Prior art keywords
wall
steel pipe
concrete
steel
wall beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310284984.6A
Other languages
Chinese (zh)
Other versions
CN103410344A (en
Inventor
张凤勇
王全忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CMTCC Shanghai Shisanye Construction Co Ltd filed Critical CMTCC Shanghai Shisanye Construction Co Ltd
Priority to CN201310284984.6A priority Critical patent/CN103410344B/en
Publication of CN103410344A publication Critical patent/CN103410344A/en
Application granted granted Critical
Publication of CN103410344B publication Critical patent/CN103410344B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a kind of steel concrete wall beam strengthen device, by steel pipe top beam, force transmission element, helix swiveling plate and screw thread pole composition, screw thread pole is made up of lower substrate and the threaded rod being vertically connected on thereon, helix swiveling plate installed by the threaded rod of screw thread pole, helix swiveling plate is welded to form by being with female hollow cylinder and round steel handle, on threaded rod above helix swiveling plate, cover has force transmission element, multidiameter is formed outside it, the comparatively large and helix swiveling plate of lower diameter matches, the steel tube inner hole of upper diameter and steel pipe top beam matches, on it, cover has steel pipe top beam, steel pipe top beam is made up of steel pipe connected vertically below upper end top board and top board.The present invention makes easily, easy for installation, with strong points, simple to operate, solve a difficult problem for steel concrete wall beam strengthen, there is good economic benefit and social benefit, by wall support wall beam, finally remove body of wall, instead of original wall beam with the reinforced concrete beam reinforced.

