CN103523653A - Construction hanging basket with built-in translational goods basket - Google Patents

Construction hanging basket with built-in translational goods basket Download PDF

Info

Publication number
CN103523653A
CN103523653A CN201310485493.8A CN201310485493A CN103523653A CN 103523653 A CN103523653 A CN 103523653A CN 201310485493 A CN201310485493 A CN 201310485493A CN 103523653 A CN103523653 A CN 103523653A
Authority
CN
China
Prior art keywords
hanging basket
basket
welded
track
goods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310485493.8A
Other languages
Chinese (zh)
Other versions
CN103523653B (en
Inventor
魏发利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201310485493.8A priority Critical patent/CN103523653B/en
Publication of CN103523653A publication Critical patent/CN103523653A/en
Application granted granted Critical
Publication of CN103523653B publication Critical patent/CN103523653B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a construction hanging basket with a built-in translational goods basket and belongs to a high-rise building construction hanging basket. The construction hanging basket is characterized by mainly comprising a hanging basket, a hanging basket door, the goods basket, rails I and rails II, wherein the right side surface of the hanging basket is a hollow rectangular frame; hinges are welded at the bottom end sections of the right side surfaces of a front main vertical beam and a rear main vertical beam on the right side of the hanging basket so as to hinge the hanging basket door; two front and rear horizontal rails I are welded in an inner cavity of the hanging basket respectively; the hanging basket door mainly comprises a door frame, a door handrail and the rails II; two front and rear parallel rails II are welded at the left side surface of an upper longitudinal beam and a lower longitudinal beam of the door frame in front and rear directions; the goods basket is arranged on the rails I in the hanging basket; two front and rear bottom beams are welded at the bottom of the basket frame of the goods basket, and traveling wheels are fixedly mounted at the bottom of the basket frame of the goods basket; the traveling wheels are arranged on the rails I or the rails II to roll leftwards and rightwards. When the construction hanging basket is used, the hanging basket door is turned rightwards to form a transition platform, so that the efficiency is improved and the safety of constructors is guaranteed.

