CN107298368A - Hanging basket and suspension bracket for building - Google Patents

Hanging basket and suspension bracket for building Download PDF

Info

Publication number
CN107298368A
CN107298368A CN201710759357.1A CN201710759357A CN107298368A CN 107298368 A CN107298368 A CN 107298368A CN 201710759357 A CN201710759357 A CN 201710759357A CN 107298368 A CN107298368 A CN 107298368A
Authority
CN
China
Prior art keywords
hanging basket
door
building
top plate
basket body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710759357.1A
Other languages
Chinese (zh)
Inventor
蔡菲
杨燕
石磊
梅世霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHOUGANG SHUICHENG IRON AND STEEL (GROUP) SAIDE CONSTRUCTION CO., LTD.
Original Assignee
Guizhou Jing Zheng Inspection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Jing Zheng Inspection Co Ltd filed Critical Guizhou Jing Zheng Inspection Co Ltd
Priority to CN201710759357.1A priority Critical patent/CN107298368A/en
Publication of CN107298368A publication Critical patent/CN107298368A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/02Cages, i.e. cars

Abstract

The present invention relates to building machinery technical field, more particularly to a kind of hanging basket for building and suspension bracket, hanging basket body including frame structure, the side of hanging basket body is provided with hanging basket door, the bottom of hanging basket door is articulated with the bottom of hanging basket body, and upper bottom edge is removably connected to the top of hanging basket body by locking mechanism;Conveyer is provided with hanging basket body.The hanging basket door of opening can be overlapped in the material receiving on floor, form the passage transported for material building materials, now, the material building materials in hanging basket are positioned on conveyer, material building materials can be delivered to the material receiving of floor by conveyer.As can be seen that hanging basket door can activity be overlapped on the material receiving of floor, carrying work when not only facilitating hanging basket transported material building materials between material receiving also prevents hanging basket from producing in work is carried to rock, great safety guarantee is provided for staff.

