CN104831726B - Barb grouting formula anchor pole and construction method thereof - Google Patents

Barb grouting formula anchor pole and construction method thereof Download PDF

Info

Publication number
CN104831726B
CN104831726B CN201510219708.0A CN201510219708A CN104831726B CN 104831726 B CN104831726 B CN 104831726B CN 201510219708 A CN201510219708 A CN 201510219708A CN 104831726 B CN104831726 B CN 104831726B
Authority
CN
China
Prior art keywords
barb
rod
push rod
anchor pole
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510219708.0A
Other languages
Chinese (zh)
Other versions
CN104831726A (en
Inventor
周晓蓉
黄宏星
徐敏
阎凌云
张佳路
王羽
王一羽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi University
Original Assignee
Guangxi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi University filed Critical Guangxi University
Priority to CN201510219708.0A priority Critical patent/CN104831726B/en
Publication of CN104831726A publication Critical patent/CN104831726A/en
Application granted granted Critical
Publication of CN104831726B publication Critical patent/CN104831726B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of barb grouting formula anchor pole, including: the body of rod, in cavity structure inside it, described cavity is used for accommodating slurry;Barb plate, its mobilizable front portion being located at the described body of rod;And push rod, itself and described barb plate active link, described push rod is located on the described body of rod, and can be moved axially along the described body of rod, to drive opening and Guan Bi of described barb plate;When described barb plate opens, grouting material in described body of rod cavity, slurry can be overflowed by the gap that described barb plate and the described body of rod are formed.Barb of the present invention grouting formula anchor pole, when barb plate opens, makes anchor pole have barb, improves the withdrawal resistance of anchor pole, is also not easy to produce to slide, it is ensured that the safety of slope reinforcement after long-time use.The construction method of the present invention, its construction is convenient, improves work efficiency, economical good.