Description

Construction hanging basket with built-in translation goods basket
Technical field
The invention belongs to high-building construction hanging basket, especially relate to a kind of construction hanging basket with built-in goods basket.
Background technology
At present, in high-building construction, conventionally adopt building tower crane and hanging basket by goods handling to each layer of material receiving, but because every layer of material receiving all designs in same vertical plane surface position, like this except top layer material receiving, the goods handling of middle each layer, hanging basket can only be hovered over to the outside, edge of material receiving, in the time of loading, unloading goods, workmen must enter operation in hanging basket unsettled and that swing, so both be unfavorable for the carrying of goods, also had potential safety hazard simultaneously.
Summary of the invention
The object of the invention is to propose a kind of construction hanging basket with built-in translation goods basket, not only rational in infrastructure, safe and reliable, and when handling, handling goods, can avoid operating personnel to enter in hanging basket unsettled and that swing, not only improve operating efficiency, but also ensured workmen's safety.
The object of the present invention is achieved like this: a kind of construction hanging basket with built-in translation goods basket (abbreviation construction hanging basket), comprise hanging basket, this hanging basket is the cuboid of cavity, this hanging basket is mainly by hoop, railing, base plate and hanger form, this hoop is by four main vertical beams of left-right and front-back (post) and upper, lower main beam, on, the steel structure frame that lower main longitudinal grider assembly welding forms, left facade at this hoop, front facade, in the inner chamber of rear facade, be welded respectively and be the railing of right-angled crossing, bottom cross beam and netted base plate are welded in the bottom surface of hoop, simultaneously, the stage casing of the front upper main beam of hoop and rear on the stage casing of the main beam hanger that is welded respectively symmetrically, it is characterized in that: this construction hanging basket with built-in translation goods basket is mainly by hanging basket, hanging basket door, goods basket and track I, track II forms, the right flank of this hanging basket is the oblong frame of cavity, in the top section of the leading flank of the front main vertical beam on hanging basket right side and the pipe spreader I that is welded respectively vertical symmetrically in the top section of the trailing flank of the rear main vertical beam on hanging basket right side, on the epimere of the leading flank of the front main vertical beam on hanging basket right side with the vertical bearing pin I that is welded respectively symmetrically on the epimere of the trailing flank of rear main vertical beam on hanging basket right side, and be welded respectively symmetrically hinge with hinged hanging basket door in the bottom section of the right flank of the front main vertical beam on hanging basket right side and in the bottom section of the right flank of the rear main vertical beam on hanging basket right side, and hanging basket door can be opened to the right, in the inner chamber of hanging basket, correspondence is positioned at lower-left main longitudinal grider, the track I (being basket inner orbit) of two parallel and levels before and after being welded symmetrically on the main longitudinal grider of bottom right,
This hanging basket door is mainly by doorframe, impages and track II form, this doorframe is rectangle, this doorframe is formed by front and back vertical beam and upper and lower longeron assembly welding, the size of the size of this doorframe and the right facade of hanging basket is corresponding to the same, in the inner chamber of this doorframe, be welded and be the impages of right-angled crossing, front vertical beam at doorframe, the bottom of back vertical tube is welded respectively hinge symmetrically to be hinged with the right flank of hanging basket, in the top ends of the leading flank of the front vertical beam of doorframe be welded respectively symmetrically in the top ends of the trailing flank of the back vertical tube of doorframe pipe spreader II vertical, the vertical bearing pin II that is welded respectively symmetrically at the middle part of the trailing flank of the middle part of the leading flank of the front vertical beam of doorframe and back vertical tube at doorframe, longeron on sagittal in being of doorframe, two parallel track II (door gets on the right track) before and after being welded symmetrically on the left surface of lower longeron, when turn over while being the level of state on the hanging basket door right side, the docking corresponding to track I of this track II, simultaneously, at homonymy (is front side, rear side) digonal link is installed between bearing pin I and bearing pin II, this digonal link is the straight-bar that upper and lower side Duan Jun offers pin-and-hole, the correspondence of pin-and-hole up and down on digonal link is sleeved on to bearing pin I, in bearing pin II, and difference construction opening pin is with spacing, when hanging basket door is in vertical state and when lean with the right flank of hanging basket, at homonymy (is front side, rear side) latch of plug-in mounting ∩ shape respectively in pipe spreader I and pipe spreader II,