Description

Hanging basket and suspension bracket for building
Technical field
The present invention relates to technical field of building construction, more particularly, to a kind of hanging basket and suspension bracket for building.
Background technology
In building constructions industry, the material building materials transport to skyscraper is mainly realized by lifting frame of hanging basket.
General means of transportation is to set suspension bracket in building roof in the prior art, and hanging basket is hung by pulley rope On suspension bracket, by realizing moving up and down for hanging basket in operation pulley rope.It is exactly to pass through especially by hanging basket transported material building materials Then lifting of hanging basket to suitable story height is received goods by suspension bracket in the material receiving of the floor.But, existing building is applied Material receiving in work is all that, at floor edge, after hanging basket is moved to suitable floor, hanging basket still hovers over material receiving Outside.Due to hanging basket hanging on suspension bracket, be originally not sufficiently stable, when load and unload material building materials when, can more produce it is certain rock, this The situation of kind not only influences the carrying of material building materials, and the more life security to operating personnel produces great hidden danger.
The information for being disclosed in the background section is merely intended to deepen the understanding of the general background technology to the present invention, and It is not construed as recognizing or implies information structure prior art known to those skilled in the art in any form.
The content of the invention
It is an object of the invention to provide a kind of hanging basket and suspension bracket for building, alleviate and transported in the prior art using hanging basket When material building materials are to skyscraper, carry work and be inconvenient to implement and there is the technical problem of very big potential safety hazard.
On the one hand, the present invention provides a kind of hanging basket for building, including hanging basket body, and the side of the hanging basket body is provided with Hanging basket door, the bottom of the hanging basket door is articulated with the bottom of the hanging basket body, and the hanging basket door upper bottom edge is tied by locking Structure is removably connected to the top of the hanging basket body;Conveyer is provided with the hanging basket body.
As further technical scheme, the conveyer lifts component and transfer assembly, institute including what is set gradually State the inner side that transfer assembly transmission is installed on the hanging basket door;It is described to lift the bottom that component is movably set in the hanging basket body Portion, the bottom for being capable of relatively described hanging basket body is moved up and down;It is movably set with described lift on component for support will to be located at Lift the pushing plate that the material building materials on component are pushed on the transfer assembly.
As further technical scheme, the component of lifting includes the first top plate, the second top plate and cylinder, described second Top plate is horizontally installed to the bottom of the hanging basket body, and the cylinder is installed on the bottom of the hanging basket body and the cylinder Clutch end is connected to the bottom of first top plate through second top plate;First top plate is provided with for described The track of pushing plate movement.
As further technical scheme, several locating pieces are movably set with first top plate.
As further technical scheme, the transfer assembly includes motor, gearbox and transmission belt, the electricity Machine, the gearbox and the transmission belt are connected successively.
As further technical scheme, anti-skid structure is provided with the transmission belt, and parallel to its direction of transfer Both sides be provided with position limiting structure.
As further technical scheme, the locking mechanism includes locking catch and locking post, and the locking post is vertical It is arranged at the top of the hanging basket body;The locking catch is articulated with the upper bottom edge of the hanging basket door, and the locking catch On be provided with for the locking through hole that matches of locking post.
As further technical scheme, stretch rod, the drawing are provided between the hanging basket door and the hanging basket body The first end of boom is operatively connected to the top of the hanging basket body, and the second end of the stretch rod is articulated with the hanging basket door Upper bottom edge end.
As further technical scheme, it is provided with the top of the hanging basket body for being slidably matched with the stretch rod Sliding sleeve, the sliding sleeve is articulated with the hanging basket body.
On the other hand, the present invention provides a kind of building suspension bracket, including suspension bracket body and such as the offer of above-mentioned technical scheme Any described hanging basket for building, the suspension bracket body is fixed on building roof, and one end of the suspension bracket body is provided with admittedly Fixed pulley, the hanging basket for building is connected to the fixed block by rope.
Compared with prior art, the hanging basket for building and suspension bracket that the present invention is provided can reach following beneficial effect:
