CN103567601A - 利用千斤顶和起重机垂直组对焊接塔器方法 - Google Patents
利用千斤顶和起重机垂直组对焊接塔器方法 Download PDFInfo
- Publication number
- CN103567601A CN103567601A CN201310559886.9A CN201310559886A CN103567601A CN 103567601 A CN103567601 A CN 103567601A CN 201310559886 A CN201310559886 A CN 201310559886A CN 103567601 A CN103567601 A CN 103567601A
- Authority
- CN
- China
- Prior art keywords
- tower
- welding
- jack
- crane
- perpendicularity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K31/00—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
- B23K31/02—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/053—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Butt Welding And Welding Of Specific Article (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
利用千斤顶和起重机垂直组对焊接塔器方法包括以下步骤:1)校核塔器各段直线度,切割掉每段塔器的封头,在每段塔器对口的端部切割坡口;2)将下塔固定到基础上,找正其垂直度、标高;3)在下塔外周壁上均布有多个第一支撑工装,在每个第一支撑工装上设千斤顶,将各千斤顶调整到同一水平位置,千斤顶上装测力仪;4)在上塔外周壁上均布有多个第二支撑工装;5)起重机吊装上塔,使每个第二支撑工装对应到每个千斤顶上,调整千斤顶受力,组对上、下塔端部坡口,调整上塔垂直度及上、下塔组对间隙,千斤顶负载力总和为N,起重机负载力为F,上塔重量为Q,保持Q=N+F;6)多名焊工使用相同的焊接电流同时进行对称焊接,将焊缝分多层焊成。
Description
技术领域
本发明涉及一种对能源化工建设行业的塔器设备进行空中垂直组对焊接的方法,属于焊接技术领域。
背景技术
随着生产装置的设计日益变得庞大,建设项目中不少设备运输成为了一大难题,所以很多较为精密的大型设备选择现场组对焊接,现场组对又分水平组对和垂直组对,水平组对然后整体吊装的方法较为简便,但是对于高精密的设备可能会造成设备本体的变形。分段垂直空中组对可较好的控制设备本体的变形,达到精密设备精密安装的要求,但是施工过程中对于某些材质存在焊接变形大、垂直度难以控制、焊接难度大等问题,尤其是铝质塔器和不锈钢塔器,而一些使用铝质、不锈钢材质塔器的领域对塔器的垂直度要求却非常高,如空气分离装置冷箱内塔,众所周知大型空气分离装置的核心设备是设计在冷箱内的塔器和管道,其塔器的垂直度直接影响到产品的纯度和产量,一般安装后的垂直度小于等于0.5mm/m最大不得超过15mm,采用现有技术中通过起重机吊装垂直组对焊接方法,上、下塔之间没有任何连系,不稳定,在焊接过程中经常会产生垂直度、错边量超差,焊缝不合格返修带来垂直度变化等情况。
发明内容
本发明要解决的技术问题是提供一种新的利用千斤顶和起重机垂直组对焊接塔器方法,适用于各类垂直组对的各种材质塔器、壳体、大直径管道等的焊接,可有效降低焊接过程中导致的塔体垂直度变化,避免错边量超差,使塔器安装质量得到提高。
本发明利用千斤顶和起重机垂直组对焊接塔器方法,包括以下步骤:
1)校核塔器各段的直线度,按照塔器切割线将每段塔器的封头切割掉,并在每段塔器对口的端部切割坡口;
2)将塔器位于组对焊缝下方的下塔固定到基础上,找正其垂直度、标高;
3)在下塔靠近组对焊接位置的外周壁上均匀分布安装多个第一支撑工装,并在每个所述第一支撑工装上安装千斤顶,将各个千斤顶调整到同一水平位置,在各个千斤顶上安装测力仪;
4)在塔器位于组对焊缝上方的上塔上安装多个第二支撑工装,所述第二支撑工装均匀分布在上塔靠近焊接位置的外周壁上与下塔上的第一支撑工装相对应;
5)用起重机吊装上塔,使上塔的每个第二支撑工装对应到每个千斤顶上,调整千斤顶受力,组对上塔端部坡口与下塔端部坡口,调整上塔的垂直度及上塔与下塔组对间隙,千斤顶的负载力总和为N,起重机的负载力为F,上塔的重量为Q,保持Q=N+F;
6)多名焊工使用相同的焊接电流同时进行对称焊接,并将焊缝分多层焊成。
本发明利用千斤顶和起重机垂直组对焊接塔器方法,其中所述步骤6)中对焊缝进行多层焊接时,在第一、二、三层焊接中,每完成一层焊接,微调提升N,同时相应降低F,直至N=Q时撤出起重机,在焊缝最后一层盖面焊时,将所有千斤顶撤出。
本发明利用千斤顶和起重机垂直组对焊接塔器方法,其中所述步骤6)中对焊缝进行多层焊接时,每焊完一层,测量塔器垂直度,若超出规定限度,在塔器倾斜相反的方向增加焊接层数,加大焊接电流以增大焊缝收缩量,至塔器垂直度达到要求后,清除增加的焊接层,保持圆周的焊层厚度相同。
本发明利用千斤顶和起重机垂直组对焊接塔器方法,其中塔器垂直度的测量通过在每段塔器顶部的0°、90°、180°和270°位置分别悬挂铅垂线,其中铅锤置于水中。
本发明利用千斤顶和起重机垂直组对焊接塔器方法,其中所述步骤6)中对焊缝进行多层焊接时,自第二层焊接起,每层分多条焊道焊成。
本发明利用千斤顶和起重机垂直组对焊接塔器方法,其中所述焊缝每一层的焊接厚度和每一条焊道的宽度均不超过4mm。
本发明利用千斤顶和起重机垂直组对焊接塔器方法,其中所述第一、第二支撑工装分别设置四个,分别位于上、下塔外周壁的0°、90°、180°和270°位置处。
本发明利用千斤顶和起重机垂直组对焊接塔器方法,其中所述坡口切割好后,对坡口进行打磨保证其整齐。
本发明利用千斤顶和起重机垂直组对焊接塔器方法与现有技术不同之处在于本发明利用千斤顶和起重机垂直组对焊接塔器方法通过在组对的上、下塔上安装支撑工装,在下塔的支撑工装上安装千斤顶,通过千斤顶配合起重机共同对上塔进行支撑,在组对过程中通过调节千斤顶的支撑力调整上塔的垂直度和上下塔的组对间隙,调整到位后,千斤顶与起重机配合可有效保证塔器的稳定性,降低了焊接过程中导致的塔体垂直度变化,避免错边量超差,经多次焊接试验,组对焊接一次合格率达到100%,错边量控制在4mm以内,塔器垂直度小于等于0.5mm/m,最大不超过8mm,使塔器的安装质量明显得到了提高。
下面结合附图对本发明的利用千斤顶和起重机垂直组对焊接塔器方法作进一步说明。
附图说明
图1为塔器上、下塔垂直组对的立面图;
图2为千斤顶的俯视布置图;
图3为铅垂线校核塔器各段垂直度的立面图;
图4为铅垂线校核塔器各段垂直度的俯视图。
具体实施方式
本实施方式以60000Nm3/h的空气分离装置冷箱内塔器焊接为例进一步说明本发明技术方案,塔器材质为5083。
具体步骤如下:
首先,校核塔器各段的直线度,按照塔器切割线将每段塔器的封头切割掉,并在每段塔器对口的端部切割坡口1,坡口1的形式可采用现有技术中的形式,为保证后续的精确组对间隙和垂直度,对坡口进行打磨使其更整齐。
然后,将塔器位于组对焊缝下方的下塔2固定到基础上(如塔架等),校核下塔2的垂直度,如图3、4所示,在每段塔器下塔2顶部的0°、90°、180°和270°位置分别悬挂铅垂线,其中为防止其晃动影响准确性,将铅锤8置于水中,找正其垂直度、标高,测量垂直度数据时应避免阳光直射塔器,以防造成塔器四周温度不均匀存在偏移的假象。
再如图1、2所示,在下塔2靠近组对焊接位置的外周壁上均匀分布安装四个第一支撑工装3,分别位于下塔外周壁的0°、90°、180°和270°位置处,在每个第一支撑工装3上安装千斤顶4,将各个千斤顶调整到同一水平位置,在各个千斤顶上安装测力仪5;在塔器位于组对焊缝上方的上塔6上同样安装4个第二支撑工装7,第二支撑工装7均匀分布在上塔靠近焊接位置的外周壁上,同样分别位于上塔外周壁的0°、90°、180°和270°位置处与下塔上的第一支撑工装3相对应;用起重机吊装上塔6,使上塔的每个第二支撑工装7对应到每个千斤顶4上,调整千斤顶受力,组对上塔端部坡口与下塔端部坡口,调整上塔的垂直度及上塔与下塔组对间隙,千斤顶的负载力总和为N,起重机的负载力为F,上塔的重量为Q,其中上塔的重量包括固定安装在上塔上的第二支撑工装的重量,保持Q=N+F。
组对完成后,采用多名焊工使用相同的焊接电流同时进行对称焊接,分多层焊接形成最后完整的焊缝,且自第二层其每层分多条焊道焊接成,焊接时采用较小的电流,快速焊接,保证焊缝每一层的焊接厚度和每一条焊道的宽度均不超过4mm,这样小电流焊接打开的熔池小,焊接变形小;在进行第一、二、三层焊接中,每完成一层,微调提升N,同时相应降低F,直至N=Q时撤出起重机,这样可以降低起重机的使用率,节约成本,通过不断调整千斤顶的负载力与起重机的负载力,还可避免焊接过程中对焊缝产生应力,避免重心偏离导致受力不对称使垂直度、角变形超出规定;在焊缝的最后一层盖面焊时,将所有千斤顶4撤出。
在焊接过程中,每焊完一层,测量塔器垂直度,同样的,通过在塔器顶部的0°、90°、180°和270°位置分别悬挂铅垂线,将铅锤置于水中测量塔器垂直度,若超出规定限度,在塔器倾斜相反的方向增加焊接层数,加大焊接电流以增大焊缝收缩量,通过收缩量调整塔器的垂直度,至塔器垂直度达到要求后,清除用来调整而增加的焊接层,保持圆周的焊层厚度相同,再由多名焊工同时焊接下一层,直至最后盖面层。
通过以上方法焊接完成的塔器经测试性能指标及参数数据如下列各表:
一、对口间隙、错边量检查,均取圆周均布的8个监测点:
二、塔体垂直度、焊缝最大棱角度检查,其中塔体垂直度取垂直对称两组,焊缝最大棱角度检查取圆周均布的8个监测点:
三、焊缝咬边、余高检查,取圆周均布的8个监测点:
经过检测可以看出,本发明采用千斤顶和起重机相结合的方法垂直组对焊接成的塔器各项指标均优良。
以上所述的实施例仅仅是对本发明的优选实施方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通技术人员对本发明的技术方案作出的各种变形和改进,均应落入本发明权利要求书确定的保护范围内。
Claims (8)
1.一种利用千斤顶和起重机垂直组对焊接塔器方法,其特征在于,包括以下步骤:
1)校核塔器各段的直线度,按照塔器切割线将每段塔器的封头切割掉,并在每段塔器对口的端部切割坡口(1);
2)将塔器位于组对焊缝下方的下塔(2)固定到基础上,找正其垂直度、标高;
3)在下塔(2)靠近组对焊接位置的外周壁上均匀分布安装多个第一支撑工装(3),并在每个所述第一支撑工装(3)上安装千斤顶(4),将各个千斤顶调整到同一水平位置,在各个千斤顶上安装测力仪(5);
4)在塔器位于组对焊缝上方的上塔(6)上安装多个第二支撑工装(7),所述第二支撑工装(7)均匀分布在上塔靠近焊接位置的外周壁上与下塔上的第一支撑工装(3)相对应;
5)用起重机吊装上塔(6),使上塔的每个第二支撑工装(7)对应到每个千斤顶(4)上,调整千斤顶受力,组对上塔端部坡口与下塔端部坡口,调整上塔的垂直度及上塔与下塔组对间隙,千斤顶的负载力总和为N,起重机的负载力为F,上塔的重量为Q,保持Q=N+F;
6)多名焊工使用相同的焊接电流同时进行对称焊接,并将焊缝分多层焊成。
2.根据权利要求1所述的利用千斤顶和起重机垂直组对焊接塔器方法,其特征在于:所述步骤6)中对焊缝进行多层焊接时,在第一、二、三层焊接中,每完成一层焊接,微调提升N,同时相应降低F,直至N=Q时撤出起重机,在焊缝最后一层盖面焊时,将所有千斤顶(4)撤出。
3.根据权利要求2所述的利用千斤顶和起重机垂直组对焊接塔器方法,其特征在于:所述步骤6)中对焊缝进行多层焊接时,每焊完一层,测量塔器垂直度,若超出规定限度,在塔器倾斜相反的方向增加焊接层数,加大焊接电流以增大焊缝收缩量,至塔器垂直度达到要求后,清除增加的焊接层,保持圆周的焊层厚度相同。
4.根据权利要求3所述的利用千斤顶和起重机垂直组对焊接塔器方法,其特征在于:塔器垂直度的测量通过在每段塔器顶部的0°、90°、180°和270°位置分别悬挂铅垂线,其中铅锤(8)置于水中。
5.根据权利要求1所述的利用千斤顶和起重机垂直组对焊接塔器方法,其特征在于:所述步骤6)中对焊缝进行多层焊接时,自第二层焊接起,每层分多条焊道焊成。
6.根据权利要求5所述的利用千斤顶和起重机垂直组对焊接塔器方法,其特征在于:所述焊缝每一层的焊接厚度和每一条焊道的宽度均不超过4mm。
7.根据权利要求1至6任一项所述的利用千斤顶和起重机垂直组对焊接塔器方法,其特征在于:所述第一、第二支撑工装(3、7)分别设置四个,分别位于上、下塔外周壁的0°、90°、180°和270°位置处。
