CN103485548A - Vertical reinforcement connecting method for fabricated hollow concrete superimposed shear wall - Google Patents

Vertical reinforcement connecting method for fabricated hollow concrete superimposed shear wall Download PDF

Info

Publication number
CN103485548A
CN103485548A CN201310486007.4A CN201310486007A CN103485548A CN 103485548 A CN103485548 A CN 103485548A CN 201310486007 A CN201310486007 A CN 201310486007A CN 103485548 A CN103485548 A CN 103485548A
Authority
CN
China
Prior art keywords
shear wall
vertical
vertical reinforcement
reinforcing bar
precast shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310486007.4A
Other languages
Chinese (zh)
Other versions
CN103485548B (en
Inventor
孟凡林
孟祥瑞
付萍
孟锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fanlin Assembly Building Technology Co ltd
Original Assignee
孟凡林
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=49826101&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN103485548(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 孟凡林 filed Critical 孟凡林
Priority to CN201310486007.4A priority Critical patent/CN103485548B/en
Publication of CN103485548A publication Critical patent/CN103485548A/en
Application granted granted Critical
Publication of CN103485548B publication Critical patent/CN103485548B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a vertical reinforcement connecting method for a fabricated hollow concrete superimposed shear wall, and belongs to the field of concrete structure engineering of building construction. The method comprises the steps of: 1, upwards throwing away vertically distributed component reinforcements in shear wall components, reserving externally slung reinforcements, and forming slotted holes in the lower parts of the components to facilitate the alignment overlapping connection of the reinforcements when the upper and lower layers of components are jointed; 2, enabling the outwards thrown reinforcements at the upper parts of the components to penetrate through floor positions when the outwards thrown reinforcements are arranged; 3, enabling the upper layers of hollow concrete shear wall components to be corresponding to vertical component holes, inserting the outwards thrown reinforcements of the lower layers of shear wall components into the holes, and connecting the externally slung reinforcements with the vertical reinforcements in the components at the positions of the reserved slotted holes in an overlapping way; 4, pouring concrete at hollow parts for core filling to finish installation of the components, and enabling the components to form a whole. According to the method disclosed by the invention, the vertical reinforcements of the fabricated hollow concrete superimposed shear wall can be simply connected, the quality is easy to ensure, the productivity is improved, the building construction quality can be ensured, and the construction cost can be lowered.

