CN103556579A - 一种综合注浆保压加管幕支护的箱涵顶推工法 - Google Patents

一种综合注浆保压加管幕支护的箱涵顶推工法 Download PDF

Info

Publication number
CN103556579A
CN103556579A CN201310564705.1A CN201310564705A CN103556579A CN 103556579 A CN103556579 A CN 103556579A CN 201310564705 A CN201310564705 A CN 201310564705A CN 103556579 A CN103556579 A CN 103556579A
Authority
CN
China
Prior art keywords
box culvert
pipe
jacking
curtain
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310564705.1A
Other languages
English (en)
Other versions
CN103556579B (zh
Inventor
杜辉
陈佑新
禹作利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Water Conservancy Engineering Group Co ltd
Original Assignee
TIANJIN MUNICIPAL WATER Ltd CONSERVANCY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN MUNICIPAL WATER Ltd CONSERVANCY filed Critical TIANJIN MUNICIPAL WATER Ltd CONSERVANCY
Priority to CN201310564705.1A priority Critical patent/CN103556579B/zh
Publication of CN103556579A publication Critical patent/CN103556579A/zh
Application granted granted Critical
Publication of CN103556579B publication Critical patent/CN103556579B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

一种综合注浆保压加管幕支护的箱涵顶推工法,其特征在于,在同一个顶涵施工工作面上采用管幕支护下顶推箱涵,同时采取综合注浆、润滑减阻措施和保压措施控制路面沉降,所述工法,包括管幕支护下顶推箱涵、多处综合注浆、在箱涵顶体周围形成保压润滑膜和路面下注浆微调控减少路面沉降的控制步骤,有益效果是:本工法在普通顶涵法基础上,增加了管幕支护和综合注浆及保压润滑措施,在管幕保护下顶进预制箱涵,整个施工过程结合了地下闭水措施和掌子面临时加固措施以及地面高程微调控措施,可以在确保高速公路正常通行条件下完成穿越施工,且无需增加土地征用和辅路修建费用,风险小、造价低、工期短,与以往常规顶涵工艺相比显示了巨大的优越性。

Description

一种综合注浆保压加管幕支护的箱涵顶推工法
技术领域
本发明涉及高速公路路面下顶涵施工技术领域,特别涉及一种综合注浆保压加管幕支护的箱涵顶推工法,即钢管幕+综合注浆工法,其应用于下穿高速路顶涵施工及其它道面下顶涵施工。
背景技术
顶涵施工又称顶进涵施工,这种施工方法的优点是:对既有道路上的行车影响小。
目前,路面下顶涵施工的现有技术通常采用的方法包括:
   1. 无管棚支护情况下,直接顶入涵体,不采取任何措施(属于公知技术)的缺点是:顶涵距离受限,一般不超过35米,顶进过程中涵周土体随顶进被涵体带走,由于无润滑和保压措施,顶进阻力大,涵体摆尾严重,由于频繁纠偏,不仅严重影响了顶进精度,也加大了涵体周边与土体的空隙,加之为减少阻力,常常出现不得已的超挖现象,导致涵周土体下沉。若顶进速度过快,则出现地面隆起,若掌子面超挖则路面下沉。
2、小管棚支护条件下顶进涵体,情况较第一中情况稍好,管棚直径一般为70-180mm,在长距离顶进时,由于管棚直径较小,挠度大,对地面支撑强度不足,加之顶涵阶段没有注浆润滑措施,情况一中出现的问题经常发生,威胁路面安全。
3、大管幕支护顶推箱涵技术,其缺点是:钢管直径一般在600-1000mm左右,管幕施工完成后,在钢管内浇筑混凝土,管幕自身强度高,挠度小,同时,在钢管两侧设有锁扣,通过公母扣的互锁对管幕外侧滞水进行有效阻止,使管幕形成一个封闭的空间。另外,通过锁扣增加管幕的整体刚度,在实际施工中钢管进洞口保压密封困难,互锁后顶力急剧增加,且无法进行纠偏。另外,在顶管及顶涵前没有路基土体注浆加固措施,路基土体仍处于松散状态,顶进阶段没有采取润滑和保压措施,不仅顶进阻力大,精度不准,同时由于无端头封堵和保压措施,与涵体接触的土体不断被涵体带走,引起路面较大沉降和严重裂缝;该工法于2003年首次在上海使用并成功实现贯通,印证了该工艺的实用性,也开创了国内管幕顶涵法穿越地面建筑的先河,由于其具有工期短、占地少、不破坏交通道路诸多优点,在国内市场逐渐得到拓展,但由于该工艺在国内尚处于初期阶段,很多细节还正在逐渐成熟和完善,尤其在保证路面高程和顶进精度上,与理论目标值之间还存在不小的差距,穿越后的路面沉降值均较大,对高速公路及路面建筑造成了不小的影响。
基于目前顶涵穿越高速公路技术的实际状况,需要设计一种综合各种控沉和减阻措施工法来克服现有技术的缺陷,而国内目前尚无此类技术文献报道和实施成功的案例。具体包括:1、目前国内尚无自下向上打管、在公路面板下注浆控沉的实例记载,2.目前国内尚无在顶涵时,同时加固土体注浆和帷幕堵水注浆的实例,3.目前国内尚无在公路顶涵时,在 涵体 两端密封保压润滑减阻成功的实例。
发明内容
本发明的目的就是为克服现有技术的不足,针对顶涵过程中路面沉降大、中后期顶进困难的难题,提供一种在顶涵过程中钢管幕支护+保压润滑+综合注浆工法。通过本方法所采取的措施,实现对管幕施工中盾头泥水仓压力的控制、有效堵水、控制沉降、对已发生的沉降空隙填充水泥浆进行顶升路面、减少涵表面与土体摩擦阻力和防止润滑浆流失及强化润滑效果。从而克服现有技术的缺陷。
本发明是通过这样的技术方案实现的:一种综合注浆保压加管幕支护的箱涵顶推工法,其特征在于,在同一个顶涵施工工作面上采用管幕支护下顶推箱涵,同时采取综合注浆、润滑减阻措施和保压措施控制路面沉降,所述工法,包括管幕支护下顶推箱涵、多处综合注浆、在箱涵及钢管周围形成保压润滑膜和路面下注浆微调控减少路面沉降的控制步骤。
所述管幕支护下顶推箱涵的步骤包括:
步骤1、沿涵体周侧浇筑钢筋混凝土保压梁,保压梁兼做为框架梁,预先做好钢管进出洞口,做好保压胶圈,用直径970mm的钢管排列围成一个口字型的管幕,钢管采用顶管技术用微型盾构机水平顶进土里,并对管幕间缝隙进行注浆闭水;
步骤2、预制箱涵顶进启动,边顶进边出土,挖运土方与顶进作业循环交替进行,顶进过程中,始终保持钢刃角位置欠挖500mm,确保钢刃角切土顶进,这样将预制好的箱涵被顶进钢管围成一个矩型的管幕内;
把箱涵顶进钢管围成一个矩型的管幕内,
箱涵下边沿与下边外围排列的钢管之间不留空隙;
箱涵上边沿与其外围排列的钢管之间留有250mm的空隙;
箱涵左边沿与其外围排列的钢管之间留有265mm的空隙;
箱涵右边沿与其外围排列的钢管之间留有265mm的空隙。
所述多处综合注浆的步骤包括:
步骤1:在路基两侧覆土厚度不足3米的管幕顶进范围内,施做厚度为10mm的混凝土保压盖板,防止由于覆土厚度不足,在管幕施工中盾头泥水仓压力大,泥浆外溢,引起道面下陷;
步骤2:在顶涵前,加固土体注浆,和帷幕堵水注浆;对管幕范围内地下水位线以下的土体进行水玻璃-水泥浆双液注浆加固,对钢管间缝隙土体采用化学浆封闭止水,对顶涵掌子面进行喷锚加固;
步骤3:在顶涵影响范围土体内加固注浆,目的是为了增加土体抗剪强度,防顶涵时掌子面塌方,以控沉降;首先为保证高速公路路基稳定,对穿越处路基土体分二次注浆加固处理,第一次加固范围为顶层管幕以上至高速路面以下2米,主要目的是通过在原状土体中高压注入水泥浆液,使水泥浆液与土体发生一系列的物理化学反应,将高速路基土体固结成块体,以增强路基的整体稳定性和密实度,提高土体抗剪性能;第二次加固范围为管幕实施后对管幕周侧进行加固,主要目的是防止后期高速运营过程中出现W沉降(W沉降就是路面在后期运行过程中由于不均匀沉降而于道路表面形成的位于顶进涵体两侧的凹陷),注浆对于控制路基沉降有着重要的意义;
步骤4:在已完成的管幕内自下向上打管在公路面板下注浆控沉,用多次低压脉冲注浆法,不断对已发生的沉降空隙填充水泥浆进行补偿顶升。
所述在箱涵顶体周围形成保压润滑膜的步骤包括:
步骤1、在公路顶涵时两端密封,并进行保压条件下润滑减阻,涵结构体内沿涵周外皮布置注浆嘴及管路系统,向涵周不断注入润滑浆,润滑浆的成分为BIOS颗粒一体型滑材(市面上有售),该润滑浆液遇水不分解,不被土层吸收,砂层中不渗漏,长时间不变粘绸,不变硬失效,能够在顶进物周围形成长效保护膜,有效减少顶进阻力,防止由于顶进阻力过大造成的涵体摆尾及频繁纠偏导致的顶进精度不足甚至路面波形隆起;经验证,可以减少涵表面与土体摩擦阻力的40%;
步骤2、涵进出洞口两端设计安装密封保压系统,目的防止润滑浆流失,避免由于浆液流失带走涵周土体;
所述路面下注浆微调控减少路面沉降的控制步骤包括:
步骤1、路面高程监测:用全站仪自动扫测路面上已粘贴好的反光片,在高速路面沿行车方向设8条测线,垂直轴线方向18条测线,共设置测点144个,与施工干扰区外侧设观测站,正常施工时每2小时观测一次路面高程情况,当路面变化速率高于设计允许值时,立即停止施工,及时研究采取措施后方可继续作业;
步骤2、注浆抬升:注浆泵通过管路和向上打入的钢管将水泥浆液压入道面板下,从而固结为一薄层5~20mm厚的水泥石;
步骤3、注浆抬升达到要求:路面总沉降小于30mm。
有益效果是:通过本方法所采取的措施,实现对管幕施工中盾头泥水仓压力的控制、有效堵水、控制沉降、对已发生的沉降空隙填充水泥浆进行顶升路面、减少涵表面与土体摩擦阻力和防止润滑浆流失,从而克服现有技术的缺陷。
本工法在普通顶涵法基础上,增加了管幕支护和综合注浆及保压润滑措施,在管幕保护下顶进预制箱涵,工艺流程为路基土体加固—管幕保压润滑顶进—箱涵保压润滑顶进,同时,整个施工过程结合了地下闭水措施和掌子面临时加固措施以及地面高程微调控措施。可以在确保高速公路正常通行的条件下完成穿越施工任务,且无需增加土地征用和辅路修建费用,具有风险小、造价低、工期短的优点,与以往常规顶涵工艺在穿越高速公路控制工程质量保证高速路面安全方面显示了巨大的优越性。
附图说明
图1、顶进箱涵段管幕布置的断面图;
图2、多处综合注浆分布图A;
图3、图2的1-1向剖视图;;
图4、箱涵四周润滑浆管道系统布置图;
图5、涵两端密封保压剖视图;
图6、图5的2-2向剖视图;
图7、图6的A-A向剖视图;
图8、图6的B-B向剖视图。
图中:1.管幕,2.螺旋焊接钢管,3.地面 ,4.进口门架,5. 顶排管幕,6. 顶排管幕 ,7. 注浆水泥土盖板 ,8. 箱涵湿周止水帷幕,9. 箱涵断面沉降范围土体注浆加固处,10.箱涵 ,11.注浆范围,12. 喷浆主管,13. 喷浆支管,14.橡胶密封保压环 ,15. 润滑注浆 ,16.封口梁,17.箱涵顶板。
具体实施方式
为了更清楚的理解本发明,结合附图和实施例详细描述本发明: 
如图1至图8所示,南水北调输水箱涵在扬芬港下穿津保高速,采用了南水北调输水箱涵以下几项创新技术,顺利顶推成功。路面沉降符合设计要求。
1、多处综合注浆,见附图1所示:
在管幕顶部进行多次低压脉冲加固注浆以形成水泥土顶盖板。目的是防止管幕施工中盾头泥水仓压力大,拱裂道面,同时防止土压仓失压时引起道面下陷。
在水位线以下沿箱涵湿周采用化学止水帷幕注浆。目的:堵水。
顶涵影响范围土体加固注浆。目的是为了增加土体抗剪强度,防顶涵时掌子面塌方,以控沉降。
道面板下控沉注浆。(多次低压脉冲注浆法),目的:不断对已发生的沉降空隙填充水泥浆进行顶升路面。
2.箱涵保压润滑膜
涵结构体内沿涵周外皮布置注浆嘴及管路系统,向涵周不断注入润滑浆以减阻(见附图2),目的:减少涵表面与土体摩擦阻力40%。
涵进出洞口两端设计安装密封保压系统(附图3)。目的防止润滑浆流失。
3.路面沉降控制法:适时监测→注浆抬升→沉降及监测反馈分析→注浆抬升达到要求。
应用推广前景:1.可在下穿高速路顶涵及其它道面下顶涵推广。2.多次低压脉冲注浆技术可在浅表地下工程注浆中推广应用。如街道下人防商业街的暗挖注浆,各种城市浅埋管廊,如电力,污水暗挖通道的顶部注浆加固。
在同一个顶涵施工工作面上采用管幕预支护方式,同时采取综合注浆、保压措施控制路面沉降。
实施例中,管幕支护下顶推箱涵的步骤包括:
步骤1、沿涵体周侧浇筑钢筋混凝土保压梁,保压梁兼做为框架梁,预先做好钢管进出洞口,做好保压胶圈,用直径970mm的钢管排列围成一个口字型的管幕,钢管采用顶管技术用微型盾构机水平顶进土里,并对管幕间缝隙进行注浆闭水;
步骤2、预制箱涵顶进启动,边顶进边出土,挖运土方与顶进作业循环交替进行,顶进过程中,始终保持钢刃角位置欠挖500mm,确保钢刃角切土顶进,这样将预制好的箱涵被顶进钢管围成一个矩型的管幕内;
把箱涵顶进钢管围成一个矩型的管幕内,
箱涵下边沿与下边外围排列的钢管之间不留空隙;
箱涵上边沿与其外围排列的钢管之间留有250mm的空隙;
箱涵左边沿与其外围排列的钢管之间留有265mm的空隙;
箱涵右边沿与其外围排列的钢管之间留有265mm的空隙。
根据上述说明,结合本领域技术可实现本发明的方案。

Claims (5)

1.一种综合注浆保压加管幕支护的箱涵顶推工法,其特征在于,在同一个顶涵施工工作面上采用管幕支护下顶推箱涵,同时采取综合注浆、润滑减阻措施和保压措施控制路面沉降,所述工法,包括管幕支护下顶推箱涵、多处综合注浆、在箱涵顶体周围形成保压润滑膜和路面下注浆微调控减少路面沉降的控制步骤。
2.如权利要求1所述一种综合注浆保压加管幕支护的箱涵顶推工法,其特征在于,  所述管幕支护下顶推箱涵的步骤包括:
步骤1、沿涵体周侧浇筑钢筋混凝土保压梁,保压梁兼做为框架梁,预先做好钢管进出洞口,做好保压胶圈,用直径970mm的钢管排列围成一个口字型的管幕,钢管采用顶管技术用微型盾构机水平顶进土里,并对管幕间缝隙进行注浆闭水;
步骤2、预制箱涵顶进启动,边顶进边出土,挖运土方与顶进作业循环交替进行,顶进过程中,始终保持钢刃角位置欠挖500mm,确保钢刃角切土顶进,这样将预制好的箱涵被顶进钢管围成一个矩型的管幕内;
箱涵下边沿与下边外围排列的钢管之间不留空隙;
箱涵上边沿与其外围排列的钢管之间留有250mm的空隙;
箱涵左边沿与其外围排列的钢管之间留有265mm的空隙;
箱涵右边沿与其外围排列的钢管之间留有265mm的空隙。
3.如权利要求1所述一种综合注浆保压加管幕支护的箱涵顶推工法,其特征在于,所述多处综合注浆的步骤包括:
步骤1:在路基两侧覆土厚度不足3米的管幕顶进范围内,施做厚度为10mm的混凝土保压盖板,防止由于覆土厚度不足,在管幕施工中盾头泥水仓压力大,泥浆外溢,引起道面下陷;
步骤2:在顶涵前,加固土体注浆,和帷幕堵水注浆;对管幕范围内地下水位线以下的土体进行水玻璃-水泥浆双液注浆加固,对钢管间缝隙土体采用化学浆封闭止水,对顶涵掌子面进行喷锚加固;
步骤3:在顶涵影响范围土体内加固注浆,目的是为了增加土体抗剪强度,防顶涵时掌子面塌方,以控沉降;首先为保证高速公路路基稳定,对穿越处路基土体分二次注浆加固处理,第一次加固范围为顶层管幕以上至高速路面以下2米,主要目的是通过在原状土体中高压注入水泥浆液,使水泥浆液与土体发生一系列的物理化学反应,将高速路基土体固结成块体,以增强路基的整体稳定性和密实度,提高土体抗剪性能;第二次加固范围为管幕实施后对管幕周侧进行加固,主要目的是防止后期高速运营过程中出现W沉降,注浆对于控制路基沉降有着重要的意义;
步骤4:在已完成的管幕内自下向上打管在公路面板下注浆控沉,用多次低压脉冲注浆法,不断对已发生的沉降空隙填充水泥浆进行补偿顶升。
4.如权利要求1所述一种综合注浆保压加管幕支护的箱涵顶推工法,其特征在于,所述在箱涵顶体周围形成保压润滑膜的步骤包括:
步骤1、在公路顶涵时两端密封,并进行保压条件下润滑减阻,涵结构体内沿涵周外皮布置注浆嘴及管路系统,向涵周不断注入润滑浆,润滑浆的成分为BIOS颗粒一体行滑材,该润滑浆液遇水不分解,不被土层吸收,砂层中不渗漏,长时间不变粘绸,不变硬失效,能够在顶进物周围形成长效保护膜,有效减少顶进阻力,防止由于顶进阻力过大造成的涵体摆尾及频繁纠偏导致的顶进精度不足甚至路面波形隆起;经验证,可以减少涵表面与土体摩擦阻力的40%;
步骤2、涵进出洞口两端设计安装密封保压系统,目的防止润滑浆流失,避免由于浆液流失带走涵周土体。
5.如权利要求1所述一种综合注浆保压加管幕支护的箱涵顶推工法,其特征在于,所述路面下注浆微调控减少路面沉降的控制步骤包括:
步骤1、路面高程监测:全站仪自动扫测路面上已粘贴好的反光片,在高速路面沿行车方向设8条测线,垂直轴线方向18条测线,共设置测点144个,与施工干扰区外侧设观测站,正常施工时每2小时观测一次路面高程情况,当路面变化速率高于设计允许值时,立即停止施工,及时研究采取措施后方可继续作业;
步骤2、注浆抬升:注浆泵通过管路和向上打入的钢管将水泥浆液压入道面板下,从而固结为一薄层5~20mm厚的水泥石;
步骤3、注浆抬升达到要求:路面总沉降小于30mm。
CN201310564705.1A 2013-11-14 2013-11-14 一种综合注浆保压加管幕支护的箱涵顶推工法 Active CN103556579B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310564705.1A CN103556579B (zh) 2013-11-14 2013-11-14 一种综合注浆保压加管幕支护的箱涵顶推工法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310564705.1A CN103556579B (zh) 2013-11-14 2013-11-14 一种综合注浆保压加管幕支护的箱涵顶推工法

Publications (2)

Publication Number Publication Date
CN103556579A true CN103556579A (zh) 2014-02-05
CN103556579B CN103556579B (zh) 2016-01-06

Family

ID=50010915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310564705.1A Active CN103556579B (zh) 2013-11-14 2013-11-14 一种综合注浆保压加管幕支护的箱涵顶推工法

Country Status (1)

Country Link
CN (1) CN103556579B (zh)

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695315A (zh) * 2015-03-06 2015-06-10 中铁工程设计咨询集团有限公司 既有铁路下深基坑框架结构及对其实施的分层顶进方法
CN105019913A (zh) * 2015-08-03 2015-11-04 中铁六局集团有限公司 基岩隆起区盾构换刀原位加固方法
CN105134259A (zh) * 2015-09-29 2015-12-09 上海隧道工程有限公司 管幕管节间的连接止水结构以及管幕施工方法
CN105221160A (zh) * 2015-10-10 2016-01-06 上海市政工程设计研究总院(集团)有限公司 一种错层隧道的竖向分岔布置结构
CN105821771A (zh) * 2016-04-03 2016-08-03 郑州市市政工程总公司 高填方城市快速路下超长箱桥顶进施工工艺及其施工结构
CN105909258A (zh) * 2016-06-12 2016-08-31 中铁十九局集团轨道交通工程有限公司 下穿既有构筑物管幕施工沉降控制补偿系统及方法
CN106012877A (zh) * 2016-08-02 2016-10-12 长安大学 一种排管涵洞及其施工方法
CN106089243A (zh) * 2016-06-12 2016-11-09 东北大学 一种基于钢管混凝土连接的管幕支护结构
CN106284112A (zh) * 2016-09-09 2017-01-04 中铁六局集团有限公司 管幕支护顶推施工中箱体外跟进注入触变泥浆施工方法
CN106638732A (zh) * 2017-01-11 2017-05-10 中铁第四勘察设计院集团有限公司 地下基桩管幕支撑结构及施工方法
CN106837343A (zh) * 2016-12-16 2017-06-13 上海市政建设有限公司 顶管出洞口二次加固的施工方法
CN106894350A (zh) * 2017-02-13 2017-06-27 中交隧道工程局有限公司 一种钢刃角入土顶进箱涵装置及施工方法
CN107013221A (zh) * 2017-05-26 2017-08-04 华东交通大学 微扰动顶管施工方法
CN108978481A (zh) * 2018-08-20 2018-12-11 中铁六局集团天津铁路建设有限公司 箱体顶进就位后防塌方方法
CN109594990A (zh) * 2018-11-21 2019-04-09 中铁二局第三工程有限公司 一种复杂地层大断面顶管施工方法
CN110006570A (zh) * 2019-04-18 2019-07-12 中铁隧道局集团有限公司 一种顶管机用摩擦力测试方法
CN111287217A (zh) * 2020-04-13 2020-06-16 中国建筑一局(集团)有限公司 一种管节与内隔板整体预制的管廊的施工体系及施工方法
CN111485893A (zh) * 2019-10-10 2020-08-04 上海申通地铁集团有限公司 饱和软土地区超大断面管幕通道土方开挖施工方法
CN112012752A (zh) * 2020-08-27 2020-12-01 中铁隧道局集团有限公司 一种用于建造暗挖地铁车站的微型盾构缠绕方法
CN112253155A (zh) * 2020-09-07 2021-01-22 河南城建学院 一种基于cd功法的平衡顶管施工方法
CN112323772A (zh) * 2019-08-05 2021-02-05 张继红 一种管幕法施工时被保护对象位移实时控制方法
CN112761647A (zh) * 2020-12-30 2021-05-07 西安市政设计研究院有限公司 一种矩形大断面综合管廊无支护暗挖顶推施工方法
CN113293665A (zh) * 2021-06-02 2021-08-24 新疆铁道勘察设计院有限公司 一种铁路桥涵接长侧路基加固方法
CN113374936A (zh) * 2021-06-29 2021-09-10 中建市政工程有限公司 下穿施工中顶部承插管道的托换保护系统及施工方法
CN114414117A (zh) * 2022-01-26 2022-04-29 合肥市市政设计研究总院有限公司 一种适用管幕箱涵顶进的摩阻力测试装置
CN114856635A (zh) * 2022-05-18 2022-08-05 中铁工程装备集团有限公司 一种注浆连接管幕结构的方法和装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000352296A (ja) * 1999-06-11 2000-12-19 Maeda Corp 地下構造物直下の通路の形成方法
KR20050050727A (ko) * 2003-11-26 2005-06-01 이창원 비개착식 지하통로 개설방법과 그 구조물
CN101487274A (zh) * 2009-02-23 2009-07-22 北京交通大学 一种城市隧道穿越既有建(构)筑物注浆抬升方法
CN102535473A (zh) * 2010-12-09 2012-07-04 上海市基础工程有限公司 管幕与地下结构连接方法
KR101255515B1 (ko) * 2011-07-29 2013-04-23 (주)고려씨엔씨 비개착 타입 터널 시공 방법

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000352296A (ja) * 1999-06-11 2000-12-19 Maeda Corp 地下構造物直下の通路の形成方法
KR20050050727A (ko) * 2003-11-26 2005-06-01 이창원 비개착식 지하통로 개설방법과 그 구조물
CN101487274A (zh) * 2009-02-23 2009-07-22 北京交通大学 一种城市隧道穿越既有建(构)筑物注浆抬升方法
CN102535473A (zh) * 2010-12-09 2012-07-04 上海市基础工程有限公司 管幕与地下结构连接方法
KR101255515B1 (ko) * 2011-07-29 2013-04-23 (주)고려씨엔씨 비개착 타입 터널 시공 방법

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
姜景山等: "地铁沉降的注浆恢复施工", 《铁道勘察》 *
张成平等: "暗挖地铁车站下穿既有地铁隧道施工控制", 《中国铁道科学》 *
赵素洁: "大管幕保护下的箱涵吃土顶进技术在高速公路上的应用", 《交通标准化》 *
马雪红: "《南水北调天津干线津保高速穿越工程顶进法施工工艺》", 《红水河》 *

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695315B (zh) * 2015-03-06 2017-02-01 中铁工程设计咨询集团有限公司 既有铁路下深基坑框架结构及对其实施的分层顶进方法
CN104695315A (zh) * 2015-03-06 2015-06-10 中铁工程设计咨询集团有限公司 既有铁路下深基坑框架结构及对其实施的分层顶进方法
CN105019913A (zh) * 2015-08-03 2015-11-04 中铁六局集团有限公司 基岩隆起区盾构换刀原位加固方法
CN105134259A (zh) * 2015-09-29 2015-12-09 上海隧道工程有限公司 管幕管节间的连接止水结构以及管幕施工方法
CN105221160A (zh) * 2015-10-10 2016-01-06 上海市政工程设计研究总院(集团)有限公司 一种错层隧道的竖向分岔布置结构
CN105221160B (zh) * 2015-10-10 2020-05-19 上海市政工程设计研究总院(集团)有限公司 一种错层隧道的竖向分岔布置结构
CN105821771A (zh) * 2016-04-03 2016-08-03 郑州市市政工程总公司 高填方城市快速路下超长箱桥顶进施工工艺及其施工结构
CN106089243B (zh) * 2016-06-12 2018-05-04 东北大学 一种基于钢管混凝土连接的管幕支护结构
CN105909258B (zh) * 2016-06-12 2018-02-06 中铁十九局集团轨道交通工程有限公司 下穿既有构筑物管幕施工沉降控制补偿系统及方法
CN106089243A (zh) * 2016-06-12 2016-11-09 东北大学 一种基于钢管混凝土连接的管幕支护结构
CN105909258A (zh) * 2016-06-12 2016-08-31 中铁十九局集团轨道交通工程有限公司 下穿既有构筑物管幕施工沉降控制补偿系统及方法
CN106012877A (zh) * 2016-08-02 2016-10-12 长安大学 一种排管涵洞及其施工方法
CN106284112A (zh) * 2016-09-09 2017-01-04 中铁六局集团有限公司 管幕支护顶推施工中箱体外跟进注入触变泥浆施工方法
CN106837343A (zh) * 2016-12-16 2017-06-13 上海市政建设有限公司 顶管出洞口二次加固的施工方法
CN106837343B (zh) * 2016-12-16 2019-03-01 上海市政建设有限公司 顶管出洞口二次加固的施工方法
CN106638732A (zh) * 2017-01-11 2017-05-10 中铁第四勘察设计院集团有限公司 地下基桩管幕支撑结构及施工方法
CN106894350A (zh) * 2017-02-13 2017-06-27 中交隧道工程局有限公司 一种钢刃角入土顶进箱涵装置及施工方法
CN107013221A (zh) * 2017-05-26 2017-08-04 华东交通大学 微扰动顶管施工方法
CN107013221B (zh) * 2017-05-26 2019-05-21 华东交通大学 微扰动顶管施工方法
CN108978481B (zh) * 2018-08-20 2019-11-05 中铁六局集团天津铁路建设有限公司 箱体顶进就位后防塌方方法
CN108978481A (zh) * 2018-08-20 2018-12-11 中铁六局集团天津铁路建设有限公司 箱体顶进就位后防塌方方法
CN109594990A (zh) * 2018-11-21 2019-04-09 中铁二局第三工程有限公司 一种复杂地层大断面顶管施工方法
CN110006570A (zh) * 2019-04-18 2019-07-12 中铁隧道局集团有限公司 一种顶管机用摩擦力测试方法
CN112323772A (zh) * 2019-08-05 2021-02-05 张继红 一种管幕法施工时被保护对象位移实时控制方法
CN111485893A (zh) * 2019-10-10 2020-08-04 上海申通地铁集团有限公司 饱和软土地区超大断面管幕通道土方开挖施工方法
CN111287217A (zh) * 2020-04-13 2020-06-16 中国建筑一局(集团)有限公司 一种管节与内隔板整体预制的管廊的施工体系及施工方法
CN112012752B (zh) * 2020-08-27 2022-02-08 中铁隧道局集团有限公司 一种用于建造暗挖地铁车站的微型盾构缠绕方法
CN112012752A (zh) * 2020-08-27 2020-12-01 中铁隧道局集团有限公司 一种用于建造暗挖地铁车站的微型盾构缠绕方法
CN112253155A (zh) * 2020-09-07 2021-01-22 河南城建学院 一种基于cd功法的平衡顶管施工方法
CN112761647A (zh) * 2020-12-30 2021-05-07 西安市政设计研究院有限公司 一种矩形大断面综合管廊无支护暗挖顶推施工方法
CN113293665A (zh) * 2021-06-02 2021-08-24 新疆铁道勘察设计院有限公司 一种铁路桥涵接长侧路基加固方法
CN113374936A (zh) * 2021-06-29 2021-09-10 中建市政工程有限公司 下穿施工中顶部承插管道的托换保护系统及施工方法
CN113374936B (zh) * 2021-06-29 2022-12-27 中建市政工程有限公司 下穿施工中顶部承插管道的托换保护系统及施工方法
CN114414117A (zh) * 2022-01-26 2022-04-29 合肥市市政设计研究总院有限公司 一种适用管幕箱涵顶进的摩阻力测试装置
CN114414117B (zh) * 2022-01-26 2024-05-10 合肥市市政设计研究总院有限公司 一种适用管幕箱涵顶进的摩阻力测试装置
CN114856635A (zh) * 2022-05-18 2022-08-05 中铁工程装备集团有限公司 一种注浆连接管幕结构的方法和装置

Also Published As

Publication number Publication date
CN103556579B (zh) 2016-01-06

Similar Documents

Publication Publication Date Title
CN103556579B (zh) 一种综合注浆保压加管幕支护的箱涵顶推工法
CN103215960B (zh) 高聚物垂直支护体系注浆方法
CN103874803A (zh) 用于建造结构的方法,尤其是建造运营铁路或类似物下通道的方法
CN102943479A (zh) 分区卸荷控制深大基坑变形的系统及方法
CN101824824A (zh) 桩板支护控制基坑下既有建筑物隆起变形施工方法
CN103911996B (zh) 临近既有建筑物钢板桩拔除施工方法
CN103670448B (zh) 一种地下管线保护装置及应用该装置的支护方法
CN102777189A (zh) 一种超长管幕无中继间顶进施工装置及方法
CN102733816A (zh) 一种盾构近距离穿越建筑物时的变形控制方法
CN105926633A (zh) 一种在基坑施工时保护周边土体或建筑物的方法
CN103696416B (zh) 一种地基处理方法
CN109208545B (zh) 一种具有消能效果的人工景观溢流坝施工方法
CN108611985A (zh) 特殊地质超重框架桥顶进施工方法
CN202970719U (zh) 一种超长管幕无中继间顶进施工装置
CN110055973B (zh) 施工空间受限时的高铁桥下基坑围护结构与止水方法
CN105040707B (zh) 组合密排桩深基坑支护围护结构的施工方法
CN207032212U (zh) 一种新老路基在浸水路段稳固拼接的排水加固结构
CN103276645A (zh) 既有线隧道基底病害预制桩梁板整治技术
CN209557009U (zh) 一种适用于软弱土层盾构隧道的加固构造
CN109811612B (zh) 冲沟处理永临结合便道结构及其施工方法
CN109487793A (zh) 一种复杂环境下的密排灌注桩内支撑基坑永久支护结构
CN102900026B (zh) 隧道开挖地段加固高架桥基保护桥面的施工方法
CN208293588U (zh) 一种膨胀土路堑边坡加筋式换填综合结构
CN202954367U (zh) 分区卸荷控制深大基坑变形的系统
CN115681613A (zh) 用于淤泥质粉质黏土层施工中的顶管施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 29, Zhujiang Road, Hexi District, Tianjin

Patentee after: Tianjin Water Conservancy Engineering Group Co.,Ltd.

Address before: No. 29, Zhujiang Road, Hexi District, Tianjin

Patentee before: TIANJIN MUNICIPAL WATER LIMITED CONSERVANCY