CN103469812A CN2013104089575A CN201310408957A CN103469812A CN 103469812 A CN103469812 A CN 103469812A CN 2013104089575 A CN2013104089575 A CN 2013104089575A CN 201310408957 A CN201310408957 A CN 201310408957A CN 103469812 A CN103469812 A CN 103469812A
Authority
CN
China
Prior art keywords
dowel
buried plate
plug welding
leveling
anchor bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013104089575A
Other languages
English (en)
Inventor
刘喜春
沈山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongfeng Design Institute Co Ltd
Original Assignee
Dongfeng Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongfeng Design Institute Co Ltd filed Critical Dongfeng Design Institute Co Ltd
Priority to CN2013104089575A priority Critical patent/CN103469812A/zh
Publication of CN103469812A publication Critical patent/CN103469812A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本发明涉及一种冲压设备土建安装水平度控制装置,属于机床设备技术领域。它包括开有灌浆孔和塞焊孔的支座埋板和焊接在塞焊孔内的调平锚筋和固定锚筋。本发明还公开了一种安装方法:将调平锚筋和固定锚筋预埋在混凝土中,调节调平锚筋至水平;将支座埋板上的塞焊孔对准调平锚筋和固定锚筋放置支座埋板,并在支座埋板下预留混凝土待浇筑空间,再次调节调平锚筋至支座埋板水平;将支座埋板与调平锚筋和固定锚筋塞焊,并切除调平锚筋和固定锚筋上端面露出支座埋板的部分后磨平;通过从支座埋板上的灌浆孔浇筑混凝土,将支座埋板下预留的混凝土待浇筑空间填实。本发明设计方法明确,施工控制简便,可有效降低施工的失误。

Description

冲压设备土建安装水平度控制装置及安装方法
技术领域
本发明属于机床设备技术领域,具体涉及一种冲压设备土建安装水平度控制装置及安装方法。
背景技术
在汽车工厂中冲压设备土建安装的水平度控制一直是行业难点。冲压设备一般有4个受力支座,每个支座承载力要求达数百吨,支座埋板尺寸约1000mm—1500mm、支座埋板厚度一般不小于50mm、支座埋板锚筋需¢25mm,支座处混凝土厚度达1500mm。为满足冲压设备安装要求,需在土建施工时控制4个支座埋板平面的水平度高差在2mm以内,每个支座埋板平面的水平度公差为1000:0.15(两个支座埋板间距离一般大于10m)。施工难度大,且很难达到设备安装水平度要求。采用何种方法能在土建施工时保证设备安装的水平度是技术重点。
目前现有的方法是将冲压设备支座埋板与锚筋先行焊接,再将该埋板固定后浇筑混凝土。因浇筑混凝土时的振动导致埋板移位,使埋板平面的水平度高差及每个支座埋板平面的水平度公差不好控制,如出现失误补救十分困难。
发明内容
本发明的目的就是针对现有技术的缺陷,提供一种冲压设备土建安装水平度控制装置及安装方法,适用于汽车工厂中冲压设备土建安装的水平度控制。
本发明采用的技术方案是:一种冲压设备土建安装水平度控制装置,它包括开有灌浆孔和塞焊孔的支座埋板和焊接在塞焊孔内的调平锚筋和固定锚筋。
进一步地,所述调节锚筋和固定锚筋的高度低于支座埋板的高度。
进一步地,所述塞焊孔外端直径大于内端直径。
进一步地,所述塞焊孔剖面成锥形。
进一步地,所述调节锚筋焊接在支座埋板四周边缘的塞焊孔内。
更进一步地,所述固定锚筋均匀焊接在支座埋板中间的塞焊孔内。
一种冲压设备土建安装方法,其特征在于:它包括以下步骤:
(1)、将调平锚筋和固定锚筋预埋在混凝土中,调节调平锚筋至水平;
(2)、将支座埋板上的塞焊孔对准调平锚筋和固定锚筋放置支座埋板,并在支座埋板下预留混凝土待浇筑空间,再次调节调平锚筋至支座埋板水平;
(3)、将支座埋板与调平锚筋和固定锚筋塞焊,并切除调平锚筋和固定锚筋上端面露出支座埋板的部分后磨平;
(4)、通过从支座埋板上的灌浆孔浇筑混凝土,将支座埋板下预留的混凝土待浇筑空间填实。
进一步地,所述支座埋板上的塞焊孔外端直径大于内端直径。
进一步地,所述塞焊孔剖面成锥形。
更进一步地,所述调节锚筋焊接在支座埋板四周边缘的塞焊孔内,所述固定锚筋均匀焊接在支座埋板中间的塞焊孔内。
本发明设计方法明确,施工控制简便,可有效降低施工的失误。
附图说明
图1为本发明结构俯视图;
图2为本发明结构侧视图;
图3为调平锚筋结构示意图;
图4为固定锚筋结构示意图;
图5为固定锚筋塞焊并磨平后状态示意图。
图中,1—支座埋板;2—调平锚筋;3—固定锚筋;4—灌浆孔;5—塞焊孔。
具体实施方式
下面结合附图和具体实施例对本发明作进一步的详细说明,便于清楚地了解本发明,但它们不对本发明构成限定。
如图1—图5所示,一种冲压设备土建安装水平度控制装置,它包括开有灌浆孔4和塞焊孔5的支座埋板1和焊接在塞焊孔5内的调平锚筋2和固定锚筋3。所述塞焊孔5外端直径大于内端直径,所述塞焊孔5剖面成锥形。所述调节锚筋2焊接在支座埋板1四周边缘的塞焊孔5内,所述固定锚筋3均匀焊接在支座埋板1中间的塞焊5孔内。
一种冲压设备土建安装方法,其特征在于:它包括以下步骤:
(1)、将调平锚筋2和固定锚筋3预埋在混凝土中,调节调平锚筋2至水平;
(2)、将支座埋板上1的塞焊孔5对准调平锚筋2和固定锚筋3放置支座埋板1,并在支座埋板1下预留混凝土待浇筑空间,再次调节调平锚筋2至支座埋板1水平;
(3)、将支座埋板1与调平锚筋2和固定锚筋3塞焊,并切除调平锚筋2和固定锚筋3上端面露出支座埋板1的部分后磨平,图5中所示为固定锚筋3塞焊并磨平后的状态示意图;
(4)、通过从支座埋板上1的灌浆孔4浇筑混凝土,将支座埋板1下预留的混凝土待浇筑空间填实。
上述方案中,所述支座埋板上1的塞焊孔5外端直径大于内端直径。
上述方案中,所述塞焊孔5剖面成锥形。
上述方案中,所述调节锚筋2焊接在支座埋板1四周边缘的塞焊孔5内,所述固定锚筋3均匀焊接在支座埋板1中间的塞焊孔5内。
本说明书未作详细描述的内容属于本领域专业技术人员公知的现有技术。

