CN205907820U - Steel and concrete built -up connection component - Google Patents
Steel and concrete built -up connection component Download PDFInfo
- Publication number
- CN205907820U CN205907820U CN201620882332.1U CN201620882332U CN205907820U CN 205907820 U CN205907820 U CN 205907820U CN 201620882332 U CN201620882332 U CN 201620882332U CN 205907820 U CN205907820 U CN 205907820U
- Authority
- CN
- China
- Prior art keywords
- hole
- end plate
- component
- peg
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a steel and concrete built -up connection component, including the built -in fitting, the built -in fitting contains to be opened first end plate (2) that have the through -hole and opens second end plate (5) that have the through -hole, be connected with possess through hole component (4) of (3) between first end plate (2) and second end plate (5), the through -hole intercommunication of through hole (3) and first end plate (2) and second end plate (5), component (4) longitudinal section profile is L shape or trapezoidal, placed cant chisei (1) in through hole (3), the cavity intussuseption between cant chisei (1) and through hole (3) is filled with the concrete. The utility model provides an assembly methods is connected to new cant chisei, concrete member easy operation that this kind of assembly methods formed, select nimble, can the full play cant chisei with the connection performance of concrete.
Description
Technical field
The utility model is related to the connection in building structural element field, particularly concrete prefabricated element and peg, specifically
It is applied to fabricated construction precast floor slab, beam, the connection between pillar and the connection between building superstructure and basis.
Background technology
Along with the fast development of assembled architecture industry, it has, and construction is convenient, and safe and reliable, anti-seismic performance is good, section
Many advantages, such as energy environmental protection, country is just in the building structure pattern of this environmental protection of iterative method.
Fabricated construction precast floor slab, beam at present, the connection between pillar is frequently with shaped steel, the connection side such as regular reinforcement
Formula, shaped steel shearing strength is fine, but its site operation is higher to welding technological level requirement, and difficulty of construction is larger, and steel using amount
Larger, regular reinforcement often take curved muscle form resist shearing, easy construction, but due to shearing direction be likely to be of uncertain
Property, the effect that curved muscle bends up effect there is also uncertainty, or even the situation being difficult to resist shearing action.
, as flexible shear connector, its range is very wide for peg, and common using method is that welding of peg exists
The outer surface of steel construction piece, such as steel pipe, the outer wall such as shaped steel, be then combined with concrete.
For assembled architecture industry, need the connected mode of more flexibility and reliability, beneficial to assembled in situ.
Content of the invention
The technical problems to be solved in the utility model is: provides a kind of steel and Combined concrete connecting elements, preparation technology
Process is simple, and the connected mode of peg is simple and reliable, functional, is particularly suitable for assembled in situ.
The technical solution of the utility model is as follows:
A kind of steel and Combined concrete connecting elements, including built-in fitting, described built-in fitting comprises the first end having through hole
Plate and the second end plate having through hole, are connected with, between described first end plate and the second end plate, the component possessing through hole, run through
Hole is connected with the through hole of first end plate and the second end plate, and described component longitudinal cross-section profile is in l shape or trapezoidal;In described through hole
It is placed with peg, in the cavity between peg and through hole, be filled with concrete.First end plate and the second end plate may be selected rectangle
Or circle slab, both parallel (for trapezoid cross section components) or vertical (for l tee section component).When actually used, will be pre-
Bury the beam of built-in fitting, after plate, post be transported to job site, then insert peg thereto, and casting concrete in cavity.
Described built-in fitting is steel components, such as engineering steel.
Described through hole is more than through hole external diameter with the cross section external diameter at first end plate through hole interface.At interface
The through-hole diameter group credit union of different through hole external diameters and first end plate brings peg and the concrete failure mode of multi-form,
So being that both external diameter diameter ratios need to calculate in advance in design.
The depth that described peg is inserted through hole is more than or equal to the half running through hole length.The length of embedment of peg will affect
The mechanical property of concrete and peg and failure mode in whole built-in fitting through hole.
Described longitudinal cross-section profile is in the through hole of l shape component, and the head depth of peg is not higher than the corner of l shape component
Place's height.The embedded mode that the special cross-section property of l shape component determines peg is different from trapezoid cross section, the head of usual peg
Embedment can give play to preferable switching performance below turning.
Described first end plate and the second end plate pass through to be weldingly connected with component.Whole built-in fitting can be that integral die-cast becomes
Type or using split welding by the way of connect.
Described peg includes that light is round and screw-type, the peg switching performance of different cross section diameter or different surfaces form
Difference, can select according to actual needs.
Described component outer wall uniform thickness, the component outer wall of usual built-in fitting is equal thickness, is easy to test and calculates outer wall thickness
The performance impact that concrete peg is connected.
The steel components that the utility model adopts and Combined concrete peg can be prefabricated in the factory, in fabricated construction structure
Carry out pre-buried during part making, arrive job site afterwards and install, convenient construction.
The utility model discloses a kind of steel and Combined concrete connecting elements, by concrete prefabricated in beam, plate, post etc.
Pre-buried above-mentioned built-in fitting in part, facilitates operation during assembled in situ, and the component of different cross section form can adapt to different demands,
Concrete grade due to filling in component can be different from the concrete grade outside component, further enhance the connection of peg
Performance.
Brief description
Fig. 1 is the embedded part structure and peg connection diagram that the utility model comprises trapezoid cross section component;
Fig. 2 is the generalized section of Fig. 1;
Fig. 3 is the schematic diagram that in Fig. 1, built-in fitting imbeds in the precast concretes such as beam, plate, post;
Fig. 4 is embedded part structure and the peg connection diagram that the utility model comprises l tee section component;
Fig. 5 is the schematic diagram that in Fig. 4, built-in fitting imbeds in the precast concretes such as beam, plate, post;
Fig. 6 is the structural representation that peg heads are located at below at l shape component corner;
Fig. 7 is the structural representation of dissimilar peg.
Specific embodiment
Embodiment 1
As illustrated in fig. 1 and 2, a kind of built-in fitting comprising steel trapezoid cross section component 4, trapezoid cross section component 4 upper and lower ends
It is weldingly connected with steel first end plate 2 and steel the second end plate 5 respectively, component 4 outer wall uniform thickness, and the round peg of light 1 embedment structure
The depth of the through hole 3 of part 4 is more than the half of the height of component 4.
As shown in figure 3, built-in fitting is placed in concrete prefabricated board at equal intervals, the through hole of first end plate 2 upper surface exposes,
Peg 1 via through holes insert in the through hole 3 of component 4, and in through hole 3, the strength grade of concrete of filling is more than the coagulation of prefabricated board
Native grade.
Embodiment 2
As shown in Fig. 4,5 and 6, a kind of built-in fitting comprising steel l tee section component 4, trapezoid cross section component 4 upper and lower ends
It is weldingly connected with steel first end plate 2 and steel the second end plate 5 respectively, component 4 outer wall uniform thickness, and the head 7 of screw-type peg 1
The depth location of embedment through hole 3 is below l shape corner.Built-in fitting is placed in concrete prefabricated board at equal intervals, first end
The through hole of plate 2 upper surface exposes, and peg 1 via through holes insert in the through hole 3 of component 4, the concrete strength of filling in through hole 3
Grade is more than the concrete grade of prefabricated board.
Claims (7)
1. a kind of steel and Combined concrete connecting elements it is characterised in that: include built-in fitting, described built-in fitting comprises to have through hole
First end plate (2) and the second end plate (5) having through hole, be connected with tool between described first end plate (2) and the second end plate (5)
The component (4) of standby through hole (3), through hole (3) is connected with the through hole of first end plate (2) and the second end plate (5), described component
(4) longitudinal cross-section profile is in l shape or trapezoidal;Be placed with peg (1) in described through hole (3), peg (1) and through hole (3) it
Between cavity in be filled with concrete.
2. a kind of steel according to claim 1 and Combined concrete connecting elements it is characterised in that: described through hole (3)
It is more than through hole external diameter with the cross section external diameter at first end plate (2) through hole interface.
3. a kind of steel according to claim 1 and Combined concrete connecting elements it is characterised in that: described peg (1) is inserted
The depth entering through hole (3) is more than or equal to the half of through hole (3) length.
4. a kind of steel according to claim 1 and Combined concrete connecting elements it is characterised in that: described longitudinal cross-section wheel
In the wide through hole (3) of component (4) in l shape, head (7) depth of peg (1) is not higher than the corner height of l shape component (4)
Degree.