The present invention provides a kind of hanging basket and suspension bracket for building, hanging basket door is set in the side of hanging basket body, the side is referred to Hanging basket is in face of the side of building.The bottom of hanging basket door is articulated with hanging basket body bottom portion, and upper bottom edge is removably connected to hanging basket sheet Body top, when lifting of hanging basket is to when needing to load and unload the floor of material building materials, opens the locking mechanism of hanging basket door upper bottom edge, hanging basket Rotated around its bottom to the direction away from hanging basket body.The hanging basket door of opening can be overlapped in the material receiving on floor, shape Into the passage transported for material building materials, now, the material building materials in hanging basket are positioned on conveyer, conveyer can Material building materials are delivered to the material receiving of floor.As can be seen that hanging basket door movable can be overlapped on the material receiving of floor, On the one hand the passage of material transportation is formed, on the one hand certain stabilization is served to hanging basket in the horizontal direction, not only side Hanging basket transported material building materials when and material receiving between carrying work, also prevent hanging basket carry work in produce rolling It is dynamic, provide great safety guarantee for staff.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art The accompanying drawing used required in embodiment or description of the prior art is briefly described, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of structural representation of hanging basket for building provided in an embodiment of the present invention;
The enlarged drawing that Fig. 2 is A in Fig. 1;
Fig. 3 is Fig. 1 right view;
The enlarged drawing that Fig. 4 is B in Fig. 3;
Fig. 5 is a kind of use state schematic diagram of hanging basket for building provided in an embodiment of the present invention.
Icon:1- hanging basket bodies;11- hanging baskets door;The top plates of 21- first;The top plates of 22- second;23- cylinders;24- is pushed away Send plate;3- transfer assemblies;41- locks catch;411- locks through hole;42- locks post;5- stretch rods;51- sliding sleeves.
Embodiment
Technical scheme is clearly and completely described below in conjunction with accompanying drawing, it is clear that described implementation Example is a part of embodiment of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill The every other embodiment that personnel are obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
In the description of the invention, it is necessary to explanation, term " on ", " under ", "left", "right", " vertical ", " level ", The orientation or position relationship of the instructions such as " interior ", " outer " are, based on orientation shown in the drawings or position relationship, to be for only for ease of and retouch State the present invention and simplify description, rather than indicate or imply that the device or element of meaning there must be specific orientation, with specific Azimuth configuration and operation, therefore be not considered as limiting the invention.In addition, term " first ", " second " are only used for retouching Purpose is stated, and it is not intended that indicating or implying relative importance.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for the ordinary skill in the art, can understand above-mentioned term with concrete condition Concrete meaning in the present invention.
The embodiment of the present invention is described in detail below in conjunction with accompanying drawing.It should be appreciated that this place is retouched The embodiment stated is merely to illustrate and explain the present invention, and is not intended to limit the invention.
Reference picture 1-5, the present invention provides a kind of hanging basket for building, including hanging basket body 1, and the side of hanging basket body 1 is set There is hanging basket door 11, the bottom of hanging basket door 11 is articulated with the bottom of hanging basket body 1, and the upper bottom edge of hanging basket door 11 passes through locking mechanism It is removably connected to the top of hanging basket body 1;Conveyer is provided with hanging basket body 1.
Wherein, hanging basket body 1 includes bottom plate, and the surrounding of bottom plate is provided with four side plates, side plate and bottom plate perpendicular to bottom plate Constitute the hanging basket body 1 of frame structure.Hanging basket door 11 is arranged at hanging basket at work close to a side plate of building, sets the side Plate is the first side plate.
The beneath base of hanging basket door 11 is hinged on the bottom of the first side plate, hanging basket door 11 can around bottom rotation so as to Hanging basket door 11 is opened.
Specifically, hanging basket door 11 is articulated with the base of the first side plate by articulated elements.Articulated elements includes the be mutually matched The base of the first side plate is fixed in one articulated section and the second articulated section, the first articulated section, and hanging basket door 11 is fixed in the second articulated section Bottom.Rotation of second articulated section relative to the first articulated section can realize rotation of the hanging basket door 11 relative to hanging basket body 1.
Preferably, the bottom of hanging basket body 1 is provided with the limiting section for limiting hanging basket door 11, and the limiting section can be limited Angle between hanging basket door 11 and the side plate of hanging basket body 1 first, prevents that hanging basket 11 anglecs of rotation of door are excessive, with hanging basket door 11 Base is suspended to hanging basket body 1, is unfavorable for staff's control hanging basket door 11.Specifically, the relative hanging basket body 1 of hanging basket door 11 revolves Turn to be less than or equal to 190 ° with the angular range of side plate formation.
When hanging basket door 11 is opened, hanging basket door 11 is rotated away from the direction of hanging basket body 1, and 11 bottoms of hanging basket door are hinged In hanging basket body 1,11 upper bottom edges of hanging basket door can be overlapped in the material receiving of floor, now, the splicing of hanging basket body 1 and floor Platform is connected, and forms the transport channel of material building materials.Now, the conveyer set in hanging basket body 1 can facilitate work people The transport channel that material building materials are formed by hanging basket door 11 is delivered to the material receiving of floor by member.
