CN103452327B - Constructional column bar planting positioning construction method - Google Patents

Constructional column bar planting positioning construction method Download PDF

Info

Publication number
CN103452327B
CN103452327B CN201310387323.6A CN201310387323A CN103452327B CN 103452327 B CN103452327 B CN 103452327B CN 201310387323 A CN201310387323 A CN 201310387323A CN 103452327 B CN103452327 B CN 103452327B
Authority
CN
China
Prior art keywords
bar
bar planting
constructional column
concrete
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310387323.6A
Other languages
Chinese (zh)
Other versions
CN103452327A (en
Inventor
张涛
赵跃林
朱永清
肖宁
张东波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shanxi Sijian Group Co Ltd
Original Assignee
China Shanxi Sijian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shanxi Sijian Group Co Ltd filed Critical China Shanxi Sijian Group Co Ltd
Priority to CN201310387323.6A priority Critical patent/CN103452327B/en
Publication of CN103452327A publication Critical patent/CN103452327A/en
Application granted granted Critical
Publication of CN103452327B publication Critical patent/CN103452327B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of construction method, be specially a kind of constructional column bar planting positioning construction method. Solve the inaccurate problem in location existing in the construction of post reinforcing steel implant, a kind of constructional column bar planting positioning construction method is provided. After concrete beam reinforcing and template install, prepare to carry out, before concreting, beam bottom board being cleared up; measure unwrapping wire, determine constructional column position, smear location at beam bottom board with red paint; cast concrete; form removal, according to the boring of red paint position, clear hole; injecting glue; bar planting, solidifies, protects, and checks and accepts. Compared with prior art, the key point of technical solution of the present invention is to install at concrete beam reinforcing and template, prepares to carry out before concreting. Use U-shaped reinforcing bar jig according to constructional column main reinforce position at beam bottom board correspondence position, smear location with red paint. Can dodge out reinforcing bar in beam. After beam concrete bottom die is removed, according to red paint position corresponding on the beam base concrete bar planting of holing, can ensure that a bar planting puts in place.

