CN103452328B - Post brutal bracing means and method is subtracted for reinforced concrete member - Google Patents

Post brutal bracing means and method is subtracted for reinforced concrete member Download PDF

Info

Publication number
CN103452328B
CN103452328B CN201310285293.8A CN201310285293A CN103452328B CN 103452328 B CN103452328 B CN 103452328B CN 201310285293 A CN201310285293 A CN 201310285293A CN 103452328 B CN103452328 B CN 103452328B
Authority
CN
China
Prior art keywords
steel pipe
reinforced concrete
girder
concrete
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310285293.8A
Other languages
Chinese (zh)
Other versions
CN103452328A (en
Inventor
张凤勇
刘海明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CMTCC Shanghai Shisanye Construction Co Ltd filed Critical CMTCC Shanghai Shisanye Construction Co Ltd
Priority to CN201310285293.8A priority Critical patent/CN103452328B/en
Publication of CN103452328A publication Critical patent/CN103452328A/en
Application granted granted Critical
Publication of CN103452328B publication Critical patent/CN103452328B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to and a kind ofly subtract post brutal bracing means and method for reinforced concrete member, reinforced steel concrete girder can be realized and reach dismounting pillar, meet the object of room layout and using function, utilize steel pipe four pin pillar to substitute the supporting role of reinforced concrete column, then complete enhancing and the reinforcing of reinforced concrete girder.In the both sides of reinforced concrete column, two steel pipe four pin pillars are set, at steel pipe four pin column upper section, utilize jack that steel pipe top beam is shored the bottom of reinforced concrete girder, be reached through the load that above device transmits reinforced concrete girder, substitute the object of reinforced concrete column.Then excise reinforced concrete column, installation form concreting, realize the object that reinforced concrete girder is reinforced.The present invention makes easily, easy for installation, with strong points, simple to operate, solves a difficult problem for steel concrete wall beam strengthen, has good economic benefit and social benefit.

