CN102486049A - Filler wall masonry tie bar planting method - Google Patents

Filler wall masonry tie bar planting method Download PDF

Info

Publication number
CN102486049A
CN102486049A CN201010575003XA CN201010575003A CN102486049A CN 102486049 A CN102486049 A CN 102486049A CN 201010575003X A CN201010575003X A CN 201010575003XA CN 201010575003 A CN201010575003 A CN 201010575003A CN 102486049 A CN102486049 A CN 102486049A
Authority
CN
China
Prior art keywords
bar planting
glue
hole
tension rib
tie bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201010575003XA
Other languages
Chinese (zh)
Inventor
黄爱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI HUOLONG INDUSTRIAL CO LTD
Original Assignee
SHANGHAI HUOLONG INDUSTRIAL CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI HUOLONG INDUSTRIAL CO LTD filed Critical SHANGHAI HUOLONG INDUSTRIAL CO LTD
Priority to CN201010575003XA priority Critical patent/CN102486049A/en
Publication of CN102486049A publication Critical patent/CN102486049A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to the field of engineering construction, in particular to a filler wall masonry tie bar planting method. The filler wall masonry tie bar planting method sequentially comprises the steps of line snapping and positioning, hole drilling, hole cleaning, glue preparation, glue filling, bar planting, checking, inspection and acceptance and the like, tie bars or embedded parts thereof are not embedded in the construction process of a reinforced concrete structure, the post-planting construction of the tie bars is conducted by adopting the bar planting method before a filler wall masonry is built, holes are drilled on a wall body at the positions of the tie bars, glue is filled and the tie bars are planted, so as to ensure that the bonding and tying strength between the design tie bars and the original structural column concrete satisfies design requirements and tension on the tie bars can be transferred to a concrete column through chemical bonding and tying agent. By using chemical anchoring glue as bonding agent for the tie bars and the column concrete, the reliable bonding between the tie bars and the column concrete is ensured, the damages to the original structural members are reduced and the correct positions of the tie bars determined according to masonry modulus are ensured.