Description

Constructional column bar planting positioning construction method
Technical field
The present invention relates to a kind of construction method, be specially a kind of constructional column bar planting positioning construction method.
Background technology
When traditional constructional column bar planting is constructed, be to punch on the beams of concrete member of closely having constructed, then plantMuscle. Due to the three-dimensional steel muscles and bones frame systems such as principal rod, stirrup that gather in beam concrete component, while causing bar planting boring for dodgingFramework of steel reinforcement in the beam of having built, is offset serious construction quality problem ubiquity and produce constructional column reinforcement location,Through having formed the main mass defect in Constructional Col-umn Construction. As schematically shown in Figure 1, 2, position and the design attitude of bar planting are inconsistent,Cause like this flexural deformation of bar planting, affect the mechanical property of member integrated. Therefore, solve the construction method of this difficult problem non-Normal urgent.
Summary of the invention
The present invention, in order to solve the inaccurate problem in location existing in the construction of post reinforcing steel implant, provides a kind of constructional columnBar planting positioning construction method.
Technical scheme of the present invention is: a kind of constructional column bar planting positioning construction method, and in concrete beam reinforcing and template peaceAfter dress, prepare to carry out, before concreting, beam bottom board being cleared up, measure unwrapping wire, determine constructional column position, use chilli oilPaint is smeared location at beam bottom board, cast concrete, and form removal, according to the boring of red paint position, clear hole, injecting glue, bar planting, solidifies, protects,Check and accept.
Concrete steps are to install at concrete beam reinforcing and template, prepare to carry out before concreting, by template baseOn layer, clean out; Determine constructional column main reinforce position according to designing requirement and regulation and stipulation, and guarantee in bar planting depth boundsNo-reinforcing-bar and other members block; According to the position determining, the U-shaped reinforcing bar that uses width to make for the main muscle width of constructional column is determinedPosition mould, dips in red paint in the termination of orientation tool, smears location on beam bottom board, and the red anchor point of formation is mixed like thisSolidifying soil is built complete, and after form removal, red paint can form visual anchor point on beams of concrete bottom surface; Again according to visual anchor point positionPut and hole, hole depth meets bar planting requirement; Boring is cleared up, adopt behind the clear hole of compressed air, then be stained with third with absorbent cottonKetone is cleaned hole wall, and answers retaining hole inner drying; By glue kind join glue and to boring injecting glue; Adopt rustless reinforcing bar implant bore, rightReinforcing bar is rotated bonding in order to structure glue and the wall of a borehole, and the reinforcing bar of implantation does temporary fixed; After bar planting completes, according to bar plantingGlue type and environment temperature guarantee that planted reinforcing bar is cured at the appointed time, and setting up period is forbidden disturbance reinforcing bar; Structure glueAfter solidifying, the pull-out test that adopts instrument to carry out on-the-spot bar planting according to amount of inspection, to check the performance of bar planting, and wants by specificationAsk and carry out an acceptance inspection.
Compared with prior art, the key point of technical solution of the present invention is to install at concrete beam reinforcing and template,Preparation is carried out before concreting. Use U-shaped reinforcing bar jig according to constructional column main reinforce position at beam bottom board correspondence position, useRed paint is smeared location. Owing to being in concreting prelocalization, therefore can dodge out reinforcing bar in beam. Treat beam concrete bottom dieAfter dismounting, according to red paint position corresponding on the beam base concrete bar planting of holing, can ensure that a bar planting puts in place. Thereby keep awayExempt from the direction blindness in traditional bar planting construction, effectively improved efficiency of construction and construction quality.
Brief description of the drawings
Fig. 1 is one of state diagram after existing bar planting method construction
Fig. 2 is two of state diagram after the construction of existing bar planting method
Fig. 3 is SBR figure before bar planting of the present invention
Fig. 4 is U-shaped reinforcing bar jig
Fig. 5 is the state diagram after scheme construction of the present invention
The bar planting of 1-back timber, 2-distortion, 3-post reinforcing bar, 4-side form, 5-reinforcing bar beam, 6-side form, 7-reinforcing bar beam, 8-locationAnchor point at the bottom of point, 9-beam bottom board, 10-post reinforcing bar, 11-reinforcing bar, 12-soffit, 13-beam.
Detailed description of the invention
As Fig. 3,4,5 illustrate, a kind of constructional column bar planting positioning construction method, step is as follows:
1, install at concrete beam reinforcing 7,5 and side template 6,4, prepare to carry out before concreting. For ensureing matterAmount, will clean out in basic unit, do not wait and have water stain grade of greasy dirt to hinder the spot of painting brushing, and beam bottom board 9 should be smooth, must notDamaged cracking.
2, measure unwrapping wire, determine constructional column position
Determine constructional column main reinforce position according to designing requirement and regulation and stipulation, can within the scope of tolerance, suitably avoidThe position of beam main tendon. And guarantee that the interior no-reinforcing-bar of bar planting depth bounds and other members block.
3, smear location with red paint at beam bottom board
According to the position determining, use long 1.5m left and right, width is the U-shaped reinforcing bar location that the main muscle width of constructional column is madeMould, this mould structure is as Fig. 4. Dip in appropriate red paint in termination, then insert in template, on beam bottom board, smear location. ShapeThe anchor point 8 becoming is round point shape, and diameter is advisable for " drilling diameter "+5mm. This mould structure is simple, can pass slow setting Tu LiangThe bar-mat reinforcement that reinforcing bar forms.
4, casting concrete.
5, form removal, after form removal, red paint can be bonded at and on beams of concrete 12 bottom surfaces, form anchor point 13 at the bottom of beam, notes locationPoint is protected, and avoids colliding with.
6 hole according to red paint position
Hole according to anchor point 13 positions, boring should adopt electric hammer or air drill pore-forming, need ensure that hole is positioned at when pore-formingAnchor point center, and drill bit is vertical with soffit, without skew. Hole depth should meet bar planting requirement.
7 clear holes
Boring is cleared up, adopt behind the clear hole of compressed air, then be stained with acetone with absorbent cotton and clean hole wall, and answer retaining holeInner drying.
8 injecting glues
By glue kind join glue and to boring injecting glue, when injecting glue must get rid of boring in air, consumption with reinforcing bar implant after slightlyBe extruded as standard.
9 bar plantings
Adopt rustless reinforcing bar 11 implant bores, reinforcing bar is rotated to bonding in order to structure glue and the wall of a borehole, implantReinforcing bar do temporary fixed.
10 solidify, protect
After bar planting completes, guarantee that according to anchoring adhesive type and environment temperature planted reinforcing bar is cured within a certain period of time,Setting up period is forbidden disturbance reinforcing bar.
11 check and accept
After structure glue is solidified, adopt the instrument pull-out test that carries out on-the-spot bar planting according to amount of inspection, to check bar plantingPerformance, and carry out an acceptance inspection by code requirement.