To sum up, the present invention provides a kind of hanging basket for building, and hanging basket door 11 is set in the side of hanging basket body 1, what the side referred to It is the side that hanging basket faces building.The bottom of hanging basket door 11 is articulated with the bottom of hanging basket body 1, and upper bottom edge, which is removably connected to, hangs The top of basket body 1, when lifting of hanging basket is to when needing to load and unload the floor of material building materials, opens the locking knot of 11 upper bottom edges of hanging basket door Structure, hanging basket door 11 rotates around its bottom to the direction away from hanging basket body 1.The hanging basket door 11 of opening can be overlapped on floor Material receiving, formed for material building materials transport passage, now, the material building materials in hanging basket are positioned over conveyer On, material building materials can be delivered to the material receiving of floor by conveyer.As can be seen that hanging basket door 11 can activity be overlapped in On the material receiving of floor, the passage of material transportation is on the one hand formed, on the one hand hanging basket is served necessarily in the horizontal direction Stabilization, carrying work when not only facilitating hanging basket transported material building materials between material receiving also prevents hanging basket from existing Carry to produce in work and rock, great safety guarantee is provided for staff.
Specifically, transmission device lifts component and transfer assembly 3 including what is set gradually, and the transmission of transfer assembly 3 is installed on The inner side of hanging basket door 11;The bottom that component is movably set in hanging basket body 1 is lifted, can be above and below the bottom with respect to hanging basket body 1 It is mobile;And component is being lifted away from being movably set with transfer assembly 3 for biography will to be pushed to positioned at the building materials lifted on component Pushing plate 24 on sending component 3.
When material building materials are contained in hanging basket body 1, specifically, material building materials, which are positioned over, to be lifted on component.When hanging basket exists Under the castering action of suspension bracket building is outer move up and down when, lift component and be in position closest to the bottom of hanging basket body 1, so The stability of material building materials can be kept as far as possible in hanging basket movement.The floor of loading and unloading is needed when hanging basket is moved to, is lifted Component is lifted material building materials and moved up, and material building materials is higher than transfer assembly 3, is easy to material building materials being moved to transmission group On part 3.
Transfer assembly 3 is arranged at the inner side of hanging basket door 11, and the inner side of hanging basket door 11 mentioned here is referred to when hanging basket door 11 It is locked to the inner side of hanging basket door 11 in the state of hanging basket body 1.When hanging basket door 11 is opened, it is overlapped on the material receiving of floor, Transfer assembly 3 is laterally disposed, has connected the material receiving with floor in hanging basket body 1.
In specific works, the floors of material building materials is carried when hanging basket is thus lifted to, hanging basket is hovered over outside material receiving Side, opens hanging basket door 11, forms the transport channel of material building materials.Operation lifts component and material building materials is lifted into certain altitude, Make it higher than or concordant with transfer assembly 3, operate pushing plate 24, pushing plate 24 acts on material sheet material away from transfer assembly 3 Side, pushing plate 24 is moved on platform is lifted towards transfer assembly 3, and the material building materials lifted on platform are pushed into transmission group Material sheet material is delivered to the material receiving of floor by part 3, transfer assembly 3 again.
Wherein, when hanging basket is moved up and down by suspension bracket body, the upper bottom edge of hanging basket door 11 is locked on hanging basket body 1.Its Locking mechanism includes locking catch 41 and locking post 42, and locking post 42 is vertically arranged at the top of hanging basket body 1;Lock catch 41 It is articulated with the locking through hole 411 being provided with the upper bottom edge of hanging basket door 11, and locking catch 41 for matching with locking post 42.
When hanging basket door 11 is fastened on hanging basket body 1, hanging basket door 11 is overlapped with first side, by 11 upper bottom edges of hanging basket door Locking catch 41 rotates towards hanging basket body 1 around upper bottom edge, and only the locking through hole 411 on locking catch 41 is sheathed on locking post 42, hanging basket door 11 can not rotate away from the direction of hanging basket body 1, realize the locking of hanging basket door 11.
It should be noted that when hanging basket door 11 is overlapped on floor material receiving, hanging it locking rotation of catch 41 An inclined-plane is formed between the upper bottom edge of basket door 11 and material receiving, the carrying of material building materials has been further facilitated.
Also, in order to ensure the stability of the relative motion of hanging basket body 1 of hanging basket door 11, hanging basket door 11 and hanging basket body 1 it Between be provided with stretch rod 5, the first end of stretch rod 5 is operatively connected to the top of hanging basket body 1, the second end hinge of stretch rod 5 It is connected to the end of the upper bottom edge of hanging basket door 11.
The top of hanging basket body 1 is provided with the sliding sleeve 51 for being slidably matched with stretch rod 5, and sliding sleeve 51 is articulated with hanging basket sheet Body 1.Because hanging basket door 11 is in the rotation relative to hanging basket body 1, the angle between stretch rod 5 and the first side of hanging basket body 1 Can change, sliding sleeve 51 be hinged with hanging basket body 1, can adapt to the change of the angle, make stretch rod 5 preferably play its work With.
Wherein, lifting component includes the first top plate 21, the second plate and cylinder 23, and the second top plate 22 is horizontally installed to hanging basket sheet The bottom of body 1, cylinder 23 is installed on the bottom of hanging basket body 1 and the clutch end of cylinder 23 is connected to through the second top plate 22 The bottom of first top plate 21;First top plate 21 is provided with the track moved for pushing plate 24.
Lift component and set gradually the first top plate 21, the second top plate 22 and cylinder 23, the level of the second top plate 22 from top to bottom It is installed on the bottom of hanging basket body 1.Cylinder 23 is vertically arranged to the bottom of hanging basket body 1, the clutch end connection of cylinder 23 In the bottom of the first top plate 21.In use, material building materials are positioned on the first top plate 21, start cylinder 23, the action of cylinder 23 It can be moved back and forth with the in the vertical direction of the first top plate 21, operation is lifted to material building materials to realize.
It should be noted that offering the through hole passed through for the output shaft end of cylinder 23 on the second top plate 22.Also, it is The stability that the first top plate 21 is moved up and down when cylinder 23 is promoted is improved, cylinder 23 can be evenly arranged with multiple.
Wherein, the bottom of the first top plate 21 is provided with guide rod, is provided with what is matched with guide rod on the second top plate 22 Pilot hole, when relative second top plate 22 of the first top plate 21 is moved up and down, guide rod is slided in pilot hole, prevents the first top plate 21 relative second top plates 22 produce rocking for horizontal direction, influence the transport of material sheet material.
In order to be positioned to the material sheet material being positioned on the first top plate 21, set in the surrounding activity of the first top plate 21 There are several locating pieces.
Specifically, the movable connection structure of locating piece and the first top plate 21 can have numerous embodiments, be exemplified below.
Mode one
First top plate 21 is above spreads all over mesh, and locating piece has the plug division matched with mesh.Material building materials are positioned over After on first top plate 21, several locating pieces are installed in the surrounding of material sheet material, by the position restriction of material sheet material, material are prevented Sheet material is subjected to displacement on the first top plate 21, or even is dropped.
It should be noted that the first top plate 21 and locating piece of this structure are applied to, carrier structure is larger and neat specification Material sheet material (such as sheet material), do not apply to powder particles shape (such as gravel) material.
Mode two
First top plate 21 is tabular, and locating piece is tabular, and several locating pieces, which are surrounded, detachably to be connected installed in the first top plate 21 surrounding, forms fence shape.When the material that any state can be placed on locating piece formation fence shape, the first top plate 21 is built Material.When needing the material building materials on the first top plate 21 being transported on transfer assembly 3, locating piece is disassembled, with regard to that can use Material sheet material on first top plate 21 is pushed on transfer assembly 3 by pushing plate 24.
Both the above embodiment is that the flexible connection relation of locating piece and the first top plate 21 is done with detailed citing Illustrate, be not intended to limit the present invention the protection domain for the hanging basket for building that embodiment is provided.
It should be noted that in order that the hanging basket for building that the embodiment of the present invention is provided has more wide in range use model Enclose, the first top plate 21 can be changed, the first of different structure can be used according to the species specification for the material building materials to be transported Top plate 21.
Also, the track moved for pushing plate 24 is provided with the first top plate 21.The bearing of trend of the track is first Top plate 21 points to the direction of transfer assembly 3, can realize that pushing plate 24 pushes to material sheet material the effect of transfer assembly 3.
In addition, transfer assembly 3 includes motor, gearbox and transmission belt, motor, gearbox and transmission belt are driven successively Connection.
Motor provides power for the operation of whole transfer assembly 3, and this is the process that an electric energy is converted into mechanical energy.According to Different mode classifications, motor can have different species, and the present embodiment is not restricted to motor type, as long as reality can be realized Apply the effect of example requirement.In the present embodiment, motor converts electrical energy into driving torque according to the law of electromagnetic induction, and then Impart power to gearbox.
The motor gear and guide wheel being connected successively with motor are provided with gearbox, guide wheel is arranged on transmission One end of band, and be in contact with the inwall of transmission belt one end.It is provided with and transmission belt with respect to the other end of guide wheel in transmission belt The idle pulley that is in contact of inwall, and the inner ring of transmission belt is provided with support wheel for being tensioned transmission belt.Guide wheel mainly will In gearbox transmission belt is passed to by changing the power of gearratio.Idle pulley mainly accepts the slip of transmission belt, does not do work, also not Influence is produced on the gearratio of motion.
Anti- Slipped Clove Hitch is provided with slip, transmission belt in order to which the material building materials prevented from being positioned on transmission belt are produced on the move Structure, and the both sides parallel to its direction of transfer are provided with position limiting structure.
On the other hand, the present invention also provides a kind of building suspension bracket, including suspension bracket body and above-described embodiment are provided Hanging basket for building, suspension bracket body is fixed on building roof, and one end of suspension bracket body is provided with fixed block, and hanging basket for building passes through Rope is connected to fixed block.Specifically, the suspension ring for connecting rope are provided with hanging basket body 1.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to The technical scheme described in foregoing embodiments can so be modified, or which part or all technical characteristic are entered Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology The scope of scheme.