In track I in hanging basket, goods basket is set, this goods basket is the cuboid of cavity, this goods basket is mainly by basket frame, railing, protecting wire net, road wheel and wheel carrier form, this basket of frame is the framework of the cuboid that is welded with angle steel, in the frame of the left-right and front-back of basket frame, with round steel, be welded railing, in the bottom of basket frame, be welded before and after two be all left and right to bottom girder, and the distance between these front and back two foundation beam line of centerss is consistent with the distance between the line of centers of the two horizontal rail I in front and back, (with the line of centers of the two parallel orbit II in front and back between distance consistent), and the protecting wire net that is all welded on the frame of basket frame left-right and front-back and in the bottom of basket frame, this protecting wire net available metal net sheet is made, to guarantee that goods can not drop out in goods basket, in front and back, the bottom of two foundation beams fixedly mounts road wheel in uniform way by wheel carrier symmetry respectively, this each road wheel is erected in track I or track II and rolls to do left and right.
In high-building construction, when this construction hanging basket rises to material receiving position, open the hanging basket door on hanging basket right side, make the hanging basket door right side translate into horizontal and be erected on material receiving, hanging basket door just becomes transition platform like this, by the goods basket in hanging basket along track I, the translation of track II goes out hanging basket and enters material receiving, workmen is handling goods on material receiving, after completing the handling of goods, again by goods basket along track I, track II is got back in hanging basket, shut hanging basket door and plug latch, like this, in whole working process, avoided workmen to enter operation in the hanging basket of suspention, both improved efficiency, also ensured workmen's safety.
Construction hanging basket with built-in translation goods basket proposed by the invention, not only rational in infrastructure, safe and reliable, and when handling, handling goods, can avoid operating personnel to enter in hanging basket unsettled and that swing, both improve operating efficiency, ensure again workmen's safety.
Now in conjunction with the accompanying drawings and embodiments the construction hanging basket with built-in translation goods basket proposed by the invention is described further.
Accompanying drawing explanation
Fig. 1 is that the master of the construction hanging basket with built-in translation goods basket proposed by the invention looks one of schematic diagram, (goods basket is positioned at hanging basket).
Fig. 2 is that the master of the construction hanging basket with built-in translation goods basket proposed by the invention looks two of schematic diagram, (it is outer that goods basket is positioned at hanging basket).
Fig. 3 is that the construction hanging basket with built-in translation goods basket proposed by the invention master while using looks schematic diagram.
fig. 1, fig. 2, figurein 3:
1, hanging basket door 2-1, pipe spreader I 2-2, pipe spreader II 3, hinge 4, hanging basket 5, track II 6, hanger 7, track I 8, latch 9, goods basket 10, protecting wire net 11, road wheel 12, wheel carrier 13, digonal link 14, material receiving.
The specific embodiment
From Fig. 1-Fig. 3, can find out: a kind of construction hanging basket with built-in translation goods basket (abbreviation construction hanging basket), comprise hanging basket 4, this hanging basket 4 is cuboids of cavity, this hanging basket 4 is mainly by hoop, railing, base plate and hanger 6 form, this hoop is by four main vertical beams of left-right and front-back (post) and upper, lower main beam, on, the steel structure frame that lower main longitudinal grider assembly welding forms, left facade at this hoop, front facade, in the inner chamber of rear facade, be welded respectively and be the railing of right-angled crossing, bottom cross beam and netted base plate are welded in the bottom surface of hoop, simultaneously, the stage casing of the front upper main beam of hoop and rear on the stage casing of the main beam hanger 6 that is welded respectively symmetrically, it is characterized in that: this construction hanging basket with built-in translation goods basket is mainly by hanging basket 4, hanging basket door 1, goods basket 9 and track I 7, track II 5 forms, the right flank of this hanging basket 4 is the oblong frame of cavity, in the top section of the leading flank of the front main vertical beam on hanging basket 4 right sides and the pipe spreader I 2-1 that