Description

The method of attachment of assembling hollow concrete overlapped shear wall vertical reinforcement
Technical field
The invention belongs to building construction concrete structure engineering field, particularly relate to prefabricated concrete structure, is a kind of improvement to existing prefabricated concrete structure design and job practices.
Background technology
Housing industrialization is the development trend that Modern Residence is built.The fabricated shear wall structure is that maximum form of structure is applied in current housing construction.
At present, the method that assembled integral shear wall structure vertical reinforcement connects mainly contains: reinforced bar sleeve grouting connects, indirectly overlaps connection, mechanical connection or welding etc.Refer to the 6th phase paper " development and the application abroad of prefabricated concrete structure key technology " that " housing industry " periodical was published in 2011, the author of this article is Li Xiaoming.Sleeve connects and need to when the precast shear wall member, reinforced bar sleeve be connected with reinforcing bar, and concreting completes element precast, during installation, the reinforcing bar of lower member is inserted in sleeve, and then grouting, complete the vertical connection of member reinforcing steel bar.This kind of connected mode is more in the U.S. and day this application, the sleeve installation accuracy of prefabricated units is had relatively high expectations, and the cost that sleeve connects is higher, and application is restricted.Overlap joint is in precast unit embedded bar lower end indirectly, be reserved with the hole that inwall is the rough surfaces such as corrugated or helical form, after the precast unit installation, overlap reinforcing bar inserts in hole to setting lap length simultaneously, by grout hole and the steam vent be connected with hole, pour into grouting material in hole, can realize that after the grouting material setting and harden overlap joint of vertical reinforcement connects.Mechanical connection is identical with the conventional concrete construction method with welding, inconvenient operation.
For the many weak points that exist in the middle of prior art, this area is needed the problem of wanting a kind of new method to solve its existence badly.
Summary of the invention
Technical problem to be solved by this invention is: a kind of method that provides assembling hollow concrete overlapped shear wall vertical reinforcement to connect, improve q&r, quickening speed of application that reinforcing bar connects, and can reduce the engineering construction cost again simultaneously.
The method of attachment of assembling hollow concrete overlapped shear wall vertical reinforcement is characterized in that:
Step 1, in the end of precast shear wall member, by the member vertical reinforcement, to top, make reserved, this top reserved part is the vertical outer reinforcing bar that gets rid of of member, the vertical outer outer length of getting rid of of getting rid of reinforcing bar of member is 15d~40d, the diameter that wherein d is the member vertical reinforcement, when the precast shear wall member is the floor top layer, the vertical outer length value that gets rid of reinforcing bar of member is that the high value of floor roof top mark deducts 20mm, the spacing of getting rid of reinforcing bar outside member is vertical is identical with the spacing of member vertical reinforcement, is 100mm~300mm;
Step 2, in the bottom of precast shear wall member, be provided with the installation slotted eye;
Step 3, described member vertical reinforcement are positioned at the both sides of the vertical hollow hole of member, and the member vertical reinforcement is walked around the vertical hollow hole of member by member annular steel tie and realized drawknot;
Step 4, at first by the vertical hollow hole of the member in the precast shear wall member of upper strata, with the member in lower floor precast shear wall member, vertical outer to get rid of reinforcing bar corresponding, then the vertical outer reinforcing bar that gets rid of of member is inserted in the vertical hollow hole of member, get rid of reinforcing bar and be connected with the member vertical reinforcement overlap joint in the precast shear wall member outside the position that slotted eye is installed is vertical by member;
Step 5, by the hollow part of precast shear wall member, filling with the core concreting, complete the installation of precast shear wall member, make the precast shear wall member form an integral body.
Described precast shear wall member consists of modular level reinforcing bar, member vertical reinforcement, member annular steel tie, the vertical hollow hole of member and concrete members.
Described member vertical reinforcement adopts in the method for attachment of the vertical hollow hole of member position that colligation connects, is welded to connect, any reinforcing bar connected mode in mechanical connection.
Described installation slotted eye is arranged at the bottom of precast shear wall member, or the bottom of precast shear wall member is not provided with the installation slotted eye.
The closed steel hoop of described member annular steel tie for forming by welding.
