CN102777189A - 一种超长管幕无中继间顶进施工装置及方法 - Google Patents

一种超长管幕无中继间顶进施工装置及方法 Download PDF

Info

Publication number
CN102777189A
CN102777189A CN2012102832234A CN201210283223A CN102777189A CN 102777189 A CN102777189 A CN 102777189A CN 2012102832234 A CN2012102832234 A CN 2012102832234A CN 201210283223 A CN201210283223 A CN 201210283223A CN 102777189 A CN102777189 A CN 102777189A
Authority
CN
China
Prior art keywords
pipe
jacking
grouting
steel
curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102832234A
Other languages
English (en)
Other versions
CN102777189B (zh
Inventor
陈佑新
孙国著
张晓峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority to CN201210283223.4A priority Critical patent/CN102777189B/zh
Publication of CN102777189A publication Critical patent/CN102777189A/zh
Application granted granted Critical
Publication of CN102777189B publication Critical patent/CN102777189B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

本发明公开了一种超长管幕无中继间顶进施工装置及方法,所述装置包括洞门保压装置和管幕钢管;所述洞门保压装置包括土体、设于土体外侧的旋喷桩和注浆管,旋喷桩作为密封止水墙,旋喷桩内设有钢护筒,钢护筒外端依次设有密封胶圈和钢板环,钢板环外侧设有与注浆管相连接的盲板;在管幕钢管设润滑注浆孔和注浆连接与控制装置,减少顶进阻力,同时在土孔与管外周35mm间隙中建立0.1至0.5mPa压力,以抵抗土洞形变,达到控制其上道面沉降的目的。本发明的有益效果为:在实行无中继间顶进方法的基础上,消除了使用中继间结构所带来的不利因素,解决了超长管幕顶进施工难的问题,并且在施工中所需要的顶力小、施工精度高、沉降程度小。