is welded respectively vertical symmetrically in the top section of the trailing flank of the rear main vertical beam on hanging basket 4 right sides, on the epimere of the leading flank of the front main vertical beam on hanging basket 4 right sides with the vertical bearing pin I that is welded respectively symmetrically on the epimere of the trailing flank of rear main vertical beam on hanging basket 4 right sides, and be welded respectively symmetrically hinge 3 with hinged hanging basket door 1 in the bottom section of the right flank of the front main vertical beam on hanging basket 4 right sides and in the bottom section of the right flank of the rear main vertical beam on hanging basket 4 right sides, and hanging basket door 1 can be opened to the right, in the inner chamber of hanging basket 4, correspondence is positioned at lower-left main longitudinal grider, before and after being welded symmetrically on the main longitudinal grider of bottom right, two track I 7(parallel and level are basket inner orbit),
This hanging basket door 1 is mainly by doorframe, impages and track II 5 form, this doorframe is rectangle, this doorframe is formed by front and back vertical beam and upper and lower longeron assembly welding, the size of the size of this doorframe and hanging basket 4 right facades is corresponding to the same, in the inner chamber of this doorframe, be welded and be the impages of right-angled crossing, front vertical beam at doorframe, the bottom of back vertical tube is welded respectively hinge 3 symmetrically to be hinged with the right flank of hanging basket 4, in the top ends of the leading flank of the front vertical beam of doorframe be welded respectively symmetrically in the top ends of the trailing flank of the back vertical tube of doorframe pipe spreader II 2-2 vertical, the vertical bearing pin II that is welded respectively symmetrically at the middle part of the trailing flank of the middle part of the leading flank of the front vertical beam of doorframe and back vertical tube at doorframe, longeron on sagittal in being of doorframe, before and after being welded symmetrically on the left surface of lower longeron, two parallel track II 5(are that door gets on the right track), when turn over while being the level of state on hanging basket door 1 right side, the docking corresponding to track I 7 of this track II 5, simultaneously, at homonymy (is front side, rear side) digonal link 13 is installed between bearing pin I and bearing pin II, this digonal link 13 is offered the straight-bar of pin-and-hole for upper and lower side Duan Jun, the correspondence of pin-and-hole up and down on digonal link 13 is sleeved on to bearing pin I, in bearing pin II, and difference construction opening pin is with spacing, when hanging basket door 1 is in vertical state and when lean with the right flank of hanging basket 4, at homonymy (is front side, rear side) latch 8 of plug-in mounting ∩ shape in pipe spreader I 2-1 and pipe spreader II 2-2,
In track I 7 in hanging basket 4, goods basket 9 is set, this goods basket 9 is cuboids of cavity, this goods basket 9 is mainly by basket frame, railing, protecting wire net, road wheel 11 and wheel carrier 12 form, this basket of frame is the basket frame of the cuboid that is welded with angle steel, in the frame of the left-right and front-back of basket frame, with round steel, be welded railing, in the bottom of basket frame, be welded before and after two be all left and right to bottom girder, and the distance between the line of centers of the track I 7 of two levels of distance and front and back between these front and back two foundation beam line of centerss is consistent, (the distance between the line of centers of the track II 5 parallel with two of front and back is consistent), and the protecting wire net 10 that is all welded on the frame of basket frame left-right and front-back and in the bottom of basket frame, these protecting wire net 10 available metal net sheets are made, to guarantee that goods can not drop out in goods basket 9, in front and back, the bottom of two foundation beams fixedly mounts road wheel 11 in uniform way by wheel carrier 12 symmetries respectively, this each road wheel 11 is erected in track I 7 or track II 5 and rolls to do left and right.
In high-building construction, when this construction hanging basket rises to the position of material receiving 14, open the hanging basket door 1 on hanging basket 4 right sides, make hanging basket door 1 right side translate into horizontal and be erected on material receiving 14, hanging basket door 1 just becomes transition platform like this, by the goods basket 9 in hanging basket 4 along track I 7, 5 translations of track II go out hanging basket 4 and enter material receiving 14, workmen is handling goods on material receiving 14, after completing the handling of goods, again by goods basket 9 along track II 5, track I 7 is got back in hanging basket 4, shut hanging basket door 1 and plug latch 8, like this, in whole working process, avoided workmen to enter operation in the hanging basket 4 of suspention, both improved efficiency, also ensured workmen's safety.