Description

Post brutal bracing means and method is subtracted for reinforced concrete member
Technical field
What the invention belongs to reinforced concrete member subtracts post brutal technical field, particularly relates to a kind ofly subtracting post brutal bracing means and method for reinforced concrete member.
Background technology
General in reinforced concrete frame structure construction work, by reinforced concrete girder, building load is passed to reinforced concrete column, final load is delivered to basis.Expanding room area to meet using function, often needing remove pillar and reinforce wall beam.But wall beam cannot meet supporting capacity requirement after pillar dismounting, method is improper easily brings potential safety hazard.
Summary of the invention
Technical problem to be solved by this invention is to provide and a kind ofly subtracts post brutal bracing means and method for reinforced concrete member, makes easily, easy for installation, with strong points, simple to operate, improves efficiency of construction, ensure that workmanship, reduce engineering cost.
The technical solution adopted for the present invention to solve the technical problems is: provide a kind of and subtract post brutal bracing means for reinforced concrete member, comprise jack, described jack is arranged on steel pipe four pin pillar, the jack-up end on described jack top is equipped with force transmission element, described force transmission element forms multidiameter outward, lower outer diameter is comparatively large and end face has blind hole, the jack-up end of described jack is arranged on force transmission element bottom compared with in the blind hole of large end face, described force transmission element upper end diameter comparatively small end is provided with steel pipe top beam, described steel pipe top beam is made up of steel pipe connected vertically below upper end top board and top board, described pipe diameter and force transmission element upper end diameter comparatively small end match.
The upper end top board of described back timber part is connected with welding manner with steel pipe connected vertically below top board.
A wall beam Enhancement Method for steel concrete wall beam strengthen device, step is as follows:
A, described bracing means is arranged on reinforced concrete column both sides below girder, steel pipe top beam upper end top board withstands below girder by adjustment jack;
B, remove reinforced concrete column, only with bracing means support girder;
C, by after cleaning out below girder, below girder, use the stupefied bar of steel pipe support, the lumps of wood, wooden form and supporting steel pipe that concrete grouting mould is set, reserved concrete pouring gate
D, placing of concrete;
After the wall beam reinforced concrete set strength of e, pouring reaches requirement, remove steel pipe support, the stupefied bar of the lumps of wood, wooden form and supporting steel pipe, removing the pouring concrete port part cross section left over is leg-of-mutton plain concrete;
F, adjustment jack unclamp bracing means and remove, and then remove force transmission element, finally adopt pea gravel concreten to close left hole.
In described steps d, during placing of concrete, the face of building of pouring concrete port part is higher than original bottom plane of main girder 2cm.
Beneficial effect
Present invention accomplishes pillar remove after the requirement of girder supporting capacity, provide novel effective device and solution, be conducive to raising the efficiency and reduce costs, there is good application and promotional value, make easily, easy for installation, with strong points, simple to operate.
Accompanying drawing explanation
Fig. 1 is the view in the present invention after completing steps e.
Fig. 2 is the view in the present invention after completing steps f.
Fig. 3 is the head schematic diagram under bracing means of the present invention is arranged on girder.
Fig. 4 is the elevational schematic view of steel pipe four pin pillar of the present invention.
Fig. 5 is the cross section structure schematic diagram that girder interlude of the present invention arranges concrete grouting mould.
Fig. 6 is the cross section structure schematic diagram in the present invention after completing steps e.
Fig. 7 is the longitudinal section sectional structure schematic diagram after bracing means of the present invention is installed.
Fig. 8 is the longitudinal profile schematic diagram of steel pipe top beam of the present invention.
Fig. 9 is the upward view of Fig. 8 of the present invention.
Figure 10 is the longitudinal profile schematic diagram of force transmission element of the present invention.
Figure 11 is the top view of Figure 10 of the present invention.
Detailed description of the invention
Below in conjunction with specific embodiment, set forth the present invention further.Should be understood that these embodiments are only not used in for illustration of the present invention to limit the scope of the invention.In addition should be understood that those skilled in the art can make various changes or modifications the present invention, and these equivalent form of values fall within the application's appended claims limited range equally after the content of having read the present invention's instruction.
As shown in Fig. 1 to 11, a kind ofly subtract post brutal bracing means for reinforced concrete member, comprise jack 14, described jack 14 is arranged on steel pipe four pin pillar 4, the jack-up end on described jack 14 top is equipped with force transmission element 12, multidiameter is formed outside described force transmission element 12, lower outer diameter is comparatively large and end face has blind hole, the jack-up end of described jack 14 is arranged on force transmission element 12 bottom compared with in the blind hole of large end face, described force transmission element 12 upper end diameter comparatively small end is provided with steel pipe top beam 11, described steel pipe top beam 11 is made up of steel pipe connected vertically below upper end top board and top board, described pipe diameter and force transmission element 12 upper end diameter comparatively small end match.
The upper end top board of described back timber part 11 is connected with welding manner with steel pipe connected vertically below top board.
A wall beam Enhancement Method for steel concrete wall beam strengthen device, step is as follows:
A, described bracing means is arranged on reinforced concrete column 3 both sides below girder 1, steel pipe top beam 11 upper end top board withstands below girder 1 by adjustment jack 14;
B, remove reinforced concrete column 3, only with bracing means support girder 1;
C, girder 1 is cleaned out below after, below girder 1, use the stupefied bar 6 of steel pipe support 5, the lumps of wood, wooden form 7 and supporting steel pipe 8 that concrete grouting mould is set, reserved concrete pouring gate 9
D, placing of concrete;
After wall beam reinforced concrete 10 set strength of e, pouring reaches requirement, remove steel pipe support 5, the stupefied bar 6 of the lumps of wood, wooden form 7 and supporting steel pipe 8, removing the cross section, concrete pouring gate 9 position left over is leg-of-mutton plain concrete;
F, adjustment jack 14 unclamp bracing means and remove, and then remove force transmission element 12, finally adopt pea gravel concreten to close left hole.
In described steps d, during placing of concrete, the face of building at concrete pouring gate 9 position is higher than original girder 1 bottom surface 2cm.
Fig. 1 middle girder 1 by bracing means for pillar: in order to the girder 1 realizing reinforced steel concrete reaches dismounting pillar, meet the object of room layout and using function.First utilize the devices such as steel pipe four pin pillar 4 and top jack 14 to substitute the supporting role of reinforced concrete column 3, bearing bar concrete girder 1, then excise reinforced concrete column 3.
In Fig. 2, the girder 1 of steel concrete removes bracing means after reinforcing: treat that completion reinforced by the girder 1 of steel concrete, and concrete reaches intensity, i.e. dismountable four bracing or strutting arrangements such as pin pillar 4 grade, reach the object of reinforced steel concrete girder 1 and removal reinforced concrete column 3.
Reinforced concrete girder model sheetinstallat situation in Fig. 3: before the template system reinforced for reinforced concrete girder 1 is installed, reinforced concrete girder 1 bottom concrete bottom will be cleaned out, and reaches the requirement about constuction joint of relevant specification and standard.When template system is installed, the stupefied bar 6 of steel pipe support 5, the lumps of wood, wooden form 7, supporting steel pipe 8, concrete pouring gate 9 constitute the template system of reinforcing steel bar concrete beam, and the colligation of reinforcing steel bar concrete beam reinforcing skeleton and installation are carried out with model sheetinstallat synchronous matching.Treat that above work completes, get final product concreting, complete the making of reinforcing steel bar concrete beam.During concreting, in order to ensure the concrete density of wall beam reinforced concrete 10, when concreting is to last, the face of building at concrete pouring gate 9 position is higher than the girder 1 bottom surface 2cm of original steel concrete, and sprue gate Formation cross-section is leg-of-mutton plain concrete.
Reinforced concrete girder support zone model sheetinstallat situation in Fig. 5: girder 1 bracing or strutting arrangement of steel concrete and model sheetinstallat match, plays the supporting role of device such as steel pipe four pin pillar 4 grade all the time, guarantees that work progress is implemented smoothly.Steel pipe four pin pillar 4 is made up of 4 steel pipes and two block plates, and two block plates are welded in steel pipe two ends respectively as shown in the figure, plays the effect of pressure and the going down load bearing jack 14.
Situation in Fig. 6 after reinforced concrete girder form removal: after the template system dismounting of girder 1, leg-of-mutton plain concrete 13 excises in time.When steel pipe four pin pillar 4 is removed, first and remove loosening jack 14, then remove force transmission element 12, the left back hole utilizing concrete to be left over by support zone is closed.
Bracing or strutting arrangement installation situation in Fig. 7: when bracing or strutting arrangement is installed, first steel pipe four pin pillar 4 is set, require that the bottom face of steel pipe four pin pillar 4 is hard, smooth and there is enough supporting capacitys, then jack 14 is set on steel pipe four pin pillar 4 top, utilize force transmission element 12 that steel pipe top beam 11 is withstood on reinforced concrete girder 1 bottom, reach the object of displacement reinforced concrete column 3.
In Fig. 8 to 11, bracing or strutting arrangement is made up of steel pipe top beam 11, force transmission element 12, jack 14.Steel pipe top beam 11 is formed by steel plate and steel-pipe welding, and force transmission element 12 is made by steel, and the bearing capacity of jack 14 is selected according to actual conditions.

Claims (4)

1. one kind subtracts post brutal bracing means for reinforced concrete member, comprise jack (14), it is characterized in that, described jack (14) is arranged on steel pipe four pin pillar (4), the jack-up end on described jack (14) top is equipped with force transmission element (12), described force transmission element (12) forms multidiameter outward, lower outer diameter is comparatively large and end face has blind hole, the jack-up end of described jack (14) is arranged on force transmission element (12) bottom compared with in the blind hole of large end face, described force transmission element (12) upper end diameter comparatively small end is provided with steel pipe top beam (11), described steel pipe top beam (11) is made up of steel pipe connected vertically below upper end top board and top board, described pipe diameter and force transmission element (12) upper end diameter comparatively small end match.
2. according to claim 1ly a kind ofly subtract post brutal bracing means for reinforced concrete member, it is characterized in that, the upper end top board of described back timber part (11) is connected with welding manner with steel pipe connected vertically below top board.
3., according to a kind of wall beam Enhancement Method subtracting post brutal bracing means for reinforced concrete member described in claim 1 or 2, step is as follows:
A, bracing means is arranged on reinforced concrete column (3) both sides of girder (1) below, steel pipe top beam (11) upper end top board withstands below girder (1) by adjustment jack (14);
B, remove reinforced concrete column (3), only with bracing means support girder (1);
C, girder (1) is cleaned out below after, use steel pipe support (5), the stupefied bar of the lumps of wood (6), wooden form (7) and supporting steel pipe (8) that concrete grouting mould is set in girder (1) below, reserved concrete pouring gate (9);
D, placing of concrete;
After wall beam reinforced concrete (10) set strength of e, pouring reaches requirement, remove steel pipe support (5), the stupefied bar of the lumps of wood (6), wooden form (7) and supporting steel pipe (8), removing concrete pouring gate (9) cross section, position left over is leg-of-mutton plain concrete;
F, adjustment jack (14) are unclamped bracing means and remove, and then remove force transmission element (12), finally adopt pea gravel concreten to close left hole.
4. a kind of wall beam Enhancement Method according to claim 3, is characterized in that, in described steps d, during placing of concrete, the face of building at concrete pouring gate (9) position is higher than original girder (1) bottom surface 2cm.
CN201310285293.8A 2013-07-08 2013-07-08 Post brutal bracing means and method is subtracted for reinforced concrete member Active CN103452328B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310285293.8A CN103452328B (en) 2013-07-08 2013-07-08 Post brutal bracing means and method is subtracted for reinforced concrete member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310285293.8A CN103452328B (en) 2013-07-08 2013-07-08 Post brutal bracing means and method is subtracted for reinforced concrete member

Publications (2)

Publication Number Publication Date
CN103452328A CN103452328A (en) 2013-12-18
CN103452328B true CN103452328B (en) 2016-01-20

Family

ID=49735124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310285293.8A Active CN103452328B (en) 2013-07-08 2013-07-08 Post brutal bracing means and method is subtracted for reinforced concrete member

Country Status (1)

Country Link
CN (1) CN103452328B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835524B (en) * 2014-03-09 2017-01-25 湖南金海钢结构股份有限公司 Load-bearing floor steel beam section diminishing method according to design change
CN106812335B (en) * 2017-01-20 2019-02-01 湖南大学 The equipment and construction method of haftplatte Shear Strengthening concrete component
CN107740538B (en) * 2017-10-16 2023-11-10 杭萧钢构(安徽)有限公司 Steel upright post structure and application method thereof
CN110043060B (en) * 2019-03-29 2021-05-18 杭州通达集团有限公司 Method for changing floor frame column into beam-on-column structure
CN111140033B (en) * 2020-01-20 2024-04-09 广东华科大建筑技术开发有限公司 Device for partially detaching supporting roof of vertical stress component and construction method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1147655C (en) * 2001-09-29 2004-04-28 李全贵 Method for changing ridgepole by lifting roof
JP4297854B2 (en) * 2004-09-14 2009-07-15 株式会社竹中工務店 Load provision method
GB2443181A (en) * 2006-10-27 2008-04-30 Christopher Nicholls Screwed support jack
CN201671356U (en) * 2010-04-24 2010-12-15 林光明 Early form removal supporting system
CN102644386A (en) * 2012-04-28 2012-08-22 上海建工集团股份有限公司 Unloading control method for steel structure temporary bracing

Also Published As

Publication number Publication date
CN103452328A (en) 2013-12-18

Similar Documents

Publication Publication Date Title
CN206800451U (en) A kind of piping lane top board construction chassis and chassis group
CN103452328B (en) Post brutal bracing means and method is subtracted for reinforced concrete member
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN204266590U (en) Sump, hoistway formwork bed die anti-floating system
CN102587659A (en) Construction method for using concrete columns to support structures on both sides of post-pouring strip
CN104763446A (en) Multi-functional trolley for subway station construction
CN205000974U (en) A tire formula automatic rising equipment rack for tunnel excavation construction
CN108252504A (en) Tube shear wall concrete structure large form hoisting type construction method and constructing device
CN103074871A (en) Arc-shaped slope concrete sliding and lifting template
CN203200745U (en) Strengthening support of underground diaphragm wall in inverse construction method
CN205100119U (en) Steel form device in self -propelled
CN102400552B (en) Boundary beam upper-port anti-expansion mold reinforcing device
CN203924703U (en) Chamfered edge important actor hat cone plate
CN103410344B (en) A kind of steel concrete wall beam strengthen device and wall beam Enhancement Method
CN205501843U (en) Consolidate rigid framed arch bridge
CN204001702U (en) A kind of J-shaped wall plastic formwork
CN203583514U (en) Pre-buried structure of ultra-deep foundation bolt
CN204532374U (en) The multi-functional chassis of metro station construction
CN206205905U (en) A kind of chassis suitable for City Subway Station abnormity big cross section lining cutting one-piece casting
CN205369714U (en) A constructional column structure that be used for at bottom of tie -beam with brick wall or floor
CN205421352U (en) Adopt reverse construction method post -cast strip reinforced structure of dowel steel
CN206859263U (en) A kind of large formwork construction device of subway station side wall
CN103526698B (en) Cast-in-cantilever construction 0# block concrete supporting system and construction method
CN207512612U (en) Cantilever beam cradle construction end head formwork
CN202055259U (en) Foundation bolt preformed hole structure for equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Patentee after: SHANGHAI MCC NO.13 CONSTRUCTION CO., LTD.

Address before: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Patentee before: CMTCC Shanghai Shisanye Construction Co., Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Patentee after: Shanghai twenty Metallurgical Construction Co., Ltd.

Address before: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Patentee before: SHANGHAI MCC NO.13 CONSTRUCTION CO., LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190628

Address after: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199

Co-patentee after: China Twenty Metallurgical Group Co., Ltd.

Patentee after: Shanghai twenty Metallurgical Construction Co., Ltd.

Address before: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199

Patentee before: Shanghai twenty Metallurgical Construction Co., Ltd.