By above-mentioned design scheme, the present invention can bring following beneficial effect: a kind of method that prefabricated assembled hollow concrete overlapped shear wall structural element vertical reinforcement overlap joint connects, make and do not need complicated working procedure and equipment, the reliable overlap joint that just can realize prefabricated hollow concrete overlapped shear wall member vertical reinforcement connects, accelerate speed of application, reduce the link cost of reinforcing bar and then reduce the engineering construction cost.
Connection between precast shear wall of the present invention is reliable, and the security performance of this fabricated shear wall structure is equal to cast-in-place shear wall structure.
The accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is further illustrated:
Fig. 1 is precast shear wall member elevation of the present invention.
The A-A sectional drawing that Fig. 2 is the precast shear wall member.
The B-B sectional drawing that Fig. 3 is the precast shear wall member.
Fig. 4 is the vertical connected node of precast shear wall member.
1-precast shear wall member, 2-modular level reinforcing bar, 3-member vertical reinforcement, 4-member annular steel tie, the vertical hollow hole of 5-member, vertical outer reinforcing bar, 7-installation slotted eye, 8-concrete members, the 9-concrete of getting rid of of 6-member in figure.
The specific embodiment
As shown in the figure: precast shear wall member 1 of the present invention consists of modular level reinforcing bar 2, member vertical reinforcement 3, member annular steel tie 4, the vertical hollow hole 5 of member and concrete members 8.The present invention is the end at precast shear wall member 1, by the vertical outer reinforcing bar 6 that gets rid of of the upwards reserved member of member vertical reinforcement 3, getting rid of length outward is the diameter that 15d~40d(d is vertical reinforcement 3, when the precast shear wall member is the floor top layer, for the high value of floor plates top mark subtracts 20mm), spacing is identical with the vertical reinforcement spacing, is 100mm~300mm; At member, install in splicing, outside its reserved member is vertical, get rid of in the vertical hollow hole 5 of member of reinforcing bar 6 insertion last layer precast shear wall members 1, in last layer precast shear wall member 1 bottom, slotted eye 7 places are installed, realize that with last layer member vertical reinforcement 3 overlap joint is connected, the concrete 9 of then building hollow part completes the vertical splicing of member.Default member annular steel tie 4 in prefabricated units is that the assurance vertical distribution reinforcement of wall body is realized effective drawknot in the situation that hole can be walked around in the vertical hollow hole of member 5 both sides, center.
Described installation slotted eye 7 can not arrange under the condition that can guarantee reliable overlap joint connection yet.
Specific embodiment 1(typical floor position)
Step 1, in the end of precast shear wall member 1, by member vertical reinforcement 3, to top, make reserved, this top reserved part is the vertical outer reinforcing bar 6 that gets rid of of member, the vertical outer outer length range that gets rid of that gets rid of reinforcing bar 6 of member is 15d~40d, the diameter that wherein d is member vertical reinforcement 3, the spacing of getting rid of reinforcing bar 6 outside member is vertical is identical with the spacing of member vertical reinforcement 3, is 100mm~300mm;
Step 2, be provided with in the bottom of precast shear wall member 1 slotted eye 7 is installed;
Step 3, described member vertical reinforcement 3 are positioned at the both sides of the vertical hollow hole 5 of member, and member vertical reinforcement 3 is walked around the vertical hollow hole 5 of member by member annular steel tie 4 and realized drawknot;
Step 4, at first by the vertical hollow hole 5 of the member in upper strata precast shear wall member 1, with the member in lower floor precast shear wall member 1, vertical outer to get rid of reinforcing bar 6 corresponding, then the vertical outer reinforcing bar 6 that gets rid of of member is inserted in the vertical hollow hole 5 of member, get rid of reinforcing bar 6 and be connected with member vertical reinforcement 3 overlap joints in precast shear wall member 1 outside the position that slotted eye 7 is installed is vertical by member;
Step 5, by the hollow part of precast shear wall member 1, filling with core concreting 9, complete the installation of precast shear wall member 1, make precast shear wall member 1 form an integral body.
Specific embodiment 2(top layer position)
Step 1, in the end of precast shear wall member 1, by prefabricated units vertical reinforcement 3, to top, make reserved, this top reserved part is the vertical outer reinforcing bars 6 that get rid of of prefabricated units, when precast shear wall member 1 is the floor top layer, the vertical outer outer length of getting rid of of getting rid of reinforcing bar 6 of prefabricated units is that the high value of floor roof top mark deducts 20mm, the spacing of getting rid of reinforcing bar 6 outside prefabricated units are vertical is identical with the spacing of prefabricated units vertical reinforcement 3, is 100mm~300mm;
Vertical outer the getting rid of in the Cast-in-situ Beam that reinforcing bar 6 is anchored in top layer floor absolute altitude position of step 3, described prefabricated units;
Step 4, by the hollow part of precast shear wall member 1, filling with core concreting 9, complete the installation of precast shear wall member 1, make precast shear wall member 1 form an integral body.

