galling, covering a plastic cloth on the treated positions when the surfaces are slightly dry, and carrying out maintenance until the seventh day. The method has simple processes and good pavement repairing effects, is free of large-area removal or whole-block removal because of a small damaged position of the white pavement, saves fund, and has a short construction cycle. The white pavement treated by the method is firm, has wear resistance, is not damaged easily and has a service life longer than before.

Description

The vertical transverse cracks of white pavement pitted skin hole groove is gnawed limit arrisdefect treatment process method
Technical field: the present invention relates to the vertical transverse cracks of a kind of white pavement pitted skin hole groove and gnaw limit arrisdefect treatment process method.
Background technology: at present; existing road white pavement; often there will be damaged place, as there is some breakage on road surface, just take the method for large clearing; to cheating groove or gnawing limit arrisdefect and take entire plate to remove; to the serious way that also will take entire plate to remove of the disconnected plate of vertical transverse cracks, to the processing of pitted skin, can only take entire plate to remove, not only the construction period is long; affect traffic, but also wasted a large amount of funds of building the road.
Summary of the invention: the object of the invention is to overcome above-mentioned shortcoming, provide the vertical transverse cracks of a kind of white pavement pitted skin hole groove to gnaw limit arrisdefect treatment process method, it has mainly solved the processing that white pavement occurs damaged hole groove or gnaws the disconnected plate of the vertical transverse cracks of limit arrisdefect and pitted skin, the way of taking monoblock to remove, construction period is long, affects the problems such as traffic.The object of the present invention is achieved like this, the processing to white pavement pitted skin, and the bisque loosening on pitted skin top layer carries out cross cutting with gaining machine, groove depth 3-10mm, spacing 8-12mm, is carved into latticed; Adopt steel wire abrasive brush to polish, till loosening epidermis polishing totally, with giant, rinse, be flushed to without dust non-loosening thing; With small-sized mortar mixer, stir mortar, the water of mortar, ash, sand will be prepared burden in strict accordance with national standard ratio, cement adopts double quick high-strength cement, cement grade is 75-80#, prepares material rear with artificial screeding and compaction surface, needs the road surface of plucking to carry out plucking, the road surface Troweling press finishing that does not need plucking, on surface, add a cover Polypropylence Sheet after slightly dry, health to seven day, reaches 28 days intensity of ordinary Portland cement.The treatment process method of the disconnected plate of vertical transverse cracks: by crack orientation, slot, the groove edge degree of depth 3-5cm, the groove middle crack degree of depth 6-10cm; After fluting, in groove, put into indented bars, transverse cracks need not descend reinforcing bar, reinforcing bar density and diameter are determined by former pavement design requirement, in groove, to rinse well, adopt double quick high-strength cement, cement grade 75-80#, mixing concrete is squeezed in groove, carry out vibration compacting, smear applanation surface, plucking, plastic covering cloth health seven days.Hole groove, gnaw limit, arrisdefect treatment process method: first by hole groove, gnaw limit, arrisdefect is cut into square or rectangular slot, the interior degree of depth 6-18cm of hole groove, grooving outward flange 3-5cm; Remove broken concrete, rinse well, mixing strong concrete is put into groove, and cement grade 75-80# carries out vibration compacting, smear flatten, plucking, the health of plastic covering cloth is till seven days.This invented technology is simple, the old pavement that adopts this technique to repair is effective, make old white pavement because of breakage, a bit just not take large clearing or entire plate to remove, can save a large amount of funds of building the road, conditioned time is short, can little half range or area construction, do not affect traffic, construction period is short, Ke Duo troop constructs, and to old white pavement maintenance, can reach disposable radical cure effect, and after repairing, the firm abrasion resistance in road surface is good, not fragile, the life-span that can improve 20%-50% application life on the Bi Yuan road surface, road surface after reparation.
Embodiments of the invention below:
Embodiment 1,
Processing to white pavement pitted skin: the bisque loosening on pitted skin top layer carries out cross cutting with gaining machine, groove depth 3mm, spacing 8mm, is carved into latticed; Adopt steel wire abrasive brush to polish, till loosening epidermis polishing totally; With giant, rinse, be flushed to without dust, non-loosening thing; With small-sized mortar mixer, stir mortar, the water of mortar, ash, sand will be prepared burden in strict accordance with national standard ratio, cement adopts double quick high-strength cement, and cement grade is 75-80#, prepares that to put into groove after material surperficial with artificial screeding and compaction, need the road surface of plucking to carry out plucking, the road surface Troweling press finishing that does not need plucking, after waiting surface slightly dry, adds a cover Polypropylence Sheet, health to seven day, reaches 28 days intensity of ordinary Portland cement.The treatment process method of the disconnected plate of vertical transverse cracks: by crack orientation, slot, groove edge degree of depth 3cm, groove middle crack degree of depth 6cm, after fluting, in groove, put into indented bars, transverse cracks need not descend reinforcing bar, and reinforcing bar density and diameter are determined by former pavement design requirement, in groove, will rinse well, adopt double quick high-strength cement, cement grade 75-80#, mixing concrete is squeezed in groove, carries out vibration compacting, smear applanation surface, plucking, plastic covering cloth health seven days.Hole groove, gnaw limit, arrisdefect treatment process method: first by hole groove, gnaw limit, arrisdefect is cut into square or rectangular slot, degree of depth 6cm in the groove of hole, grooving outward flange 3cm, remove broken concrete, rinse well, mixing strong concrete is put into groove, cement grade 75-80#, carry out vibration compacting, smear flatten, plucking, the health of plastic covering cloth is till seven days.
Embodiment 2, the processing to white pavement pitted skin: the bisque loosening on pitted skin top layer carries out cross cutting with gaining machine, groove depth 8mm, and spacing 10mm, is carved into latticed; Adopt steel wire abrasive brush to polish, till loosening epidermis polishing totally; With giant, rinse, be flushed to without dust, non-loosening thing; With small-sized mortar mixer, stir mortar, the water of mortar, ash, sand will be prepared burden in strict accordance with national standard ratio, cement adopts double quick high-strength cement, cement grade is 75-80#, prepares material rear with artificial screeding and compaction surface, needs the road surface of plucking to carry out plucking, the road surface Troweling press finishing that does not need plucking, on surface, add a cover Polypropylence Sheet after slightly dry, health to seven day, reaches 28 days intensity of ordinary Portland cement.The treatment process method of the disconnected plate of vertical transverse cracks: by crack orientation, slot, groove edge degree of depth 4cm, groove middle crack degree of depth 8cm, after fluting, in groove, put into indented bars, transverse cracks need not descend reinforcing bar, and reinforcing bar density and diameter are determined by former pavement design requirement, in groove, to rinse well, adopt double quick high-strength cement, cement grade 75-80#, mixing concrete is squeezed in groove, carry out vibration compacting, smear applanation surface, plucking, plastic covering cloth, health seven days.Hole groove, gnaw limit, arrisdefect treatment process method: first by hole groove, gnaw limit, arrisdefect is cut into square or rectangular slot, degree of depth 10cm in the groove of hole, grooving outward flange 4cm, remove broken concrete, rinse well, mixing strong concrete is put into groove, cement grade 75-80#, carry out vibration compacting, smear flatten, plucking, the health of plastic covering cloth is till seven days.
Embodiment 3, the processing to white pavement pitted skin: the bisque loosening on pitted skin top layer carries out cross cutting with gaining machine, groove depth 10mm, and spacing 12mm, is carved into latticed; Adopt steel wire abrasive brush to polish, till loosening epidermis polishing totally; With giant, rinse, be flushed to without dust, non-loosening thing; With small-sized mortar mixer, stir mortar, the water of mortar, ash, sand will be prepared burden in strict accordance with national standard ratio, cement adopts double quick high-strength cement, cement grade is 75-80#, prepares material rear with artificial screeding and compaction surface, needs the road surface of plucking to carry out plucking, the road surface Troweling press finishing that does not need plucking, on surface, add a cover Polypropylence Sheet after slightly dry, health to seven day, reaches 28 days intensity of ordinary Portland cement.The treatment process method of the disconnected plate of vertical transverse cracks: by crack orientation, slot, groove edge degree of depth 5cm, groove middle crack degree of depth 10cm, after fluting, in groove, put into indented bars, transverse cracks need not descend reinforcing bar, and reinforcing bar density and diameter are determined by former pavement design requirement, in groove, to rinse well, adopt double quick high-strength cement, cement grade 75-80#, mixing concrete is squeezed in groove, carry out vibration compacting, smear applanation surface, plucking, plastic covering cloth, health seven days.Hole groove, gnaw limit, arrisdefect treatment process method: first by hole groove, gnaw limit, arrisdefect is cut into square or rectangular slot, degree of depth 18cm in the groove of hole, grooving outward flange 5cm, removes broken concrete, rinses well, mixing strong concrete is put into groove, cement grade 75-80#, carries out vibration compacting, smear flatten, plucking, plastic covering cloth, health is till seven days.

Claims (3)

1. the vertical transverse cracks of white pavement pitted skin hole groove is gnawed a limit arrisdefect treatment process method, it is characterized in that:
The processing of white pavement pitted skin:
A, the bisque loosening on pitted skin top layer carry out cross cutting with gaining machine, groove depth 3-10mm, and spacing 8-12mm, is carved into latticed;
B, employing steel wire abrasive brush are polished, and till loosening epidermis polishing totally, with giant, rinse, and are flushed to without dust non-loosening thing;
C, with small-sized mortar mixer, stir mortar, the water of mortar, ash, sand will be prepared burden in strict accordance with national standard ratio, cement adopts double quick high-strength cement, cement grade is 75-80#, prepare material rear surperficial with artificial screeding and compaction, need the road surface of plucking to carry out plucking, do not need the road surface Troweling press finishing of plucking, on surface, add a cover Polypropylence Sheet, health to seven day after slightly dry.
2. process claimed in claim 1, is characterized in that:
The processing of the disconnected plate of vertical transverse cracks:
A, by crack orientation, slot, the groove edge degree of depth 3-5cm, the groove middle crack degree of depth 6-10cm;
After b, fluting, put into indented bars in groove, transverse cracks need not descend reinforcing bar, and reinforcing bar density and diameter are determined by former pavement design requirement, in groove, will rinse well;
C, employing double quick high-strength cement, cement grade 75-80#, mixing concrete is squeezed in groove, carries out vibration compacting, smears applanation surface, plucking, plastic covering cloth health seven days.
3. process claimed in claim 1, is characterized in that:
Hole groove, the processing of gnawing limit, arrisdefect:
A, first by hole groove, gnaw limit, arrisdefect is cut into square or rectangular slot, hole groove in the degree of depth 6-18cm, grooving outward flange 3-5cm;
B, remove broken concrete, rinse well, mixing strong concrete is put into groove, and cement grade 75-80# carries out vibration compacting, smear flatten, plucking, the health of plastic covering cloth is till seven days.
CN201210296113.1A 2012-08-20 2012-08-20 Method for treating pitted surface, transverse and longitudinal cracks, pot holes and edge and angle failure of white pavement Pending CN103628399A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210296113.1A CN103628399A (en) 2012-08-20 2012-08-20 Method for treating pitted surface, transverse and longitudinal cracks, pot holes and edge and angle failure of white pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210296113.1A CN103628399A (en) 2012-08-20 2012-08-20 Method for treating pitted surface, transverse and longitudinal cracks, pot holes and edge and angle failure of white pavement