Description

Infilled wall masonry tension rib bar planting method
Technical field
The present invention relates to the engineering construction field, particularly a kind of infilled wall masonry tension rib bar planting method.
Background technology
Bar planting method construction infilled wall tie bar, the tension rib accurate positioning makes things convenient for building wall.Not direct pre-buried tension rib does not need in reinforced concrete structure post (wall), embedded part to be set in advance yet, and can carry out the position setting by the building block modulus; Compare with built-in process; Do not need template boring to wear muscle, and when having avoided, owing to vibrate etc. former thereby built-in fitting position that cause is inaccurate because of concrete construction; The tension rib construction time pick cut a hole dark or area excessive, influence problems such as main tendon protective layer and weakening concrete structure cross dimensions.
Summary of the invention
The technical problem that the present invention will solve provides a kind of infilled wall masonry tension rib bar planting method; This method assurance tension rib and post (wall) are concrete reliably bonding; Thereby alleviate damage, and guarantee the tram that tension rib is confirmed according to the building block modulus the original structure member.
For solving the problems of the technologies described above, described infilled wall masonry tension rib bar planting method, this method are carried out the construction of tension rib before the construction of infilled wall masonry after structure of reinforced concrete finishes, comprise the steps:
(1) the snap the line location contrasts working drawing, wants the body structure surface that is connected at infilled wall and post or wall; By designing or construct requirement in the position that tension rib is set, carry out snap the line along short transverse, play vertical line earlier; Play horizontal line again, line intersection area anyhow is the bore position of tension rib;
(2) boring, based on the bore position that ejects, with percussion drill boring, hole depth and aperture are confirmed by designing requirement;
(3) clear hole, boring can be operated after accomplishing a structural plane as follows: first blowing-out hole floating dust, clean hole wall with water with special-purpose hairbrush then, hairbrush pull in the hole rotates when cleaning with water, blows brush so repeatedly, cleans out foreign material in the hole;
(4) join glue, will carry out the inspection of bar planting preparation before joining glue, guarantee that boring, the work of clear hole accomplished a construction section, and organized examination, carry out record of acceptance of concealed work, steel tie is ready simultaneously, reaches the requirement of bar planting operation preparation; Joining glue will prepare according to the construction section consumption of being divided, and joins the glue ratio and prepares by the bar planting manual of selecting for use, and use up in the stipulated time at manual;
(5) injecting glue, adopt hand-held automatic pressure filling device to carry out the injecting glue operation: the pulling pull bar sucks capsula interna with the bar planting glue mixture for preparing; To note getting rid of the air in the boring during injecting glue; Injecting glue chewed to stretch into bore in the good bar planting hole about about 8cm, pushing drawing rod makes in the sizing material injection hole, and filling device is pulled out on pull bar limit, limit outside the hole; Chewing until the filling device injecting glue and can stop injecting glue when being drawn to from the aperture 1/3 hole depth, is degree to implant behind the tension rib that glue slightly is extruded;
(6) bar planting, bar planting should be carried out after injecting glue is accomplished immediately; Full for guaranteeing colloid, after injecting glue is accomplished, the tension rib that processes is implanted end dip in a little glue, slowly insert the bar planting hole; Want the limit to insert the edge certain orientation during operation and rotate repeatedly, so that bar planting glue and tension rib and concrete hole wall surface bonding are closely knit;
(7) inspect for acceptance, product gel time and the hardening time introduced by bar planting glue manual, general 15 minutes kinds and 1 hour, after bar planting put in place, the tension rib that will send the on-the-spot nurse of special messenger to construct before the gel was strictly on guard against collision; Can carry out pull-out test after colloid solidifies fully, adopt nondestructive test, test value to reach off-load after the designing requirement.
Wherein, in said step (2), hole depth is pressed >=the 15d consideration, generally adopts 100mm, and d+2~4mm control is pressed in the aperture, generally adopts 10mm.
Wherein, in said step (2), to use Churn drill evenly to pierce during boring, so that keyhole is vertical perpendicular to body structure surface; Hole depth is controlled with the Churn drill upper ejector pin; The position of a bar diameter of bore position horizontal translation; Again pierce, the useless hole of the former not moulding that gets out might overlap with 1: 1 cement mortar muscle bore position, then needs suitably to adjust stirrup or concrete wall horizontal bar according to the building block modulus; Suitably adjust bore position according to the mortar joint size, useless hole still adopts method noted earlier to handle.
Wherein, in said step (6), tension rib should thoroughly be removed surface attachments, floating rust and greasy dirt before the bar planting construction; It is the most deep that tension rib will insert the duct, and normal temperature guarantees down not disturbance in 24 hours, can carry out the filled wall building construction after reaching requirement.
Compared with prior art; Infilled wall masonry tension rib bar planting method of the present invention is not carried out the pre-buried of tension rib or its embedded part in reinforced concrete structure post (wall) work progress; Build back implantation (anchoring) construction that tension rib is carried out in preceding employing " bar planting method " by laying bricks or stones at the infilled wall masonry; At the position boring of body of wall tension rib, injecting glue and implant tension rib, utilize chemical anchoring glue as tension rib and the concrete adhesive of post (wall), guarantee that tension rib and post (wall) are concrete reliably bonding; Thereby alleviate damage, and guarantee the tram that tension rib is confirmed according to the building block modulus the original structure member.Make design (or structure) tension rib and concrete the gluing of original structure post (wall) draw intensity to reach design (or standard) requirement, the pulling force on the tension rib draws agent in concrete column (wall), to transmit through chemistry is sticking.
Description of drawings
Fig. 1 is the workflow diagram of infilled wall masonry tension rib bar planting method of the present invention.
The specific embodiment
Infilled wall masonry tension rib bar planting method as shown in Figure 1, this method are carried out the construction of tension rib before the construction of infilled wall masonry after structure of reinforced concrete finishes, comprise the steps:
(1) the snap the line location contrasts working drawing, wants the body structure surface that is connected at infilled wall and post or wall; By designing or construct requirement in the position that tension rib is set, carry out snap the line along short transverse, play vertical line earlier; Play horizontal line again, line intersection area anyhow is the bore position of tension rib;
(2) boring, based on the bore position that ejects, with percussion drill boring, hole depth and aperture are confirmed by designing requirement;
(3) clear hole, boring can be operated after accomplishing a structural plane as follows: first blowing-out hole floating dust, clean hole wall with water with special-purpose hairbrush then, hairbrush pull in the hole rotates when cleaning with water, blows brush so repeatedly, cleans out foreign material in the hole;
(4) join glue, will carry out the inspection of bar planting preparation before joining glue, guarantee that boring, the work of clear hole accomplished a construction section, and organized examination, carry out record of acceptance of concealed work, steel tie is ready simultaneously, reaches the requirement of bar planting operation preparation; Joining glue will prepare according to the construction section consumption of being divided, and joins the glue ratio and prepares by the bar planting manual of selecting for use, and use up in the stipulated time at manual;
(5) injecting glue, adopt hand-held automatic pressure filling device to carry out the injecting glue operation: the pulling pull bar sucks capsula interna with the bar planting glue mixture for preparing; To note getting rid of the air in the boring during injecting glue; Injecting glue chewed to stretch into bore in the good bar planting hole about about 8cm, pushing drawing rod makes in the sizing material injection hole, and filling device is pulled out on pull bar limit, limit outside the hole; Chewing until the filling device injecting glue and can stop injecting glue when being drawn to from the aperture 1/3 hole depth, is degree to implant behind the tension rib that glue slightly is extruded;
(6) bar planting, bar planting should be carried out after injecting glue is accomplished immediately; Full for guaranteeing colloid, after injecting glue is accomplished, the tension rib that processes is implanted end dip in a little glue, slowly insert the bar planting hole; Want the limit to insert the edge certain orientation during operation and rotate repeatedly, so that bar planting glue and tension rib and concrete hole wall surface bonding are closely knit;
(7) inspect for acceptance, product gel time and the hardening time introduced by bar planting glue manual, general 15 minutes kinds and 1 hour, after bar planting put in place, the tension rib that will send the on-the-spot nurse of special messenger to construct before the gel was strictly on guard against collision; Can carry out pull-out test after colloid solidifies fully, adopt nondestructive test, test value to reach off-load after the designing requirement.
Wherein, in said step (2), hole depth is pressed >=the 15d consideration, generally adopts 100mm, and d+2~4mm control is pressed in the aperture, generally adopts 10mm.
Wherein, in said step (2), to use Churn drill evenly to pierce during boring, so that keyhole is vertical perpendicular to body structure surface; Hole depth is controlled with the Churn drill upper ejector pin; The position of a bar diameter of bore position horizontal translation; Again pierce, the useless hole of the former not moulding that gets out might overlap with 1: 1 cement mortar muscle bore position, then needs suitably to adjust stirrup or concrete wall horizontal bar according to the building block modulus; Suitably adjust bore position according to the mortar joint size, useless hole still adopts method noted earlier to handle.
Wherein, in said step (6), tension rib should thoroughly be removed surface attachments, floating rust and greasy dirt before the bar planting construction; It is the most deep that tension rib will insert the duct, and normal temperature guarantees down not disturbance in 24 hours, can carry out the filled wall building construction after reaching requirement.
Compared with prior art; Infilled wall masonry tension rib bar planting method of the present invention is not carried out the pre-buried of tension rib or its embedded part in reinforced concrete structure post (wall) work progress; Build back implantation (anchoring) construction that tension rib is carried out in preceding employing " bar planting method " by laying bricks or stones at the infilled wall masonry; At the position boring of body of wall tension rib, injecting glue and implant tension rib, utilize chemical anchoring glue as tension rib and the concrete adhesive of post (wall), guarantee that tension rib and post (wall) are concrete reliably bonding; Thereby alleviate damage, and guarantee the tram that tension rib is confirmed according to the building block modulus the original structure member.Make design (or structure) tension rib and concrete the gluing of original structure post (wall) draw intensity to reach design (or standard) requirement, the pulling force on the tension rib draws agent in concrete column (wall), to transmit through chemistry is sticking.

Claims (4)

1. infilled wall masonry tension rib bar planting method, this method are carried out the construction of tension rib before the construction of infilled wall masonry after structure of reinforced concrete finishes, comprise the steps:
(1) the snap the line location contrasts working drawing, wants the body structure surface that is connected at infilled wall and post or wall; By designing or construct requirement in the position that tension rib is set, carry out snap the line along short transverse, play vertical line earlier; Play horizontal line again, line intersection area anyhow is the bore position of tension rib;
(2) boring, based on the bore position that ejects, with percussion drill boring, hole depth and aperture are confirmed by designing requirement;
(3) clear hole, boring can be operated after accomplishing a structural plane as follows: first blowing-out hole floating dust, clean hole wall with water with special-purpose hairbrush then, hairbrush pull in the hole rotates when cleaning with water, blows brush so repeatedly, cleans out foreign material in the hole;
(4) join glue, will carry out the inspection of bar planting preparation before joining glue, guarantee that boring, the work of clear hole accomplished a construction section, and organized examination, carry out record of acceptance of concealed work, steel tie is ready simultaneously, reaches the requirement of bar planting operation preparation; Joining glue will prepare according to the construction section consumption of being divided, and joins the glue ratio and prepares by the bar planting manual of selecting for use, and use up in the stipulated time at manual;
(5) injecting glue, adopt hand-held automatic pressure filling device to carry out the injecting glue operation: the pulling pull bar sucks capsula interna with the bar planting glue mixture for preparing; To note getting rid of the air in the boring during injecting glue; Injecting glue chewed to stretch into bore in the good bar planting hole about about 8cm, pushing drawing rod makes in the sizing material injection hole, and filling device is pulled out on pull bar limit, limit outside the hole; Chewing until the filling device injecting glue and can stop injecting glue when being drawn to from the aperture 1/3 hole depth, is degree to implant behind the tension rib that glue slightly is extruded;
(6) bar planting, bar planting should be carried out after injecting glue is accomplished immediately; Full for guaranteeing colloid, after injecting glue is accomplished, the tension rib that processes is implanted end dip in a little glue, slowly insert the bar planting hole; Want the limit to insert the edge certain orientation during operation and rotate repeatedly, so that bar planting glue and tension rib and concrete hole wall surface bonding are closely knit;
(7) inspect for acceptance, product gel time and the hardening time introduced by bar planting glue manual, general 15 minutes kinds and 1 hour, after bar planting put in place, the tension rib that will send the on-the-spot nurse of special messenger to construct before the gel was strictly on guard against collision; Can carry out pull-out test after colloid solidifies fully, adopt nondestructive test, test value to reach off-load after the designing requirement.
2. infilled wall masonry tension rib bar planting method as claimed in claim 1 is characterized in that: in said step (2), hole depth is pressed >=the 15d consideration, generally adopts 100mm, and d+2~4mm control is pressed in the aperture, generally adopts 10mm.
3. infilled wall masonry tension rib bar planting method as claimed in claim 1 is characterized in that: in said step (2), will use Churn drill evenly to pierce perpendicular to body structure surface during boring, so that keyhole is vertical; Hole depth is controlled with the Churn drill upper ejector pin; The position of a bar diameter of bore position horizontal translation; Again pierce, the useless hole of the former not moulding that gets out might overlap with 1: 1 cement mortar muscle bore position, then needs suitably to adjust stirrup or concrete wall horizontal bar according to the building block modulus; Suitably adjust bore position according to the mortar joint size, useless hole still adopts method noted earlier to handle.
4. infilled wall masonry tension rib bar planting method as claimed in claim 1 is characterized in that: in said step (6), tension rib should thoroughly be removed surface attachments, floating rust and greasy dirt before the bar planting construction; It is the most deep that tension rib will insert the duct, and normal temperature guarantees down not disturbance in 24 hours, can carry out the filled wall building construction after reaching requirement.
CN201010575003XA 2010-12-06 2010-12-06 Filler wall masonry tie bar planting method Pending CN102486049A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010575003XA CN102486049A (en) 2010-12-06 2010-12-06 Filler wall masonry tie bar planting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010575003XA CN102486049A (en) 2010-12-06 2010-12-06 Filler wall masonry tie bar planting method

Publications (1)

Publication Number Publication Date
CN102486049A true CN102486049A (en) 2012-06-06

Family

ID=46151615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010575003XA Pending CN102486049A (en) 2010-12-06 2010-12-06 Filler wall masonry tie bar planting method

Country Status (1)

Country Link
CN (1) CN102486049A (en)

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864937A (en) * 2012-10-12 2013-01-09 中建六局土木工程有限公司 Construction method of rear added insert of prefabricated pillar
CN103015734A (en) * 2012-12-20 2013-04-03 南宁铁路局房产管理所 Manufacturing method of pre-embedded mineral wool glued groove plate box of construction lacing bar
CN103306487A (en) * 2013-06-27 2013-09-18 中建五局第三建设有限公司 Multi-row beam steel bar PVC tube reserved steel bar embedding process
CN103452327A (en) * 2013-08-30 2013-12-18 山西四建集团有限公司 Positioning construction method for steel bar planting of constructional column
CN103485445A (en) * 2013-09-23 2014-01-01 云南建工水利水电建设有限公司 Connecting method and device for aerated concrete block and steel column
CN104594640A (en) * 2014-12-01 2015-05-06 中建七局第四建筑有限公司 High-rise building secondary structure foam concrete cast-in-situ bar planting technology and construction method thereof
CN104878853A (en) * 2015-04-02 2015-09-02 中国十七冶集团有限公司 Method for mounting tie bars at position of joint surface between masonry wall and concrete structure
CN105201215A (en) * 2015-08-28 2015-12-30 济南城建集团有限公司 Mounting method of embedded part for brickwork structures
CN105604338A (en) * 2015-12-21 2016-05-25 中国铁道科学研究院铁道建筑研究所 Cement-based anchoring glue construction technology
CN106401276A (en) * 2016-09-23 2017-02-15 中国人民解放军63926部队 Construction method for wall column binding bars of frame type building block enclosing wall
CN106639326A (en) * 2015-10-28 2017-05-10 上海十三冶建设有限公司 Method for planting steel bar in structure through expansion bolt
CN106760535A (en) * 2017-03-23 2017-05-31 中冶建工集团有限公司 One kind exempts from plastering construction method using aluminum alloy mould plate casting concrete interior wall
CN106894542A (en) * 2017-03-23 2017-06-27 中冶建工集团有限公司 One kind exempts from plastering construction method using aluminum alloy mould plate casting concrete inner side of outer wall
CN107012957A (en) * 2017-04-27 2017-08-04 四川农业大学 The varied rigid link technique and device of a kind of new filling wall and chassis body
CN107059536A (en) * 2017-04-26 2017-08-18 河北工业大学 A kind of new-to-old concrete interface bar planting adhesive method
CN108221692A (en) * 2018-01-15 2018-06-29 广东省建筑工程机械施工有限公司 A kind of Landscape Bridge arch ring stone material bar planting method
CN108505457A (en) * 2018-04-16 2018-09-07 杭州屹方建筑科技有限公司 A kind of method that steel flanged beam cemented rock arch bridge side wall is reinforced
CN108625777A (en) * 2018-05-14 2018-10-09 广东和立土木工程有限公司 Movable automatic drilling machine and its construction method for bar planting drilling
CN108952200A (en) * 2018-08-13 2018-12-07 浙江科技学院 The construction method that building steel-bar-planting is reinforced under wet environment
CN109375257A (en) * 2018-09-18 2019-02-22 山东大学 The support cleaning plant and application method for preventing blasthole from collapsing in Tunnel prediction
CN111535591A (en) * 2020-05-28 2020-08-14 四川省建筑科学研究院有限公司 Method for drilling through hole and planting bar, anchoring and glue pouring
CN113431364A (en) * 2021-06-28 2021-09-24 中煤地建设工程有限公司 Old building dismantling and reforming process
CN115075608A (en) * 2022-07-28 2022-09-20 北京建工四建工程建设有限公司 Reinforced concrete foundation beam section-enlarged mechanical connection bar planting method
CN115405123A (en) * 2022-08-23 2022-11-29 四川昌泰建筑工程有限公司 Stadium wall bar planting construction device and construction method thereof

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864937A (en) * 2012-10-12 2013-01-09 中建六局土木工程有限公司 Construction method of rear added insert of prefabricated pillar
CN103015734B (en) * 2012-12-20 2015-02-04 南宁铁路局房产管理所 Manufacturing method of pre-embedded mineral wool glued groove plate box of construction lacing bar
CN103015734A (en) * 2012-12-20 2013-04-03 南宁铁路局房产管理所 Manufacturing method of pre-embedded mineral wool glued groove plate box of construction lacing bar
CN103306487A (en) * 2013-06-27 2013-09-18 中建五局第三建设有限公司 Multi-row beam steel bar PVC tube reserved steel bar embedding process
CN103452327A (en) * 2013-08-30 2013-12-18 山西四建集团有限公司 Positioning construction method for steel bar planting of constructional column
CN103452327B (en) * 2013-08-30 2016-05-11 山西四建集团有限公司 Constructional column bar planting positioning construction method
CN103485445B (en) * 2013-09-23 2014-10-08 云南建工水利水电建设有限公司 Connecting method and device for aerated concrete block and steel column
CN103485445A (en) * 2013-09-23 2014-01-01 云南建工水利水电建设有限公司 Connecting method and device for aerated concrete block and steel column
CN104594640A (en) * 2014-12-01 2015-05-06 中建七局第四建筑有限公司 High-rise building secondary structure foam concrete cast-in-situ bar planting technology and construction method thereof
CN104878853A (en) * 2015-04-02 2015-09-02 中国十七冶集团有限公司 Method for mounting tie bars at position of joint surface between masonry wall and concrete structure
CN105201215A (en) * 2015-08-28 2015-12-30 济南城建集团有限公司 Mounting method of embedded part for brickwork structures
CN106639326A (en) * 2015-10-28 2017-05-10 上海十三冶建设有限公司 Method for planting steel bar in structure through expansion bolt
CN105604338A (en) * 2015-12-21 2016-05-25 中国铁道科学研究院铁道建筑研究所 Cement-based anchoring glue construction technology
CN106401276A (en) * 2016-09-23 2017-02-15 中国人民解放军63926部队 Construction method for wall column binding bars of frame type building block enclosing wall
CN106760535A (en) * 2017-03-23 2017-05-31 中冶建工集团有限公司 One kind exempts from plastering construction method using aluminum alloy mould plate casting concrete interior wall
CN106894542A (en) * 2017-03-23 2017-06-27 中冶建工集团有限公司 One kind exempts from plastering construction method using aluminum alloy mould plate casting concrete inner side of outer wall
CN107059536A (en) * 2017-04-26 2017-08-18 河北工业大学 A kind of new-to-old concrete interface bar planting adhesive method
CN107059536B (en) * 2017-04-26 2019-01-25 河北工业大学 A kind of new-to-old concrete interface bar planting adhesive method
CN107012957A (en) * 2017-04-27 2017-08-04 四川农业大学 The varied rigid link technique and device of a kind of new filling wall and chassis body
CN108221692A (en) * 2018-01-15 2018-06-29 广东省建筑工程机械施工有限公司 A kind of Landscape Bridge arch ring stone material bar planting method
CN108505457A (en) * 2018-04-16 2018-09-07 杭州屹方建筑科技有限公司 A kind of method that steel flanged beam cemented rock arch bridge side wall is reinforced
CN108625777B (en) * 2018-05-14 2021-08-20 广东和立土木工程有限公司 Movable automatic drilling machine for bar planting drilling and construction method thereof
CN108625777A (en) * 2018-05-14 2018-10-09 广东和立土木工程有限公司 Movable automatic drilling machine and its construction method for bar planting drilling
CN108952200A (en) * 2018-08-13 2018-12-07 浙江科技学院 The construction method that building steel-bar-planting is reinforced under wet environment
CN109375257A (en) * 2018-09-18 2019-02-22 山东大学 The support cleaning plant and application method for preventing blasthole from collapsing in Tunnel prediction
CN111535591A (en) * 2020-05-28 2020-08-14 四川省建筑科学研究院有限公司 Method for drilling through hole and planting bar, anchoring and glue pouring
CN113431364A (en) * 2021-06-28 2021-09-24 中煤地建设工程有限公司 Old building dismantling and reforming process
CN115075608A (en) * 2022-07-28 2022-09-20 北京建工四建工程建设有限公司 Reinforced concrete foundation beam section-enlarged mechanical connection bar planting method
CN115405123A (en) * 2022-08-23 2022-11-29 四川昌泰建筑工程有限公司 Stadium wall bar planting construction device and construction method thereof
CN115405123B (en) * 2022-08-23 2023-12-08 四川昌泰建筑工程有限公司 Gymnasium wall bar planting construction device and construction method thereof

Similar Documents

Publication Publication Date Title
CN102486049A (en) Filler wall masonry tie bar planting method
CN108019219A (en) Tunnel defect comprehensive improvement automatization operation system and method
CN107059536B (en) A kind of new-to-old concrete interface bar planting adhesive method
CN104594640A (en) High-rise building secondary structure foam concrete cast-in-situ bar planting technology and construction method thereof
CN111042564A (en) Method and device for quickly detecting and repairing floor tile hollowing area in building
CN101936113A (en) Method for grouting sealing of gap between steel door frame of protective sealed door and wall
CN101899868A (en) Construction method for rear planted wall steel tie
JP6921536B2 (en) Construction method of anchors to be installed in existing masonry and post-construction anchors
CN207813620U (en) Tunnel defect comprehensive improvement automatization operation system
CN105649652A (en) Real-time monitoring and grouting reinforcement method for weak surrounding rock tunnel building
JP5474900B2 (en) Method for cleaning voids in concrete slabs
CN105821748B (en) The reinforcing device and method used after a kind of road construction cast-in-place walls core boring sampling
JP3112409U (en) Guide ruler for drilling into tile joints
JP6985717B2 (en) Pinning method
CN105735487A (en) Wall tied reinforcement component
CN110607881A (en) Whitewash mortar hollowing bonding regeneration technology
CN109057066A (en) A kind of flexible connection anti-seismic structure and construction method
CN106320189A (en) Transverse reinforcing construction method of existing railway line T beam
CN106801418A (en) The demolding structure of profundal zone cast-in-situ bored pile steel pile casting
CN214834063U (en) Bar planting device for secondary structure infilled wall tie bar
CN107338969B (en) Simple glue injection tool for building structure bar planting and application method thereof
CN208933959U (en) Repeatedly control slip casting pre-stressed steel anchor pipe anchor cable composite structure
CN206174455U (en) Main muscle pore mould is reserved to constructional column
CN104727551A (en) Ring beam screw thread core pulling embedded steel bar construction method
JP4221674B2 (en) Regeneration repair method in the ground anchor method

Legal Events

Date Code Title Description
DD01 Delivery of document by public notice

Addressee: Luo Xuemei

Document name: Notification of Passing Preliminary Examination of the Application for Invention

C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120606