CN105547467A - Device for fixing explosion vibration measuring sensor on soil layer - Google Patents
Device for fixing explosion vibration measuring sensor on soil layer Download PDFInfo
- Publication number
- CN105547467A CN105547467A CN201510950699.2A CN201510950699A CN105547467A CN 105547467 A CN105547467 A CN 105547467A CN 201510950699 A CN201510950699 A CN 201510950699A CN 105547467 A CN105547467 A CN 105547467A
- Authority
- CN
- China
- Prior art keywords
- soil layer
- sensor
- substrate
- measuring sensor
- explosion vibration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01H—MEASUREMENT OF MECHANICAL VIBRATIONS OR ULTRASONIC, SONIC OR INFRASONIC WAVES
- G01H17/00—Measuring mechanical vibrations or ultrasonic, sonic or infrasonic waves, not provided for in the preceding groups
Abstract
The invention relates to a device for fixing an explosion vibration measuring sensor on a soil layer, and the device is mainly used for fixing the explosion vibration measuring sensor on the soft soil layer rapidly. The sensor is structurally composed of a substrate, hollow steel pipes, separable bullets and cast in situ cylindrical rigid piles; the substrate is pasted to the sensor, and provided with a level bubble and a compass which are used for determining the levelness and the direction respectively; the hollow steep pipes are connected with the substrate and used for supporting and fixing the substrate; the separable bullets are mounted in the end portions of the hollow steel pipes respectively, can be separated from the steel pipes, and can be wedged into the soil layer under impact of drill steel to form a cylindrical pile wells till a a ground supporting layer; and after that the cylindrical pile wells are formed, filling materials, i.e., quickly hardened concrete, are injected into the pile wells through the ports of the steel pipes till the substrate, and are hardened to form the rigid piles, the ground bottom supporting layer is connected with the ground surface substrate via the rigid piles, and thus, the substrate and the ground supporting layer are coupled, integrated and thus vibration synchronously.
Description
Technical field
The present invention is used for, in engineering explosion, soil layer being fixed Blast Vibration Monitoring sensor.
Background technology
In blasting engineering, for objects such as the optimization to blasting design scheme, the impact evaluation to environment, scientific researches, and the requirement of " shotfiring safety code " GB6722-2014, need to monitor the ground vibration that engineering explosion produces with vialog, concrete monitoring method utilizes sensor to pick up measuring point vibration signal, is then recorded in vialog storer.To the requirement that sensor is fixing be must and measuring point place ground supporting course be coupled as integrally, when vibration wave passes to measuring point, sensor and measuring point place ground supporting course generation associated movement, so just can monitor real vibration data.In addition, because explosion surrounding environment is all often strange for monitoring personnel, leave before explosion that monitoring personnel reconnoitre, the time of vialog of layouting, lay is very urgent again for, so require that vialog and laying of sensor are fixed and must fast, be ensured to complete all preliminary work in the dozens of minutes before explosion is cleared out a gathering place.When being weak overburden layer for burst region surrounding environment, when utilizing vialog to shake with monitoring explosion, the method for fixation of sensor generally has two kinds, the first is on soft layer (namely having the material of the characteristics such as elasticity, plasticity, elastoplasticity), the pin (solid conical of long about 7cm or cylinder) of staying installed on a sensor is used to insert in ground, the friction force F of surface in pin and ground is relied on to fix sensor, this method rig-site utilization more; Second method uses the device of Chinese patent ZL2015204550087 to utilize the lateral resistance of telescopic post tooth in pipe and friction force F to fix sensor.For first method, can fixation of sensor x, y to position, but, in the process of measuring point vibration, when the Dynamic Inertia power that soil layer is more loose, friction force F is less than sensor, will along z to there is relative sliding in pin and ground, namely sensor and measuring point depart from, and data of shaking are inaccurate with finally causing monitored explosion.For second method, when the length of suspension column is less than the thickness of the layer, suspension column does not reach the position of supporting course (hard rock-soil layer), sensor can only apply on soil layer, in the process of measuring point vibration, can there is elastic-plastic deformation and absorbing vibrational energy in soil layer, cause sensor asynchronous with supporting course particle movement.Visible, above-mentioned two kinds of methods all do not reach the requirement of the fixing vibration-measuring sensor of coupling in the soil layer that the layer that comparatively loosens the soil, on-plane surface, the degree of depth are changeable, thus monitoring is less than real vibration data.
Summary of the invention
In order to overcome the deficiencies in the prior art, meet the requirement of laying fixing vialog before explosion fast, the invention provides a kind of device, fixation of sensor fast in the soil layer of soil layer that can be more loose at the scene, on-plane surface, thickness uncertain (change), makes sensor and measuring point place ground supporting course be coupled as one.
The technical solution adopted for the present invention to solve the technical problems is: structure is made up of four parts, and Part I is substrate, and material is aluminium sheet, for pasting sensor, substrate has air level and compass, for determining direction and levelness; Part II is hollow out steel pipe, steel pipe hollow out, can increase with compaction material in conjunction with firmness, steel pipe is connected with substrate, inserts after soil layer and is combined as a whole with compaction material, for supporting fixing base; Part III is detachable bullet, and shape is circular cone cylindricality, is arranged on hollow out steel tube end part, can be separated with steel pipe, diameter is greater than diameter of steel tube, and effect is that in soil layer, wedging forms cylindrical paxilla well under the impact of drill steel, can be suitable for the soil layer of different depth until ground supporting course; Part IV is cast-in-place rigidity pile body, after detachable bullet arrives supporting course formation stake well, rapidly compaction material is injected in stake well from steel pipe opening, until substrate position, just cylindrical rigidity pile body is become after material hardening to be filled, Main Function connects supporting course and earth's surface substrate bottom ground, making substrate and ground supporting course be coupled as one can synchronous vibration, material of body of a pile selects cement fondu, can reach hardening strength within a short period of time, the requirement of sensor to rapidity is laid at satisfied scene.In principle, the combination of these four parts is equivalent to set up a miniature abutment, Part I solves scene cannot paste sensor on weak soil, and determine the problem of direction and levelness inconvenience, steel pipe is made hollow out by Part II, be conducive to compaction material on the one hand, strengthen on the other hand with compaction material in conjunction with firmness, the fixed sturcture pattern of conventional suspension column " head body one " broken by the detachable bullet of Part III, coordinate the cast-in-place rigidity pile body of Part IV, functionally breach by the fixing restriction of conventional suspension column length, how thick Soft Soil Layer have, how dark bullet just can be squeezed into, how dark pile body just can do, until supporting course, reach the object of fixation of sensor under different soil thickness condition, also overcome a difficult problem for on-plane surface fixation of sensor simultaneously, achieving only just can thickness uncertain (change arbitrarily) at the scene by set of device, on-plane surface, sensor and supporting course are coupled as one by weak soil layer.
The invention has the beneficial effects as follows, can, on-plane surface uncertain at thickness, on weak soil layer (namely there is the material of the characteristics such as elasticity, plasticity, elastoplasticity), sensor and measuring point place ground supporting course are coupled as rapidly one, applicability is good, efficiency is high, structure is simple, easy to operate, with low cost.
Accompanying drawing explanation
Fig. 1 is structure of the present invention composition schematic diagram.
Fig. 2 substrate schematic diagram, is of a size of 18cm × 12cm.
Fig. 3 is hollow out steel pipe schematic diagram, hollow out steel pipe height 9cm, top screw thread height 0.8cm.
Fig. 4 is detachable warhead structure schematic diagram, and high 2cm bored by detachable bullet, short column height 1cm, necking down height 0.5cm, and necking down external diameter is equal with pipe diameter, tenon height 0.8cm, external diameter 0.5cm.
Fig. 5 is drill steel schematic diagram, and diameter is less than pipe diameter, and length can lengthen by interface as required, and one end mortise diameter is 0.5cm, dark 0.8cm.