Description

Barb grouting formula anchor pole and construction method thereof
Technical field
The present invention relates to reinforcing side slope technique field, particularly to a kind of barb grouting formula anchor pole and construction thereof Method.
Background technology
The fast development built along with highway in China, during the roadbed Collapse Accidents caused because of slope of highway unstability There is generation.Therefore slope reinforcement is always the basic demand of slope project, and slope reinforcement can be divided into outside to add Gu and the big class of internal reinforcement two.Externally reinforced conventional method is pitched work structure, and internal reinforcement body is normal Method be that the measure such as soil nailing, anchor pole is set in slope soil.Wherein, pitched work structure needs Exploiting a large amount of building stones, and great in constructing amount, by contrast, anchor pole is applicable to various environment, be one relatively For preferable support form, play important in underground engineering, slope project, deep-foundation pit engineering etc. are stable Effect.Existing anchor pole, after slope reinforcement a period of time, easily produces and slides up and down, and impact is reinforced Effect.
The information being disclosed in this background section is merely intended to increase the reason of the general background to the present invention Solve, and be not construed as recognizing or imply in any form that this information structure is for this area general technology Prior art well known to personnel.
Summary of the invention
It is an object of the invention to provide a kind of barb grouting formula anchor pole, thus overcome existing anchor pole easily to produce The shortcoming that life slides up and down, withdrawal resistance is little.
Another object of the present invention is to provide the construction method of a kind of barb grouting formula anchor pole.
For achieving the above object, the invention provides a kind of barb grouting formula anchor pole, including: the body of rod, its Internal in cavity structure, described cavity is used for accommodating slurry;Barb plate, it is mobilizable is located at described bar The front portion of body;And push rod, it is with described barb plate active link, and described push rod is located on the described body of rod, And can move axially along the described body of rod, to drive opening and Guan Bi of described barb plate;At described barb Under the state that plate opens, grouting material in described body of rod cavity, slurry can be by described barb plate with described The gap that the body of rod is formed is overflowed.
Preferably, in technique scheme, also including push rod, its one end is hinged with described push rod, another End is slidably located in the push rod guide groove of described barb plate.
Preferably, in technique scheme, the outer wall of the described body of rod is provided with the described push rod displacement of restriction Spacing preiection.
Preferably, in technique scheme, described barb plate is 4 pieces, and uniform ring is set around the described body of rod Outer surface.
Preferably, in technique scheme, the described body of rod is provided with push rod guide groove, and described push rod is located at this In push rod guide groove, and can slide in described push rod guide groove.
Preferably, in technique scheme, the described body of rod is the conehead body of rod.
The construction method of a kind of hook grouting formula anchor pole, comprises the following steps:
(1) slope body is holed, to implementing reaming at the bottom of drilling hole, make to be formed at the bottom of hole can accommodate to be in and open The cavity of barb plate during open state;
(2) anchor pole that barb plate is first in closure state inserts in the hole, and then promotes push rod, push rod to push away Dynamic barb plate opens, and then fixes push rod;
(3), toward grouting in the cavity of the body of rod, after grouting, the rear portion toward anchor pole adds upper padding plate, baffle ring And concrete capping.
Compared with prior art, there is advantages that barb of the present invention grouting formula anchor pole, When barb plate opens, make anchor pole have barb, improve the withdrawal resistance of anchor pole, after long-time use also It is not easy to produce and slides, it is ensured that the safety of slope reinforcement.The construction method of the present invention, its construction is just Victory, improves work efficiency, economical good.
Accompanying drawing explanation
Fig. 1 is structure when being in closure state of the barb plate in the barb grouting formula anchor pole according to the present invention Schematic diagram.
Fig. 2 is structure when being in open configuration of the barb plate in the barb grouting formula anchor pole according to the present invention Schematic diagram.
Fig. 3 is the A-A profile according to Fig. 2 barb grouting formula anchor pole.
Detailed description of the invention
Below in conjunction with the accompanying drawings, the detailed description of the invention of the present invention is described in detail, it is to be understood that this The protection domain of invention is not limited by detailed description of the invention.
Explicitly indicate that unless otherwise other, otherwise in entire disclosure and claims, term " bag Include " or its conversion as " comprising " or " including " etc. will be understood to comprise stated element or Ingredient, and do not get rid of other element or other ingredient.
As shown in Figure 1 to Figure 3, according to a kind of barb grouting formula anchor pole of the specific embodiment of the invention, Including the body of rod 1, barb plate 2 and push rod 3.The body of rod 1 is internal, and in cavity structure, cavity is used for accommodating slurry, The front end of the body of rod 1 is conehead structure.The mobilizable front portion being located at the described body of rod 1 of barb plate 2.Preferably Ground, barb plate 2 is 4 pieces, and uniform ring is set around the outer surface of the described body of rod 1.Push rod 3 and barb plate 2 One_to_one corresponding active link, described push rod 3 is located at the upper of the described body of rod 1, and can be along the described body of rod 1 Move axially, with drive described barb plate 2 open with Guan Bi.In the state that described barb plate opens Under, grouting material in the described body of rod 1 cavity, slurry can be by described barb plate 2 and the described body of rod 1 shape The gap become is overflowed, and after slurry solidifies so that the barb shape of anchor pole front end is more stable, anchor pole has There is barb, improve the withdrawal resistance of anchor pole, be also not easy to produce after long-time use to slide, it is ensured that limit The safety that slope reinforces.
Preferably, also including push rod 4, push rod 4 one end is hinged with described push rod 3 by movable pin 5, The other end is slidably located in the push rod guide groove 6 of described barb plate 2.Promote push rod 3 along the body of rod 1 When sliding axially, push rod 3 by movable pin 5 by push rod 4 along push rod guide groove 6 upwards jack-up, make Barb plate 2 opens.
Preferably, the outer wall of the described body of rod 1 is provided with the spacing preiection 7 limiting described push rod 3 displacement, When push rod 3 moves to this spacing preiection 7, stop promoting push rod 3, fixing push rod 3.Now, barb Plate 2 is also flared to better suited position, and in use, anchor pole can bear bigger power, makes anchor pole be in Optimum state.
Preferably, the described body of rod 1 is provided with push rod guide groove 8, and described push rod 3 is located in this push rod guide groove 8, And can slide in described push rod guide groove 8, make push rod 3 not offset when sliding, move the most flat Surely.
The construction method of a kind of hook grouting formula anchor pole, comprises the following steps:
(1) slope body 9 is holed, to implementing reaming at the bottom of drilling hole, make to be formed to accommodate at the bottom of hole to be in The cavity of barb plate during open configuration;
(2) anchor pole that barb plate is first in closure state inserts in the hole, and then promotes push rod, push rod to push away Dynamic barb plate opens, and then fixes push rod;
(3), toward grouting in the cavity of the body of rod, after grouting, the rear portion toward anchor pole adds upper padding plate 10, gear Ring 11 and concrete capping 12.
The aforementioned description to the specific illustrative embodiment of the present invention illustrates that and the purpose of illustration. These descriptions are not wishing to limit the invention to disclosed precise forms, and it will be apparent that according to above-mentioned Teaching, can much change and change.The purpose selected exemplary embodiment and describe exists In explaining the certain principles of the present invention and actual application thereof, so that those skilled in the art can be real Now and utilize the various different exemplary of the present invention and various different selection and change. The scope of the present invention is intended to be limited by claims and equivalents thereof.

Claims (7)

1. a barb grouting formula anchor pole, it is characterised in that including:
The body of rod, in cavity structure inside it, described cavity is used for accommodating slurry;
Barb plate, its mobilizable front portion being located at the described body of rod;And
Push rod, it is with described barb plate active link, and described push rod is located on the described body of rod, and can be along The described body of rod moves axially, to drive opening and Guan Bi of described barb plate;Open at described barb plate Under state, grouting material in described body of rod cavity, slurry can be formed with the described body of rod by described barb plate Gap overflow.
Barb the most according to claim 1 grouting formula anchor pole, it is characterised in that also include push rod, Its one end is hinged with described push rod, and the other end is slidably located in the push rod guide groove of described barb plate.
Barb the most according to claim 1 grouting formula anchor pole, it is characterised in that outside the described body of rod Wall is provided with the spacing preiection limiting described push rod displacement.
Barb the most according to claim 1 grouting formula anchor pole, it is characterised in that described barb plate is 4 pieces, uniform ring is set around the outer surface of the described body of rod.
Barb the most according to claim 1 grouting formula anchor pole, it is characterised in that set on the described body of rod There are push rod guide groove, described push rod to be located in this push rod guide groove, and can slide in described push rod guide groove.
Barb the most according to claim 1 grouting formula anchor pole, it is characterised in that the described body of rod is cone Head rod body.
7. the construction method of a barb as claimed in claim 1 grouting formula anchor pole, it is characterised in that Comprise the following steps:
(1) slope body is holed, to implementing reaming at the bottom of drilling hole, make to be formed at the bottom of hole can accommodate to be in and open The cavity of barb plate during open state;
(2) anchor pole that barb plate is first in closure state inserts in the hole, and then promotes push rod, push rod to push away Dynamic barb plate opens, and then fixes push rod;
(3), toward grouting in the cavity of the body of rod, after grouting, the rear portion toward anchor pole adds upper padding plate, baffle ring And concrete capping.
CN201510219708.0A 2015-04-30 2015-04-30 Barb grouting formula anchor pole and construction method thereof Active CN104831726B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510219708.0A CN104831726B (en) 2015-04-30 2015-04-30 Barb grouting formula anchor pole and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510219708.0A CN104831726B (en) 2015-04-30 2015-04-30 Barb grouting formula anchor pole and construction method thereof

Publications (2)

Publication Number Publication Date
CN104831726A CN104831726A (en) 2015-08-12
CN104831726B true CN104831726B (en) 2016-08-17

Family

ID=53809897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510219708.0A Active CN104831726B (en) 2015-04-30 2015-04-30 Barb grouting formula anchor pole and construction method thereof

Country Status (1)

Country Link
CN (1) CN104831726B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106555394B (en) * 2017-01-12 2019-01-22 广西大学 A kind of excessively moist ultra-soft soil drainage arrangement of artificial hydraulic reclamation
CN107268642B (en) * 2017-06-30 2019-08-16 浙江中良市政工程有限公司 Slope reinforcement synthesis structure and construction method
CN113136875B (en) * 2021-04-29 2022-03-08 江苏科技大学 Foundation pit supporting structure and construction method thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4296660B2 (en) * 1999-11-25 2009-07-15 株式会社大林組 Slope stabilization method
CN103469793B (en) * 2012-06-08 2016-10-05 深圳市工勘岩土工程有限公司 For connecting sealing off and covering anchorage body structure and the construction method thereof of Vierendeel girder and anchor pole
CN204098049U (en) * 2014-10-15 2015-01-14 中冶集团武汉勘察研究院有限公司 A kind of protective reinforcing structure of broken rock mass slope

Also Published As

Publication number Publication date
CN104831726A (en) 2015-08-12

Similar Documents

Publication Publication Date Title
CN104831726B (en) Barb grouting formula anchor pole and construction method thereof
CN200985518Y (en) Portal type anti floating structure
CN108221977A (en) A kind of environment-friendly type anchor pole of architectural engineering
CN106759305B (en) One kind is reusable provisionally to descend foundation pile
CN206346205U (en) A kind of sawtooth anchor formula miniature steel pipe concrete-pile for slope treatment
CN205012953U (en) Drill bit of rotary drilling rig
CN105649073A (en) Static root drilling type construction method for planting piles
CN105547467A (en) Device for fixing explosion vibration measuring sensor on soil layer
CN208328666U (en) A kind of Extended chemotherapy seat-plate type bridge abutment structure with anchor pole
CN205975641U (en) Deep -cut necromancer matter cutting side slope protecting structure
CN103321222A (en) Recoverable type anchor rod, pressure-bearing plate type anchor pile and anchoring method
CN205246208U (en) Fixed blasting vibration -measuring sensor's device on soil layer
CN207260151U (en) Drill bit is pulled out in a kind of rotation of the long casing of rotary drilling rig pulling bored concrete pile
CN203334288U (en) Novel vertical foundation pit space enclosing structure
CN110359447A (en) A kind of tubing string
CN203361147U (en) Recyclable anchor rod and bearing plate type anchor pile
CN206328752U (en) A kind of environment-friendly type anchor pole of architectural engineering
CN216108605U (en) Pile plate type retaining wall
CN205116168U (en) End grout static pressure tubular pile construction equipment is expanded in drilling
CN105239575B (en) One kind drilling base expanding and base expanding grouting Static Pipe Pile Construction device and construction method
CN209523202U (en) Foundation pit supporting anchor pulling structure
CN108589720B (en) Use method of cross extrusion anchoring anchor rod
CN207348055U (en) A kind of casing external member for Bridge Pile Foundation Construction
CN207092116U (en) Road and bridge, which build, repaiies construction roadbed supporting pile
CN217027065U (en) Recyclable pile tip assembly for precession type PC (polycarbonate) pipe pile and precession type PC pipe pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant