CN203112295U - Hoisting basket for construction engineering - Google Patents

Hoisting basket for construction engineering Download PDF

Info

Publication number
CN203112295U
CN203112295U CN 201320087621 CN201320087621U CN203112295U CN 203112295 U CN203112295 U CN 203112295U CN 201320087621 CN201320087621 CN 201320087621 CN 201320087621 U CN201320087621 U CN 201320087621U CN 203112295 U CN203112295 U CN 203112295U
Authority
CN
China
Prior art keywords
rail
fence
bayonet lock
pin grooves
clamping pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320087621
Other languages
Chinese (zh)
Inventor
程伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320087621 priority Critical patent/CN203112295U/en
Application granted granted Critical
Publication of CN203112295U publication Critical patent/CN203112295U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model relates to a hoisting basket for construction engineering, and belongs to the filed of building construction facilities. The hoisting basket for the construction engineering comprises a rail and a lifting lug which is arranged on the top of the rail. The hoisting basket for the construction engineering is characterized in that at least one side face of the rail is provided with a movable baffle, the lower end of the movable baffle is hinged to the rail through rotating shafts, the upper portion of the rail and the upper portion of the movable baffle are respectively provided with upper clamping pin grooves and lower clamping pin grooves, the positions of the upper clamping pin grooves correspond to the positions of the lower clamping pin grooves, and clamping pins are arranged in the upper clamping pin grooves and the lower clamping pin grooves. The movable baffle is fixed with the rail through the clamping pins, and a bedplate with rotating wheels is arranged on the inner bottom of the rail. The hoisting basket is simple and reasonable in structure, the movable baffle is arranged on the side face of the rail, the bedplate is further arranged, bricks can be integrally taken out, the fact that the bricks inside the hoisting basket are manually taken out and placed one by one is of no need, operating is convenient and fast, labor intensity is lowered, working efficiency is improved, the construction schedule is guaranteed, and the hoisting basket for the construction engineering can be popularized and used in a large scale conveniently.

Description

Cradle for constructional engineering
Technical field
The utility model relates to a kind of cradle for constructional engineering, belongs to building operation facility field.
Background technology
At present, usually adopting hanging basket that brick is transported to upstairs from ground on the building ground goes, the tradition hanging basket all is the casher box that is welded into and since hanging basket all around be fixing enclosed construction with the bottom, when therefore transporting brick, need manually to be placed on fragment of brick in the hanging basket earlier, start jacking system then hanging basket is raised to upstairs, put inconvenient operation well by artificial fragment of brick in the hanging basket is taken out block by block again, labour intensity is big, and influences construction speed.
The utility model content
According to above deficiency of the prior art, the technical problems to be solved in the utility model is: provide a kind of rational in infrastructure, easy to operate, reduce labour intensity and increase work efficiency, guarantee the cradle for constructional engineering of construction speed.
Cradle for constructional engineering described in the utility model, comprise fence and the hanger that is installed in the fence top, at least one side of fence is provided with shifting board, the lower end of shifting board is hinged by turning cylinder and fence, fence and shifting board top arrange bayonet lock groove, following bayonet lock groove respectively, and the position of upper and lower bayonet lock groove is corresponding, and bayonet lock is installed in the upper and lower bayonet lock groove, shifting board is fixed by bayonet lock and fence, and the inner bottom part of fence is provided with the platen of roller.
Described platen one side arranges vertical push rod, is convenient to promote platen.
During use, elder generation will carry on the bayonet lock, makes bayonet lock from deviating from the bayonet lock groove down, outwards spurs shifting board simultaneously, and shifting board is tilted earthward, and the platen that is placed with fragment of brick is pushed in the fence, then shifting board is back into original position and also fixes with bayonet lock and fence; By jacking system hanging basket is raised to upstairs, by above-mentioned steps shifting board is outwards drawn back then, and the pulling platen is with the whole taking-up of fragment of brick, need not artificial fragment of brick in the hanging basket is taken out block by block puts well, convenient to operation, both reduced labour intensity, and improved work efficiency again, guaranteed construction speed.
The beneficial effect that the utility model compared with prior art has is:
This cradle for constructional engineering is simple and reasonable, shifting board is set and platen is set by the side with fence, can be with the whole taking-up of fragment of brick, need not artificial fragment of brick in the hanging basket is taken out block by block puts well, convenient to operation, both reduced labour intensity, and improved work efficiency again, guaranteed construction speed, and be convenient to large-scale promotion and use.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of platen.
Among the figure: 1, fence; 2, hanger; 3, shifting board; 4, bayonet lock; 5, go up the bayonet lock groove; 6, following bayonet lock groove; 7, turning cylinder; 8, platen; 9, roller; 10, vertical push rod.
The specific embodiment
Below in conjunction with accompanying drawing embodiment of the present utility model is described further:
As Fig. 1, shown in 2, this cradle for constructional engineering comprises fence 1 and is installed in the hanger 2 at fence 1 top, at least one side of fence 1 is provided with shifting board 3, the lower end of shifting board 3 is hinged by turning cylinder 7 and fence 1, fence 1 and shifting board 3 tops arrange bayonet lock 4 grooves 5 respectively, following bayonet lock 4 grooves 6, on, the position of following bayonet lock 4 grooves 6 is corresponding, bayonet lock 4 is installed in, in following bayonet lock 4 grooves 6, shifting board 3 is fixing with fence 1 by bayonet lock 4, the inner bottom part of fence 1 is provided with the platen 8 of roller 9, one side of platen 8 arranges vertical push rod 10, is convenient to promote platen 8.
During use, will carry on the bayonet lock 4 earlier, make bayonet lock 4 from deviating from bayonet lock 4 grooves 6 down, outwards spur shifting board 3 simultaneously, shifting board 3 is tilted earthward, the platen 8 that is placed with fragment of brick is pushed in the fence 1, then shifting board 3 is back into original position and fixing with fence 1 with bayonet lock 4; By jacking system hanging basket is raised to upstairs, by above-mentioned steps shifting board 3 is outwards drawn back then, and pulling platen 8 is with the whole taking-up of fragment of brick, need not artificial fragment of brick in the hanging basket is taken out block by block puts well, convenient to operation, both reduced labour intensity, and improved work efficiency again, guaranteed construction speed.

Claims (2)

1. cradle for constructional engineering, comprise fence (1) and be installed in the hanger (2) at fence (1) top, it is characterized in that: at least one side of fence (1) is provided with shifting board (3), the lower end of shifting board (3) is hinged by turning cylinder (7) and fence (1), fence (1) and shifting board (3) top are respectively arranged with bayonet lock groove (5), following bayonet lock groove (6), on, the position of following bayonet lock groove is corresponding, bayonet lock (4) is installed in, in the following bayonet lock groove, shifting board (3) is fixing by bayonet lock (4) and fence (1), and the inner bottom part of fence (1) is provided with the platen (8) of roller (9).
2. cradle for constructional engineering according to claim 1, it is characterized in that: described platen (8) one sides arrange vertical push rod (10).
CN 201320087621 2013-02-26 2013-02-26 Hoisting basket for construction engineering Expired - Fee Related CN203112295U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320087621 CN203112295U (en) 2013-02-26 2013-02-26 Hoisting basket for construction engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320087621 CN203112295U (en) 2013-02-26 2013-02-26 Hoisting basket for construction engineering

Publications (1)

Publication Number Publication Date
CN203112295U true CN203112295U (en) 2013-08-07

Family

ID=48892664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320087621 Expired - Fee Related CN203112295U (en) 2013-02-26 2013-02-26 Hoisting basket for construction engineering

Country Status (1)

Country Link
CN (1) CN203112295U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103407199A (en) * 2013-08-29 2013-11-27 昆山硕华模具板有限公司 Hot-pressing plate convenient to lift
CN103523653A (en) * 2013-10-17 2014-01-22 中国十七冶集团有限公司 Construction hanging basket with built-in translational goods basket
CN107298368A (en) * 2017-08-29 2017-10-27 贵州精正检测有限公司 Hanging basket and suspension bracket for building
CN108217549A (en) * 2017-12-13 2018-06-29 安徽电气集团股份有限公司 A kind of house construction engineering structurally variable formula hanging basket

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103407199A (en) * 2013-08-29 2013-11-27 昆山硕华模具板有限公司 Hot-pressing plate convenient to lift
CN103523653A (en) * 2013-10-17 2014-01-22 中国十七冶集团有限公司 Construction hanging basket with built-in translational goods basket
CN107298368A (en) * 2017-08-29 2017-10-27 贵州精正检测有限公司 Hanging basket and suspension bracket for building
CN108217549A (en) * 2017-12-13 2018-06-29 安徽电气集团股份有限公司 A kind of house construction engineering structurally variable formula hanging basket

Similar Documents

Publication Publication Date Title
CN203112295U (en) Hoisting basket for construction engineering
CN203064994U (en) Lifting device for disassembling negative ring segments
CN103276910B (en) Wallboard assembling robot
CN202039851U (en) Lifting device of shaft sleeve inner wall construction assembling template
CN204851299U (en) Colliery is combined in pit and is adopted working face hydraulic support loading device
CN204022376U (en) Cable channel cover plate promotes Handling device
CN205442452U (en) Convenient hoisting accessory of substation equipment safety
CN202864836U (en) Heat preservation building block carrying trolley
CN206299163U (en) Mobile reinforcement processes factory building
CN202227705U (en) Tensioning device
CN203271769U (en) Concrete pipe piece steel mould with box structure
CN204163658U (en) With the rigid guide device of car folding type tourist bus
CN203978466U (en) A kind of symmetrical interchangeable Quick-return device
CN203130100U (en) Tunnel eave wall construction trolley
CN204624982U (en) The vertical overhead hoist of a kind of tubing
CN204752071U (en) Cable manhole cover opening device
CN204321560U (en) A kind of coal pulverizer steel liner plate erecting device
CN204124396U (en) Steel frame pipe bundling device
CN203822344U (en) Fully-mechanized recycling special hydraulic support
CN203845686U (en) Joist steel hoisting tool
CN202788665U (en) Automatic drill pipe layer-picker for oilfield drilling
CN202462610U (en) Novel jacking translational mechanism
CN203269425U (en) Movable lifting equipment
CN203936995U (en) Lath spicing forming type device
CN217010120U (en) Simple and easy job site formal cable disc fixing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130807

Termination date: 20140226