Description

一种超长管幕无中继间顶进施工装置及方法
技术领域
本发明涉及隧道施工及管幕支护领域,尤其涉及一种超长管幕无中继间顶进施工装置及方法。
背景技术
目前的在隧道施工中通用的管幕工法是非开挖工艺的一种,作为利用小口径顶管机建造大断面地下空间的施工方法,国外已有20年的发展历程,在日本、美国、新加坡和中国等应用于穿越道路.铁路、结构物、机场等下方之开挖工程,都取得了不错的效果,积累了一定的施工经验。该方法适用于回填土、砂土、粘土、岩层等多种地层。
管幕工法是以单管顶进为基础,各单管间依靠锁口在钢管侧面相接形成管排,并在锁口空隙注入止水剂以达到止水要求。管排顶进完成后,形成管幕。然后对管幕内土体进行加固处理,随后在内部边开挖边支撑,直至管幕段开挖贯通,再浇筑结构体。管幕可以为各种形状,包括半圆型,圆型、门字型、口字型等。管幕由刚性的钢管形成临时棚结构,减少开挖时对邻近土体的扰动并相应减少周围土体的变形,达到开挖时不影响地面活动,并维持上部建(构)筑物与管线正常使用功能的目的。同时应对超长管幕施工时,一般采用增加中继间接力顶进方式完成各单管长距离顶进施工,这种方式给长距离管幕施工带来一定的成功性,但风险较高,主要存在以下位问题和缺点:
1、中继间在频繁收缩顶进过程容易损坏,造成动力不足,管幕不能正常顶进,顶管失败。
2、因中继间的频繁收缩,中继间自身密闭系统容易破坏,造成管外壁减阻泥浆渗漏和失压,可能造成管幕阻力增大和抱管现象。
3、未能从根本上解决顶力问题,顶进方向控制难度大,顶进精度偏差大。
4、顶进偏差大和中继间漏浆失压均会造成土体沉降大,不能满足高标准沉降控制部位的施工。
5、中继间费用高,施工成本增加。
发明内容
本发明的一种目的是提供一种超长管幕无中继间顶进施工装置及方法,以克服现有方法存在的以上不足。
本发明的目的通过以下方法方案来实现:
一种超长管幕无中继间顶进施工装置,包括洞门和管幕钢管,所述洞门处设有密封机构,所述管幕钢管末端设有防回弹装置,所述防回弹装置包括顶镐和设于顶镐后端的分配梁,分配梁后端设有相互连接的后背梁与后背桩,所述顶镐与分配梁通过钢楔相连接;所述密封机构包括土体、设于土体外侧的旋喷桩和注浆管,旋喷桩作为密封止水墙,旋喷桩内设有钢护筒,钢护筒外端依次设有密封胶圈和钢板环,钢板环外侧设有与注浆管相连接的盲板,所述注浆管上设有压力表和控制阀,在管幕钢管设润滑注浆孔和注浆连接与控制装置,减少顶进阻力,提高控制精度。
一种超长管幕无中继间顶进施工方法,其包括以下步骤:
1)依据《给水排水管道工程施工及验收规范GB50268-2008》和施工具体条件计算管幕钢管在使用时所需承受的顶力,并根据顶力的数值以及顶镐的强度条件选取主顶油缸、后背梁和后背桩,并将生物泥浆和水混合,制成减阻泥浆;
2)在洞门的土体增加500mm厚度的 C30混凝土止浆墙,止浆墙在管幕钢管出口部位预留直径为1080mm的预留洞口,并在此预留洞口处安装钢护筒、密封保压胶圈和钢板环,在底部铺设20cm厚的混凝土垫层,以在混凝土垫层上安装轨道,并在轨道末端架设防回弹装置,所述防回弹装置包括顶镐和设于顶镐后端的分配梁,分配梁后端设有相互连接的后背梁与后背桩,所述顶镐与分配梁通过钢楔相支垫;
3)将管幕钢管的各管节吊下井,并将后一节管节头部与前一节尾部相连接,拼接时,错边不应大于2mm,前后管节间应有2~4mm 的空隙,利于焊接牢固,保证钢管焊缝密闭有效,不漏浆;以及
4)顶进时在管幕钢管外形成35mm间隙,通过保压减阻系统装置在间隙内充填减阻润滑浆,实现减阻效果。保压减阻系统注浆主管用可调压力稳压注浆,压力范围值为0.1至0.5mpa,控制值为0.1mpa。浆液由减阻浆孔注入管幕管外周,注浆孔安装单向阀,提高注浆保压效率达到设计压力时停注。
进一步的,顶进过程中对管幕钢管外的减阻泥浆压力进行实时监测,并针对压力改变实时进行补浆处理,始终保持管外环状间隙减阻泥浆压力达到设计预控值。
进一步的,在各注浆孔上设置单向阀和节门,以提高安全系数,防止外侧水土进入管内。
进一步的,在顶进过程中突遇松散软弱土层时,通过顶进仓向软弱土层压注混合浆对土体进行加固与封闭,并在浆液初凝前0.5~1小时开始缓慢顶进。
本发明的有益效果为:消除了使用中继间结构所带来的不利因素,解决了超长管幕顶进施工难的问题,提高效率、质量、精度,降低减阻材料使用,操作和控制便捷,并且在施工中所需要的顶力小、施工精度高、沉降程度小。
附图说明
下面根据附图对本发明作进一步详细说明。
图1为本发明的实施例的一种超长管幕无中继间顶进施工装置的结构示意图;
图2为本发明的实施例的一种超长管幕无中继间顶进施工装置的洞门保压装置的结构示意图;
图3为本发明的实施例的一种超长管幕无中继间顶进施工装置的防回弹装置的结构示意图;
图4为本发明的另一个实施例的一种超长管幕无中继间顶进施工装置的结构示意图;
图5为本发明的另一个实施例的一种超长管幕无中继间顶进施工装置的洞门保压装置的结构示意剖视图;
图6为图5的一种超长管幕无中继间顶进施工装置的洞门保压装置的保压密封装置的结构示意剖视图;
图7为本发明的实施例的一种超长管幕无中继间顶进施工装置的钢管注浆装置的结构示意图。
图中:
1、洞门;11、土体;12、旋喷桩;13、止水墙;14、钢护筒;15、密封胶圈;16、钢板环;17、盲板;18、注浆管;2、混凝土垫层;3、管幕钢管;31、钢管焊缝;32、支撑钢管;33、支撑三角钢;4、防回弹装置;41、顶镐;42、分配梁;43、后背梁;44、后背桩;45、钢楔;46、进排泥水管。
具体实施方式
如图1-3所示,本发明的实施例的一种超长管幕无中继间顶进施工装置,包括洞门1和管幕钢管3,所述洞门1处设有密封机构,所述管幕钢管3末端设有防回弹装置4,所述防回弹装置4包括顶镐41和设于顶镐41后端的分配梁42,分配梁42后端设有相互连接的后背梁43与后背桩44,所述顶镐41与分配梁42通过钢楔45相连接,后背桩44上设有通至管幕钢管3外侧的进排泥水管;所述密封机构包括土体11、设于土体外侧的旋喷桩12和注浆管18,旋喷桩12上方设有止水墙13,旋喷桩12内设有钢护筒14,钢护筒14外端依次设有密封胶圈15和钢板环16,钢板环16外侧设有与注浆管18相连接的盲板17,所述注浆管18上设有压力表和控制阀,在管幕钢管设润滑注浆孔和注浆连接与控制装置,减少顶进阻力,提高控制精度。
本发明的实施例的一种超长管幕无中继间顶进施工方法,其包括以下步骤:
1)依据《给水排水管道工程施工及验收规范GB50268-2008》和施工具体条件计算管幕钢管在使用时所需承受的顶力,并根据顶力的数值以及顶镐的强度条件选取主顶油缸、后背梁和后背桩,并将生物泥浆和水混合,制成减阻泥浆;
2)在洞门的土体增加500mm厚度的 C30混凝土止浆墙,止浆墙在管幕钢管出口部位预留直径为1080mm的预留洞口,并在此预留洞口处安装钢护筒、密封保压胶圈和钢板环,在底部铺设20cm厚的混凝土垫层,以在混凝土垫层上安装轨道,并在轨道末端架设防回弹装置,所述防回弹装置包括顶镐和设于顶镐后端的分配梁,分配梁后端设有相互连接的后背梁与后背桩,所述顶镐与分配梁通过钢楔相支垫;
3)将管幕钢管的各管节吊下井,并将后一节管节头部与前一节尾部相连接,拼接时,错边不应大于2mm,前后管节间应有2~4mm 的空隙,利于焊接牢固,保证钢管焊缝密闭有效,不漏浆;以及
4)顶进时在管幕钢管外形成35mm间隙,通过保压减阻系统装置在间隙内充填减阻润滑浆,实现减阻效果。保压减阻系统注浆主管用可调压力稳压注浆,压力范围值为0.1至0.5mpa,控制值为0.1mpa。浆液由减阻浆孔注入管幕管外周,注浆孔安装单向阀,提高注浆保压效率达到设计压力时停注。顶进过程中对管幕钢管外的减阻泥浆压力进行实时监测,并针对压力改变实时进行补浆处理,始终保持管外环状间隙减阻泥浆压力达到设计值。
同时,在各注浆孔上设置单向阀和节门,以提高安全系数,防止外侧水土进入管内。
在顶进过程中突遇松散软弱土层时,通过顶进仓向软弱土层压注混合浆对土体进行加固与封闭,并在浆液初凝前0.5~1小时开始缓慢顶进。
图4为本发明的另一个实施例的一种超长管幕无中继间顶进施工装置,其防回弹装置使用千斤顶,管幕钢管与机头之间通过过渡管相连接。
图5为本发明的另一个实施例的一种超长管幕无中继间顶进施工装置的简化的洞门保护装置。
图6为图5中的一种超长管幕无中继间顶进施工装置的洞门保护装置的保压密封装置,其牛角形的结构进一步优化了保压密封的效果,使得整体的密封结构更为严密且效果更为优秀。
如图4-6所示的超长管幕无中继间顶进施工装置,其结构更为简单,使用更为方便,且效果也能保证基本的要求。
图7为本发明的实施例的一种超长管幕无中继间顶进施工装置的钢管注浆装置的结构示意图。
本发明通过对顶进装置结构以及施工工艺的改进,在实行无中继间顶进方法的基础上,消除了使用中继间结构所带来的不利因素,解决了超长管幕顶进施工难的问题,提高效率、质量、精度,降低减阻材料使用,操作和控制便捷,并且在施工中所需要的顶力小、施工精度高、沉降程度小。
虽然以上仅描述了本发明的具体实施方式范例,但是本领域的方法人员应当理解,这些仅是举例说明,本发明的保护范围是由所附权利要求书限定的。本领域的方法人员在不背离本发明的原理和实质的前提下,可以对这些实施方式做出多种变更或修改,但这些变更或修改均落入本发明的保护范围。