Description

A kind of steel concrete wall beam strengthen device and wall beam Enhancement Method
Technical field
The invention belongs to wall beam and strengthen technical field, particularly relate to a kind of steel concrete wall beam strengthen device and wall beam Enhancement Method.
Background technology
In multistory building engineering, transfer the load to brickwork by brickwork top wall beam, final load is delivered to basis.Expanding room area to meet using function, often needing remove body of wall and reinforce wall beam.But after body of wall dismounting, wall beam cannot meet supporting capacity requirement, easily brings potential safety hazard.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of steel concrete wall beam strengthen device and wall beam Enhancement Method, meet body of wall and remove rear wall beam supporting capacity requirement, provide novel effective device and solution, be conducive to raising the efficiency and reduce costs, there is good application and promotional value.
The technical solution adopted for the present invention to solve the technical problems is: provide a kind of steel concrete wall beam strengthen device, by steel pipe top beam, force transmission element, helix swiveling plate and screw thread pole composition, described screw thread pole is made up of lower substrate and the threaded rod being vertically connected on thereon, helix swiveling plate installed by the threaded rod of described screw thread pole, described helix swiveling plate is welded to form by being with female hollow cylinder and round steel handle, on threaded rod above described helix swiveling plate, cover has force transmission element, described force transmission element forms multidiameter outward, the comparatively large and helix swiveling plate of lower diameter matches, the steel tube inner hole of upper diameter and steel pipe top beam matches, on described force transmission element, cover has steel pipe top beam, described steel pipe top beam is made up of steel pipe connected vertically below upper end top board and top board, described pipe diameter is greater than the external diameter of threaded rod.
The lower substrate of described screw thread pole is connected with welding manner with the screw thread being vertically connected on thereon.
The upper end top board of described back timber part is connected with welding manner with steel pipe connected vertically below top board.
A wall beam Enhancement Method for steel concrete wall beam strengthen device, step is as follows:
A, under beam on brick wall, some digging hole in walls are set below wall beam;
B, strengthen device to be loaded in digging hole in wall;
C, screw thread pole is arranged on digging hole in wall position under beam, rotates helix swiveling plate and by force transmission element, steel pipe top beam is shored bottom wall beam, be supported between wall beam and brick wall;
D, the brick wall part between digging hole in wall got through, brick wall and wall beam support with strengthen device completely;
E, by after cleaning out below wall beam, below wall beam, use the stupefied bar of steel pipe support, the lumps of wood, wooden form and supporting steel pipe that concrete grouting mould is set, reserved concrete pouring gate;
F, placing of concrete;
After the wall beam reinforced concrete set strength of g, pouring reaches requirement, remove steel pipe support, the stupefied bar of the lumps of wood, wooden form and supporting steel pipe, removing the pouring concrete port part cross section left over is leg-of-mutton plain concrete;
H, rotation helix swiveling plate loosen the pressure to lower wall body, and then limit is removed body of wall limit and extracted screw thread pole and helix swiveling plate out, then removes force transmission element, finally adopt pea gravel concreten to close left hole.
In described step f, during placing of concrete, the face of building of pouring concrete port part is higher than original wall beam bottom surface 2cm.
Beneficial effect
The present invention meets body of wall and removes rear wall beam supporting capacity requirement, provides novel effective device and solution, is conducive to raising the efficiency reducing costs, and has good application and promotional value.
Accompanying drawing explanation
Fig. 1 is that the present invention installs rear pouring pre-structure schematic diagram.
Fig. 2 is the schematic diagram that in the present invention, brick wall arranges fittable slackening device after digging hole in wall.
Fig. 3 is the view after the digging hole in wall of brick wall in the present invention is got through.
Fig. 4 is the structural representation watering structure in the present invention between bracing or strutting arrangement.
Fig. 5 is that the present invention waters rear structural representation.
Fig. 6 is schematic diagram after step of the present invention all completes.
Fig. 7 is the cross-sectional view of bracing or strutting arrangement holding state of the present invention.
Fig. 8 is the longitudinal sectional drawing of steel pipe top beam of the present invention.
Fig. 9 is the upward view of Fig. 8 of the present invention.
Figure 10 is the longitudinal sectional drawing of force transmission element of the present invention.
Figure 11 is the top view of Figure 10 of the present invention.
Figure 12 is the longitudinal sectional drawing of screw thread pole of the present invention.
Figure 13 is the top view of Figure 12 of the present invention.
Figure 14 is the longitudinal sectional drawing of helix swiveling plate of the present invention.
Figure 15 is the top view of Figure 14 of the present invention.
Detailed description of the invention
Below in conjunction with specific embodiment, set forth the present invention further.Should be understood that these embodiments are only not used in for illustration of the present invention to limit the scope of the invention.In addition should be understood that those skilled in the art can make various changes or modifications the present invention, and these equivalent form of values fall within the application's appended claims limited range equally after the content of having read the present invention's instruction.
As shown in Fig. 1 to 15, a kind of steel concrete wall beam strengthen device, by steel pipe top beam 11, force transmission element 12, helix swiveling plate 13 and screw thread pole 14 form, described screw thread pole 14 is made up of lower substrate and the threaded rod being vertically connected on thereon, helix swiveling plate 13 installed by the threaded rod of described screw thread pole 14, described helix swiveling plate 13 is welded to form by the female hollow cylinder of band and round steel handle, on threaded rod above described helix swiveling plate 13, cover has force transmission element 12, multidiameter is formed outside described force transmission element 12, the comparatively large and helix swiveling plate 13 of lower diameter matches, the steel tube inner hole of upper diameter and steel pipe top beam 11 matches, on described force transmission element 12, cover has steel pipe top beam 11, described steel pipe top beam 11 is made up of steel pipe connected vertically below upper end top board and top board, described pipe diameter is greater than the external diameter of threaded rod.
The lower substrate of described screw thread pole 14 is connected with welding manner with the screw thread being vertically connected on thereon.
The upper end top board of described back timber part 11 is connected with welding manner with steel pipe connected vertically below top board.
A wall beam Enhancement Method for steel concrete wall beam strengthen device, step is as follows:
A, under beam on brick wall 1, some digging hole in walls 3 are set below wall beam 2;
B, strengthen device to be loaded in digging hole in wall 3;
C, screw thread pole 14 is arranged on digging hole in wall 3 position under beam, rotates helix swiveling plate 13 and by force transmission element 12, steel pipe top beam 11 is shored bottom wall beam 2, be supported between wall beam 2 and brick wall 1;
D, brick wall 1 part between digging hole in wall 3 got through, brick wall 1 and wall beam 2 support with strengthen device completely;
E, wall beam 2 is cleaned out below after, below wall beam 2, use the stupefied bar 6 of steel pipe support 5, the lumps of wood, wooden form 7 and supporting steel pipe 8 that concrete grouting mould is set, reserved concrete pouring gate 9;
F, placing of concrete;
After wall beam reinforced concrete 10 set strength of g, pouring reaches requirement, remove steel pipe support 5, the stupefied bar 6 of the lumps of wood, wooden form 7 and supporting steel pipe 8, removing the cross section, concrete pouring gate 9 position left over is leg-of-mutton plain concrete;
H, rotation helix swiveling plate 13 loosen the pressure to lower wall body, and then limit is removed body of wall limit and extracted screw thread pole 14 and helix swiveling plate 13 out, then removes force transmission element 12, finally adopt pea gravel concreten to close left hole.
In described step f, during placing of concrete, the face of building at concrete pouring gate 9 position is higher than original wall beam 2 bottom surface 2cm.
In Fig. 2, wall beam supports transfer process: before construction, the position of digging hole in wall 3 and quantity under beam, and the position of wall beam bracing or strutting arrangement and quantity, will determine, guarantee safety of structure through Specialized Theory checking computations.After digging hole in wall, substitute the part supporting role of brick wall 1 under beam with wall beam bracing or strutting arrangement 4.
In Fig. 3, wall beam supports situation: treat wall beam bracing or strutting arrangement 4 all installations, removes the brick wall masonry supporting wall beam 2 bottom and leave over, and bracing or strutting arrangement 4 substitutes whole supporting roles of brick wall 1 under beam, for the enhancing of wall beam 2 and reinforcing provide condition.
Wall beam formwork in Fig. 4: before the template system reinforced for wall beam is installed, wall beam 2 bottom concrete bottom will be cleaned out, and reaches the requirement about constuction joint of relevant specification and standard.When template system is installed, the stupefied bar 6 of steel pipe support 5, the lumps of wood, wooden form 7, supporting steel pipe 8, concrete pouring gate 9 constitute the template system of reinforcing steel bar concrete beam 10, and reinforcing steel bar concrete beam 10 tie with reinforcing bar and installation are carried out with model sheetinstallat synchronous matching.Treat that above work completes, get final product concreting, complete the making of reinforcing steel bar concrete beam 10.During concreting, in order to ensure the concrete density of reinforcing steel bar concrete beam 10, when concreting is to last, the face of building at concrete pouring gate 9 position is higher than original wall beam 2 bottom surface 2cm, and sprue gate Formation cross-section is leg-of-mutton plain concrete.
Wall beam support zone formwork situation in Fig. 1: wall beam bracing or strutting arrangement 4 and model sheetinstallat match, plays the supporting role of wall beam bracing or strutting arrangement 4 all the time, guarantees that work progress is implemented smoothly.
After Fig. 5 form removal, wall beam supports schematic diagram: after form removable, be that leg-of-mutton plain concrete 15 excises by the cross section, concrete pouring gate 9 position left over.After template system is removed, wall beam bracing or strutting arrangement 4 is still supported on brick wall, after reinforcing steel bar concrete beam 10 concrete strength reaches requirement, i.e. and dismountable wall beam bracing or strutting arrangement 4.
Fig. 6 reinforcing steel bar concrete beam schematic diagram: after wall beam bracing or strutting arrangement 4 is all removed, reinforcing steel bar concrete beam 10 assume responsibility for top whole load, and lower wall body is all removed, and completes steel concrete wall beam strengthen.
Each component part of wall beam bracing or strutting arrangement in Fig. 8 to Figure 15: wall beam bracing or strutting arrangement 4 is made up of steel pipe top beam 11, force transmission element 12, helix swiveling plate 13, screw thread pole 14 respectively.Wherein, steel pipe top beam 11, is made up of steel plate and steel-pipe welding; Force transmission element 12 is circular cross-section steel part; Helix swiveling plate 13 is welded to form by the female hollow cylinder of band and round steel handle; Screw thread pole 14 is formed by screwed round steel and Plate Welding.
Wall beam bracing or strutting arrangement assembling schematic diagram in Fig. 7: end face screw thread pole 14 being arranged on the brick wall 1 of digging hole in wall under beam, the movement produced when utilizing helix swiveling plate 13 to rotate, by force transmission element 12, steel pipe top beam 11 is shored bottom wall beam 2, reach and the load of wall beam 2 is substituted by wall beam bracing or strutting arrangement 4 object that body of wall is delivered to lower wall body.When wall beam bracing or strutting arrangement is removed, first rotation helix swiveling plate 13 loosens the pressure to lower wall body, and then limit is removed body of wall limit and extracted screw thread pole 14 and helix swiveling plate 13 out, then removes force transmission element 12, finally adopts pea gravel concreten to close left hole.

Claims (2)

1. a steel concrete wall beam strengthen method, adopt a kind of steel concrete wall beam strengthen device, described steel concrete wall beam strengthen device is by steel pipe top beam (11), force transmission element (12), helix swiveling plate (13) and screw thread pole (14) composition, it is characterized in that, described screw thread pole (14) is made up of lower substrate and the threaded rod being vertically connected on thereon, helix swiveling plate (13) installed by the threaded rod of described screw thread pole (14), described helix swiveling plate (13) is welded to form by the female hollow cylinder of band and round steel handle, on the threaded rod of described helix swiveling plate (13) top, cover has force transmission element (12), described force transmission element (12) forms multidiameter outward, the comparatively large and helix swiveling plate (13) of lower diameter matches, the steel tube inner hole of upper diameter and steel pipe top beam (11) matches, the upper cover of described force transmission element (12) has steel pipe top beam (11), described steel pipe top beam (11) is made up of steel pipe connected vertically below upper end top board and top board, described pipe diameter is greater than the external diameter of threaded rod, the lower substrate of described screw thread pole (14) is connected with welding manner with the screw thread being vertically connected on thereon, the upper end top board of described back timber part (11) is connected with welding manner with steel pipe connected vertically below top board, and step is as follows:
A, under beam, upper, wall beam (2) below of brick wall (1) arranges some digging hole in walls (3);
B, strengthen device is loaded in digging hole in wall (3);
C, screw thread pole (14) is arranged on digging hole in wall (3) position under beam, rotate helix swiveling plate (13), by force transmission element (12), steel pipe top beam (11) is shored wall beam (2) bottom, be supported between wall beam (2) and brick wall (1);
D, by between digging hole in wall (3) brick wall (1) part get through, brick wall (1) and wall beam (2) support with strengthen device completely;
E, wall beam (2) is cleaned out below after, use steel pipe support (5), the stupefied bar of the lumps of wood (6), wooden form (7) and supporting steel pipe (8) that concrete grouting mould is set in wall beam (2) below, reserved concrete pouring gate (9);
F, placing of concrete;
After wall beam reinforced concrete (10) set strength of g, pouring reaches requirement, remove steel pipe support (5), the stupefied bar of the lumps of wood (6), wooden form (7) and supporting steel pipe (8), removing concrete pouring gate (9) cross section, position left over is leg-of-mutton plain concrete;
H, rotate helix swiveling plate (13) and loosen pressure to lower wall body, then limit is removed body of wall limit and is extracted screw thread pole (14) and helix swiveling plate (13) out, remove force transmission element (12) again, finally adopt pea gravel concreten to close left hole.
2. a kind of steel concrete wall beam strengthen method according to claim 1, it is characterized in that, in described step f, during placing of concrete, the face of building at concrete pouring gate (9) position is higher than original wall beam (2) bottom surface 2cm.
CN201310284984.6A 2013-07-08 2013-07-08 A kind of steel concrete wall beam strengthen device and wall beam Enhancement Method Active CN103410344B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310284984.6A CN103410344B (en) 2013-07-08 2013-07-08 A kind of steel concrete wall beam strengthen device and wall beam Enhancement Method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310284984.6A CN103410344B (en) 2013-07-08 2013-07-08 A kind of steel concrete wall beam strengthen device and wall beam Enhancement Method

Publications (2)

Publication Number Publication Date
CN103410344A CN103410344A (en) 2013-11-27
CN103410344B true CN103410344B (en) 2016-03-23

Family

ID=49603381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310284984.6A Active CN103410344B (en) 2013-07-08 2013-07-08 A kind of steel concrete wall beam strengthen device and wall beam Enhancement Method

Country Status (1)

Country Link
CN (1) CN103410344B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594655A (en) * 2014-12-05 2015-05-06 杭州固力建筑工程有限公司 Application method for dismantling temporary supports in brick-concrete structure wall
CN107327155B (en) * 2016-02-24 2019-03-08 朱奎 Reinforcing Construction Method of Concrete Sick Columns
CN108979144B (en) * 2018-07-30 2021-06-04 中铁八局集团建筑工程有限公司 Method for pouring floor top plate by adopting aluminum die

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1457135A (en) * 1973-06-16 1976-12-01 Mills Scaffold Co Ltd Builders scaffolding
GB2048334A (en) * 1979-05-03 1980-12-10 Pynford Ltd Stool for in situ cast beam
CN101509319A (en) * 2009-04-09 2009-08-19 青岛市胶州建设集团有限公司 Replacement construction method for post-adding reinforced concrete beam unit for wall
CN201620615U (en) * 2010-01-30 2010-11-03 盛明春 Supporting adjustable upright column of construction engineering formwork
CN201649690U (en) * 2010-05-20 2010-11-24 锦宸集团有限公司 Height adjustable support of steel-tube back shore
CN201671356U (en) * 2010-04-24 2010-12-15 林光明 Early form removal supporting system
CN202012207U (en) * 2010-12-20 2011-10-19 北京市建筑工程研究院有限责任公司 Mechanical adjustment type bearing bracket mount
CN202324684U (en) * 2011-11-14 2012-07-11 东北石油大学 Electric adjustable support device for supporting beams in the process of demolishing walls

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1457135A (en) * 1973-06-16 1976-12-01 Mills Scaffold Co Ltd Builders scaffolding
GB2048334A (en) * 1979-05-03 1980-12-10 Pynford Ltd Stool for in situ cast beam
CN101509319A (en) * 2009-04-09 2009-08-19 青岛市胶州建设集团有限公司 Replacement construction method for post-adding reinforced concrete beam unit for wall
CN201620615U (en) * 2010-01-30 2010-11-03 盛明春 Supporting adjustable upright column of construction engineering formwork
CN201671356U (en) * 2010-04-24 2010-12-15 林光明 Early form removal supporting system
CN201649690U (en) * 2010-05-20 2010-11-24 锦宸集团有限公司 Height adjustable support of steel-tube back shore
CN202012207U (en) * 2010-12-20 2011-10-19 北京市建筑工程研究院有限责任公司 Mechanical adjustment type bearing bracket mount
CN202324684U (en) * 2011-11-14 2012-07-11 东北石油大学 Electric adjustable support device for supporting beams in the process of demolishing walls

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
砖混建筑拆墙改造技术;孙丽;《建筑技术》;20130215;第44卷(第2期);正文第1-2页,附图2-4 *

Also Published As

Publication number Publication date
CN103410344A (en) 2013-11-27

Similar Documents

Publication Publication Date Title
CN207131072U (en) A kind of super thick shear wall corner template reinforcing device
CN207553314U (en) A kind of concrete postposition beam anchor bar constructing structure
CN103866866B (en) Super High Core Walls Structure and housing water node after setting a roof beam in place
CN103556819B (en) A construction method for reserving structural column holes on beam slabs
CN213979033U (en) One-sided formwork fixing structure for concrete gravity retaining wall
CN103410344B (en) A kind of steel concrete wall beam strengthen device and wall beam Enhancement Method
CN103452328B (en) Post brutal bracing means and method is subtracted for reinforced concrete member
CN210013551U (en) Square chimney construction external corner template reinforcing tool
CN203716498U (en) Special support device for overcoming split bolt hole defects of fair-faced concrete walls, columns and beams
CN204875558U (en) Shaped steel runs through inside and outside compound support formula bracket system of encorbelmenting
CN204781960U (en) High -rise building shear force wall movement joint department template is propped up and is established and reinforcement system
CN203514807U (en) Formwork supporting device
CN203924102U (en) Building implements foundation bolt preformed hole construction mould
CN204326100U (en) The Preserved node of covered back-digging side wall bar splice
CN103669831B (en) A kind of transformer station's cast-in-situ wall combined steel and construction method thereof
CN203625915U (en) Embedded creeping formwork structure in caisson prefabrication construction
CN203846679U (en) Tie bar of embedded sleeve of infilled wall
CN206091298U (en) Hole special stand is reserved to brickwork
CN202644980U (en) Joint reinforcing system for structural edge member formwork
CN201250516Y (en) Single-side wall mould holder strengthening device
CN213476966U (en) Novel assembled post-cast strip template system
CN205134364U (en) Basement uprises poor section slant bottom plate formwork system that links up
CN204098216U (en) Bulky concrete wall pours roof beam connection structure after with
CN208473286U (en) A kind of wall form of car ramp circular arc wall
CN207700688U (en) A kind of linking beam formwork structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address before: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190703

Address after: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.