Claims (10)

1.一种冲压设备土建安装水平度控制装置,其特征在于:它包括开有灌浆孔和塞焊孔的支座埋板和焊接在塞焊孔内的调平锚筋和固定锚筋。
2.根据权利要求1所述的冲压设备土建安装水平度控制装置,其特征在于:所述调节锚筋和固定锚筋的高度低于支座埋板的高度。
3.根据权利要求1所述的冲压设备土建安装水平度控制装置,其特征在于:所述塞焊孔外端直径大于内端直径。
4.根据权利要求3所述的冲压设备土建安装水平度控制装置,其特征在于:所述塞焊孔剖面成锥形。
5.根据权利要求4所述的冲压设备土建安装水平度控制装置,其特征在于:所述调节锚筋焊接在支座埋板四周边缘的塞焊孔内。
6.根据权利要求5所述的冲压设备土建安装水平度控制装置,其特征在于:所述固定锚筋均匀焊接在支座埋板中间的塞焊孔内。
7.一种冲压设备土建安装方法,其特征在于:它包括以下步骤:
(1)、将调平锚筋和固定锚筋预埋在混凝土中,调节调平锚筋至水平;
(2)、将支座埋板上的塞焊孔对准调平锚筋和固定锚筋放置支座埋板,并在支座埋板下预留混凝土待浇筑空间,再次调节调平锚筋至支座埋板水平;
(3)、将支座埋板与调平锚筋和固定锚筋塞焊,并切除调平锚筋和固定锚筋上端面露出支座埋板的部分后磨平;
(4)、通过从支座埋板上的灌浆孔浇筑混凝土,将支座埋板下预留的混凝土待浇筑空间填实。
8.根据权利要求7所述的冲压设备土建安装水平度控制装置,其特征在于:所述支座埋板上的塞焊孔外端直径大于内端直径。
9.根据权利要求8所述的冲压设备土建安装水平度控制装置,其特征在于:所述塞焊孔剖面成锥形。
10.根据权利要求9所述的冲压设备土建安装水平度控制装置,其特征在于:所述调节锚筋焊接在支座埋板四周边缘的塞焊孔内,所述固定锚筋均匀焊接在支座埋板中间的塞焊孔内。
CN2013104089575A 2013-09-10 2013-09-10 冲压设备土建安装水平度控制装置及安装方法 Pending CN103469812A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013104089575A CN103469812A (zh) 2013-09-10 2013-09-10 冲压设备土建安装水平度控制装置及安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013104089575A CN103469812A (zh) 2013-09-10 2013-09-10 冲压设备土建安装水平度控制装置及安装方法

Publications (1)

Publication Number Publication Date
CN103469812A true CN103469812A (zh) 2013-12-25

Family

ID=49794841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013104089575A Pending CN103469812A (zh) 2013-09-10 2013-09-10 冲压设备土建安装水平度控制装置及安装方法

Country Status (1)

Country Link
CN (1) CN103469812A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894439A (zh) * 2017-04-12 2017-06-27 国网江苏省电力公司连云港供电公司 一种变电站主变压器基础结构及其建造方法
CN108131530A (zh) * 2017-11-13 2018-06-08 武汉船用机械有限责任公司 一种设备安装平台的安装方法
CN109412320A (zh) * 2018-12-25 2019-03-01 江苏亚力防爆电机有限公司 一种电机内外水套焊接结构
CN117340395A (zh) * 2023-11-23 2024-01-05 迪森(常州)能源装备有限公司 一种板材的塞焊方法、采用该塞焊方法的法兰及压力容器

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5630303A (en) * 1995-12-08 1997-05-20 Nec America, Inc. Remote enclosure anchor frame and installation method
CN101280629A (zh) * 2008-05-08 2008-10-08 烟建集团有限公司 超大型铁件的高精度安装施工方法
CN101871265A (zh) * 2010-07-02 2010-10-27 中国十七冶集团有限公司 平垫板可调的座浆安装方法
CN101881031A (zh) * 2010-02-11 2010-11-10 中国二十二冶集团有限公司 可调式灌浆料垫板装置及其安装方法
CN102650135A (zh) * 2012-05-18 2012-08-29 中国十七冶集团有限公司 烧结环冷机立柱柱底预埋件找平方法
CN102943484A (zh) * 2012-12-01 2013-02-27 新余钢铁集团有限公司 一种大中型设备安装斜铁坐浆快速找平法
CN203546745U (zh) * 2013-09-10 2014-04-16 东风设计研究院有限公司 冲压设备土建安装水平度控制装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5630303A (en) * 1995-12-08 1997-05-20 Nec America, Inc. Remote enclosure anchor frame and installation method
CN101280629A (zh) * 2008-05-08 2008-10-08 烟建集团有限公司 超大型铁件的高精度安装施工方法
CN101881031A (zh) * 2010-02-11 2010-11-10 中国二十二冶集团有限公司 可调式灌浆料垫板装置及其安装方法
CN101871265A (zh) * 2010-07-02 2010-10-27 中国十七冶集团有限公司 平垫板可调的座浆安装方法
CN102650135A (zh) * 2012-05-18 2012-08-29 中国十七冶集团有限公司 烧结环冷机立柱柱底预埋件找平方法
CN102943484A (zh) * 2012-12-01 2013-02-27 新余钢铁集团有限公司 一种大中型设备安装斜铁坐浆快速找平法
CN203546745U (zh) * 2013-09-10 2014-04-16 东风设计研究院有限公司 冲压设备土建安装水平度控制装置

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894439A (zh) * 2017-04-12 2017-06-27 国网江苏省电力公司连云港供电公司 一种变电站主变压器基础结构及其建造方法
CN108131530A (zh) * 2017-11-13 2018-06-08 武汉船用机械有限责任公司 一种设备安装平台的安装方法
CN108131530B (zh) * 2017-11-13 2019-12-31 武汉船用机械有限责任公司 一种设备安装平台的安装方法
CN109412320A (zh) * 2018-12-25 2019-03-01 江苏亚力防爆电机有限公司 一种电机内外水套焊接结构
CN117340395A (zh) * 2023-11-23 2024-01-05 迪森(常州)能源装备有限公司 一种板材的塞焊方法、采用该塞焊方法的法兰及压力容器

Similar Documents

Publication Publication Date Title
CN103469812A (zh) 冲压设备土建安装水平度控制装置及安装方法
CN102296813B (zh) 一种钢柱脚的施工方法及其钢柱脚结构
CN104404882B (zh) 一种支座辅助安装模具及其施工方法
CN207863507U (zh) 一种用于高层建筑楼层的竖向构件置换装置
CN206233276U (zh) 一种预试桩静压施加装置
CN103644429A (zh) 一种利用三点固定法快速调整平垫板的施工方法
CN203546745U (zh) 冲压设备土建安装水平度控制装置
CN201635410U (zh) 承受吊装施工荷载的混凝土结构临时加固装置
CN203960919U (zh) 煤矿采动区输电铁塔纠偏顶升装置
CN203846359U (zh) 铁路无砟轨道板压紧控制装置
CN103669432A (zh) 一种煤矿采动区输电铁塔纠偏顶升装置
CN204252023U (zh) 一种支座辅助安装模具
CN205243006U (zh) 一种侧模支撑顶托
CN204530501U (zh) 一种便于施工时控制拱肋线形的支架支座
CN201982898U (zh) 一种设备安装垫板调整装置
CN205115970U (zh) 机场场道工程中水泥混凝土道面模板及支撑系统
CN104612175A (zh) 用于保证精密设备安装平面水平度的装置及其方法
CN105625462A (zh) 预制梁台座施工工艺
CN104895319A (zh) 现浇混凝土剪力墙、框架柱模板的安装标高的定位装置
CN203430027U (zh) 可调式大钢模板
CN209556123U (zh) 一种在现浇混凝土节点中的专用辅助固定装置
CN108506032B (zh) 一种导洞内大体积顶纵梁的施工方法
CN106758845B (zh) 混凝土结构物落梁用托梁装置及利用其的落梁施工方法
CN206408536U (zh) 用于落梁净空不足条件下的混凝土结构物落梁用托梁装置
CN104818730A (zh) 一种设备基础顶部埋件及其安装方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20131225