1. substrates in figure, 2. hollow out steel pipe, 3. detachable bullet, 4. cast-in-place cylindrical rigidity pile body, 5. air level, 6. compass, 7. steel pipe interface, 8. screw thread, 9. hollow out, 10. tenon, 11. necking downs, 12. short columns, 13. coneheads, 14. mortises, 15. drill steel interfaces, 16. bit shanks.
Embodiment
Preliminary work, with the foreign material, surface dust etc. at spade removing measuring point place.According to field condition, for the situation that placed side is more smooth, method of operating is, the yellow glycerine of sensor is first pasted onto on substrate (1) by the first step, two hollow out steel pipe (2) thread end are screwed into two steel pipe interfaces (7) of substrate (1) by second step respectively, detachable bullet (3) is inserted hollow out steel pipe (2) other end by the 3rd step, hollow out steel pipe (2) inserts in the soil body with reference to the sensing of compass (6) according to monitoring direction by the 4th step, 5th step uses drill steel in steel pipe, impact detachable bullet (3), make it be separated with steel pipe and enter until supporting course is (according to soil thickness to hyposphene, can continued access drill steel, to adapt to the soil layer of different-thickness), situation about not waiting is there is in the degree of depth of two stake wells according to supporting course distance size, the cylindrical stake well of formation two after this step completes, cement fondu and water are stirred rear to inject from steel pipe opening rapidly by the 6th step in proportion, cement should be fills up to substrate (1) from stake bottom, now at stake well, hollow out (9), in steel pipe and outer hoop direct clearance be full of cement to substrate, namely from supporting course to substrate, between (1), define two cast-in-place cylindrical rigidity pile bodies (4), 7th step is with reference to the levelness of air level (5) fine-tuning sensor.After treating 10-15 minute, hardening of cement microdilatancy, in the soil body, supporting course to earth's surface defines two rigidity pile bodies, sensor and measuring point place supporting course is firmly coupled as one.
Placed side is had to the situation of certain slope, method of operating is, front five steps operates identical with the first situation, except stake well fills up except cement fondu during the 6th step, when ensure substrate level with cement fondu by substrate and lay domatic between space fill up, subsequent step is identical with the first situation.
Claims (4)
1. on soil layer, fix the device of explosion vibration-measuring sensor for one kind, be made up of substrate, hollow out steel pipe, detachable bullet, cast-in-place rigidity pile body, it is characterized in that: adopt detachable bullet, be arranged on hollow out steel tube end part, can be separated with steel pipe, under the impact of drill steel, in soil layer, wedging forms cylindrical stake well, can be suitable for the soil layer of different depth until ground supporting course.
2. a kind of device fixing explosion vibration-measuring sensor on soil layer according to claim 1, it is characterized in that: adopt cast-in-place cylindrical rigidity pile body, how thick Soft Soil Layer have, how dark pile body just can do, until supporting course, reach the object of fixation of sensor under different soil thickness condition, also overcome a difficult problem for on-plane surface fixation of sensor simultaneously.
3. a kind of device fixing explosion vibration-measuring sensor on soil layer according to claim 1, is characterized in that: cast-in-place pile body material selection cement fondu, the requirement of sensor to rapidity is laid at satisfied scene.
4. a kind of device fixing explosion vibration-measuring sensor on soil layer according to claim 1, is characterized in that: adopt hollow out steel pipe, can increase with compaction material in conjunction with firmness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510950699.2A CN105547467A (en) | 2015-12-19 | 2015-12-19 | Device for fixing explosion vibration measuring sensor on soil layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510950699.2A CN105547467A (en) | 2015-12-19 | 2015-12-19 | Device for fixing explosion vibration measuring sensor on soil layer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105547467A true CN105547467A (en) | 2016-05-04 |
Family
ID=55826818
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510950699.2A Pending CN105547467A (en) | 2015-12-19 | 2015-12-19 | Device for fixing explosion vibration measuring sensor on soil layer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105547467A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105973460A (en) * | 2016-06-09 | 2016-09-28 | 辽宁科技学院 | Device for fixing explosion vibration measurement sensor on loose soil |
CN106197645A (en) * | 2016-08-10 | 2016-12-07 | 中国地质大学(武汉) | A kind of pedestal |
CN106644048A (en) * | 2016-09-14 | 2017-05-10 | 中国地质大学(武汉) | Auxiliary explosion vibration tester and explosion vibration test method |
CN108716946A (en) * | 2018-05-30 | 2018-10-30 | 北京市市政三建设工程有限责任公司 | Under a kind of complex environment in the soil body at different depth blasting vibration monitoring device |
CN108760036A (en) * | 2018-06-08 | 2018-11-06 | 成都泰测科技有限公司 | A kind of easy Blasting Vibration Meter connector |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6062085A (en) * | 1997-05-13 | 2000-05-16 | Hyundai Engineering & Construction Co., Ltd. | Interpenetration apparatus for meausurement of underground blasting vibration |
CN2414425Y (en) * | 2000-04-20 | 2001-01-10 | 中国石油化工集团公司 | Earthquake rectifier |
CN101813785A (en) * | 2010-05-10 | 2010-08-25 | 中南大学 | Sensor tailstock for seismic exploration or vibration test |
CN101963672A (en) * | 2010-07-21 | 2011-02-02 | 中国神华能源股份有限公司 | Detector |
CN102053257A (en) * | 2009-11-02 | 2011-05-11 | 煤矿瓦斯治理国家工程研究中心 | Sensor fixing device, mounting device and mounting method |
CN102253408A (en) * | 2011-04-14 | 2011-11-23 | 中国神华能源股份有限公司 | Wave detector |
CN202494465U (en) * | 2012-04-01 | 2012-10-17 | 于浩 | Explosion test apparatus |
CN203908662U (en) * | 2014-05-26 | 2014-10-29 | 葛洲坝易普力股份有限公司 | Explosion vibration sensor fixing device |
CN104165688A (en) * | 2014-08-06 | 2014-11-26 | 中钢集团马鞍山矿山研究院有限公司 | Method for fixedly installing mine blasting vibration testing sensors |
CN204694856U (en) * | 2015-06-24 | 2015-10-07 | 中国矿业大学 | A kind of blasting vibration sensor fastening device |
CN204730938U (en) * | 2015-06-30 | 2015-10-28 | 辽宁科技学院 | A kind of fix in soft rock-soil vibration-measuring sensor simple and easy stay foot device |
CN205246208U (en) * | 2015-12-19 | 2016-05-18 | 辽宁科技学院 | Fixed blasting vibration -measuring sensor's device on soil layer |
-
2015
- 2015-12-19 CN CN201510950699.2A patent/CN105547467A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6062085A (en) * | 1997-05-13 | 2000-05-16 | Hyundai Engineering & Construction Co., Ltd. | Interpenetration apparatus for meausurement of underground blasting vibration |
CN2414425Y (en) * | 2000-04-20 | 2001-01-10 | 中国石油化工集团公司 | Earthquake rectifier |
CN102053257A (en) * | 2009-11-02 | 2011-05-11 | 煤矿瓦斯治理国家工程研究中心 | Sensor fixing device, mounting device and mounting method |
CN101813785A (en) * | 2010-05-10 | 2010-08-25 | 中南大学 | Sensor tailstock for seismic exploration or vibration test |
CN101963672A (en) * | 2010-07-21 | 2011-02-02 | 中国神华能源股份有限公司 | Detector |
CN102253408A (en) * | 2011-04-14 | 2011-11-23 | 中国神华能源股份有限公司 | Wave detector |
CN202494465U (en) * | 2012-04-01 | 2012-10-17 | 于浩 | Explosion test apparatus |
CN203908662U (en) * | 2014-05-26 | 2014-10-29 | 葛洲坝易普力股份有限公司 | Explosion vibration sensor fixing device |
CN104165688A (en) * | 2014-08-06 | 2014-11-26 | 中钢集团马鞍山矿山研究院有限公司 | Method for fixedly installing mine blasting vibration testing sensors |
CN204694856U (en) * | 2015-06-24 | 2015-10-07 | 中国矿业大学 | A kind of blasting vibration sensor fastening device |
CN204730938U (en) * | 2015-06-30 | 2015-10-28 | 辽宁科技学院 | A kind of fix in soft rock-soil vibration-measuring sensor simple and easy stay foot device |
CN205246208U (en) * | 2015-12-19 | 2016-05-18 | 辽宁科技学院 | Fixed blasting vibration -measuring sensor's device on soil layer |
Non-Patent Citations (4)
Title |
---|
任锡泰: "爆破振动对建筑物影响测试要点", 《东北地震研究》 * |
孙翠兰: "《施工员专业管理实务》", 31 July 2015, 中国电力出版社 * |
杨年华著: "《爆破振动理论与测控技术》", 31 July 2014, 中国铁道出版社 * |
胡峰等: "《爆破量测技术研究》", 31 July 1982, 山东矿业学院建井研究室 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105973460A (en) * | 2016-06-09 | 2016-09-28 | 辽宁科技学院 | Device for fixing explosion vibration measurement sensor on loose soil |
CN106197645A (en) * | 2016-08-10 | 2016-12-07 | 中国地质大学(武汉) | A kind of pedestal |
CN106644048A (en) * | 2016-09-14 | 2017-05-10 | 中国地质大学(武汉) | Auxiliary explosion vibration tester and explosion vibration test method |
CN108716946A (en) * | 2018-05-30 | 2018-10-30 | 北京市市政三建设工程有限责任公司 | Under a kind of complex environment in the soil body at different depth blasting vibration monitoring device |
CN108760036A (en) * | 2018-06-08 | 2018-11-06 | 成都泰测科技有限公司 | A kind of easy Blasting Vibration Meter connector |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105547467A (en) | Device for fixing explosion vibration measuring sensor on soil layer | |
CN205246208U (en) | Fixed blasting vibration -measuring sensor's device on soil layer | |
CN102979535B (en) | Draining type section of jurisdiction is used in a kind of tunnel lining | |
CN107063881B (en) | A kind of landslide monitoring model equipment and its test method based on secondary audio technology | |
CN107268604B (en) | Construction system and construction method of hollow precast pile | |
CN104762978A (en) | Anchor rod gravity retaining wall for high slope support and manufacturing method | |
KR20160025180A (en) | Helical pile and construction method thereof | |
CN105649073A (en) | Static root drilling type construction method for planting piles | |
CN105672311A (en) | Novel anchor rod and construction method thereof | |
CN205576908U (en) | Novel anchoring rod | |
CN102926413A (en) | Embedded pipe for sampling pile tip of filling pile | |
CN105241648A (en) | Loading device simulating loess tunnel lock foot anchor pipe end stress and use method thereof | |
CN211646445U (en) | Riprap layer pile | |
CN104831726B (en) | Barb grouting formula anchor pole and construction method thereof | |
CN101824962B (en) | Method for soil mass supporting construction by jet mixing drilling tool | |
CN106120714A (en) | A kind of device improving hollow pile bearing capacity and using method thereof | |
CN201334664Y (en) | Spike-shaped anchor rod | |
CN106638574A (en) | Anchoring ball for preventing bored concrete pile reinforcement cage from floating | |
CN207047834U (en) | A kind of construction system of hollow preformed pile | |
CN105178355A (en) | Stratum pre-reinforcement treatment method for underground space construction | |
CN206916543U (en) | Structure is repaired in a kind of non-fragment orbit railway tunnel arch | |
CN104612124A (en) | Vane type multipoint displacement meter anchor head | |
CN205116168U (en) | End grout static pressure tubular pile construction equipment is expanded in drilling | |
CN104532815B (en) | A kind of telescopic boom multipoint displacement meter anchor head for soft soil layer | |
KR20090050562A (en) | The installation method of long piles using steel pipe with taper shape |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160504 |
|
RJ01 | Rejection of invention patent application after publication |