Claims (2)

1. the construction hanging basket with built-in translation goods basket, comprise hanging basket (4), this hanging basket (4) is the cuboid of cavity, this hanging basket (4) is mainly by hoop, railing, base plate and hanger (6) form, this hoop is by four main vertical beams and upper of left-right and front-back, lower main beam, on, the steel structure frame that lower main longitudinal grider assembly welding forms, left facade at this hoop, front facade, in the inner chamber of rear facade, be welded respectively and be the railing of right-angled crossing, bottom cross beam and netted base plate are welded in the bottom surface of hoop, simultaneously, the stage casing of the front upper main beam of hoop and rear on the stage casing of the main beam hanger (6) that is welded respectively symmetrically, it is characterized in that: this construction hanging basket with built-in translation goods basket is mainly by hanging basket (4), hanging basket door (1), goods basket (9) and track I (7), track II (5) forms, the right flank of this hanging basket (4) is the oblong of cavity, in the top section of the leading flank of the front main vertical beam on hanging basket (4) right side and the pipe spreader I (2-1) that is welded respectively vertical symmetrically in the top section of the trailing flank of the rear main vertical beam on hanging basket (4) right side, on the epimere of the leading flank of the front main vertical beam on hanging basket (4) right side with the vertical bearing pin that is welded (I) respectively symmetrically on the epimere of the trailing flank of rear main vertical beam on hanging basket (4) right side, and the hinge (3) that is welded respectively symmetrically in the bottom section of the right flank of the front main vertical beam on hanging basket (4) right side and in the bottom section of the right flank of the rear main vertical beam on hanging basket (4) right side, in the inner chamber of hanging basket (4), correspondence is positioned at lower-left main longitudinal grider, before and after being welded symmetrically on the main longitudinal grider of bottom right, two track I (7) parallel and level are basket inner orbit,
This hanging basket door (1) is mainly by doorframe, impages and track II (5) form, this doorframe is rectangle, this doorframe is formed by front and back vertical beam and upper and lower longeron assembly welding, the size of the right facade of the size of this doorframe and hanging basket (4) is corresponding to the same, in the inner chamber of this doorframe, be welded and be the impages of right-angled crossing, front vertical beam at doorframe, be welded the respectively symmetrically right flank of hinge (3) and hanging basket (4) of the bottom of back vertical tube is hinged, in the top ends of the leading flank of the front vertical beam of doorframe be welded respectively symmetrically in the top ends of the trailing flank of the back vertical tube of doorframe pipe spreader II (2-2) vertical, the vertical bearing pin II that is welded respectively symmetrically at the middle part of the trailing flank of the middle part of the leading flank of the front vertical beam of doorframe and back vertical tube at doorframe, longeron on sagittal in being of doorframe, the parallel track II (5) i.e. in two of front and back that is welded symmetrically on the left surface of lower longeron door gets on the right track, when turn over while being the level of state on hanging basket door (1) right side, this track II (5) and the corresponding docking of track I (7), simultaneously, between the bearing pin I of homonymy and bearing pin II, digonal link (13) is installed, this digonal link (13) is offered the straight-bar of pin-and-hole for upper and lower side Duan Jun, the correspondence of pin-and-hole up and down on digonal link (13) is sleeved on to bearing pin I, in bearing pin II, and difference construction opening pin is with spacing, when hanging basket door (1) is in vertical state and when lean with the right flank of hanging basket (4), the latch (8) of plug-in mounting ∩ shape in the pipe spreader I (2-1) of homonymy and pipe spreader II (2-2),
In track I (7) in hanging basket (4), goods basket (9) is set, this goods basket (9) is the cuboid of cavity, this goods basket (9) is mainly by basket frame, railing, protecting wire net, road wheel (11) and wheel carrier (12) form, this basket of frame is the framework of the cuboid that is welded with angle steel, in the frame of the left-right and front-back of basket frame, with round steel, be welded railing, in the bottom of basket frame, be welded before and after two be all left and right to bottom girder, and the distance between the line of centers of the track I (7) of two levels of distance and front and back between these front and back two foundation beam line of centerss is consistent, the distance between the line of centers of the track II (5) parallel with two of front and back is consistent, and the protecting wire net (10) that is all welded on the frame of basket frame left-right and front-back and in the bottom of basket frame, in front and back, the bottom of two foundation beams uses respectively wheel carrier (12) symmetry to fixedly mount in uniform way road wheel (11), each road wheel (11) is erected in track I (7) or track II (5).
2. the construction hanging basket with built-in translation goods basket according to claim 1, is characterized in that this protecting wire net (10) makes with metal mesh sheet.
CN201310485493.8A 2013-10-17 2013-10-17 Construction hanging basket with built-in translational goods basket Active CN103523653B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310485493.8A CN103523653B (en) 2013-10-17 2013-10-17 Construction hanging basket with built-in translational goods basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310485493.8A CN103523653B (en) 2013-10-17 2013-10-17 Construction hanging basket with built-in translational goods basket

Publications (2)

Publication Number Publication Date
CN103523653A true CN103523653A (en) 2014-01-22
CN103523653B CN103523653B (en) 2015-07-15