Claims (5)

1. assembling hollow concrete overlapped shear wall vertical reinforcement method of attachment is characterized in that:
Step 1, end in precast shear wall member (1), by member vertical reinforcement (3), to top, make reserved, this top reserved part is the vertical outer reinforcing bar (6) that gets rid of of member, the vertical outer outer length of getting rid of of getting rid of reinforcing bar (6) of member is 15d~40d, the diameter that wherein d is member vertical reinforcement (3), when precast shear wall member (1) is the floor top layer, the vertical outer length value that gets rid of reinforcing bar (6) of member is that the high value of floor roof top mark deducts 20mm, the spacing of getting rid of reinforcing bar (6) outside member is vertical is identical with the spacing of member vertical reinforcement (3), for 100mm~300mm,
Step 2, be provided with in the bottom of precast shear wall member (1) slotted eye (7) is installed;
Step 3, described member vertical reinforcement (3) are positioned at the both sides of the vertical hollow hole of member (5), and member vertical reinforcement (3) is walked around the vertical hollow hole of member (5) by member annular steel tie (4) and realized drawknot;
Step 4, at first by the vertical hollow hole of the member in upper strata precast shear wall member (1) (5), with member in lower floor's precast shear wall member (1), vertical outer to get rid of reinforcing bar (6) corresponding, then the vertical outer reinforcing bar (6) that gets rid of of member is inserted in the vertical hollow hole of member (5), get rid of reinforcing bar (6) and be connected with member vertical reinforcement (3) overlap joint in precast shear wall member (1) outside the position that slotted eye (7) is installed is vertical by member;
Step 5, by the hollow part of precast shear wall member (1), filling with core concreting (9), complete the installation of precast shear wall member (1), make precast shear wall member (1) form an integral body.
2. assembling hollow concrete overlapped shear wall vertical reinforcement according to claim 1 method of attachment is characterized in that: described precast shear wall member (1) consists of modular level reinforcing bar (2), member vertical reinforcement (3), member annular steel tie (4), the vertical hollow hole of member (5) and concrete members (8).
3. assembling hollow concrete overlapped shear wall vertical reinforcement according to claim 1 method of attachment is characterized in that: described member vertical reinforcement (3) adopts in the method for attachment of the vertical hollow hole of member (5) position that colligation connects, is welded to connect, any reinforcing bar connected mode in mechanical connection.
4. assembling hollow concrete overlapped shear wall vertical reinforcement according to claim 1 method of attachment, it is characterized in that: described installation slotted eye (7) is arranged at the bottom of precast shear wall member (1), or the bottom of precast shear wall member (1) is not provided with installation slotted eye (7).
5. assembling hollow concrete overlapped shear wall vertical reinforcement according to claim 1 method of attachment is characterized in that: the closed steel hoop of described member annular steel tie (4) for forming by welding.
CN201310486007.4A 2013-10-17 2013-10-17 Assembling hollow concrete overlapped shear wall Vertical bar connection method Active CN103485548B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310486007.4A CN103485548B (en) 2013-10-17 2013-10-17 Assembling hollow concrete overlapped shear wall Vertical bar connection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310486007.4A CN103485548B (en) 2013-10-17 2013-10-17 Assembling hollow concrete overlapped shear wall Vertical bar connection method

Publications (2)

Publication Number Publication Date
CN103485548A true CN103485548A (en) 2014-01-01
CN103485548B CN103485548B (en) 2015-08-12

Family

ID=49826101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310486007.4A Active CN103485548B (en) 2013-10-17 2013-10-17 Assembling hollow concrete overlapped shear wall Vertical bar connection method

Country Status (1)

Country Link
CN (1) CN103485548B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047381A (en) * 2014-07-04 2014-09-17 孟凡林 Assembly integrated type lightly reinforced concrete shear wall structure
CN104878855A (en) * 2015-05-05 2015-09-02 合肥工业大学 Wallboard interlayer connection for use at bottom enhanced part of laminated shear wall structure
CN106193623A (en) * 2016-07-29 2016-12-07 刘祥锦 A kind of prefabricated concrete structure construction method
CN107254933A (en) * 2017-07-17 2017-10-17 广东省建科建筑设计院有限公司 The high-rise single through hole precast shear wall of assembled and its assembling structure and construction method
CN107762072A (en) * 2017-11-06 2018-03-06 河南远大天成住宅工业股份有限公司 A kind of wall vertical reinforcement constrains construction method
CN108412131A (en) * 2018-05-15 2018-08-17 孟凡林 The connecting node of the vertical distribution bar of assembled circular hole slab shear wall and connection method
CN108729591A (en) * 2018-05-22 2018-11-02 吉林建筑大学 Circular hole slab shear wall is vertically distributed the positioning device and localization method of connection reinforcing bar
CN111749395A (en) * 2020-06-22 2020-10-09 吉林建筑大学 Hollow partition plate and vertical connection method thereof
CN114892840A (en) * 2022-04-08 2022-08-12 吉林建筑大学 Prefabricated assembly type concrete prefabricated shear wall with mould net and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1035631A (en) * 1964-01-16 1966-07-13 Nuclear Power Plant Co Ltd Core access assembly for nuclear reactors
CN2327740Y (en) * 1997-06-12 1999-07-07 易静 Lightweight porous wall panel
CN2349275Y (en) * 1997-12-08 1999-11-17 中美合资北京福安水泥制品有限公司 Prestressed hollow board, concrete shearing force wall and beam joint point
WO2004092504A1 (en) * 2003-04-17 2004-10-28 Csr Building Products Limited Autoclaved aerated concrete building panel system
CN201121340Y (en) * 2007-08-21 2008-09-24 同济大学 Pre-stress assembled underground continuous wall and preformed block thereof
CN101967851A (en) * 2009-07-28 2011-02-09 董杨 Board-mixing structure assembly type house and building method thereof
CN102409796A (en) * 2011-08-24 2012-04-11 中国建筑设计研究院 Fabricated blocks, fabricated-block building system and construction method thereof
CN102808465A (en) * 2012-08-08 2012-12-05 沈阳建筑大学 Assembly connecting structure and assembly connecting method of assembled concrete frame and shear wall combination

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1035631A (en) * 1964-01-16 1966-07-13 Nuclear Power Plant Co Ltd Core access assembly for nuclear reactors
CN2327740Y (en) * 1997-06-12 1999-07-07 易静 Lightweight porous wall panel
CN2349275Y (en) * 1997-12-08 1999-11-17 中美合资北京福安水泥制品有限公司 Prestressed hollow board, concrete shearing force wall and beam joint point
WO2004092504A1 (en) * 2003-04-17 2004-10-28 Csr Building Products Limited Autoclaved aerated concrete building panel system
CN201121340Y (en) * 2007-08-21 2008-09-24 同济大学 Pre-stress assembled underground continuous wall and preformed block thereof
CN101967851A (en) * 2009-07-28 2011-02-09 董杨 Board-mixing structure assembly type house and building method thereof
CN102409796A (en) * 2011-08-24 2012-04-11 中国建筑设计研究院 Fabricated blocks, fabricated-block building system and construction method thereof
CN102808465A (en) * 2012-08-08 2012-12-05 沈阳建筑大学 Assembly connecting structure and assembly connecting method of assembled concrete frame and shear wall combination

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047381A (en) * 2014-07-04 2014-09-17 孟凡林 Assembly integrated type lightly reinforced concrete shear wall structure
CN104878855A (en) * 2015-05-05 2015-09-02 合肥工业大学 Wallboard interlayer connection for use at bottom enhanced part of laminated shear wall structure
CN106193623A (en) * 2016-07-29 2016-12-07 刘祥锦 A kind of prefabricated concrete structure construction method
CN107254933A (en) * 2017-07-17 2017-10-17 广东省建科建筑设计院有限公司 The high-rise single through hole precast shear wall of assembled and its assembling structure and construction method
CN107762072A (en) * 2017-11-06 2018-03-06 河南远大天成住宅工业股份有限公司 A kind of wall vertical reinforcement constrains construction method
CN107762072B (en) * 2017-11-06 2020-03-17 河南远大天成住宅工业股份有限公司 Wall vertical steel bar constraint construction method
CN108412131B (en) * 2018-05-15 2020-05-01 孟凡林 Connecting node and connecting method for vertically distributed reinforcing steel bars of assembled circular hole plate shear wall
CN108412131A (en) * 2018-05-15 2018-08-17 孟凡林 The connecting node of the vertical distribution bar of assembled circular hole slab shear wall and connection method
CN108729591A (en) * 2018-05-22 2018-11-02 吉林建筑大学 Circular hole slab shear wall is vertically distributed the positioning device and localization method of connection reinforcing bar
CN108729591B (en) * 2018-05-22 2020-05-01 吉林建筑大学 Positioning device and positioning method for vertically distributed connecting steel bars of round hole plate shear wall
CN111749395A (en) * 2020-06-22 2020-10-09 吉林建筑大学 Hollow partition plate and vertical connection method thereof
CN114892840A (en) * 2022-04-08 2022-08-12 吉林建筑大学 Prefabricated assembly type concrete prefabricated shear wall with mould net and construction method
CN114892840B (en) * 2022-04-08 2023-11-24 吉林建筑大学 Prefabricated concrete shear wall with mould net and construction method

Also Published As

Publication number Publication date
CN103485548B (en) 2015-08-12

Similar Documents

Publication Publication Date Title
CN103485548A (en) Vertical reinforcement connecting method for fabricated hollow concrete superimposed shear wall
WO2018219024A1 (en) Steel-plate-encased precast concrete column foot joint and construction method therefor
CN205530667U (en) Prefabricated assembled concrete member
KR101314081B1 (en) Retaining wall and upeer structure connection method for rahmen structure
CN106223360A (en) Use the open cut cast in place and precast construction subway station construction method of stake supporting system
CN106049506B (en) A kind of APS assembleds supporting pile structure and construction method
CN103850363B (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN106592440B (en) A kind of construction method of prefabricated subsection type bridge pier
CN107044177A (en) A kind of assembly concrete shear wall fractionation, assembled attachment structure and connection method
CN111042185B (en) Construction method of basement raft foundation with tower crane foundation
CN107327030A (en) The plate-column structure node and its cap prefabricated components and construction method of a kind of steel column
CN208685438U (en) A kind of wet seam type of attachment of sectional type floorings
CN106968381A (en) With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection
CN208844417U (en) A kind of outer precast construction for pier column and its outer prefabricated interior cast-in-place pier column
CN106284655A (en) Precast concrete beam stud connects node and method of attachment in succession
CN206174195U (en) Assembled concrete shear force wall split, assemble connection structure
CN103243640A (en) Cap beam efficient, convenient and quick to construct and construction method thereof
CN106320537A (en) Prefabricated concrete-filled square steel tube column and steel girder connecting joint
CN110924537A (en) Construction process of H-shaped steel concrete transfer beam-reinforced concrete column joint
CN108179806A (en) A kind of complete assembled steel reinforced concrete frame structure system
CN103628571B (en) Beam-column joint for reverse construction method and construction method
CN107090908A (en) A kind of new vertical prefabricated components joint connecting method
KR101451167B1 (en) Hollowed Precast reinforced concrete Assembly And Connecting Method Thereof
CN105220809B (en) A kind of arch top plate and the attachment structure and its construction method of bracket stake
CN205063961U (en) Push pipe tube coupling structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20140101

Assignee: Hebei Xinyan Youjian Assembly Building Technology Co., Ltd

Assignor: Meng Fanlin

Contract record no.: X2020220000008

Denomination of invention: Vertical reinforcement connecting method for fabricated hollow concrete superimposed shear wall

Granted publication date: 20150812

License type: Exclusive License

Record date: 20200525

Application publication date: 20140101

Assignee: Fanlin Assembly Building Technology Co., Ltd

Assignor: Meng Fanlin

Contract record no.: X2020220000007

Denomination of invention: Vertical reinforcement connecting method for fabricated hollow concrete superimposed shear wall

Granted publication date: 20150812

License type: Common License

Record date: 20200522

EE01 Entry into force of recordation of patent licensing contract
TR01 Transfer of patent right

Effective date of registration: 20210618

Address after: Room 101, unit 0, building b3-2-1, Wanda Plaza, Changchun Auto City, west of Xihu Road, Changchun Auto Development Zone, Jilin Province, 130000

Patentee after: Changchun Jianlin Education Consulting Co.,Ltd.

Address before: 130061 Room 405, four building, Star Street, 2577 building street, Changchun, Jilin.

Patentee before: Meng Fanlin

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210902

Address after: Room 101, building b3-2-1, group B3, Wanda Plaza, Changchun City, automobile economic and Technological Development Zone, Changchun City, Jilin Province, 130062

Patentee after: Fanlin Assembly Building Technology Co.,Ltd.

Address before: Room 101, unit 0, building b3-2-1, Wanda Plaza, Changchun Auto City, west of Xihu Road, Changchun Auto Development Zone, Jilin Province, 130000

Patentee before: Changchun Jianlin Education Consulting Co.,Ltd.

TR01 Transfer of patent right