Publications (1)

Publication Number Publication Date
CN103628399A true CN103628399A (en) 2014-03-12

Family

ID=50209826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210296113.1A Pending CN103628399A (en) 2012-08-20 2012-08-20 Method for treating pitted surface, transverse and longitudinal cracks, pot holes and edge and angle failure of white pavement

Country Status (1)

Country Link
CN (1) CN103628399A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193890A (en) * 2017-12-29 2018-06-22 河南兴安新型建筑材料有限公司 Autoclave aerated concrete building block repair technology and its spatula with extravasating hole

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3868146A (en) * 1972-06-09 1975-02-25 Super Cut Pavement grooving machine
JP2003049403A (en) * 2001-08-06 2003-02-21 Sato Road Co Ltd Crack repairing method for asphalt pavement
CN102226330A (en) * 2011-05-20 2011-10-26 重庆诚邦科技发展有限公司 Method for micro-treatment of cement concrete road surface

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3868146A (en) * 1972-06-09 1975-02-25 Super Cut Pavement grooving machine
JP2003049403A (en) * 2001-08-06 2003-02-21 Sato Road Co Ltd Crack repairing method for asphalt pavement
CN102226330A (en) * 2011-05-20 2011-10-26 重庆诚邦科技发展有限公司 Method for micro-treatment of cement concrete road surface

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
朱斌,谭悦,袁捷: "《水泥混凝土道面麻面病害预防与处治方法研究》", 《山西建筑》 *
程培峰,徐永丽: "《现代公路养护管理技术》", 31 July 2008, 东北林业大学出版社 *
郭峰,王鹤翼: "《水泥混凝土路面预养护技术对策研究》", 《山西建筑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193890A (en) * 2017-12-29 2018-06-22 河南兴安新型建筑材料有限公司 Autoclave aerated concrete building block repair technology and its spatula with extravasating hole

Similar Documents

Publication Publication Date Title
CN1210472C (en) Concrete building construction form unit and manufacturing device therefor, and concrete building constructed by using concrete building construction form
CN101886457B (en) Method for constructing wear-resistant and crack-resistant hardened ground
CN107143111A (en) A kind of construction method of abrasion-proof terrace
CN105256973A (en) Method for paving and constructing floor tiles with elevation cushion blocks
CN109441059A (en) A kind of plastic floor laying structure and its construction method
CN110656753A (en) Concrete grindstone terrace
CN103628399A (en) Method for treating pitted surface, transverse and longitudinal cracks, pot holes and edge and angle failure of white pavement
CN205840248U (en) A kind of cast-type concrete abrasion-resistant ground
CN108069654A (en) A kind of paver concrete special and preparation method thereof and construction method
CN109624066A (en) A kind of concrete component water rushes dabbing technique
CN106948233B (en) A kind of town road asphalt concrete construction method
CN110952752A (en) Method for paving anti-cracking, anti-sanding and wear-resistant ground
CN204238574U (en) A kind of mobile mortar spreader
CN207829495U (en) Control the combination tool of building wall level, vertical mortar joint plumpness and thickness
CN208717677U (en) The zip mode of measures of cracks on concrete pavement repairs structure
CN104179258B (en) External wall shear wall bolt hole Seepage method
CN205935571U (en) Brush that draws for building
CN114876155A (en) Construction process for polishing ground by using non-ignition fine stone concrete
CN100350101C (en) Bituminous pavement softening-repairing machine
CN103806630B (en) Floor tile made of steel plate mounting process
TWM283017U (en) Pre-cast stone board
CN103171021A (en) Method for enhancing concrete strength, improving volume stability and reducing cracking
CN106193462A (en) Roofing Splitting Tile construction method modelled after an antique
CN105735087A (en) Garden ground surface decoration construction process
KR101052085B1 (en) Flagstone by using waste materials and how to make it

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140312