CN103615009A - Cfg桩复合地基的桩间土挖除方法 - Google Patents

Cfg桩复合地基的桩间土挖除方法 Download PDF

Info

Publication number
CN103615009A
CN103615009A CN201310613678.2A CN201310613678A CN103615009A CN 103615009 A CN103615009 A CN 103615009A CN 201310613678 A CN201310613678 A CN 201310613678A CN 103615009 A CN103615009 A CN 103615009A
Authority
CN
China
Prior art keywords
excavated
cfg
piles
soil
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310613678.2A
Other languages
English (en)
Inventor
高美忠
张鹏飞
张树根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201310613678.2A priority Critical patent/CN103615009A/zh
Publication of CN103615009A publication Critical patent/CN103615009A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及一种CFG桩复合地基的桩间土挖除方法,其挖除方法包括如下步骤:⑴开挖前用钢钎进行探桩,用白灰将CFG桩桩位逐一放出;⑵将桩上部的土方挖除后,然后根据实际桩位确定斜向开挖的方向;⑶挖土时分层开挖,每层厚度为500~800mm,CFG桩周围的土人工挖除,桩间土采用宽度改装为600mm宽的反铲进行挖除;⑷挖土分层开挖同时进行分层截桩,截桩时在同一水平面按同一角度对称放置2个或4个钢钎,用大锤同时击打,将桩头截断,CFG桩复合地基的桩间土挖除完毕。本发明挖出的基坑土表面平整,改善了挖土的质量,有效避免了开挖时将CFG桩碰断,且施工进度大大加快,满足了施工要求。

Description

CFG桩复合地基的桩间土挖除方法
技术领域
本发明属于桩间土挖除领域,尤其是一种CFG桩复合地基的桩间土挖除方法。
背景技术
在建筑工程中地基的种类较多,由于CFG桩复合地基具有造价低、工期短等特点,所以CFG桩复合地基在建筑工程中得以广泛应用。由于CFG桩设计时往往成梅花型布置,且间距为1.3m~2.0m,在挖土时采用以下方法:一是普通反铲配以人工从左到右横向开挖,由于反铲挖土时直线进行,由于反铲太宽,导致许多CFG桩被反铲碰断或挤断,影响地基承载力,且土表面凹凸不平;二是纯人工开挖,工人劳动强度太大、进度太慢满足不了工期要求;上述两种方法都满足不了大面积CFG桩复合地基基坑的桩间土挖除要求。
发明内容
本发明的目的在于克服现有技术的不足,提供一种CFG桩复合地基的桩间土挖除方法,该挖除方法操作简单,改善了挖土的质量,降低了人工劳动强度,施工速度快,效率高。
本发明解决其技术问题是通过以下技术方案实现的:
一种CFG桩复合地基的桩间土挖除方法,其挖除方法包括如下步骤:
⑴、开挖前用钢钎进行探桩,用白灰将CFG桩桩位逐一放出;
⑵、将桩上部的土方挖除后,然后根据实际桩位确定斜向开挖的方向;
⑶、挖土时分层开挖,每层厚度为500~800mm,CFG桩周围的土人工挖除,桩间土采用宽度改装为600mm宽的反铲进行挖除;
⑷、挖土分层开挖同时进行分层截桩,截桩时在同一水平面按同一角度对称放置2个或4个钢钎,用大锤同时击打,将桩头截断,CFG桩复合地基的桩间土挖除完毕。
而且,所述的桩间土挖除完毕后对CFG桩逐根进行低应变检测。
本发明的优点和有益效果为:
本CFG桩复合地基的桩间土挖除方法挖出的基坑土表面平整,改善了挖土的质量,有效避免了开挖时将CFG桩碰断,且施工进度大大加快,满足了施工要求。
附图说明
图1为本发明CFG桩开挖方向示意图。
具体实施方式
下面通过具体实施例对本发明作进一步详述,以下实施例只是描述性的,不是限定性的,不能以此限定本发明的保护范围。
一种CFG桩复合地基的桩间土挖除方法,其挖除方法包括如下步骤:
⑴、开挖前用钢钎进行探桩,用白灰将CFG桩1桩位逐一放出;
⑵、将桩上部的土方挖除后,然后根据实际桩位确定斜向开挖的方向,图1中箭头所示方向为斜向开挖方向;
⑶、挖土时分层开挖,每层厚度为500~800mm,CFG桩周围的土人工挖除,桩间土采用宽度改装为600mm宽的反铲进行挖除;
⑷、挖土分层开挖同时进行分层截桩,截桩时在同一水平面按同一角度对称放置2个或4个钢钎,用大锤同时击打,将桩头截断,CFG桩复合地基的桩间土挖除完毕。桩间土挖除完毕后对CFG桩逐根进行低应变检测。低应变检测、接桩完毕合格后进行200mm厚的褥垫层施工。

Claims (2)

1.一种CFG桩复合地基的桩间土挖除方法,其特征在于:该挖除方法包括如下步骤:
⑴、开挖前用钢钎进行探桩,用白灰将CFG桩桩位逐一放出;
⑵、将桩上部的土方挖除后,然后根据实际桩位确定斜向开挖的方向;
⑶、挖土时分层开挖,每层厚度为500~800mm,CFG桩周围的土人工挖除,桩间土采用宽度改装为600mm宽的反铲进行挖除;
⑷、挖土分层开挖同时进行分层截桩,截桩时在同一水平面按同一角度对称放置2个或4个钢钎,用大锤同时击打,将桩头截断,CFG桩复合地基的桩间土挖除完毕。
2.根据权利要求1所述的CFG桩复合地基的桩间土挖除方法,其特征在于:所述的桩间土挖除完毕后对CFG桩逐根进行低应变检测。
CN201310613678.2A 2013-11-26 2013-11-26 Cfg桩复合地基的桩间土挖除方法 Pending CN103615009A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310613678.2A CN103615009A (zh) 2013-11-26 2013-11-26 Cfg桩复合地基的桩间土挖除方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310613678.2A CN103615009A (zh) 2013-11-26 2013-11-26 Cfg桩复合地基的桩间土挖除方法

Publications (1)

Publication Number Publication Date
CN103615009A true CN103615009A (zh) 2014-03-05

Family

ID=50165724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310613678.2A Pending CN103615009A (zh) 2013-11-26 2013-11-26 Cfg桩复合地基的桩间土挖除方法

Country Status (1)

Country Link
CN (1) CN103615009A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759337A (zh) * 2016-12-23 2017-05-31 山东万鑫建设有限公司 整体推进式截桩施工方法
CN113914304A (zh) * 2021-11-19 2022-01-11 中国水利水电第五工程局有限公司 一种cfg桩长螺旋钻孔芯管泵送混合料灌注成桩施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5927026A (ja) * 1982-08-06 1984-02-13 Hasegawa Komuten Co Ltd 場所打ち杭の杭頭処理工法
CN102587354A (zh) * 2012-02-13 2012-07-18 中天建设集团有限公司 一种软土中围护桩间土钉增强挡土方法
CN103215963A (zh) * 2013-05-06 2013-07-24 陈灿斌 一种桩或桩群结构

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5927026A (ja) * 1982-08-06 1984-02-13 Hasegawa Komuten Co Ltd 場所打ち杭の杭頭処理工法
CN102587354A (zh) * 2012-02-13 2012-07-18 中天建设集团有限公司 一种软土中围护桩间土钉增强挡土方法
CN103215963A (zh) * 2013-05-06 2013-07-24 陈灿斌 一种桩或桩群结构

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中国建筑第七工程局有限公司: "《http://wenku.baidu.com/view/b1b7732c4b35eefdc8d33375.html》", 1 March 2013, article "桩间土开挖技术交底" *
中太建设集团股份有限公司: "《http://wenku.baidu.com/view/3a4df8dfa58da0116c174962.html?re=view》", 9 February 2012, article "五矿邯邢矿业有限公司棚户区改建工程1#、3#、17#桩间土开挖、破桩头施工方案" *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759337A (zh) * 2016-12-23 2017-05-31 山东万鑫建设有限公司 整体推进式截桩施工方法
CN113914304A (zh) * 2021-11-19 2022-01-11 中国水利水电第五工程局有限公司 一种cfg桩长螺旋钻孔芯管泵送混合料灌注成桩施工方法

Similar Documents

Publication Publication Date Title
CN103061777B (zh) 预设加固桩群建立城市地下隧道盾构刀盘修复空间的方法
CN102182472B (zh) 隧道塌方空腔的回填修复方法
CN109296378B (zh) 潜孔钻配合破碎锤掘进开挖施工方法
CN204199335U (zh) 一种减小phc管桩施工挤土效应的泄压井
CN104805831A (zh) 一种大直径硬岩基桩成孔方法
CN104131571B (zh) 一种深基坑支护施工方法
CN111005381A (zh) 兜底式振动锤型钢拔桩机及其拔桩方法
CN104895121A (zh) 一种减小地下结构建设中地表沉降及建构筑物变形的横向隔断法
CN103615009A (zh) Cfg桩复合地基的桩间土挖除方法
CN105065006A (zh) 一种挖斗和挖掘机
CN202881954U (zh) 一种用于清理钻孔桩钢护筒外侧粘附物的振动铲
CN106761800A (zh) 软弱围岩隧道开挖施工工艺
CN110130321A (zh) 一种人工挖孔桩施工中岩石的处理方法
CN202430762U (zh) 振动液压挖掘斗
CN202509545U (zh) 一种松土器及工程机械
CN205954729U (zh) 用于基坑底部清槽的刮铲装置
CN204877483U (zh) 一种挖掘机用的挖斗
CN214033851U (zh) 一种碾压滚轮式防渗墙成槽装置
CN211500541U (zh) 用于砂土地层反循环钻进的钻头
CN105421462B (zh) 极软岩地基的施工及保护方法
CN204877485U (zh) 基岩隆起区盾构换刀原位加固结构
CN203213189U (zh) 一种带有凸尖层的挖掘机斗齿
CN103967000A (zh) 联合施工旋挖桩施工方法
CN102561415A (zh) 挖掘机
CN206246064U (zh) 一种旋挖钻辅助卸渣简易装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140305