CN109624066A - A kind of concrete component water rushes dabbing technique - Google Patents

A kind of concrete component water rushes dabbing technique Download PDF

Info

Publication number
CN109624066A
CN109624066A CN201811549615.4A CN201811549615A CN109624066A CN 109624066 A CN109624066 A CN 109624066A CN 201811549615 A CN201811549615 A CN 201811549615A CN 109624066 A CN109624066 A CN 109624066A
Authority
CN
China
Prior art keywords
concrete
template
dabbing
ash
agent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811549615.4A
Other languages
Chinese (zh)
Inventor
孟祥烨
佟印
张乃超
叶立娟
辛军
刘娜
田伟
梁井瑞
黄陆思
韩玉明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201811549615.4A priority Critical patent/CN109624066A/en
Publication of CN109624066A publication Critical patent/CN109624066A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/04Producing shaped prefabricated articles from the material by tamping or ramming
    • B28B1/045Producing shaped prefabricated articles from the material by tamping or ramming combined with vibrating or jolting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/08Apparatus or processes for treating or working the shaped or preshaped articles for reshaping the surface, e.g. smoothing, roughening, corrugating, making screw-threads
    • B28B11/0872Non-mechanical reshaping of the surface, e.g. by burning, acids, radiation energy, air flow, etc.
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/38Treating surfaces of moulds, cores, or mandrels to prevent sticking

Abstract

The present invention is that a kind of concrete component water rushes dabbing technique, includes the following steps: S1: the processing of bottom tire;S2: brushing interleaving agent;S3: cleaning template simultaneously checks;S4: the undisguised material agent of stirring;S5: the undisguised material agent of template surface spraying;S6: branching standing template;S7: casting concrete;S8: form removal;S9: concrete surface is checked;S10: giant rinses;S11: result is washed away in examination;S12: maintenance.The present invention uses high-pressure water hair technique, can effectively wash away the concrete laitance coating of beam slab side, aggregate is uniformly exposed, and new-old concrete can be effectively ensured coheres fastness;Water rushes hair compared to traditional dabbing, will not destroy the corner of component, be conducive to the protection of finished product, improve construction quality, and technological operation is simple, and labor intensity is little, can save the artificial and time, substantially increase construction efficiency, saved cost;Noise and dust will not be generated in work progress, environmental protection.

Description

A kind of concrete component water rushes dabbing technique
Technical field
The present invention relates to dabbing technology fields more particularly to a kind of concrete component water to rush dabbing technique.
Background technique
Precast beam two ends have protruding bar, and Cast-in-situ Beam, plate splice, therefore beam slab both ends head surface needs to dig Hair, traditional dabbing method are manually to use pneumatic pick dabbing, and construction intensity is big, and time-consuming and laborious and dabbing is of low quality, pneumatic pick chisel Noise is larger when hair, and dust is more;The overhanging muscle portion dabbing of beam end, plate is not in place, and part slurry epidermis is not cut completely, depth Not enough, it is not completely exposed stone faying face, in subsequent cast-in-situ beam slab connector, influences new-old concrete cohesiveness.
Summary of the invention
Present invention seek to address that the deficiencies in the prior art, and a kind of concrete component water is provided and rushes dabbing technique.
To achieve the above object, using following technical scheme: a kind of concrete component water rushes dabbing technique to the present invention, including Following steps:
S1: bottom tire processing
Bottom tire is checked, it is ensured that bottom tire surface keeps smooth, bright and clean, and sideline is straight, no pit, bottom tire two sides rubber Item is intact, and without slag inclusion between rubber strip and bottom tire, the iron sheet surface of bottom tire surface two sides should ensure that the fitting of smooth and flitch is tight, Ensure iron sheet without heaving, without lime-ash under iron sheet and flitch, when having lime-ash, part sedimentation, cracking, rubber strip damage, iron on the tire of bottom Skin lesion is bad, when pressing from both sides grey phenomenon, and bottom tire is placed under repair or replaced;
S2: brushing interleaving agent
Uniform brushing interleaving agent on bottom tire after treatment, interleaving agent must not be blocked up, and oil accumulation on the tire of bottom is avoided to occur, in order to avoid Greasy dirt is caused to framework of steel reinforcement;
S3: cleaning template simultaneously checks
Template surface and mortar suitable for reading, lime-ash, rusty stain and dirt are removed with angle grinder, checks template, limiting card and plug The use state of plate guarantees normal use, must not use if bulkhead deformation, and need to repair rear can be used;
S4: the undisguised material agent of stirring
The pH of undisguised material agent is 6.9-7.1, and the undisguised solid content for expecting agent is 48-50%, is uniformly stirred undisguised material agent It mixes;
S5: the undisguised material agent of template surface spraying
The undisguised material agent stirred evenly is uniformly sprayed to template to the side for being adjacent to concrete using atomizer, in coagulation Without spraying in template of the native avris less than 2.5cm, prevent concrete corner impaired, the undisguised material agent of spraying must not be in template At under plume, spraying carries out an acceptance inspection to spraying situation after completing on surface, main to check coating thickness and spraying uniformity coefficient, together When check the mobility for having sprayed undisguised material agent;
S6: branching standing template
S7: casting concrete
Ash bucket is dragged using trailer, small arc shaped hangs ash bucket and enters mould casting concrete, when lower ash cannot concentrate it is impact steel bar reinforced, under Grey height is not more than 2m, is layered lower ash and every thickness degree is not more than 50cm, vibrate 4-6cm to be overlapped between adjacent layer, such as finds Framework of steel reinforcement sinks or rising phenomenon adjusts in time, it is ensured that the thickness of protective layer is poured in Concrete, it is necessary to have full-time people Member keeps a close eye on whether Capsules have phenomena such as gas leakage, burst, if there is exception, adopts remedial measures, forbids non-full-time personnel Tonifying Qi is given to capsule, template top surface must not arbitrarily be removed to bolt is worn, if influencing plastering, the concrete vibratings such as need finish plastering When remove again, concrete vibrating sequence is first outside and then inside since at near-lying mode plate, and mobile spacing is not more than 25cm, avoids collision, and shakes Smashing should be inserted perpendicularly into, and insert pull out slowly fastly, twitch up and down, guarantee uniform jolt ramming, receive stick location-appropriate and reduce spacing of vibrating, be conducive to mix Solidifying air in soil steeps outlet, and vibrating time prevents over vibration or leakage between 15-20s;
Component top surface mortar thickness check at any time after vibrating such as finds that excessive mortar floats, it is necessary to desurfacing mortar, more Fresh concrete is changed, surface layer mortar is avoided to generate crack, back portion uses secondary vibration to prevent pine top and concrete dry draw Seam, sucks moisture content with water-absorbent material if any excreting water phenomenon, and concreting should be carried out continuously, and such as interrupts for some reason, should be in time to having Pass personnel reflect and deal carefully with that the permission intermittent time of ordinary portland cement is as shown in table 1:
The permission intermittent time of ordinary portland cement when 1 concreting of table
After concreting, if meeting strong wind weather or unexpected rainfall, it need to arrange personnel after plastering with two ropes made of hemp It ties up on clamp suitable for reading, is covered with blue silver-colored cloth in parallel, to prevent excessively leading to cracking or because of drop because of the dehydration of strong wind component surface Rain makes component surface leak stone sand leakage, is turned over a finished item again after weather takes a turn for the better, and forbids using the grey casting concrete of landing, work progress It is middle to be cleaned out in time by template, to the lime-ash worn on bolt, and clean out landing ash after constructing;
S8: form removal
After concrete reaches drying time, dismantling concrete needs the template at dabbing position;
S9: concrete surface is checked
After form removable, the surface of concrete is checked, the surface strength of concrete cannot be less than 8.5MPa;
S10: giant rinses
It rushes hair surface to the concrete after inspection using giant to wash away, giant scouring head is apart from concrete Wash surface is 1-2m, and the water that giant sprays must not be vertical with concrete surface, flushing time 10-15min/m2
S11: result is washed away in examination
Concrete rushes hair surface communications centre and cleans down, if surface erosion is not clean, needs to carry out manually to mend chisel, there is protruding bar Beam-ends head, plate side, dabbing range is to reject the magma of the concrete surface in edge 1.5cm, exposes fresh coagulation Native face, top surface of the beam have the part of protruding bar, and dabbing range is by the original of the concrete surface at protruding bar and its within the scope of 5cm Slurry is rejected, and fresh concrete face is exposed;
S12: maintenance.
Particularly, the mixing time in the step S4 is 3-10min.
Particularly, the coating thickness that agent spraying is undisguisedly expected in the step S5 is 0.3-0.6mm.
Particularly, the drying time in the step S8 determines according to temperature, when one day temperature on average is at 30 DEG C or more When, drying time 7-9h, every 5 DEG C of the decline of temperature on average, then drying time needs to increase 2h, and drying time must not exceed 20h.
Particularly, the hydraulic pressure that washes away of the step S10 high-pressure gun is 15-20MPa.
The beneficial effects of the present invention are: the present invention uses high-pressure water hair technique, it can be effectively by the coagulation of beam slab side Soil paste skin washes away, and aggregate is uniformly exposed, and new-old concrete can be effectively ensured coheres fastness;Water rushes hair compared to tradition Dabbing will not destroy the corner of component, be conducive to the protection of finished product, improve construction quality, and technological operation is simple, labor intensity Less, the artificial and time can be saved, construction efficiency is substantially increased, has saved cost;Noise will not be generated in work progress And dust, environmental protection.
Specific embodiment
The present invention is further explained in the light of specific embodiments: a kind of concrete component water rushes dabbing technique, wraps Include following steps:
S1: bottom tire processing
Bottom tire is checked, it is ensured that bottom tire surface keeps smooth, bright and clean, and sideline is straight, no pit, bottom tire two sides rubber Item is intact, and without slag inclusion between rubber strip and bottom tire, the iron sheet surface of bottom tire surface two sides should ensure that the fitting of smooth and flitch is tight, Ensure iron sheet without heaving, without lime-ash under iron sheet and flitch, when having lime-ash, part sedimentation, cracking, rubber strip damage, iron on the tire of bottom Skin lesion is bad, when pressing from both sides grey phenomenon, and bottom tire is placed under repair or replaced;
S2: brushing interleaving agent
Uniform brushing interleaving agent on bottom tire after treatment, interleaving agent must not be blocked up, and oil accumulation on the tire of bottom is avoided to occur, in order to avoid Greasy dirt is caused to framework of steel reinforcement;
S3: cleaning template simultaneously checks
Template surface and mortar suitable for reading, lime-ash, rusty stain and dirt are removed with angle grinder, checks template, limiting card and plug The use state of plate guarantees normal use, must not use if bulkhead deformation, and need to repair rear can be used;
S4: the undisguised material agent of stirring
The pH of undisguised material agent is 6.9-7.1, and the undisguised solid content for expecting agent is 48-50%, is uniformly stirred undisguised material agent It mixes;
S5: the undisguised material agent of template surface spraying
The undisguised material agent stirred evenly is uniformly sprayed to template to the side for being adjacent to concrete using atomizer, in coagulation Without spraying in template of the native avris less than 2.5cm, prevent concrete corner impaired, the undisguised material agent of spraying must not be in template At under plume, spraying carries out an acceptance inspection to spraying situation after completing on surface, main to check coating thickness and spraying uniformity coefficient, together When check the mobility for having sprayed undisguised material agent;
S6: branching standing template
S7: casting concrete
Ash bucket is dragged using trailer, small arc shaped hangs ash bucket and enters mould casting concrete, when lower ash cannot concentrate it is impact steel bar reinforced, under Grey height is not more than 2m, is layered lower ash and every thickness degree is not more than 50cm, vibrate 4-6cm to be overlapped between adjacent layer, such as finds Framework of steel reinforcement sinks or rising phenomenon adjusts in time, it is ensured that the thickness of protective layer is poured in Concrete, it is necessary to have full-time people Member keeps a close eye on whether Capsules have phenomena such as gas leakage, burst, if there is exception, adopts remedial measures, forbids non-full-time personnel Tonifying Qi is given to capsule, template top surface must not arbitrarily be removed to bolt is worn, if influencing plastering, the concrete vibratings such as need finish plastering When remove again, concrete vibrating sequence is first outside and then inside since at near-lying mode plate, and mobile spacing is not more than 25cm, avoids collision, and shakes Smashing should be inserted perpendicularly into, and insert pull out slowly fastly, twitch up and down, guarantee uniform jolt ramming, receive stick location-appropriate and reduce spacing of vibrating, be conducive to mix Solidifying air in soil steeps outlet, and vibrating time prevents over vibration or leakage between 15-20s;
Component top surface mortar thickness check at any time after vibrating such as finds that excessive mortar floats, it is necessary to desurfacing mortar, more Fresh concrete is changed, surface layer mortar is avoided to generate crack, back portion uses secondary vibration to prevent pine top and concrete dry draw Seam, sucks moisture content with water-absorbent material if any excreting water phenomenon, observes concrete slump situation at any time, such as finds that concrete has exception Situation should reflect to testing crew or technical staff in time, must not contact mixing building tune ash privately, concreting should continuously into Row such as interrupts for some reason, should reflect and deal carefully with to the relevant personnel in time, the permission intermittent time of ordinary portland cement is as shown in table 1:
The permission intermittent time of ordinary portland cement when 1 concreting of table
Concrete molding temperature (DEG C) Allow intermittent time (h)
30-35 1.5
20-29 2.0
10-19 2.5
5-9 3.0
After concreting, if meeting strong wind weather or unexpected rainfall, it need to arrange personnel after plastering with two ropes made of hemp It ties up on clamp suitable for reading, is covered with blue silver-colored cloth in parallel, to prevent excessively leading to cracking or because of drop because of the dehydration of strong wind component surface Rain makes component surface leak stone sand leakage, is turned over a finished item again after weather takes a turn for the better, and forbids using the grey casting concrete of landing, work progress It is middle to be cleaned out in time by template, to the lime-ash worn on bolt, and clean out landing ash after constructing;
S8: form removal
After concrete reaches drying time, dismantling concrete needs the template at dabbing position;
S9: concrete surface is checked
After form removable, the surface of concrete is checked, the surface strength of concrete cannot be less than 8.5MPa;
S10: giant rinses
It rushes hair surface to the concrete after inspection using giant to wash away, giant scouring head is apart from concrete Wash surface is 1-2m, and the water that giant sprays must not be vertical with concrete surface, flushing time 10-15min/m2
S11: result is washed away in examination
Concrete rushes hair surface communications centre and cleans down, if surface erosion is not clean, needs to carry out manually to mend chisel, there is protruding bar Beam-ends head, plate side, dabbing range is to reject the magma of the concrete surface in edge 1.5cm, exposes fresh coagulation Native face, top surface of the beam have the part of protruding bar, and dabbing range is by the original of the concrete surface at protruding bar and its within the scope of 5cm Slurry is rejected, and fresh concrete face is exposed;
S12: maintenance.
Particularly, the mixing time in the step S4 is 3-10min.
Particularly, the coating thickness that agent spraying is undisguisedly expected in the step S5 is 0.3-0.6mm.
Particularly, the drying time in the step S8 determines according to temperature, when one day temperature on average is at 30 DEG C or more When, drying time 7-9h, every 5 DEG C of the decline of temperature on average, then drying time needs to increase 2h, and drying time must not exceed 20h.
Particularly, the hydraulic pressure that washes away of the step S10 high-pressure gun is 15-20MPa.
Embodiment one
A kind of concrete component water rushes dabbing technique, includes the following steps:
S1: bottom tire processing
Bottom tire is checked, it is ensured that bottom tire surface keeps smooth, bright and clean, and sideline is straight, no pit, bottom tire two sides rubber Item is intact, and without slag inclusion between rubber strip and bottom tire, the iron sheet surface of bottom tire surface two sides should ensure that the fitting of smooth and flitch is tight, Ensure iron sheet without heaving, without lime-ash under iron sheet and flitch, when having lime-ash, part sedimentation, cracking, rubber strip damage, iron on the tire of bottom Skin lesion is bad, when pressing from both sides grey phenomenon, and bottom tire is placed under repair or replaced;
S2: brushing interleaving agent
Uniform brushing interleaving agent on bottom tire after treatment, interleaving agent must not be blocked up, and oil accumulation on the tire of bottom is avoided to occur, in order to avoid Greasy dirt is caused to framework of steel reinforcement;
S3: cleaning template simultaneously checks
Template surface and mortar suitable for reading, lime-ash, rusty stain and dirt are removed with angle grinder, checks template, limiting card and plug The use state of plate guarantees normal use, must not use if bulkhead deformation, and need to repair rear can be used;
S4: the undisguised material agent of stirring
The pH of undisguised material agent is 7, and the undisguised solid content for expecting agent is 49%, carries out uniform stirring to undisguised material agent;
S5: the undisguised material agent of template surface spraying
The undisguised material agent stirred evenly is uniformly sprayed to template to the side for being adjacent to concrete using atomizer, in coagulation Without spraying in template of the native avris less than 2.5cm, prevent concrete corner impaired, the undisguised material agent of spraying must not be in template At under plume, spraying carries out an acceptance inspection to spraying situation after completing on surface, main to check coating thickness and spraying uniformity coefficient, together When check the mobility for having sprayed undisguised material agent;
S6: branching standing template
S7: casting concrete
Ash bucket is dragged using trailer, small arc shaped hangs ash bucket and enters mould casting concrete, when lower ash cannot concentrate it is impact steel bar reinforced, under Grey height is not more than 2m, is layered lower ash and every thickness degree is not more than 50cm, vibrate 5cm to be overlapped between adjacent layer, such as finds steel Tendons skeleton is sunk or rising phenomenon adjusts in time, it is ensured that the thickness of protective layer is poured in Concrete, it is necessary to have full-time staff It keeps a close eye on whether Capsules have phenomena such as gas leakage, burst, if there is exception, adopts remedial measures, forbid non-full-time personnel couple Capsule gives tonifying Qi, and template top surface must not arbitrarily be removed to bolt is worn, if influencing plastering, when the concrete vibratings such as need finish plastering It removes again, concrete vibrating sequence is first outside and then inside since at near-lying mode plate, and mobile spacing is not more than 25cm, avoids collision, vibrates It should be inserted perpendicularly into, insert pull out slowly fastly, twitch up and down, guarantee uniform jolt ramming, receive stick location-appropriate and reduce spacing of vibrating, be conducive to coagulation Air in soil steeps outlet, and vibrating time prevents over vibration or leakage between 18s;
Component top surface mortar thickness check at any time after vibrating such as finds that excessive mortar floats, it is necessary to desurfacing mortar, more Fresh concrete is changed, surface layer mortar is avoided to generate crack, back portion uses secondary vibration to prevent pine top and concrete dry draw Seam, sucks moisture content with water-absorbent material if any excreting water phenomenon, observes concrete slump situation at any time, such as finds that concrete has exception Situation should reflect to testing crew or technical staff in time, must not contact mixing building tune ash privately, concreting should continuously into Row such as interrupts for some reason, should reflect and deal carefully with to the relevant personnel in time;
After concreting, if meeting strong wind weather or unexpected rainfall, it need to arrange personnel after plastering with two ropes made of hemp It ties up on clamp suitable for reading, is covered with blue silver-colored cloth in parallel, to prevent excessively leading to cracking or because of drop because of the dehydration of strong wind component surface Rain makes component surface leak stone sand leakage, is turned over a finished item again after weather takes a turn for the better, and forbids using the grey casting concrete of landing, work progress It is middle to be cleaned out in time by template, to the lime-ash worn on bolt, and clean out landing ash after constructing;
S8: form removal
After concrete reaches drying time, dismantling concrete needs the template at dabbing position;
S9: concrete surface is checked
After form removable, the surface of concrete is checked, the surface strength of concrete cannot be less than 8.5MPa;
S10: giant rinses
It rushes hair surface to the concrete after inspection using giant to wash away, giant scouring head is apart from concrete Wash surface is 1.5m, and the water that giant sprays must not be vertical with concrete surface, flushing time 12min/m2
S11: result is washed away in examination
Concrete rushes hair surface communications centre and cleans down, if surface erosion is not clean, needs to carry out manually to mend chisel, there is protruding bar Beam-ends head, plate side, dabbing range is to reject the magma of the concrete surface in edge 1.5cm, exposes fresh coagulation Native face, top surface of the beam have the part of protruding bar, and dabbing range is by the original of the concrete surface at protruding bar and its within the scope of 5cm Slurry is rejected, and fresh concrete face is exposed;
S12: maintenance.
Particularly, the mixing time in the step S4 is 5min.
Particularly, the coating thickness that agent spraying is undisguisedly expected in the step S5 is 0.5mm.
Particularly, the drying time in the step S8 determines according to temperature, when one day temperature on average is at 30 DEG C or more When, drying time 8h, every 5 DEG C of the decline of temperature on average, then drying time needs to increase 2h, and drying time must not exceed 20h.
Particularly, the hydraulic pressure that washes away of the step S10 high-pressure gun is 18MPa.
Embodiment two
A kind of concrete component water rushes dabbing technique, includes the following steps:
S1: bottom tire processing
Bottom tire is checked, it is ensured that bottom tire surface keeps smooth, bright and clean, and sideline is straight, no pit, bottom tire two sides rubber Item is intact, and without slag inclusion between rubber strip and bottom tire, the iron sheet surface of bottom tire surface two sides should ensure that the fitting of smooth and flitch is tight, Ensure iron sheet without heaving, without lime-ash under iron sheet and flitch, when having lime-ash, part sedimentation, cracking, rubber strip damage, iron on the tire of bottom Skin lesion is bad, when pressing from both sides grey phenomenon, and bottom tire is placed under repair or replaced;
S2: brushing interleaving agent
Uniform brushing interleaving agent on bottom tire after treatment, interleaving agent must not be blocked up, and oil accumulation on the tire of bottom is avoided to occur, in order to avoid Greasy dirt is caused to framework of steel reinforcement;
S3: cleaning template simultaneously checks
Template surface and mortar suitable for reading, lime-ash, rusty stain and dirt are removed with angle grinder, checks template, limiting card and plug The use state of plate guarantees normal use, must not use if bulkhead deformation, and need to repair rear can be used;
S4: the undisguised material agent of stirring
The pH of undisguised material agent is 6.9, and the undisguised solid content for expecting agent is 48%, carries out uniform stirring to undisguised material agent;
S5: the undisguised material agent of template surface spraying
The undisguised material agent stirred evenly is uniformly sprayed to template to the side for being adjacent to concrete using atomizer, in coagulation Without spraying in template of the native avris less than 2.5cm, prevent concrete corner impaired, the undisguised material agent of spraying must not be in template At under plume, spraying carries out an acceptance inspection to spraying situation after completing on surface, main to check coating thickness and spraying uniformity coefficient, together When check the mobility for having sprayed undisguised material agent;
S6: branching standing template
S7: casting concrete
Ash bucket is dragged using trailer, small arc shaped hangs ash bucket and enters mould casting concrete, when lower ash cannot concentrate it is impact steel bar reinforced, under Grey height is not more than 2m, is layered lower ash and every thickness degree is not more than 50cm, vibrate 4cm to be overlapped between adjacent layer, such as finds steel Tendons skeleton is sunk or rising phenomenon adjusts in time, it is ensured that the thickness of protective layer is poured in Concrete, it is necessary to have full-time staff It keeps a close eye on whether Capsules have phenomena such as gas leakage, burst, if there is exception, adopts remedial measures, forbid non-full-time personnel couple Capsule gives tonifying Qi, and template top surface must not arbitrarily be removed to bolt is worn, if influencing plastering, when the concrete vibratings such as need finish plastering It removes again, concrete vibrating sequence is first outside and then inside since at near-lying mode plate, and mobile spacing is not more than 25cm, avoids collision, vibrates It should be inserted perpendicularly into, insert pull out slowly fastly, twitch up and down, guarantee uniform jolt ramming, receive stick location-appropriate and reduce spacing of vibrating, be conducive to coagulation Air in soil steeps outlet, and vibrating time prevents over vibration or leakage between 15s;
Component top surface mortar thickness check at any time after vibrating such as finds that excessive mortar floats, it is necessary to desurfacing mortar, more Fresh concrete is changed, surface layer mortar is avoided to generate crack, back portion uses secondary vibration to prevent pine top and concrete dry draw Seam, sucks moisture content with water-absorbent material if any excreting water phenomenon, observes concrete slump situation at any time, such as finds that concrete has exception Situation should reflect to testing crew or technical staff in time, must not contact mixing building tune ash privately, concreting should continuously into Row such as interrupts for some reason, should reflect and deal carefully with to the relevant personnel in time;
After concreting, if meeting strong wind weather or unexpected rainfall, it need to arrange personnel after plastering with two ropes made of hemp It ties up on clamp suitable for reading, is covered with blue silver-colored cloth in parallel, to prevent excessively leading to cracking or because of drop because of the dehydration of strong wind component surface Rain makes component surface leak stone sand leakage, is turned over a finished item again after weather takes a turn for the better, and forbids using the grey casting concrete of landing, work progress It is middle to be cleaned out in time by template, to the lime-ash worn on bolt, and clean out landing ash after constructing;
S8: form removal
After concrete reaches drying time, dismantling concrete needs the template at dabbing position;
S9: concrete surface is checked
After form removable, the surface of concrete is checked, the surface strength of concrete cannot be less than 8.5MPa;
S10: giant rinses
It rushes hair surface to the concrete after inspection using giant to wash away, giant scouring head is apart from concrete Wash surface is 1m, and the water that giant sprays must not be vertical with concrete surface, flushing time 10min/m2
S11: result is washed away in examination
Concrete rushes hair surface communications centre and cleans down, if surface erosion is not clean, needs to carry out manually to mend chisel, there is protruding bar Beam-ends head, plate side, dabbing range is to reject the magma of the concrete surface in edge 1.5cm, exposes fresh coagulation Native face, top surface of the beam have the part of protruding bar, and dabbing range is by the original of the concrete surface at protruding bar and its within the scope of 5cm Slurry is rejected, and fresh concrete face is exposed;
S12: maintenance.
Particularly, the mixing time in the step S4 is 3min.
Particularly, the coating thickness that agent spraying is undisguisedly expected in the step S5 is 0.3mm.
Particularly, the drying time in the step S8 determines according to temperature, when one day temperature on average is at 30 DEG C or more When, drying time 7h, every 5 DEG C of the decline of temperature on average, then drying time needs to increase 2h, and drying time must not exceed 20h.
Particularly, the hydraulic pressure that washes away of the step S10 high-pressure gun is 15MPa.
Embodiment three
A kind of concrete component water rushes dabbing technique, includes the following steps:
S1: bottom tire processing
Bottom tire is checked, it is ensured that bottom tire surface keeps smooth, bright and clean, and sideline is straight, no pit, bottom tire two sides rubber Item is intact, and without slag inclusion between rubber strip and bottom tire, the iron sheet surface of bottom tire surface two sides should ensure that the fitting of smooth and flitch is tight, Ensure iron sheet without heaving, without lime-ash under iron sheet and flitch, when having lime-ash, part sedimentation, cracking, rubber strip damage, iron on the tire of bottom Skin lesion is bad, when pressing from both sides grey phenomenon, and bottom tire is placed under repair or replaced;
S2: brushing interleaving agent
Uniform brushing interleaving agent on bottom tire after treatment, interleaving agent must not be blocked up, and oil accumulation on the tire of bottom is avoided to occur, in order to avoid Greasy dirt is caused to framework of steel reinforcement;
S3: cleaning template simultaneously checks
Template surface and mortar suitable for reading, lime-ash, rusty stain and dirt are removed with angle grinder, checks template, limiting card and plug The use state of plate guarantees normal use, must not use if bulkhead deformation, and need to repair rear can be used;
S4: the undisguised material agent of stirring
The pH of undisguised material agent is 7.1, and the undisguised solid content for expecting agent is 50%, carries out uniform stirring to undisguised material agent;
S5: the undisguised material agent of template surface spraying
The undisguised material agent stirred evenly is uniformly sprayed to template to the side for being adjacent to concrete using atomizer, in coagulation Without spraying in template of the native avris less than 2.5cm, prevent concrete corner impaired, the undisguised material agent of spraying must not be in template At under plume, spraying carries out an acceptance inspection to spraying situation after completing on surface, main to check coating thickness and spraying uniformity coefficient, together When check the mobility for having sprayed undisguised material agent;
S6: branching standing template
S7: casting concrete
Ash bucket is dragged using trailer, small arc shaped hangs ash bucket and enters mould casting concrete, when lower ash cannot concentrate it is impact steel bar reinforced, under Grey height is not more than 2m, is layered lower ash and every thickness degree is not more than 50cm, vibrate 6cm to be overlapped between adjacent layer, such as finds steel Tendons skeleton is sunk or rising phenomenon adjusts in time, it is ensured that the thickness of protective layer is poured in Concrete, it is necessary to have full-time staff It keeps a close eye on whether Capsules have phenomena such as gas leakage, burst, if there is exception, adopts remedial measures, forbid non-full-time personnel couple Capsule gives tonifying Qi, and template top surface must not arbitrarily be removed to bolt is worn, if influencing plastering, when the concrete vibratings such as need finish plastering It removes again, concrete vibrating sequence is first outside and then inside since at near-lying mode plate, and mobile spacing is not more than 25cm, avoids collision, vibrates It should be inserted perpendicularly into, insert pull out slowly fastly, twitch up and down, guarantee uniform jolt ramming, receive stick location-appropriate and reduce spacing of vibrating, be conducive to coagulation Air in soil steeps outlet, and vibrating time prevents over vibration or leakage between 20s;
Component top surface mortar thickness check at any time after vibrating such as finds that excessive mortar floats, it is necessary to desurfacing mortar, more Fresh concrete is changed, surface layer mortar is avoided to generate crack, back portion uses secondary vibration to prevent pine top and concrete dry draw Seam, sucks moisture content with water-absorbent material if any excreting water phenomenon, observes concrete slump situation at any time, such as finds that concrete has exception Situation should reflect to testing crew or technical staff in time, must not contact mixing building tune ash privately, concreting should continuously into Row such as interrupts for some reason, should reflect and deal carefully with to the relevant personnel in time;
After concreting, if meeting strong wind weather or unexpected rainfall, it need to arrange personnel after plastering with two ropes made of hemp It ties up on clamp suitable for reading, is covered with blue silver-colored cloth in parallel, to prevent excessively leading to cracking or because of drop because of the dehydration of strong wind component surface Rain makes component surface leak stone sand leakage, is turned over a finished item again after weather takes a turn for the better, and forbids using the grey casting concrete of landing, work progress It is middle to be cleaned out in time by template, to the lime-ash worn on bolt, and clean out landing ash after constructing;
S8: form removal
After concrete reaches drying time, dismantling concrete needs the template at dabbing position;
S9: concrete surface is checked
After form removable, the surface of concrete is checked, the surface strength of concrete cannot be less than 8.5MPa;
S10: giant rinses
It rushes hair surface to the concrete after inspection using giant to wash away, giant scouring head is apart from concrete Wash surface is 2m, and the water that giant sprays must not be vertical with concrete surface, flushing time 15min/m2
S11: result is washed away in examination
Concrete rushes hair surface communications centre and cleans down, if surface erosion is not clean, needs to carry out manually to mend chisel, there is protruding bar Beam-ends head, plate side, dabbing range is to reject the magma of the concrete surface in edge 1.5cm, exposes fresh coagulation Native face, top surface of the beam have the part of protruding bar, and dabbing range is by the original of the concrete surface at protruding bar and its within the scope of 5cm Slurry is rejected, and fresh concrete face is exposed;
S12: maintenance.
Particularly, the mixing time in the step S4 is 10min.
Particularly, the coating thickness that agent spraying is undisguisedly expected in the step S5 is 0.6mm.
Particularly, the drying time in the step S8 determines according to temperature, when one day temperature on average is at 30 DEG C or more When, drying time 9h, every 5 DEG C of the decline of temperature on average, then drying time needs to increase 2h, and drying time must not exceed 20h.
Particularly, the hydraulic pressure that washes away of the step S10 high-pressure gun is 20MPa.
The present invention is exemplarily described above in conjunction with specific embodiment, it is clear that the present invention implements not by upper The limitation of mode is stated, as long as using the various improvement that the inventive concept and technical scheme of the present invention carry out, or not improved straight It scoops out for other occasions, it is within the scope of the present invention.

Claims (5)

1. a kind of concrete component water rushes dabbing technique, which comprises the steps of:
S1: bottom tire processing
Bottom tire is checked, it is ensured that bottom tire surface keeps smooth, bright and clean, and sideline is straight, no pit, and bottom tire two sides rubber strip is complete Good, without slag inclusion between rubber strip and bottom tire, the iron sheet surface of bottom tire surface two sides should ensure that the fitting of smooth and flitch is tight, it is ensured that Iron sheet is without heaving, and without lime-ash under iron sheet and flitch, when having on the tire of bottom, lime-ash, part sedimentation, cracking, rubber strip is damaged, iron sheet damages It is bad, when pressing from both sides grey phenomenon, bottom tire is placed under repair or is replaced;
S2: brushing interleaving agent
Uniform brushing interleaving agent on bottom tire after treatment;
S3: cleaning template simultaneously checks
Template surface and mortar suitable for reading, lime-ash, rusty stain and dirt are removed with angle grinder, checks template, limiting card and bulkhead Use state guarantees normal use;
S4: the undisguised material agent of stirring
The pH of undisguised material agent is 6.9-7.1, and the undisguised solid content for expecting agent is 48-50%, carries out uniform stirring to undisguised material agent;
S5: the undisguised material agent of template surface spraying
The undisguised material agent stirred evenly is uniformly sprayed to template to the side for being adjacent to concrete using atomizer, in concrete edge Without spraying in template of the side less than 2.5cm, prevent concrete corner impaired, the undisguised material agent of spraying must not be in template surface At under plume;
S6: branching standing template
S7: casting concrete
Ash bucket is dragged using trailer, small arc shaped hangs ash bucket and enters mould casting concrete, and concreting should be carried out continuously, when lower grey not Energy concentration is impact steel bar reinforced, and lower ash height is not more than 2m, and ash and every thickness degree are not more than 50cm under layering, vibrates and wants between adjacent layer It is overlapped 4-6cm, vibrating should be inserted perpendicularly into, and fast insert is pulled out slowly, twitch up and down, guarantee uniform jolt ramming, vibrating time is between 15-20s;
S8: form removal
After concrete reaches drying time, dismantling concrete needs the template at dabbing position;
S9: concrete surface is checked
After form removable, the surface of concrete is checked, the surface strength of concrete cannot be less than 8.5MPa;
S10: giant rinses
It rushes hair surface to the concrete after inspection using giant to wash away, giant scouring head is washed away apart from concrete Face is 1-2m, and the water that giant sprays must not be vertical with concrete surface, flushing time 10-15min/m2
S11: result is washed away in examination
Concrete rushes hair surface communications centre and cleans down, if surface erosion is not clean, needs to carry out manually to mend chisel, there is the beam of protruding bar End, plate side, dabbing range are to reject the magma of the concrete surface in edge 1.5cm, expose fresh concrete face, Top surface of the beam has the part of protruding bar, and dabbing range is to pick the magma of the concrete surface at protruding bar and its within the scope of 5cm It removes, exposes fresh concrete face;
S12: maintenance.
2. a kind of concrete component water according to claim 1 rushes dabbing technique, which is characterized in that the stirring in the step S4 Time is 3-10min.
3. a kind of concrete component water according to claim 2 rushes dabbing technique, which is characterized in that undisguisedly expect in the step S5 The coating thickness of agent spraying is 0.3-0.6mm.
4. a kind of concrete component water according to claim 3 rushes dabbing technique, which is characterized in that the drying in the step S8 Time determines according to temperature, when one day temperature on average is at 30 DEG C or more, drying time 7-9h, and the every decline 5 of temperature on average DEG C, then drying time needs to increase 2h, and drying time must not exceed 20h.
5. a kind of concrete component water according to claim 4 rushes dabbing technique, which is characterized in that the step S10 mesohigh The hydraulic pressure that washes away of hydraulic giant is 15-20MPa.
CN201811549615.4A 2018-12-18 2018-12-18 A kind of concrete component water rushes dabbing technique Withdrawn CN109624066A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811549615.4A CN109624066A (en) 2018-12-18 2018-12-18 A kind of concrete component water rushes dabbing technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811549615.4A CN109624066A (en) 2018-12-18 2018-12-18 A kind of concrete component water rushes dabbing technique

Publications (1)

Publication Number Publication Date
CN109624066A true CN109624066A (en) 2019-04-16

Family

ID=66075071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811549615.4A Withdrawn CN109624066A (en) 2018-12-18 2018-12-18 A kind of concrete component water rushes dabbing technique

Country Status (1)

Country Link
CN (1) CN109624066A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110405911A (en) * 2019-06-27 2019-11-05 上海鼎中新材料有限公司 Undisguised material trailing is rinsed in the positive negative sense slow setting cooperation of concrete surface
CN110843082A (en) * 2019-11-08 2020-02-28 北京科技大学 Stress-free water washing roughening method
CN111411647A (en) * 2020-04-25 2020-07-14 五冶集团上海有限公司 Method for processing construction joint of wide and large section of building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0452376A (en) * 1990-06-21 1992-02-20 Ohbayashi Corp Processing method for vertical construction joint face of concrete
CN101054854A (en) * 2007-04-30 2007-10-17 中铁大桥局集团第二工程有限公司 Construction method of quick roughening of concrete
CN103452320A (en) * 2013-09-05 2013-12-18 中铁上海工程局有限公司 Concrete dabbing construction method
CN104372952A (en) * 2014-11-19 2015-02-25 中交二公局第五工程有限公司 Unstressed permeating washing scabbling technology
CN107627444A (en) * 2017-09-28 2018-01-26 中国冶集团有限公司 Unstressed washing dabbing technique

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0452376A (en) * 1990-06-21 1992-02-20 Ohbayashi Corp Processing method for vertical construction joint face of concrete
CN101054854A (en) * 2007-04-30 2007-10-17 中铁大桥局集团第二工程有限公司 Construction method of quick roughening of concrete
CN103452320A (en) * 2013-09-05 2013-12-18 中铁上海工程局有限公司 Concrete dabbing construction method
CN104372952A (en) * 2014-11-19 2015-02-25 中交二公局第五工程有限公司 Unstressed permeating washing scabbling technology
CN107627444A (en) * 2017-09-28 2018-01-26 中国冶集团有限公司 Unstressed washing dabbing technique

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈志龙等: "现浇钢筋混凝土施工缝免剔凿施工技术", 《建筑施工》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110405911A (en) * 2019-06-27 2019-11-05 上海鼎中新材料有限公司 Undisguised material trailing is rinsed in the positive negative sense slow setting cooperation of concrete surface
CN110405911B (en) * 2019-06-27 2024-03-01 上海鼎中新材料有限公司 Method for decorating exposed bone material by combining positive and negative retarding and flushing on concrete surface
CN110843082A (en) * 2019-11-08 2020-02-28 北京科技大学 Stress-free water washing roughening method
CN111411647A (en) * 2020-04-25 2020-07-14 五冶集团上海有限公司 Method for processing construction joint of wide and large section of building

Similar Documents

Publication Publication Date Title
CN109624066A (en) A kind of concrete component water rushes dabbing technique
CN107035103A (en) A kind of cement floor construction method
CN104372952A (en) Unstressed permeating washing scabbling technology
CN106884535A (en) A kind of construction technology of imitative stone material Self-leveling waterproof mortar
CN107035085A (en) A kind of indoor wall machine spray gypsum mortar is plastered one-time formed construction method
CN109025268A (en) Kitchen and toilet concrete flanging construction method
CN109797945A (en) Abrasion-proof concrete grinding stone construction method of ground
CN110409754A (en) A kind of construction method of heat insulating and sound insulating terrace
CN105780976A (en) Compound concrete shear wall structure and concrete pouring method thereof
CN103771796A (en) Thin-layer pavement patching mortar
CN108086174B (en) Repairing method of shaping clamp for repairing surface of concrete guardrail
CN102373666A (en) Method for quickly roughening concrete by retarder flushing
CN207974027U (en) A kind of shape-setting clamp for concrete guardrail skin patching
CN112391916A (en) Quick patching device of cement concrete pavement hole
CN214656388U (en) Box girder roof delayed coagulation water flushing device
CN206937724U (en) Hollow plastic building template ash disposal goes to follow closely broken recovery system
CN108385981A (en) A kind of outdoor basement roof post-cast strip anti-seepage construction method
CN210458896U (en) Quick patching device of cement concrete pavement hole
CN113668885A (en) Plastering anti-cracking construction method for large-area arc-shaped stand
CN210482706U (en) Anchoring type secondary pouring carborundum wear-resistant ground and construction technology thereof
CN110318522A (en) A kind of quick paving structure of compound ceramic tile
CN104314288A (en) Mechanical integration flooring protective layer efficient construction method
CN104290188A (en) Constructing method for integrated precast concrete component
CN110258276A (en) A kind of micro- table breakage quick maintenance method of concrete road surface
CN202450772U (en) Architectural shading cast-in-place concrete lattice wall template

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190416

WW01 Invention patent application withdrawn after publication