8.根据权利要求1至6任一项所述的利用千斤顶和起重机垂直组对焊接塔器方法,其特征在于:所述坡口(1)切割好后,对坡口(1)进行打磨保证其整齐。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310559886.9A CN103567601B (zh) | 2013-11-12 | 2013-11-12 | 利用千斤顶和起重机垂直组对焊接塔器方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310559886.9A CN103567601B (zh) | 2013-11-12 | 2013-11-12 | 利用千斤顶和起重机垂直组对焊接塔器方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103567601A true CN103567601A (zh) | 2014-02-12 |
CN103567601B CN103567601B (zh) | 2015-12-09 |
Family
ID=50040785
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310559886.9A Active CN103567601B (zh) | 2013-11-12 | 2013-11-12 | 利用千斤顶和起重机垂直组对焊接塔器方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103567601B (zh) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104191125A (zh) * | 2014-08-19 | 2014-12-10 | 中冶天工上海十三冶建设有限公司 | 容器组对移动式错边量调整顶具 |
CN106395628A (zh) * | 2015-11-30 | 2017-02-15 | 中国化学工程第三建设有限公司 | 一种重型塔器设备分段吊装空中组对的方法 |
CN108240887A (zh) * | 2017-12-27 | 2018-07-03 | 安徽金大仪器有限公司 | 一种具有安装辅助装置的无线数传压力表 |
CN108568280A (zh) * | 2017-03-07 | 2018-09-25 | 中国二十冶集团有限公司 | 解析塔塔节的对接方法 |
CN108857284A (zh) * | 2018-07-25 | 2018-11-23 | 洛阳玉冶机械设备有限公司 | 一种改善有色金属冶炼用卧式吹炼炉炉体动平衡的方法 |
CN108994534A (zh) * | 2018-07-25 | 2018-12-14 | 洛阳玉冶机械设备有限公司 | 有色金属冶炼用卧式吹炼炉炉体对焊方法 |
CN109163562A (zh) * | 2018-07-25 | 2019-01-08 | 洛阳玉冶机械设备有限公司 | 有色金属冶炼用卧式吹炼炉炉体扩容方法 |
CN110316777A (zh) * | 2019-06-28 | 2019-10-11 | 中国电建集团河北工程有限公司 | 方形低温多效海水淡化蒸发器的组对方法 |
CN110524175A (zh) * | 2019-10-11 | 2019-12-03 | 潍坊弘润石化科技有限公司 | 一种空冷器上下塔全对称组对工装 |
CN110900021A (zh) * | 2019-11-28 | 2020-03-24 | 中国化学工程第三建设有限公司 | 一种脱氢装置框架狭小空间内反应器组焊的方法 |
CN113199116A (zh) * | 2021-04-21 | 2021-08-03 | 中国化学工程第三建设有限公司 | 一种冷箱内铝制分馏塔组对焊接方法 |
CN114473356A (zh) * | 2021-12-01 | 2022-05-13 | 铜陵有色金属集团铜冠建筑安装股份有限公司 | 重型筒状圆柱体垂直组对的周转角度偏差控制方法 |
CN115026479A (zh) * | 2022-07-05 | 2022-09-09 | 杭州汽轮机股份有限公司 | 一种多工位分段同时作业的焊接方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3927770A (en) * | 1974-04-22 | 1975-12-23 | Bennett Darel | Apparatus to facilitate joining pipe sections together to form a vertical pipe column |
CN102251486A (zh) * | 2011-06-08 | 2011-11-23 | 中交第一公路工程局有限公司 | 一种用于桥塔分节段安装的顶升支架系统及其施工工艺 |
CN102773619A (zh) * | 2012-07-02 | 2012-11-14 | 林德工程(杭州)有限公司 | 空分铝塔立式组对焊接方法 |
CN102922096A (zh) * | 2012-10-19 | 2013-02-13 | 林德工程(杭州)有限公司 | 大型铝塔现场组对焊接方法 |
CN202922130U (zh) * | 2012-10-19 | 2013-05-08 | 林德工程(杭州)有限公司 | 大型铝塔现场组对焊接支座结构 |
-
2013
- 2013-11-12 CN CN201310559886.9A patent/CN103567601B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3927770A (en) * | 1974-04-22 | 1975-12-23 | Bennett Darel | Apparatus to facilitate joining pipe sections together to form a vertical pipe column |
CN102251486A (zh) * | 2011-06-08 | 2011-11-23 | 中交第一公路工程局有限公司 | 一种用于桥塔分节段安装的顶升支架系统及其施工工艺 |
CN102773619A (zh) * | 2012-07-02 | 2012-11-14 | 林德工程(杭州)有限公司 | 空分铝塔立式组对焊接方法 |
CN102922096A (zh) * | 2012-10-19 | 2013-02-13 | 林德工程(杭州)有限公司 | 大型铝塔现场组对焊接方法 |
CN202922130U (zh) * | 2012-10-19 | 2013-05-08 | 林德工程(杭州)有限公司 | 大型铝塔现场组对焊接支座结构 |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104191125A (zh) * | 2014-08-19 | 2014-12-10 | 中冶天工上海十三冶建设有限公司 | 容器组对移动式错边量调整顶具 |
CN106395628A (zh) * | 2015-11-30 | 2017-02-15 | 中国化学工程第三建设有限公司 | 一种重型塔器设备分段吊装空中组对的方法 |
CN106395628B (zh) * | 2015-11-30 | 2018-01-26 | 中国化学工程第三建设有限公司 | 一种重型塔器设备分段吊装空中组对的方法 |
CN108568280A (zh) * | 2017-03-07 | 2018-09-25 | 中国二十冶集团有限公司 | 解析塔塔节的对接方法 |
CN108240887A (zh) * | 2017-12-27 | 2018-07-03 | 安徽金大仪器有限公司 | 一种具有安装辅助装置的无线数传压力表 |
CN108994534B (zh) * | 2018-07-25 | 2020-04-10 | 洛阳玉冶机械设备有限公司 | 有色金属冶炼用卧式吹炼炉炉体对焊方法 |
CN108857284A (zh) * | 2018-07-25 | 2018-11-23 | 洛阳玉冶机械设备有限公司 | 一种改善有色金属冶炼用卧式吹炼炉炉体动平衡的方法 |
CN108994534A (zh) * | 2018-07-25 | 2018-12-14 | 洛阳玉冶机械设备有限公司 | 有色金属冶炼用卧式吹炼炉炉体对焊方法 |
CN109163562A (zh) * | 2018-07-25 | 2019-01-08 | 洛阳玉冶机械设备有限公司 | 有色金属冶炼用卧式吹炼炉炉体扩容方法 |
CN110316777A (zh) * | 2019-06-28 | 2019-10-11 | 中国电建集团河北工程有限公司 | 方形低温多效海水淡化蒸发器的组对方法 |
CN110316777B (zh) * | 2019-06-28 | 2021-11-09 | 中国电建集团河北工程有限公司 | 方形低温多效海水淡化蒸发器的组对方法 |
CN110524175A (zh) * | 2019-10-11 | 2019-12-03 | 潍坊弘润石化科技有限公司 | 一种空冷器上下塔全对称组对工装 |
CN110900021A (zh) * | 2019-11-28 | 2020-03-24 | 中国化学工程第三建设有限公司 | 一种脱氢装置框架狭小空间内反应器组焊的方法 |
CN113199116A (zh) * | 2021-04-21 | 2021-08-03 | 中国化学工程第三建设有限公司 | 一种冷箱内铝制分馏塔组对焊接方法 |
CN114473356A (zh) * | 2021-12-01 | 2022-05-13 | 铜陵有色金属集团铜冠建筑安装股份有限公司 | 重型筒状圆柱体垂直组对的周转角度偏差控制方法 |
CN115026479A (zh) * | 2022-07-05 | 2022-09-09 | 杭州汽轮机股份有限公司 | 一种多工位分段同时作业的焊接方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103567601B (zh) | 2015-12-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103567601B (zh) | 利用千斤顶和起重机垂直组对焊接塔器方法 | |
CN105587130A (zh) | 一种空间网壳焊接球定位装置及其使用方法 | |
CN107116361B (zh) | 汽轮机组蒸汽管道整体试压、整体无应力配管施工方法 | |
CN109738141B (zh) | 一种测量大展弦比翼面静刚度的装置和方法 | |
CN104060523A (zh) | 一种超大型桥箱梁构件、专用胎架及其组装方法 | |
CN103087731B (zh) | 一种干熄焦炉炉壳的激光测量安装方法 | |
CN101618465A (zh) | 超大型油轮建造中的艉轴管分段的镗孔方法 | |
CN204024092U (zh) | 一种新型型钢柱定位组件 | |
CN109229418B (zh) | 一种翼挂物探设备吊舱的安装方法 | |
CN107988908A (zh) | 钢管拱总拼装方法 | |
CN110594536B (zh) | 一种塔类设备的垂直度调整方法 | |
CN114043171B (zh) | 一种曲线索塔钢锚箱制造方法 | |
CN102641895B (zh) | 热连轧精轧机组侧导开度快速标定方法 | |
CN107378358A (zh) | 弧形翼板中心线定位工具、定位方法及弧形梁组焊方法 | |
CN204956849U (zh) | 用于反拨结构100mark线的施工装置 | |
CN103741709B (zh) | 一种塔机预埋螺栓模具 | |
CN103982048A (zh) | 超高层钢结构箱形钢柱空中校正调整器 | |
CN210703369U (zh) | 一种分块式钢管环焊接工装 | |
CN204187217U (zh) | 一种环形螺栓套筒组整体预埋及定位工装 | |
CN106643439A (zh) | 柴油机连杆大小端孔轴线平行度快速检测装置及方法 | |
CN207267139U (zh) | 可调式分体法兰预制组对平台 | |
CN204430588U (zh) | 钢管梁组装焊接辅助支架 | |
CN212391002U (zh) | 一种焊环精度检测水平调节机构 | |
CN205999793U (zh) | 一种城市高架桥钢箱梁安装的辅助装置 | |
CN210718889U (zh) | 大型钣金件测量平台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Shi Xianglin Inventor after: Chen Yin Inventor after: Zhao Liang Inventor before: Shi Xianglin Inventor before: Chen Yi Inventor before: Zhao Liang |