5. a kind of steel according to claim 1 and Combined concrete connecting elements it is characterised in that: described first end plate
(2) and the second end plate (5) and component (4) pass through to be weldingly connected.
6. a kind of steel according to claim 1 and Combined concrete connecting elements it is characterised in that: described peg (1) bag
Include that light is round and screw-type.
7. a kind of steel according to claim 1 and Combined concrete connecting elements it is characterised in that: described component (4) is outward
Wall uniform thickness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620882332.1U CN205907820U (en) | 2016-08-15 | 2016-08-15 | Steel and concrete built -up connection component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620882332.1U CN205907820U (en) | 2016-08-15 | 2016-08-15 | Steel and concrete built -up connection component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205907820U true CN205907820U (en) | 2017-01-25 |
Family
ID=57800318
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620882332.1U Active CN205907820U (en) | 2016-08-15 | 2016-08-15 | Steel and concrete built -up connection component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205907820U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109629415A (en) * | 2018-12-07 | 2019-04-16 | 东南大学 | A kind of embedded composite joint steel-UHPC thin plate combined structure system of peg-bolt |
CN110821174A (en) * | 2019-10-22 | 2020-02-21 | 深圳市广胜达建设有限公司 | Die adjusting embedded part and aluminum alloy template diagonal bracing device |
-
2016
- 2016-08-15 CN CN201620882332.1U patent/CN205907820U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109629415A (en) * | 2018-12-07 | 2019-04-16 | 东南大学 | A kind of embedded composite joint steel-UHPC thin plate combined structure system of peg-bolt |
CN110821174A (en) * | 2019-10-22 | 2020-02-21 | 深圳市广胜达建设有限公司 | Die adjusting embedded part and aluminum alloy template diagonal bracing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104018518B (en) | The method of prefabricated diaphragm wall and construction outer wall of basement and floor | |
CN106013218B (en) | A kind of method of construction of underground garage open caisson | |
CN107687213A (en) | A kind of assembly concrete wall connecting node apparatus and construction method | |
CN109024651B (en) | Steel pipe concrete mixed pile foundation and construction method | |
CN103726586B (en) | H-shaped steel and steel plate framework assembly shear wall with interfaces with grooves and manufacturing method | |
CN206090861U (en) | Portable built -in fitting is used in curtain installation | |
CN103726589B (en) | I-shaped steel and steel and steel pipe framework interface drum projection diagonal reinforcement assembling shear wall and the practice | |
CN110284587A (en) | A kind of prefabricated window and connection joints of steel structure and the construction method of floaing of staggered floor | |
CN205907820U (en) | Steel and concrete built -up connection component | |
CN108775084B (en) | Steel-concrete combined precast beam and precast column connecting structure and construction method | |
CN103510530A (en) | Embedded foundation of composite wallboard and implementation method thereof | |
CN108240037A (en) | Transverse joint connecting node between a kind of prefabricated board wall layers | |
CN103061357B (en) | Connection joint between basement base plate and underground diaphragm wall | |
CN207363038U (en) | A kind of assembly concrete wall connecting node apparatus | |
CN204000925U (en) | Prefabricated diaphragm wall | |
CN105625449B (en) | The connecting structure method of concrete open caisson and steel open caisson | |
KR101606439B1 (en) | Spacer for fixing between truss girder and deck plate combine | |
CN215630801U (en) | Connecting structure of prefabricated assembled concrete wallboard | |
CN114135000A (en) | Assembled beam-column connecting joint partially wrapped with U-shaped steel and construction method thereof | |
CN102912928B (en) | Structural member for restraining grouting anchoring connection by using two ends of steel bar and connection method | |
CN104727307A (en) | Construction method for underground variable-cross-section pile column | |
CN111101645A (en) | Self-in-place reinforced precast concrete wallboard, connecting structure and construction method | |
CN205475849U (en) | Steel construction building assembled precast concrete shear force wall | |
CN212053436U (en) | Strenghthened type precast concrete wallboard and connection structure with from structure of taking one's place | |
CN209723230U (en) | The connecting node of steel plate combined shear wall and not equal higher baselines |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |