CN103441458A - 一种输电线路导地线直线接续管液压防弯模具 - Google Patents
一种输电线路导地线直线接续管液压防弯模具 Download PDFInfo
- Publication number
- CN103441458A CN103441458A CN2013104093354A CN201310409335A CN103441458A CN 103441458 A CN103441458 A CN 103441458A CN 2013104093354 A CN2013104093354 A CN 2013104093354A CN 201310409335 A CN201310409335 A CN 201310409335A CN 103441458 A CN103441458 A CN 103441458A
- Authority
- CN
- China
- Prior art keywords
- mould
- splicing sleeve
- liner
- inner liner
- mold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
一种输电线路导地线直线接续管液压防弯模具,包括上模具、下模具;上模具内安装有上内衬、下模具内安装有下内衬;上内衬的下表面、下内衬的上表面设有相互对应的压接槽;其特征是:所述下模具的左右两侧分别连接一个托架,每个托架的上表面分别设置一用于托置接续管的托槽,所述托槽与下内衬的压接槽同轴,且托槽的底面与下模具中安装下内衬的底面位于同一平面内,所述上模具的左右两侧分别连接一个压架,每个压架的下表面分别设置一压置接续管的压槽,所述压槽与上内衬的压接槽同轴,且压槽的顶面与上模具中安装上内衬的顶面位于同一平面内。有效的解决直线接续管铝管压接过程中弯曲问题,提高了使用质量和一次成优率。
Description
技术领域
本发明涉及输电线路工程中导地线接续用装置,具体是导地线直线接续管液压模具。
背景技术
输电线路工程路径较长,导地线展放施工需要进行直线接续施工,目前导地线直线管接续均采用液压施工的方式。
采用传统的液压模具进行液压施工,压模尺寸较短,直线接续管铝管较长,以钢芯铝铰线钢芯对接式铝管的液压部位及操作顺序为例,如图1所示,(图中1-6为按照施压顺序标记的施压区,7为铝线,8为钢管,9为铝管,10为钢芯)内有钢管8部分的铝管9不压,该部分记为不压区I;自铝管9上有印N1记处开始施压,按照1-6的施压顺序,一侧压至管口后再压另一侧。压接施工过程中易造成应力集中,边缘受力不均,造成直线接续管铝管压接过程中弯曲,降低施工质量。
发明内容
为了克服上述现有技术存在的缺点,本发明的目的在于提供一种输电线路导地线直线接续管液压防弯模具,有效的解决直线接续管铝管压接过程中弯曲问题,提高了使用质量和一次成优率。
为了解决上述问题,本发明采用以下技术方案:一种输电线路导地线直线接续管液压防弯模具,包括上模具、下模具;上模具内安装有上内衬、下模具内安装有下内衬;上内衬的下表面、下内衬的上表面设有相互对应的压接槽;
所述下模具的左右两侧分别连接一个托架,每个托架的上表面分别设置一用于托置接续管的托槽,所述托槽与下内衬的压接槽同轴,且托槽的底面与下模具中安装下内衬的底面位于同一平面内,
所述上模具的左右两侧分别连接一个压架,每个压架的下表面分别设置一压置接续管的压槽,所述压槽与上内衬的压接槽同轴,且压槽的顶面与上模具中安装上内衬的顶面位于同一平面内。
进一步的技术方案:所述托槽、压槽均为横截面为半圆形的凹槽。
进一步的技术方案:所述托架的一端通过高强度螺栓连接在下模具的左右两端面上;所述压架的一端通过高强度螺栓连接在上模具的左右两端面上。
本发明的有益效果是:它在原有的压模两侧各安装一个托架、压架,增加压接过程中和接续管接触的面积,解决了导地线直线接续管液压施压造成弯曲的质量问题,有效的提高了导地线直线接续的质量,提高了施工的一次成优率,避免了返工,提高了导线压接工作效率。而且结构简单,携带使用方便。
附图说明
下面结合附图和实施例对本发明做进一步的说明:
图1为钢芯铝铰线钢芯对接式铝管的液压部位及操作顺序;
图2为本发明实施例的主视图;
图3为本发明实施例的左视图;
图4为本发明实施例中安装有下内衬的下模具的主视图;
图5为本发明实施例中安装有下内衬的下模具的左视图;
图6为本发明实施例中托架的主视图;
图7为本发明实施例中托架的右视图;
图中:1上模具,2下模具,3上内衬,4下内衬,5压接槽,6托架,7托槽,8压架,9压槽,10高强度螺栓,11高强度螺栓。
具体实施方式
如图2、3所示,该输电线路导地线直线接续管液压防弯模具,包括上模具1、下模具2;上模具1内安装有上内衬3,下模具2内安装有下内衬4,如图4、5所示;上内衬3的下表面、下内衬4的上表面设有相互对应的压接槽5。
所述下模具2的左右两侧分别连接一个托架6,每个托架6的上表面分别设置一用于托置接续管的托槽7,如图6、7所示,所述托槽7与下内衬4的压接槽5同轴,且托槽7的底面与下模具中安装下内衬4的底面位于同一平面内。
所述上模具1的左右两侧分别连接一个压架8,每个压架8的下表面分别设置一压置接续管的压槽9,所述压槽9与上内衬3的压接槽5同轴,且压槽9的顶面与上模具2中安装上内衬的顶面位于同一平面内。压架的结构与托架对称,所以不再单独绘制示意图。
进一步的技术方案:所述托槽7、压槽9均为横截面为半圆形的凹槽。
进一步的技术方案:所述托架6的一端通过高强度螺栓10连接在下模具2的左右两端面上;所述压架8的一端通过高强度螺栓11连接在上模具1的左右两端面上,如图2、3所示。
使用时,输电线路导地线直线接续管的某一段施压区放入下内衬4的压接槽5内,施压区两端的部分放入左右两侧的托槽内7;启动液压机,液压机带动上模具1下移动,上内衬3的压接槽对接续管的该段施压区进行施压。施压过程中,由于托架的托槽7、压架的压槽9对接续管施压区两端的部分有矫直作用,因此导地线直线接续管液压施压不会弯曲。
Claims (3)
1.一种输电线路导地线直线接续管液压防弯模具,包括上模具、下模具;上模具内安装有上内衬、下模具内安装有下内衬;上内衬的下表面、下内衬的上表面设有相互对应的压接槽;其特征是:
所述下模具的左右两侧分别连接一个托架,每个托架的上表面分别设置一用于托置接续管的托槽,所述托槽与下内衬的压接槽同轴,且托槽的底面与下模具中安装下内衬的底面位于同一平面内,
所述上模具的左右两侧分别连接一个压架,每个压架的下表面分别设置一压置接续管的压槽,所述压槽与上内衬的压接槽同轴,且压槽的顶面与上模具中安装上内衬的顶面位于同一平面内。
2.根据权利要求1所述的一种输电线路导地线直线接续管液压防弯模具,其特征是:所述托槽、压槽均为横截面为半圆形的凹槽。
3.根据权利要求1所述的一种输电线路导地线直线接续管液压防弯模具,其特征是:所述托架的一端通过高强度螺栓连接在下模具的左右两端面上;所述压架的一端通过高强度螺栓连接在上模具的左右两端面上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013104093354A CN103441458A (zh) | 2013-09-10 | 2013-09-10 | 一种输电线路导地线直线接续管液压防弯模具 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013104093354A CN103441458A (zh) | 2013-09-10 | 2013-09-10 | 一种输电线路导地线直线接续管液压防弯模具 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103441458A true CN103441458A (zh) | 2013-12-11 |
Family
ID=49695140
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013104093354A Pending CN103441458A (zh) | 2013-09-10 | 2013-09-10 | 一种输电线路导地线直线接续管液压防弯模具 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103441458A (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2295279Y (zh) * | 1997-03-28 | 1998-10-21 | 常熟市船舶配件厂 | 导线液压钳 |
DE102010000821A1 (de) * | 2009-01-13 | 2010-07-29 | Yazaki Corp. | Drahtverbindungseinheit |
CN102377128A (zh) * | 2011-10-28 | 2012-03-14 | 山东送变电工程公司 | 一种送电线路压接导线防弯托架 |
CN102623868A (zh) * | 2012-04-28 | 2012-08-01 | 四川电力送变电建设公司 | 导地线液压连接操作平台 |
CN203423439U (zh) * | 2013-09-10 | 2014-02-05 | 国家电网公司 | 一种输电线路导地线直线接续管液压防弯模具 |
-
2013
- 2013-09-10 CN CN2013104093354A patent/CN103441458A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2295279Y (zh) * | 1997-03-28 | 1998-10-21 | 常熟市船舶配件厂 | 导线液压钳 |
DE102010000821A1 (de) * | 2009-01-13 | 2010-07-29 | Yazaki Corp. | Drahtverbindungseinheit |
CN102377128A (zh) * | 2011-10-28 | 2012-03-14 | 山东送变电工程公司 | 一种送电线路压接导线防弯托架 |
CN102623868A (zh) * | 2012-04-28 | 2012-08-01 | 四川电力送变电建设公司 | 导地线液压连接操作平台 |
CN203423439U (zh) * | 2013-09-10 | 2014-02-05 | 国家电网公司 | 一种输电线路导地线直线接续管液压防弯模具 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103639255A (zh) | 一种带直管段的180°弯头的弯管机 | |
CN105490126A (zh) | 便携式电缆压接平台 | |
CN204996979U (zh) | 一种凹凸整压式自动调直机 | |
CN203495034U (zh) | 一种钢管胀形模具 | |
CN203423439U (zh) | 一种输电线路导地线直线接续管液压防弯模具 | |
CN207013568U (zh) | 一种软连接铜排折弯模具 | |
CN205622020U (zh) | 一种用于导地线压接的辅助装置 | |
CN103441458A (zh) | 一种输电线路导地线直线接续管液压防弯模具 | |
CN104043704A (zh) | 液压式金属管材u型弧弯机 | |
CN203292386U (zh) | 一种圆钢调直机 | |
CN203751022U (zh) | 钢管焊接成型装置 | |
CN102377128B (zh) | 一种送电线路压接导线防弯托架 | |
CN208373883U (zh) | 一种接续管校直器 | |
CN204545058U (zh) | 一种利用普通压力机加工弯曲钢管的工装 | |
CN205092406U (zh) | 便携式电缆压接平台 | |
CN207914456U (zh) | 一种弯管增厚工装 | |
CN210379720U (zh) | 一种绞合导体连接设备 | |
CN103182414A (zh) | 墩头机 | |
CN202137732U (zh) | 矫直机轴承拉模 | |
CN202490856U (zh) | 母线排折弯机 | |
CN202411260U (zh) | 一种缩管装置 | |
CN206992615U (zh) | 电力线路补修管 | |
CN201841215U (zh) | 作用于送料机构上的顶推装置 | |
CN205289965U (zh) | 双头绞牙机 | |
CN206276822U (zh) | 金属圆管折弯加工的夹紧推送装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20131211 |