Claims (10)

1. a kind of hanging basket for building, it is characterised in that including hanging basket body, the side of the hanging basket body is provided with hanging basket door, The bottom of the hanging basket door is articulated with the bottom of the hanging basket body, and the upper bottom edge of the hanging basket door is removable by locking mechanism Unload the top for being connected to the hanging basket body;Conveyer is provided with the hanging basket body.
2. hanging basket for building according to claim 1, it is characterised in that the conveyer includes lifting for setting gradually Component and transfer assembly, the transfer assembly transmission are installed on the inner side of the hanging basket door;The component of lifting is movably set in The bottom of the hanging basket body, the bottom for being capable of relatively described hanging basket body is moved up and down;Lift activity on component described and set It is equipped with the pushing plate for that will be pushed to positioned at the material building materials lifted on component on the transfer assembly.
3. hanging basket for building according to claim 2, it is characterised in that the component of lifting includes the first top plate, second Top plate and cylinder, second top plate are horizontally installed to the bottom of the hanging basket body, and the cylinder is installed on the hanging basket sheet The clutch end of the bottom of body and the cylinder is connected to the bottom of first top plate through second top plate;Described One top plate is provided with the track moved for the pushing plate.
4. hanging basket for building according to claim 3, it is characterised in that be movably set with first top plate some Individual locating piece.
5. hanging basket for building according to claim 2, it is characterised in that the transfer assembly includes motor, speed change Case and transmission belt, the motor, the gearbox and the transmission belt are connected successively.
6. hanging basket for building according to claim 5, it is characterised in that anti-skid structure is provided with the transmission belt, and Both sides parallel to its direction of transfer are provided with position limiting structure.
7. hanging basket for building according to claim 1, it is characterised in that the locking mechanism includes locking catch and locking Post, the locking post is vertically arranged at the top of the hanging basket body;The locking catch is articulated with the upper bottom of the hanging basket door The locking through hole for matching with the locking post is provided with side, and the locking catch.
8. hanging basket for building according to claim 1, it is characterised in that set between the hanging basket door and the hanging basket body Stretch rod is equipped with, the first end of the stretch rod is operatively connected to the top of the hanging basket body, the second of the stretch rod End is articulated with the end of the upper bottom edge of the hanging basket door.
9. hanging basket for building according to claim 8, it is characterised in that be provided with the top of the hanging basket body for The sliding sleeve that the stretch rod is slidably matched, the sliding sleeve is articulated with the hanging basket body.
10. a kind of building suspension bracket, including suspension bracket body and the hanging basket for building according to any one of claim 1-9, Characterized in that, the suspension bracket body is fixed on building roof, one end of the suspension bracket body is provided with fixed block, described to build Build with hanging basket and the fixed block is connected to by rope.
CN201710759357.1A 2017-08-29 2017-08-29 Hanging basket and suspension bracket for building Pending CN107298368A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710759357.1A CN107298368A (en) 2017-08-29 2017-08-29 Hanging basket and suspension bracket for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710759357.1A CN107298368A (en) 2017-08-29 2017-08-29 Hanging basket and suspension bracket for building

Publications (1)

Publication Number Publication Date
CN107298368A true CN107298368A (en) 2017-10-27

Family

ID=60132220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710759357.1A Pending CN107298368A (en) 2017-08-29 2017-08-29 Hanging basket and suspension bracket for building

Country Status (1)

Country Link
CN (1) CN107298368A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109081233A (en) * 2018-09-30 2018-12-25 拓暄建设科技有限公司 A kind of reinforced mesh suspender
CN114044435A (en) * 2021-10-28 2022-02-15 青海第二路桥建设有限公司 Hoisting structure and method for highway construction
CN114735446A (en) * 2022-05-11 2022-07-12 中建新越建设工程有限公司 Receiving device of building construction elevator
CN114849477A (en) * 2022-03-11 2022-08-05 浙江绿创生物科技股份有限公司 Rolling type electrodialyzer

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07172736A (en) * 1993-12-21 1995-07-11 Yoshitada Etsuhara Construction elevator equipped with loading/unloading device
CN202321881U (en) * 2011-11-08 2012-07-11 山西太行建设开发有限公司 Hanging basket of material hoister
CN202544409U (en) * 2012-04-03 2012-11-21 台州正鼎建设有限公司 High-rise building construction material discharging device
CN203112295U (en) * 2013-02-26 2013-08-07 程伟 Hoisting basket for construction engineering
CN103523653A (en) * 2013-10-17 2014-01-22 中国十七冶集团有限公司 Construction hanging basket with built-in translational goods basket
CN203754173U (en) * 2014-04-11 2014-08-06 高波 Safety hanging basket for building
US20150175388A1 (en) * 2013-12-20 2015-06-25 Thyssenkrupp Elevator Corporation System and Method For Assembling An Elevator Cab

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07172736A (en) * 1993-12-21 1995-07-11 Yoshitada Etsuhara Construction elevator equipped with loading/unloading device
CN202321881U (en) * 2011-11-08 2012-07-11 山西太行建设开发有限公司 Hanging basket of material hoister
CN202544409U (en) * 2012-04-03 2012-11-21 台州正鼎建设有限公司 High-rise building construction material discharging device
CN203112295U (en) * 2013-02-26 2013-08-07 程伟 Hoisting basket for construction engineering
CN103523653A (en) * 2013-10-17 2014-01-22 中国十七冶集团有限公司 Construction hanging basket with built-in translational goods basket
US20150175388A1 (en) * 2013-12-20 2015-06-25 Thyssenkrupp Elevator Corporation System and Method For Assembling An Elevator Cab
CN203754173U (en) * 2014-04-11 2014-08-06 高波 Safety hanging basket for building

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈增强 等: "《实用五金手册》", 31 March 2004, 广州:广东科技出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109081233A (en) * 2018-09-30 2018-12-25 拓暄建设科技有限公司 A kind of reinforced mesh suspender
CN114044435A (en) * 2021-10-28 2022-02-15 青海第二路桥建设有限公司 Hoisting structure and method for highway construction
CN114044435B (en) * 2021-10-28 2024-02-02 青海第二路桥建设有限公司 Hoisting structure and method for expressway construction
CN114849477A (en) * 2022-03-11 2022-08-05 浙江绿创生物科技股份有限公司 Rolling type electrodialyzer
CN114735446A (en) * 2022-05-11 2022-07-12 中建新越建设工程有限公司 Receiving device of building construction elevator

Similar Documents

Publication Publication Date Title
CN107298368A (en) Hanging basket and suspension bracket for building
CN105645314B (en) One kind decoration ceramic tile Palletised carry trolley
CN205527564U (en) Decorate ceramic tile pile up neatly floor truck
CN106193108B (en) A kind of special retaining wall construction equipment of Concrete Highway
CN206511849U (en) A kind of mobile tower crane
CN208561599U (en) A kind of controllable extendible transport fork truck
CN107814328A (en) A kind of intelligent power equipment installation lifting apparatus
CN212024537U (en) Building site hollow brick hangs uses safe type hanging flower basket
CN209143590U (en) A kind of motor machine lifting device easy to use
CN206734438U (en) Novel crawler-type transport vehicle
CN215854751U (en) Interior decoration material conveying device
CN207597889U (en) A kind of construction device for transporting objects
CN203095343U (en) Multifunctional construction hoist for cargoes
CN103086232B (en) Multifunctional construction hoist for cargoes
CN212050263U (en) Rotatable hoist device for building engineering construction that facilitates use
CN204549905U (en) Electronicly draw cucurbit machine
KR20040096474A (en) A box for carrying materials
CN207002054U (en) A kind of electronic slidingtype suspension transferring machine
CN206669785U (en) A kind of boiler feeding device
CN205873713U (en) Portal crane
CN205471247U (en) Lifting machine for building engineering
CN220723377U (en) Lifting appliance device
CN205804359U (en) The vertical feeder of gate slot concrete
CN219081612U (en) Waterproof board trolley automatic feeding mechanism
CN218290055U (en) Vertical transportation device for building blocks

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181120

Address after: 553000 No. 78 North Metallurgical Road, Zhongshan, Liupanshui, Guizhou

Applicant after: SHOUGANG SHUICHENG IRON AND STEEL (GROUP) SAIDE CONSTRUCTION CO., LTD.

Address before: 553000 No. 78 North Metallurgical Road, Zhongshan, Liupanshui, Guizhou

Applicant before: Guizhou Jing Zheng Inspection Co., Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20171027

RJ01 Rejection of invention patent application after publication