Claims (8)

1.一种超长管幕无中继间顶进施工装置,包括洞门保压装置(1)和管幕钢管(3),其特征在于,所述洞门保压装置(1)包括密封检测机构,所述密封机构包括土体(11)、设于土体(11)外侧的旋喷桩(12)和注浆管(18),旋喷桩(12)作为止水墙(13),旋喷桩(12)内设有钢护筒(14),钢护筒(14)外端依次设有密封胶圈(15)和钢板环(16),钢板环(16)外侧设有与注浆管(18)相连接的盲板(17);所述管幕钢管(3)末端设有防回弹装置(4)。
2.根据权利要求1所述的一种超长管幕无中继间顶进施工装置,其特征在于:所述管幕钢管(3)上设有润滑注浆孔和注浆连接与控制装置。
3.根据权利要求1或2所述的一种超长管幕无中继间顶进施工装置,其特征在于,所述防回弹装置(4)包括顶镐(41)和设于顶镐(41)后端的分配梁(42),分配梁(42)后端设有相互连接的后背梁(43)与后背桩(44),所述顶镐(41)与分配梁(42)通过钢楔(45)相连接。
4.一种超长管幕无中继间顶进施工方法,其特征在于,其包括以下步骤:
1)依据《给水排水管道工程施工及验收规范GB50268-2008》和施工具体条件计算管幕钢管在使用时所需承受的顶力,并根据顶力的数值以及顶镐的强度条件选取主顶油缸、后背梁和后背桩,并将生物泥浆和水混合,制成减阻泥浆;
2)在洞门的土体增加500mm厚度的 C30混凝土止浆墙,止浆墙在管幕钢管出口部位预留直径为1080mm的预留洞口,并在此预留洞口处安装钢护筒、密封保压胶圈和钢板环,在底部铺设20cm厚的混凝土垫层,以在混凝土垫层上安装轨道,并在轨道末端架设防回弹装置,所述防回弹装置包括顶镐和设于顶镐后端的分配梁,分配梁后端设有相互连接的后背梁与后背桩,所述顶镐与分配梁通过钢楔相支垫;
3)将管幕钢管的各管节吊下井,并将后一节管节头部与前一节尾部相连接,拼接时,错边不应大于2mm,前后管节间应有2~4mm 的空隙,利于焊接牢固,保证钢管焊缝密闭有效,不漏浆;以及
4)顶进时在管幕钢管外形成35mm间隙,通过保压减阻系统装置在间隙内充填减阻润滑浆,实现减阻效果;保压减阻系统注浆主管用可调压力稳压注浆,压力范围值为0.1至0.5mpa,控制值为0.1mpa;浆液由减阻浆孔注入管幕管外周,注浆孔安装单向阀,提高注浆保压效率达到设计压力时停注。
5.根据权利要求4所述的一种超长管幕无中继间顶进施工方法,其特征在于,还包括:顶进过程中对管幕钢管外的减阻泥浆压力进行实时监测,并针对压力改变实时进行补浆处理,始终保持管外环状间隙减阻泥浆压力达到设计预控值。
6.根据权利要求4所述的一种超长管幕无中继间顶进施工方法,其特征在于,还包括:在各注浆孔上设置单向阀和节门,以提高安全系数,防止外侧水土进入管内。
7.根据权利要求4所述的一种超长管幕无中继间顶进施工方法,其特征在于,还包括:在顶进过程中突遇松散软弱土层时,通过顶进仓向软弱土层压注混合浆对土体进行加固与封闭,并在浆液初凝前0.5~1小时开始缓慢顶进。
8.根据权利要求4-8任一项所述的一种超长管幕无中继间顶进施工方法,其特征在于,所述防回弹装置包括顶镐和设于顶镐后端的分配梁,分配梁后端设有相互连接的后背梁与后背桩,所述顶镐与分配梁通过钢楔相连接。
CN201210283223.4A 2012-08-09 2012-08-09 一种超长管幕无中继间顶进施工装置及方法 Active CN102777189B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210283223.4A CN102777189B (zh) 2012-08-09 2012-08-09 一种超长管幕无中继间顶进施工装置及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210283223.4A CN102777189B (zh) 2012-08-09 2012-08-09 一种超长管幕无中继间顶进施工装置及方法

Publications (2)

Publication Number Publication Date
CN102777189A true CN102777189A (zh) 2012-11-14
CN102777189B CN102777189B (zh) 2015-09-16

Family

ID=47122278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210283223.4A Active CN102777189B (zh) 2012-08-09 2012-08-09 一种超长管幕无中继间顶进施工装置及方法

Country Status (1)

Country Link
CN (1) CN102777189B (zh)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225511A (zh) * 2013-03-29 2013-07-31 上海市城市排水有限公司 一种预制混凝土装配式顶管后座
CN104594909A (zh) * 2014-12-19 2015-05-06 中建六局土木工程有限公司 一种超长管幕的后背装置的安装施工方法
CN104695971A (zh) * 2015-01-07 2015-06-10 同济大学 一种环形顶管施工方法
CN105350971A (zh) * 2015-09-30 2016-02-24 上海隧道工程有限公司 具有锁扣导向装置的管幕顶管机及其姿态控制方法
CN105909259A (zh) * 2016-06-12 2016-08-31 中铁十九局集团轨道交通工程有限公司 近距离下穿既有盾构隧道管幕施工沉降控制系统及方法
CN106015733A (zh) * 2016-08-03 2016-10-12 北京政平建设投资集团有限公司 一种直顶钢管管道顶进施工方法
CN106869974A (zh) * 2017-03-23 2017-06-20 中交三航局第三工程有限公司 一种基于测斜的超长水平管幕顶进施工控制装置与方法
CN108915698A (zh) * 2018-08-14 2018-11-30 中铁十四局集团有限公司 一种复杂条件下大直径管幕施工方法
CN109505629A (zh) * 2018-12-29 2019-03-22 北京京水建设集团有限公司 一种隧洞内钢管背后回填混凝土结构及施工方法
CN109681211A (zh) * 2018-12-12 2019-04-26 中国人民解放军63926部队 免爆破隧道洞门施工方法
CN112145204A (zh) * 2020-10-13 2020-12-29 侯江伟 一种用于暗挖通道的导向钻进式管棚
CN113293665A (zh) * 2021-06-02 2021-08-24 新疆铁道勘察设计院有限公司 一种铁路桥涵接长侧路基加固方法
CN114183162A (zh) * 2021-12-09 2022-03-15 中铁工程装备集团有限公司 暗挖隧道的顶管装置、施工装置和施工方法
CN114321496A (zh) * 2021-12-22 2022-04-12 深圳市市政工程总公司 工具管反向顶进施工方法
CN114544481A (zh) * 2022-01-26 2022-05-27 合肥市市政设计研究总院有限公司 一种泥浆减摩效果测试仪器及方法
CN118309434A (zh) * 2024-06-11 2024-07-09 中铁吉林投资建设有限公司 一种明挖隧道上与既有地铁交叉段防护体系

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1800513A (zh) * 2005-12-13 2006-07-12 上海市第二市政工程有限公司 钢管幕顶进的施工方法
JP2011226116A (ja) * 2010-04-19 2011-11-10 Taisei Corp パイプルーフとその施工方法
CN202250099U (zh) * 2011-09-19 2012-05-30 北京深林开物市政工程有限公司 一种止浆密封装置
JP2012144942A (ja) * 2011-01-14 2012-08-02 株式会社奥村組 地下道の構築方法
CN202970719U (zh) * 2012-08-09 2013-06-05 中铁十六局集团北京工程有限公司 一种超长管幕无中继间顶进施工装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1800513A (zh) * 2005-12-13 2006-07-12 上海市第二市政工程有限公司 钢管幕顶进的施工方法
JP2011226116A (ja) * 2010-04-19 2011-11-10 Taisei Corp パイプルーフとその施工方法
JP2012144942A (ja) * 2011-01-14 2012-08-02 株式会社奥村組 地下道の構築方法
CN202250099U (zh) * 2011-09-19 2012-05-30 北京深林开物市政工程有限公司 一种止浆密封装置
CN202970719U (zh) * 2012-08-09 2013-06-05 中铁十六局集团北京工程有限公司 一种超长管幕无中继间顶进施工装置

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘学增等: "管幕法隧道施工方案研究", 《现代隧道技术》 *
曾润忠: "下穿铁路的浅埋隧道长距离管幕施工", 《铁道建筑》 *
杨晓东: "钢管幕顶进施工技术", 《上海建设科技》 *

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225511A (zh) * 2013-03-29 2013-07-31 上海市城市排水有限公司 一种预制混凝土装配式顶管后座
CN104594909A (zh) * 2014-12-19 2015-05-06 中建六局土木工程有限公司 一种超长管幕的后背装置的安装施工方法
CN104594909B (zh) * 2014-12-19 2016-10-19 中建六局土木工程有限公司 一种超长管幕的后背装置的安装施工方法
CN104695971A (zh) * 2015-01-07 2015-06-10 同济大学 一种环形顶管施工方法
CN105350971A (zh) * 2015-09-30 2016-02-24 上海隧道工程有限公司 具有锁扣导向装置的管幕顶管机及其姿态控制方法
CN105909259A (zh) * 2016-06-12 2016-08-31 中铁十九局集团轨道交通工程有限公司 近距离下穿既有盾构隧道管幕施工沉降控制系统及方法
CN105909259B (zh) * 2016-06-12 2018-02-06 中铁十九局集团轨道交通工程有限公司 近距离下穿既有盾构隧道管幕施工沉降控制系统及方法
CN106015733A (zh) * 2016-08-03 2016-10-12 北京政平建设投资集团有限公司 一种直顶钢管管道顶进施工方法
CN106015733B (zh) * 2016-08-03 2018-05-04 北京政平建设投资集团有限公司 一种直顶钢管管道顶进施工方法
CN106869974A (zh) * 2017-03-23 2017-06-20 中交三航局第三工程有限公司 一种基于测斜的超长水平管幕顶进施工控制装置与方法
CN108915698A (zh) * 2018-08-14 2018-11-30 中铁十四局集团有限公司 一种复杂条件下大直径管幕施工方法
CN109681211A (zh) * 2018-12-12 2019-04-26 中国人民解放军63926部队 免爆破隧道洞门施工方法
CN109681211B (zh) * 2018-12-12 2020-05-08 中国人民解放军63926部队 免爆破隧道洞门施工方法
CN109505629A (zh) * 2018-12-29 2019-03-22 北京京水建设集团有限公司 一种隧洞内钢管背后回填混凝土结构及施工方法
CN112145204A (zh) * 2020-10-13 2020-12-29 侯江伟 一种用于暗挖通道的导向钻进式管棚
CN113293665A (zh) * 2021-06-02 2021-08-24 新疆铁道勘察设计院有限公司 一种铁路桥涵接长侧路基加固方法
CN114183162A (zh) * 2021-12-09 2022-03-15 中铁工程装备集团有限公司 暗挖隧道的顶管装置、施工装置和施工方法
CN114183162B (zh) * 2021-12-09 2024-06-07 中铁工程装备集团有限公司 暗挖隧道的顶管装置、施工装置和施工方法
CN114321496A (zh) * 2021-12-22 2022-04-12 深圳市市政工程总公司 工具管反向顶进施工方法
CN114321496B (zh) * 2021-12-22 2023-09-26 深圳市市政工程总公司 工具管反向顶进施工方法
CN114544481A (zh) * 2022-01-26 2022-05-27 合肥市市政设计研究总院有限公司 一种泥浆减摩效果测试仪器及方法
CN118309434A (zh) * 2024-06-11 2024-07-09 中铁吉林投资建设有限公司 一种明挖隧道上与既有地铁交叉段防护体系
CN118309434B (zh) * 2024-06-11 2024-09-17 中铁吉林投资建设有限公司 一种明挖隧道上与既有地铁交叉段防护体系

Also Published As

Publication number Publication date
CN102777189B (zh) 2015-09-16

Similar Documents

Publication Publication Date Title
CN102777189B (zh) 一种超长管幕无中继间顶进施工装置及方法
US9777881B2 (en) Polymer composite grouting method for blocking leaking and sand inrush of underground pipelines
CN110821503B (zh) 一种超深盾构区间风井先隧后主体施工方法
CN102094650B (zh) 复杂工况条件下的盾构进洞施工方法
CN202970719U (zh) 一种超长管幕无中继间顶进施工装置
CN112012753B (zh) 基于异形延伸钢环的盾构机始发方法
CN106285693B (zh) 一种盾构钢套筒密闭接收施工方法
CN105804758A (zh) 浅覆土大断面小间距的矩形顶管上跨地铁隧道施工方法
CN103556579A (zh) 一种综合注浆保压加管幕支护的箱涵顶推工法
CN105298501A (zh) 暗挖车站附属风道结构施工方法
CN103711492B (zh) 一种顶进式电缆套管通道施工方法
CN109386293B (zh) 超大断面矩形顶管密封式接收施工方法
CN111810715B (zh) 非开挖管道更新方法及施工系统
CN103758123A (zh) 人工挖孔灌注桩护壁衬的施工方法
CN104763436A (zh) 一种用于高水压复杂地质条件下的顶管机接收方法及装置
CN103993885A (zh) 一种暗挖隧道侧向开洞支撑体系构建方法
CN108194703A (zh) 一种施工顶管的修正施工系统及其修正方法
CN104141314A (zh) 在岩、土两种介质中形成完整防渗帷幕的方法
CN103291313A (zh) 土压盾构开挖拱顶压力支护系统及其施工方法
CN108266207B (zh) 一种适用于深厚富水砂层地区的顶管进出洞止水方法及装置
CN103437772B (zh) 地下通道及隧道结构的顶管施工方法
CN201424658Y (zh) 地下连续墙槽段接缝处渗漏水检测及封堵修复装置
CN208058113U (zh) 一种施工顶管的修正施工系统
CN105605335A (zh) 一种用于顶进施工的大口径预应力钢筒混凝土管
CN204570696U (zh) 高架桥基础处废弃污水管道施工系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 100018, No. 2, building 2, North Court, North Korean pine garden, Beijing, Chaoyang District 8

Applicant after: BEIJING ENGINEERING COMPANY LIMITED OF CHINA RAILWAY URBAN CONSTRUCTION GROUP

Address before: 100018 sixteen China Railway Bureau Group Co., Ltd., 2 North Korean pine garden, Beijing, Chaoyang District

Applicant before: China Railway 16th Bureau Group Beijing Engineering Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHINA RAIWAY 16TH BUREAU GROUP BEIJING ENGINEERING CO., LTD. TO: BEIJING ENGINEERING COMPANY LIMITED OF CHINA RAILWAY URBAN CONSTRUCTION GROUP

GR01 Patent grant