Family

ID=49926084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310485493.8A Active CN103523653B (en) 2013-10-17 2013-10-17 Construction hanging basket with built-in translational goods basket

Country Status (1)

Country Link
CN (1) CN103523653B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104310195A (en) * 2014-09-25 2015-01-28 中建三局第二建设工程有限责任公司 Hoisting cage for hoisting electromechanical device
CN104709820A (en) * 2015-03-22 2015-06-17 广西北流市智宇陶瓷自动化设备有限公司 Small and sundry work-piece hanging basket
CN105672675A (en) * 2016-03-28 2016-06-15 中国建筑第二工程局有限公司 Size adjustable type material lifting device and construction method of size adjustable type material lifting device
CN106744247A (en) * 2017-01-07 2017-05-31 江苏海陆科技股份有限公司 The cage of ship's space unit
CN107082354A (en) * 2017-04-19 2017-08-22 中国建筑第八工程局有限公司 Self-tipping type transports cage and its construction method
CN107298368A (en) * 2017-08-29 2017-10-27 贵州精正检测有限公司 Hanging basket and suspension bracket for building
CN108910717A (en) * 2018-08-08 2018-11-30 中国十七冶集团有限公司 A kind of handling apparatus for prefabricated base board
CN109081233A (en) * 2018-09-30 2018-12-25 拓暄建设科技有限公司 A kind of reinforced mesh suspender
CN110847586A (en) * 2019-11-11 2020-02-28 郑州工业应用技术学院 Safe hanging flower basket device for construction
CN111779288A (en) * 2020-07-16 2020-10-16 赵玉粉 Hanging flower basket is used in building engineering construction
CN112186642A (en) * 2020-09-24 2021-01-05 上海市基础工程集团有限公司 Feeding cage for rapid and continuous installation of submarine cable protective sleeve
CN113321095A (en) * 2021-06-10 2021-08-31 中建七局第四建筑有限公司 Vertical transportation device for super high-rise building construction
WO2022010421A1 (en) * 2020-07-08 2022-01-13 Ram Smag Lifting Technologies Pte Ltd Lifting apparatus and method for transferring loads
CN115030578A (en) * 2022-06-24 2022-09-09 北京首嘉钢结构有限公司 Lifting appliance and stereo garage with same

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0503149A1 (en) * 1991-02-19 1992-09-16 GEDA-Dechentreiter Maschinenbau GmbH Building hoist, particularly scaffolding hoist
CN201121091Y (en) * 2007-10-23 2008-09-24 中国人民解放军海军医学研究所 Folding type multifunctional hanging cradle
CN201719564U (en) * 2010-05-07 2011-01-26 林丽英 Skin endoscopy gastrostomize supporting belt
CN202138937U (en) * 2011-06-30 2012-02-08 中国二十二冶集团有限公司 Electric hanging basket
CN202848862U (en) * 2012-05-30 2013-04-03 中建七局第一建筑有限公司 High-altitude building block hoisting safety device
CN203112295U (en) * 2013-02-26 2013-08-07 程伟 Hoisting basket for construction engineering

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0503149A1 (en) * 1991-02-19 1992-09-16 GEDA-Dechentreiter Maschinenbau GmbH Building hoist, particularly scaffolding hoist
CN201121091Y (en) * 2007-10-23 2008-09-24 中国人民解放军海军医学研究所 Folding type multifunctional hanging cradle
CN201719564U (en) * 2010-05-07 2011-01-26 林丽英 Skin endoscopy gastrostomize supporting belt
CN202138937U (en) * 2011-06-30 2012-02-08 中国二十二冶集团有限公司 Electric hanging basket
CN202848862U (en) * 2012-05-30 2013-04-03 中建七局第一建筑有限公司 High-altitude building block hoisting safety device
CN203112295U (en) * 2013-02-26 2013-08-07 程伟 Hoisting basket for construction engineering