Claims (2)

1. a constructional column bar planting positioning construction method, is characterized in that: after concrete beam reinforcing and template install, and standardFor carrying out, before concreting, beam bottom board being cleared up, measure unwrapping wire, determine constructional column position, use red paint at beam bottom boardSmear location, cast concrete, form removal, according to the boring of red paint position, clear hole, injecting glue, bar planting, solidifies, protects, and checks and accepts.
2. constructional column bar planting positioning construction method according to claim 1, is characterized in that: concrete steps are at concreteBeam steel and template install, and prepare to carry out, before concreting, on beam bottom board, cleaning out; According to designing requirement and ruleModel regulation is determined constructional column main reinforce position, and guarantees that the interior no-reinforcing-bar of bar planting depth bounds and other members block; According to determiningGood position, the U-shaped reinforcing bar jig that uses width to make for the main muscle width of constructional column, at the end of U-shaped reinforcing bar jigHead dips in red paint, smears location on beam bottom board, forms red anchor point, and concreting is complete like this, chilli oil after form removalPaint can form visual anchor point on beams of concrete bottom surface; Hole according to visual locating point position, hole depth meets bar planting againRequirement; Boring is cleared up, adopt behind the clear hole of compressed air, then be stained with acetone with absorbent cotton and clean hole wall, and answer in retaining holeDry; By glue kind join glue and to boring injecting glue; Adopt rustless reinforcing bar implant bore, reinforcing bar is rotated in order to glue and boringWall bonding, the reinforcing bar of implantation does temporary fixed; After bar planting completes, guarantee that according to glue type and environment temperature planted reinforcing bar is on ruleIn fixing time, be cured, setting up period is forbidden disturbance reinforcing bar; After adhesive curing, adopt instrument to carry out scene according to amount of inspection and plantThe pull-out test of muscle, to check the performance of bar planting, and carries out an acceptance inspection by code requirement.
CN201310387323.6A 2013-08-30 2013-08-30 Constructional column bar planting positioning construction method Active CN103452327B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310387323.6A CN103452327B (en) 2013-08-30 2013-08-30 Constructional column bar planting positioning construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310387323.6A CN103452327B (en) 2013-08-30 2013-08-30 Constructional column bar planting positioning construction method

Publications (2)

Publication Number Publication Date
CN103452327A CN103452327A (en) 2013-12-18
CN103452327B true CN103452327B (en) 2016-05-11

Family

ID=49735123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310387323.6A Active CN103452327B (en) 2013-08-30 2013-08-30 Constructional column bar planting positioning construction method

Country Status (1)

Country Link
CN (1) CN103452327B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155669B (en) * 2015-09-15 2017-12-12 成都市第四建筑工程公司 Concealed beam floor framing rod structure construction method
CN105888259A (en) * 2016-03-31 2016-08-24 张友谊 Concrete steel bar planting method
CN108868158B (en) * 2018-07-27 2020-10-30 中交一公局重庆城市建设发展有限公司 Method for positioning assembled building steel bars
CN109629421B (en) * 2018-11-20 2020-11-27 同济大学 Construction method for segment beam additionally provided with steel pipe and horizontally distributed steel bars
CN110145059B (en) * 2019-05-29 2021-02-26 中冶建工集团有限公司 Construction process of antique soil wall
CN110219374A (en) * 2019-05-30 2019-09-10 中铁第四勘察设计院集团有限公司 Connection structure and attachment device
CN114370160A (en) * 2021-12-30 2022-04-19 珠海华发人居生活研究院有限公司 Vertical member porous linkage grouting reinforcement method
CN218622648U (en) 2022-11-28 2023-03-14 中国建筑第二工程局有限公司 Constructional column bar planting pre-embedding device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01223262A (en) * 1988-03-01 1989-09-06 Taisei Corp Construction of assembled wall
CN101974902A (en) * 2010-10-14 2011-02-16 宁波大汇建设工程有限公司 Construction process for planting reinforcement bars into cement piles
CN102486049A (en) * 2010-12-06 2012-06-06 上海伙隆实业有限公司 Filler wall masonry tie bar planting method
EP2492417A1 (en) * 2011-02-25 2012-08-29 Commissariat à l'Énergie Atomique et aux Énergies Alternatives Method for assistance with the placement of construction elements of a civil engineering structure
CN103161313A (en) * 2013-03-14 2013-06-19 中国华冶科工集团有限公司 Connection method of main reinforcement of constructional column of infilled wall and framed girder

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01223262A (en) * 1988-03-01 1989-09-06 Taisei Corp Construction of assembled wall
CN101974902A (en) * 2010-10-14 2011-02-16 宁波大汇建设工程有限公司 Construction process for planting reinforcement bars into cement piles
CN102486049A (en) * 2010-12-06 2012-06-06 上海伙隆实业有限公司 Filler wall masonry tie bar planting method
EP2492417A1 (en) * 2011-02-25 2012-08-29 Commissariat à l'Énergie Atomique et aux Énergies Alternatives Method for assistance with the placement of construction elements of a civil engineering structure
CN103161313A (en) * 2013-03-14 2013-06-19 中国华冶科工集团有限公司 Connection method of main reinforcement of constructional column of infilled wall and framed girder

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
梁底植筋成孔装置的改进;赵柏明等;《建筑工人》;20091130(第11期);第30-31页 *

Also Published As

Publication number Publication date
CN103452327A (en) 2013-12-18

Similar Documents

Publication Publication Date Title
CN103452327B (en) Constructional column bar planting positioning construction method
CN103321436A (en) Pre-installation construction method for wire box on building bricked body and pre-installation supporting frame thereof
CN204645268U (en) A kind of infilled wall tie bar built-in fitting
CN206495501U (en) A kind of cast-in-place concrete floor reserving hole template
CN103374923A (en) Method for prefabricating and mounting underwater pier
CN212613903U (en) Brick-concrete structure old building body composite reinforcement structure
CN204590047U (en) A kind of protecting slope ecology sash
CN107065801B (en) Simulative construction method is automatically assembled using the section of track production line of BIM technology
CN101899868A (en) Construction method for rear planted wall steel tie
CN205421322U (en) Pre -buried rag bolt crowd's positioning tool
CN103233482A (en) Installation and construction method for embedded bolts of cable trench
CN105547467A (en) Device for fixing explosion vibration measuring sensor on soil layer
JP6921536B2 (en) Construction method of anchors to be installed in existing masonry and post-construction anchors
CN109016089A (en) A kind of mold, manufacture craft and the installation method of small-sized gate stack
CN209163138U (en) A kind of reservation device of the floor reserved steel bar for climbing formwork for construction
CN104314179A (en) Anti-shear stud for GFRP concrete combined member and construction method thereof
CN211058060U (en) Wall structure of grouting sleeve
CN205907820U (en) Steel and concrete built -up connection component
CN108868189A (en) A kind of bamboo clappers curved scissors reinforced concrete beam and manufacturing method
CN103352568A (en) Method for building constructional column on foundation pad
CN104131697B (en) Tool type formwork system for kitchen and bath concrete waterproof guide wall and construction method of tool type formwork system
CN206034257U (en) Device of homophase out -phase road surface grooving
CN107419631B (en) A kind of rapid constructing method on brick structure road surface
CN113073870A (en) Installation method for reinforcing reinforced concrete member joint
CN218814878U (en) Embedded prefabricated fair-faced concrete decorative board

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant