CN103572760A - 钻孔压灌桩全桩长振捣施工方法及装置 - Google Patents
钻孔压灌桩全桩长振捣施工方法及装置 Download PDFInfo
- Publication number
- CN103572760A CN103572760A CN201310570176.6A CN201310570176A CN103572760A CN 103572760 A CN103572760 A CN 103572760A CN 201310570176 A CN201310570176 A CN 201310570176A CN 103572760 A CN103572760 A CN 103572760A
- Authority
- CN
- China
- Prior art keywords
- vibrating
- pile
- grouting
- tamping equipment
- vibrator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title abstract description 8
- 238000005553 drilling Methods 0.000 claims abstract description 7
- 230000003014 reinforcing effect Effects 0.000 claims description 17
- 239000002689 soil Substances 0.000 claims description 9
- 239000000284 extract Substances 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 17
- 229910000831 Steel Inorganic materials 0.000 abstract description 5
- 239000010959 steel Substances 0.000 abstract description 5
- 230000007547 defect Effects 0.000 abstract description 3
- 240000007817 Olea europaea Species 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 5
- 238000007569 slipcasting Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 230000001737 promoting effect Effects 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 125000006850 spacer group Chemical group 0.000 description 2
- 239000002390 adhesive tape Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
钻孔压灌桩全桩长振捣施工方法及装置。
目前建筑市场常用钻长螺旋孔压灌超流态的相关专利及其实际操作中,存在桩身混凝土不密实、充盈系数小、摩阻力不高,单桩承载力比较低等缺点,另外在长桩注浆、振捣过程中还具有局限性、不合理的牢固性、复杂性等缺点。本发明方法包括:振捣器(
1
),所述的振捣器一端连接振动杆(
2
),所述的振动杆连接振捣橄榄头(
3
),所述的振捣器另一端连接升降钢丝绳(
4
)。
本发明用于建筑施工。
Description
技术领域:
本发明涉及一种钻孔压灌桩全桩长振捣施工方法及装置。
背景技术:
目前建筑市场常用一种工艺叫钻长螺旋孔压灌超流态,专利名称《超流态混凝土及其灌注成桩方法和该方法所用的钻机》专利号:ZL93120168.3。该装置的缺点是:一次钻进到设计深度,一次提钻在安放钢筋笼成桩。由于压灌超流态混凝土工艺流程决定的根本不能在中间对桩身混凝土进行振捣。所以桩身混凝土不密实、充盈系数小、摩阻力不高,单桩承载力比较低等缺点。另外有一种提高单桩承载里的方法叫《长螺旋钻孔压灌桩后注浆处理方法及其后置注浆管装置》专利号2007102000046.8该发明的权利要求中有几条缺点是:1、局限性:根据该方法权利要求1步骤1所述:该后置注浆管装置与钢筋连接成一体。注浆管材料要求必须是钢管,而且注浆钢管必须绑、焊在钢筋笼上。现行规范规定钢筋笼的长度是桩长的三分之二,注浆管就比钢筋笼长出三分之一,增加了跨度(L)值弯矩也随之加大,在安装起吊时珠江钢管刚度不足会造成弯曲,没有可操作性,如果配备吊车会大幅度增加不合理成本。施工速度慢不易推广。2、不合理的牢固性:根据该方法权利7、10所述:上述桩底注浆管和桩侧注浆管与定位钢筋圈绑扎或钢筋笼圆周的钢筋笼下端向圆心弯曲收拢并焊接锥形兜状物。由于注浆管需要动力贯入到桩底,需要足够的刚度和牢固性才能实现,采用焊在钢筋笼上的措施来解决,还增设了兜状钢筋材料焊接加固,解决桩下部三分之一刚度不足的问题,不合理的增加了焊接材料、人工、设备、等成本。3、复杂性:根据该方法权利要求5所述:该装置包括置于桩身环周的至少两根桩底注浆管、至少一根桩侧注浆管焊接在定位钢筋圈和兜底钢筋上。按照现行的《桩基技术规范》关于后压浆中注浆管设置的规定直径在1.2m截面积1.13m设两根管。目前钻孔压灌桩最大施工直径0.8m截面积0.5m设一根注浆管就可以满足。由于注浆钢管数量多,安装方法被合理增加了加固成本,根据该方法权利要求1步骤7所述:水泥浆时从注浆单向阀冲出。工程实践中根本不用单向阀门。实际操作时钻孔后直接用胶带纸包好就可满足注浆要求,造成设计不合理性的浪费。
总结了上述既有桩型存在的缺点,设计出有针对性的消除现有缺陷,成本低,操作简便,容易推广的有社会效益的施工装置。
发明内容:
本发明的目的是提供一种钻孔压灌桩全桩长振捣施工方法及装置。
上述的目的通过以下的技术方案实现:
一种钻孔压灌桩全桩长振捣装置,其组成包括:振捣器,所述的振捣器两端分别连接振动杆和升降钢丝绳,所述的振动杆为直尖或连接振捣头。
所述的钻孔压灌桩全桩长振捣装置,所述的振捣头为振捣橄榄头或振捣棒中的一种。
一种钻孔压灌桩全桩长振捣装置的施工方法,第一步,利用钻孔压灌混凝土钻机在设计土层钻孔,边提钻边压灌混凝土形成混凝土桩;第二步,在混凝土桩中安放钢筋笼;第三步,插入振捣装置到桩端,振捣完毕后拔出所述的振捣装置,成桩。
所述的钻孔压灌桩全桩长振捣装置的施工方法,根据土层特点制定重点振捣部位,在混凝土终凝前上下往复振捣以达到承载力要求。
有益效果:
1.本发明在振捣器的两端分别连接升降钢丝绳和振动杆,并为振动杆实行三种施工方案,分别是为振动杆连接振捣橄榄头、为振动杆连接振捣棒代替振捣橄榄头和不为振动杆连接振动头直接将振动杆设置成直尖。这样,升降钢丝绳拉动振捣器并带动振动杆做上下往复运动,实现已压灌混凝土成桩后的全桩长振捣。通过对桩身全场上下往复振捣,消除了工艺上缩颈的问题;实现全桩长混凝土的充分密实,解决因混凝土回落带动钢筋笼下沉的问题;桩身范围内混凝土到达最大限度的密实程度,加大了充盈系数就能够增加混凝土的用量;另外通过振捣桩身范围内局部截面的扩大,增加了桩身混凝土对涂层的摩擦面积,从而增加了摩擦阻力,提高了单桩承载力。
2.本发明整个装置的结构简单,提高单桩承载力效果明显,制作、使用成本低便于推广,并能够针对土层的具体特点进行重点振捣,加固桩身的同时节省劳力、节省用装数量,降低成本,增加社会效益。
附图说明:
附图1是本发明涉及的钻孔压灌桩全桩长振捣装置的结构示意图。
附图2是本发明方法施工过程中在设计土层钻孔时的示意图。
附图3是本发明方法施工过程中压灌混凝土形成混凝土桩时的示意图。
附图4是本发明方法施工过程中在混凝土桩中安放钢筋笼时的示意图。
附图5是本发明方法施工过程中插入振捣器装置到桩端时的示意图。
附图6是本发明方法施工过程中拔出振捣器装置成桩时的示意图。
图中,1为振捣器,2为振动杆,3为振捣头,4为升降钢丝绳,5为设计土层,6为混凝土桩,7为钢筋笼,8为振捣装置。
具体实施方式:
实施例1:
一种钻孔压灌桩全桩长振捣装置,其组成包括:振捣器,所述的振捣器两端分别连接振动杆和升降钢丝绳,所述的振动杆为直尖或连接振捣头。
所述的升降钢丝绳拉动振捣器,这样振捣器带动下部安装了振捣头的振动杆实现上下往复运动,同时进行振动。
实施例2:
根据实施例1所述的钻孔压灌桩全桩长振捣装置,所述的振捣头为振捣橄榄头或振捣棒中的一种。
实施例3:
一种钻孔压灌桩全桩长振捣装置的施工方法,第一步,利用钻孔压灌混凝土钻机在设计土层5钻孔,边提钻边压灌混凝土形成混凝土桩6;第二步,在混凝土桩中安放钢筋笼7;第三步,插入振捣装置8到桩端,振捣完毕后拔出所述的振捣装置,成桩。
实施例4:
根据实施例3所述的钻孔压灌桩全桩长振捣装置的施工方法,根据土层特点制定重点振捣部位,在混凝土终凝前上下往复振捣以达到承载力要求。
Claims (4)
1.一种钻孔压灌桩全桩长振捣装置,其组成包括:振捣器,其特征是:所述的振捣器两端分别连接振动杆和升降钢丝绳,所述的振动杆为直尖或连接振捣头。
2.根据权利要求1所述的钻孔压灌桩全桩长振捣装置,其特征是:所述的振捣头为振捣橄榄头或振捣棒中的一种。
3.一种钻孔压灌桩全桩长振捣装置的施工方法,其特征是:第一步,利用钻孔压灌混凝土钻机在设计土层钻孔,边提钻边压灌混凝土形成混凝土桩;第二步,在混凝土桩中安放钢筋笼;第三步,插入振捣装置到桩端,振捣完毕后拔出所述的振捣装置,成桩。
4.根据权利要求3所述的钻孔压灌桩全桩长振捣装置的施工方法,其特征是:根据土层特点制定重点振捣部位,在混凝土终凝前上下往复振捣以达到承载力要求。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310570176.6A CN103572760B (zh) | 2013-11-16 | 2013-11-16 | 钻孔压灌桩全桩长振捣施工方法及装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310570176.6A CN103572760B (zh) | 2013-11-16 | 2013-11-16 | 钻孔压灌桩全桩长振捣施工方法及装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103572760A true CN103572760A (zh) | 2014-02-12 |
CN103572760B CN103572760B (zh) | 2017-01-25 |
Family
ID=50045417
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310570176.6A Active CN103572760B (zh) | 2013-11-16 | 2013-11-16 | 钻孔压灌桩全桩长振捣施工方法及装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103572760B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104153370A (zh) * | 2014-08-17 | 2014-11-19 | 曹兴明 | 钻孔压灌超流态桩双向全长振捣施工方法及装置 |
CN104975597A (zh) * | 2015-07-08 | 2015-10-14 | 上海建工二建集团有限公司 | 钻孔压灌桩后插钢筋笼多点投送器及使用方法 |
CN111764390A (zh) * | 2020-07-07 | 2020-10-13 | 中建一局集团建设发展有限公司 | 一种辅助振捣杆快速装入竖井钢筋笼中的系统及施工方法 |
CN118148369A (zh) * | 2024-05-13 | 2024-06-07 | 河南飞吉建设工程有限公司 | 钻孔压灌桩全桩长振捣施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08105040A (ja) * | 1994-10-07 | 1996-04-23 | Mikasa Sangyo Kk | 吊下げ用コンクリート振動装置 |
CN1657710A (zh) * | 2005-01-11 | 2005-08-24 | 北京市机械施工公司 | 桩孔内现浇混凝土振捣挤密的方法及其振捣杆装置 |
CN1818230A (zh) * | 2005-02-07 | 2006-08-16 | 王利华 | 现浇钻振混凝土复合桩的成桩方法及其灌注振捣装置 |
CN200988962Y (zh) * | 2006-07-10 | 2007-12-12 | 杨修霞 | 振捣插筋钻孔压灌桩的桩端振捣装置 |
CN203007952U (zh) * | 2013-01-07 | 2013-06-19 | 甘肃第六建设集团股份有限公司 | 一种用于超深大直径灌注桩的砼振捣设备 |
-
2013
- 2013-11-16 CN CN201310570176.6A patent/CN103572760B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08105040A (ja) * | 1994-10-07 | 1996-04-23 | Mikasa Sangyo Kk | 吊下げ用コンクリート振動装置 |
CN1657710A (zh) * | 2005-01-11 | 2005-08-24 | 北京市机械施工公司 | 桩孔内现浇混凝土振捣挤密的方法及其振捣杆装置 |
CN1818230A (zh) * | 2005-02-07 | 2006-08-16 | 王利华 | 现浇钻振混凝土复合桩的成桩方法及其灌注振捣装置 |
CN200988962Y (zh) * | 2006-07-10 | 2007-12-12 | 杨修霞 | 振捣插筋钻孔压灌桩的桩端振捣装置 |
CN203007952U (zh) * | 2013-01-07 | 2013-06-19 | 甘肃第六建设集团股份有限公司 | 一种用于超深大直径灌注桩的砼振捣设备 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104153370A (zh) * | 2014-08-17 | 2014-11-19 | 曹兴明 | 钻孔压灌超流态桩双向全长振捣施工方法及装置 |
CN104975597A (zh) * | 2015-07-08 | 2015-10-14 | 上海建工二建集团有限公司 | 钻孔压灌桩后插钢筋笼多点投送器及使用方法 |
CN104975597B (zh) * | 2015-07-08 | 2017-01-18 | 上海建工二建集团有限公司 | 钻孔压灌桩后插钢筋笼多点投送器及使用方法 |
CN111764390A (zh) * | 2020-07-07 | 2020-10-13 | 中建一局集团建设发展有限公司 | 一种辅助振捣杆快速装入竖井钢筋笼中的系统及施工方法 |
CN118148369A (zh) * | 2024-05-13 | 2024-06-07 | 河南飞吉建设工程有限公司 | 钻孔压灌桩全桩长振捣施工方法 |
CN118148369B (zh) * | 2024-05-13 | 2024-07-26 | 河南飞吉建设工程有限公司 | 钻孔压灌桩全桩长振捣施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103572760B (zh) | 2017-01-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104234055B (zh) | 一种预制桩后注浆装置及其工艺 | |
CN103510510B (zh) | 一种增强型长螺旋钻孔压灌混凝土桩及施工方法 | |
CN100476082C (zh) | 长螺旋钻孔压灌桩后注浆处理施工方法及其后置注浆装置 | |
CN105569560A (zh) | 全套管式长螺旋钻孔桩机及利用该桩机施工的方法 | |
CN102409667B (zh) | 一种挤扩灌注桩的施工装置及施工工艺 | |
CN105220714B (zh) | 内置锚索灌芯复合式预应力管桩抗浮结构施工方法 | |
CN103572760A (zh) | 钻孔压灌桩全桩长振捣施工方法及装置 | |
CN203452084U (zh) | 套管式底送后插管后注浆装置 | |
CN103410142A (zh) | 一种冲孔扩底灌注桩的施工方法及扩底装置 | |
CN203213101U (zh) | 一种植入注浆组合桩 | |
CN103452115B (zh) | 一种利用套管式底送后插管后注浆装置进行施工的施工方法 | |
CN101936004A (zh) | 一种预制挤扩桩及其施工方法与施工机械设备 | |
CN102635110B (zh) | 混凝土桩的施工方法 | |
CN104878745A (zh) | 带双螺旋钻杆的成桩装置与成桩方法 | |
CN105064352A (zh) | 建筑扩大头锚杆桩施工工艺及其锚杆桩 | |
CN203594023U (zh) | 一种增强型长螺旋钻孔压灌混凝土桩 | |
CN104153370A (zh) | 钻孔压灌超流态桩双向全长振捣施工方法及装置 | |
CN203034460U (zh) | 沉管灌注桩施工用反插振动导向装置 | |
CN101135157A (zh) | 静压沉管桩施工工艺方法 | |
CN108222656A (zh) | 预制装配式围墙的施工方法 | |
CN203834483U (zh) | 钻孔压灌桩全桩长振捣装置 | |
CN103898918A (zh) | 组合支护结构及施工方法 | |
CN1214158C (zh) | 现浇混凝土锚桩的施工方法 | |
CN106013096A (zh) | 一种建筑基础施工方法 | |
CN202530447U (zh) | 一种沉双管拔内管成孔灌注桩结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191212 Address after: 150069 Ping'an Village, Chaoyang Town, Xiangfang District, Harbin, Heilongjiang Patentee after: HEILONGJIANG HUAYAN PILING TECHNOLOGY R & D CO., LTD. Address before: 150046, No. 73-3, Heung Men street, Xiangfang District, Heilongjiang, Harbin Patentee before: Cao Xingming |