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104310195A (en) * 2014-09-25 2015-01-28 中建三局第二建设工程有限责任公司 Hoisting cage for hoisting electromechanical device
CN104709820A (en) * 2015-03-22 2015-06-17 广西北流市智宇陶瓷自动化设备有限公司 Small and sundry work-piece hanging basket
CN105672675A (en) * 2016-03-28 2016-06-15 中国建筑第二工程局有限公司 Size adjustable type material lifting device and construction method of size adjustable type material lifting device
CN106744247A (en) * 2017-01-07 2017-05-31 江苏海陆科技股份有限公司 The cage of ship's space unit
CN107082354A (en) * 2017-04-19 2017-08-22 中国建筑第八工程局有限公司 Self-tipping type transports cage and its construction method
CN107298368A (en) * 2017-08-29 2017-10-27 贵州精正检测有限公司 Hanging basket and suspension bracket for building
CN108910717A (en) * 2018-08-08 2018-11-30 中国十七冶集团有限公司 A kind of handling apparatus for prefabricated base board
CN109081233A (en) * 2018-09-30 2018-12-25 拓暄建设科技有限公司 A kind of reinforced mesh suspender
CN110847586A (en) * 2019-11-11 2020-02-28 郑州工业应用技术学院 Safe hanging flower basket device for construction
WO2022010421A1 (en) * 2020-07-08 2022-01-13 Ram Smag Lifting Technologies Pte Ltd Lifting apparatus and method for transferring loads
CN111779288A (en) * 2020-07-16 2020-10-16 赵玉粉 Hanging flower basket is used in building engineering construction
CN111779288B (en) * 2020-07-16 2021-10-26 安徽滁鑫市政工程有限公司 Hanging flower basket is used in building engineering construction
CN112186642A (en) * 2020-09-24 2021-01-05 上海市基础工程集团有限公司 Feeding cage for rapid and continuous installation of submarine cable protective sleeve
CN113321095A (en) * 2021-06-10 2021-08-31 中建七局第四建筑有限公司 Vertical transportation device for super high-rise building construction
CN113321095B (en) * 2021-06-10 2023-01-24 中建七局第四建筑有限公司 Vertical transportation device for super high-rise building construction
CN115030578A (en) * 2022-06-24 2022-09-09 北京首嘉钢结构有限公司 Lifting appliance and stereo garage with same

Also Published As

Publication number Publication date
CN103523653B (en) 2015-07-15

Similar Documents

Publication Publication Date Title
CN103523653B (en) Construction hanging basket with built-in translational goods basket
CN203924696U (en) Backform hanger fast-assembling system
CN202751338U (en) Rail type suspension basket
CN108674436A (en) A kind of head cover switching mechanism, car body and hopper wagon
CN204310644U (en) A kind of single suspension centre cage guide installation and maintenance hanging basket
CN104477791B (en) Novel tower crane attached wall attachment lattice bracing frame auxiliary device
CN203698595U (en) Gantry supporting device for convenient placement of curved linear sections
CN203867583U (en) Tunnel constructing platform
CN203668857U (en) Walkable operating platform frame used for connection and reinforcement of SS-level guardrail templates
RU176422U1 (en) Gondola
CN202705913U (en) Railway cast-in-place simple box girder side mold sliding trolley
CN202577926U (en) Fixed operating platform for elevator shaft
CN203428765U (en) Hoist trolley and crane using same
CN202672762U (en) Truss-type security channel for building construction
CN203684465U (en) Modularized assembled board wall
CN209339578U (en) It is a kind of be built in hoistway packaged type protection and operating platform
CN202449491U (en) Conveyance and storage rack for inner and outer prefabricated wallboards
CN206345579U (en) It is a kind of can right-angled door-opened lift car
CN205840135U (en) A kind of crossbeam for building
CN204714340U (en) Crane portal frame
CN207597842U (en) It is a kind of can transported material scaffold
CN202672754U (en) Turnover launching vehicle for curtain wall
CN208328690U (en) A kind of plug-in operating device and steel box girder construction system
CN208309922U (en) A kind of building curtain wall facilitating maintenance
CN205354798U (en) Modularization outdoor transformer case

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant