CN103411766A - 热力膨胀阀流量测试装置及测试方法 - Google Patents

热力膨胀阀流量测试装置及测试方法 Download PDF

Info

Publication number
CN103411766A
CN103411766A CN2013103510139A CN201310351013A CN103411766A CN 103411766 A CN103411766 A CN 103411766A CN 2013103510139 A CN2013103510139 A CN 2013103510139A CN 201310351013 A CN201310351013 A CN 201310351013A CN 103411766 A CN103411766 A CN 103411766A
Authority
CN
China
Prior art keywords
test
valve
expansion valve
way solenoid
solenoid valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103510139A
Other languages
English (en)
Other versions
CN103411766B (zh
Inventor
蔡晋辉
赵丹
姚燕
曾九孙
蒋庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Jiliang University
Original Assignee
China Jiliang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Jiliang University filed Critical China Jiliang University
Priority to CN201310351013.9A priority Critical patent/CN103411766B/zh
Publication of CN103411766A publication Critical patent/CN103411766A/zh
Application granted granted Critical
Publication of CN103411766B publication Critical patent/CN103411766B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

本发明公开了一种热力膨胀阀流量测试装置及测试方法。该装置前端是工作台,工作台的台面中间位置上安装有测试工装,测试工装右侧有恒温槽控制器、进气管接口和出气管接口,工作台左侧有电源开关,工作台正上方有显示屏,显示屏下侧有合格指示灯和不合格指示灯,显示屏左侧有进气压力表,显示屏右侧有出气压力表,工作台下侧按键槽内中间位置有启动键和急停键,设备左侧下方有气源接口。本发明克服了现有手动流量测试所遇到的测试精度低、操作复杂、测试效率低的问题,为了实现对热力膨胀阀的流量自动测试与调节,以可编程控制器为核心实现对测试过程的控制,本发明测试精度高、装夹方便安全。

Description

热力膨胀阀流量测试装置及测试方法
技术领域
本发明涉及流量测试调节装置及方法,尤其是涉及一种热力膨胀阀流量测试调节装置及测试方法。
背景技术
热力膨胀阀是组成制冷装置的重要部件,是制冷系统中四个基本设备之一,用来实现冷凝压力至蒸发压力的节流,同时控制制冷剂的流量。目前的测试手段一般为手动测试调节,将热力膨胀阀安装到测试工装后放入冰水混合物的恒温槽中预冷,手动调节过热度作动压后再测试流量值。手动测试调节精度低、操作复杂、测试效率低,导致最终测试的流量值不准确、一致性差,准确的测试和调节流量成为热力膨胀阀生产企业的技术瓶颈。因此开发设计测试方便、测试结果准确、测试效率高的热力膨胀阀流量测试装置及测试方法,是满足热力膨胀阀生产企业的需求、提高热力膨胀阀质量的有效途径。
发明内容
为了克服手动测试调节时的各种缺点,提高整体工作效率和准确性,本发明的目的在于提供一种热力膨胀阀流量测试装置及测试方法。
本发明采用的技术方案是:
一、一种热力膨胀阀流量测试装置:
该装置前端是工作台,工作台的台面中间位置上安装有测试工装,测试工装右侧有恒温槽控制器、进气管接口和出气管接口,工作台左侧有电源开关,工作台正上方有显示屏,显示屏下侧有合格指示灯和不合格指示灯,显示屏左侧有进气压力表,显示屏右侧有出气压力表,工作台下侧按键槽内中间位置有启动键和急停键,设备左侧下方有气源接口。
所述的测试工装通过工装底板固定在工作台上,工装底板靠近显示屏一侧安装有气缸,气缸上端通过电机固定板连接电机,电机下方安装调节工装,工装底板远离显示屏一侧安装夹具,热力膨胀阀夹在夹具内,热力膨胀阀的感温包伸出工装底板外,并浸入恒温槽中。
所述的进气管接口和出气管接口分别连接至不同的内部气路,即进气管接口连接进气气路,进气气路分为两路进气,一路高压测试气体经第一减压过滤阀进入高压气罐,再通过第一个二位二通电磁阀到进气管接口,第一个二位二通电磁阀和进气管接口的连接气路上安装有进气压力表,另一路低压测试气体经过第二减压过滤阀进入低压气罐,再通过第二个二位二通电磁阀和单向阀到进气管接口,单向阀安装在第一个二位二通电磁阀和第二个二位二通电磁阀的连接气路上;出气管接口连接出气气路,出气管接口首先连接到稳压气罐,经过出气压力表和压力传感器后分成两路,一路经第三个二位二通电磁阀和流量比例阀连接到数字流量计,另一路经过第四个二位二通电磁阀连接到孔板。
二、一种热力膨胀阀流量测试方法:
先测试热力膨胀阀的过热度作动压,将热力膨胀阀安装到夹具上,此时热力膨胀阀的感温包位置能够浸入设备内的恒温槽中进行预冷,再连接进气管接口和出气管接口到夹具上,从第二减压过滤阀通入测试气体,打开第二个二位二通电磁阀和第四个二位二通电磁阀,测试气体从孔板排出,出口气压稳定后压力传感器读取出口压力值作为过热度作动压,再进行流量测试验证,关闭第二个二位二通电磁阀和第四个二位二通电磁阀,打开第一个二位二通电磁阀和第三个二位二通电磁阀,第一减压过滤阀通入测试气体,调节流量比例阀直到出口压力值达到前面测得的过热度作动压值,出口压力稳定后数字流量计读取流量值,流量值满足测试要求则验证合格,测试结束,不满足要求则继续调节过热度作动压,重复循环测试直到流量值合格,如果测试时间超时,则判定测试不合格,结束测试,亮不合格指示灯。
本发明与背景技术相比具有的有益效果:
1、本发明采用立式操作台结构,操作、维护和改进容易,采用PLC控制器实现测试过程的全自动控制、实现压力锁定,并内置压力零点校准系统。
2、设备内装有压力传感器和流量传感器,自动采集压力和流量值,自动判断并计算下一步工作,整个测试过程自动化程度高。
3、设备测试结果一致性好,准确度高,操作简单,安全系数高。
附图说明
图1是本发明的正视示意图。
图2是图1的侧视示意图。
图3是本发明的测试工装正视图。
图4是图3的侧视图。
图5是图3的俯视图。
图6是本发明的进气管接口内部气路图。
图7是本发明的出气管接口内部气路图。
图8是本发明的测试工艺流程图。
图中:1.气源接口,2.进气压力表,3.出气压力表,4.电源开关,5.进气管接口,6.出气管接口,7.按键槽,8.启动键,9.急停键,10.显示屏,11.合格指示灯,12.不合格指示灯,13.恒温槽控制器,14.测试工装,15.工作台,16.机柜门,21.工装底板,22.电机,23.调节工装,24.夹具,25.气缸,26.电机固定板,27.热力膨胀阀,31. 第一减压过滤阀,32. 第二减压过滤阀,33.高压气罐,34.低压气罐,35.第一个二位二通电磁阀,36.第二个二位二通电磁阀,37.第三个二位二通电磁阀,38.第四个二位二通电磁阀,39.单向阀,40.稳压气罐,41.压力传感器,42.流量比例阀,43.数字流量计,44.孔板。
具体实施方式
以下结合附图和实施例对本发明作进一步说明。
如图1、图2所示该装置前端是工作台15,工作台15的台面中间位置上安装有测试工装14,测试工装14右侧有恒温槽控制器13、进气管接口5和出气管接口6,工作台15左侧有电源开关4,工作台15正上方有显示屏10,显示屏10下侧有合格指示灯11和不合格指示灯12,显示屏10左侧有进气压力表2,显示屏10右侧有出气压力表3,工作台15下侧按键槽7内中间位置有启动键8和急停键9,设备左侧下方有气源接口1。
如图3、图4、图5所示,所述的测试工装14通过工装底板21固定在工作台15上,工装底板21靠近显示屏10一侧安装有气缸25,气缸25上端通过电机固定板26连接电机22,电机22下方安装调节工装23,工装底板21远离显示屏10一侧安装夹具24,热力膨胀阀27夹在夹具24内,热力膨胀阀27的感温包伸出工装底板21外,并浸入恒温槽中。
如图6、图7所示,所述的进气管接口5和出气管接口6分别连接至不同的内部气路,即进气管接口5连接进气气路,进气气路分为两路进气,一路高压测试气体经第一减压过滤阀31进入高压气罐33,再通过第一个二位二通电磁阀35到进气管接口5,第一个二位二通电磁阀35和进气管接口5的连接气路上安装有进气压力表2,另一路低压测试气体经过第二减压过滤阀32进入低压气罐34,再通过第二个二位二通电磁阀36和单向阀39到进气管接口5,单向阀39安装在第一个二位二通电磁阀35和第二个二位二通电磁阀36的连接气路上;出气管接口6连接出气气路,出气管接口6首先连接到稳压气罐40,再经过出气压力表3和压力传感器41后分成两路,一路经第三个二位二通电磁阀37和流量比例阀42连接到数字流量计43,另一路经过第四个二位二通电磁阀38连接到孔板44。
如图8所示,所述的一种热力膨胀阀流量测试方法,先测试热力膨胀阀27的过热度作动压,将热力膨胀阀27安装到夹具24上,此时热力膨胀阀27的感温包位置能够浸入设备内的恒温槽中进行预冷,一般预冷环境温度为0摄氏度,再连接进气管接口5和出气管接口6到夹具24上,从第二减压过滤阀32通入低于1.0MPa的低压测试气体,打开第二个二位二通电磁阀36和第四个二位二通电磁阀38,测试气体从孔板44排出,出口气压稳定后压力传感器41读取出口压力值作为过热度作动压,再进行流量测试验证,关闭第二个二位二通电磁阀36和第四个二位二通电磁阀38,打开第一个二位二通电磁阀35和第三个二位二通电磁阀37,第一减压过滤阀31通入大于1.0MPa的高压测试气体,调节流量比例阀42直到出口压力值达到前面测得的过热度作动压值,出口压力稳定后数字流量计43读取流量值,流量值满足测试要求则验证合格,测试结束,亮合格指示灯11,不满足要求则继续调节过热度作动压,重复循环测试直到流量值合格,如果测试时间超时,则判定测试不合格,结束测试,亮不合格指示灯12。

Claims (4)

1.一种热力膨胀阀流量测试装置,其特征在于:该装置前端是工作台(15),工作台(15)的台面中间位置上安装有测试工装(14),测试工装(14)右侧有恒温槽控制器(13)、进气管接口(5)和出气管接口(6),工作台(15)左侧有电源开关(4),工作台(15)正上方有显示屏(10),显示屏(10)下侧有合格指示灯(11)和不合格指示灯(12),显示屏(10)左侧有进气压力表(2),显示屏(10)右侧有出气压力表(3),工作台(15)下侧按键槽(7)内中间位置有启动键(8)和急停键(9),设备左侧下方有气源接口(1)。
2.根据权利要求1所述的一种热力膨胀阀流量测试装置,其特征在于:所述的测试工装(14)通过工装底板(21)固定在工作台(15)上,工装底板(21)靠近显示屏(10)一侧安装有气缸(25),气缸(25)上端通过电机固定板(26)连接电机(22),电机(22)下方安装调节工装(23),工装底板(21)远离显示屏(10)一侧安装夹具(24),热力膨胀阀(27)夹在夹具(24)内,热力膨胀阀(27)的感温包伸出工装底板(21)外,并浸入恒温槽中。
3.根据权利要求1所述的一种热力膨胀阀流量测试装置,其特征在于:所述的进气管接口(5)和出气管接口(6)分别连接至不同的内部气路,即进气管接口(5)连接进气气路,进气气路分为两路进气,一路高压测试气体经第一减压过滤阀(31)进入高压气罐(33),再通过第一个二位二通电磁阀(35)到进气管接口(5),第一个二位二通电磁阀(35)和进气管接口(5)的连接气路上安装有进气压力表(2),另一路低压测试气体经过第二减压过滤阀(32)进入低压气罐(34),再通过第二个二位二通电磁阀(36)和单向阀(39)到进气管接口(5),单向阀(39)安装在第一个二位二通电磁阀(35)和第二个二位二通电磁阀(36)的连接气路上;出气管接口(6)连接出气气路,出气管接口(6)首先连接到稳压气罐(40),经过出气压力表(3)和压力传感器(41)后分成两路,一路经第三个二位二通电磁阀(37)和流量比例阀(42)连接到数字流量计(43),另一路经过第四个二位二通电磁阀(38)连接到孔板(44)。
4.根据权利要求1所述的一种热力膨胀阀流量测试方法,其特征在于:先测试热力膨胀阀(27)的过热度作动压,将热力膨胀阀(27)安装到夹具(24)上,此时热力膨胀阀(27)的感温包位置能够浸入设备内的恒温槽中进行预冷,再连接进气管接口(5)和出气管接口(6)到夹具(24)上,从第二减压过滤阀(32)通入测试气体,打开第二个二位二通电磁阀(36)和第四个二位二通电磁阀(38),测试气体从孔板(44)排出,出口气压稳定后压力传感器(41)读取出口压力值作为过热度作动压,再进行流量测试验证,关闭第二个二位二通电磁阀(36)和第四个二位二通电磁阀(38),打开第一个二位二通电磁阀(35)和第三个二位二通电磁阀(37),第一减压过滤阀(31)通入测试气体,调节流量比例阀(42)直到出口压力值达到前面测得的过热度作动压值,出口压力稳定后数字流量计(43)读取流量值,流量值满足测试要求则验证合格,测试结束,不满足要求则继续调节过热度作动压,重复循环测试直到流量值合格,如果测试时间超时,则判定测试不合格,结束测试,亮不合格指示灯(12)。
CN201310351013.9A 2013-08-13 2013-08-13 热力膨胀阀流量测试装置及测试方法 Expired - Fee Related CN103411766B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310351013.9A CN103411766B (zh) 2013-08-13 2013-08-13 热力膨胀阀流量测试装置及测试方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310351013.9A CN103411766B (zh) 2013-08-13 2013-08-13 热力膨胀阀流量测试装置及测试方法

Publications (2)

Publication Number Publication Date
CN103411766A true CN103411766A (zh) 2013-11-27
CN103411766B CN103411766B (zh) 2015-09-23

Family

ID=49604793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310351013.9A Expired - Fee Related CN103411766B (zh) 2013-08-13 2013-08-13 热力膨胀阀流量测试装置及测试方法

Country Status (1)

Country Link
CN (1) CN103411766B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104122084A (zh) * 2014-08-07 2014-10-29 珠海格力电器股份有限公司 用于电子膨胀阀的检测装置和方法
CN104180569A (zh) * 2014-09-01 2014-12-03 中国计量学院 空调节流阀静止过热度自动调节台
CN104677622A (zh) * 2015-03-17 2015-06-03 上海华瑞气雾剂有限公司 一种触动器检测机
CN105698455A (zh) * 2016-03-14 2016-06-22 宁波松鹰汽车部件有限公司 膨胀阀开度控制装置
CN105841899A (zh) * 2016-03-29 2016-08-10 中国计量学院 F阀静止过热度自动测试装置及测试方法
CN106644440A (zh) * 2016-12-12 2017-05-10 浙江春晖智能控制股份有限公司 一种热力膨胀阀的检测方法与装置
CN107884130A (zh) * 2017-12-05 2018-04-06 杭州中溯智能科技有限公司 高压球阀气密性测试装置及测试和校准方法
CN109781445A (zh) * 2018-12-28 2019-05-21 大连理工大学 一种确定热力膨胀阀流通面积的方法
CN110553835A (zh) * 2019-09-26 2019-12-10 广州兰石技术开发有限公司 一种膨胀阀性能测试系统及制冷阀件性能测试系统

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03170040A (ja) * 1989-11-29 1991-07-23 Hokkaido Electric Power Co Inc:The 安全弁自動検査装置の精度確認装置
CN1587920A (zh) * 2004-09-02 2005-03-02 上海交通大学 液环法电子膨胀阀流量特性实验台控制系统
CN101464225A (zh) * 2009-01-12 2009-06-24 中国计量学院 热力膨胀阀作动压力测试装置
CN101846536A (zh) * 2010-05-27 2010-09-29 中国计量学院 电子膨胀阀流量测试设备和方法
CN102174984A (zh) * 2011-03-03 2011-09-07 杭州中久自控系统有限公司 基于plc的毛细管热力膨胀阀混合充注设备
CN102928209A (zh) * 2011-08-11 2013-02-13 上海比泽机电设备科技有限公司 一种电子膨胀阀综合性能测试装置
CN203443772U (zh) * 2013-08-13 2014-02-19 中国计量学院 一种热力膨胀阀流量测试装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03170040A (ja) * 1989-11-29 1991-07-23 Hokkaido Electric Power Co Inc:The 安全弁自動検査装置の精度確認装置
CN1587920A (zh) * 2004-09-02 2005-03-02 上海交通大学 液环法电子膨胀阀流量特性实验台控制系统
CN101464225A (zh) * 2009-01-12 2009-06-24 中国计量学院 热力膨胀阀作动压力测试装置
CN101846536A (zh) * 2010-05-27 2010-09-29 中国计量学院 电子膨胀阀流量测试设备和方法
CN102174984A (zh) * 2011-03-03 2011-09-07 杭州中久自控系统有限公司 基于plc的毛细管热力膨胀阀混合充注设备
CN102928209A (zh) * 2011-08-11 2013-02-13 上海比泽机电设备科技有限公司 一种电子膨胀阀综合性能测试装置
CN203443772U (zh) * 2013-08-13 2014-02-19 中国计量学院 一种热力膨胀阀流量测试装置

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
机械电子工业部: "JB/T 3548-91制冷用R12、R22、R502热力膨胀阀", 《中华人民共和国机械行业标准》, 1 July 1992 (1992-07-01), pages 1326 - 1328 *
杨长春等: "QC/T663-2000汽车空调(HFC-134a)用热力膨胀阀", 《中华人民共和国汽车行业标准》, 1 April 2001 (2001-04-01), pages 735 - 736 *
谢旭明等: "球型快开热力膨胀阀的流量系数试验研究", 《流体机械》, vol. 33, no. 5, 31 December 2005 (2005-12-31), pages 1 - 4 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104122084B (zh) * 2014-08-07 2016-12-21 珠海格力电器股份有限公司 用于电子膨胀阀的检测装置和方法
CN104122084A (zh) * 2014-08-07 2014-10-29 珠海格力电器股份有限公司 用于电子膨胀阀的检测装置和方法
CN104180569A (zh) * 2014-09-01 2014-12-03 中国计量学院 空调节流阀静止过热度自动调节台
CN104677622A (zh) * 2015-03-17 2015-06-03 上海华瑞气雾剂有限公司 一种触动器检测机
CN104677622B (zh) * 2015-03-17 2017-05-03 上海华瑞气雾剂有限公司 一种触动器检测机
CN105698455A (zh) * 2016-03-14 2016-06-22 宁波松鹰汽车部件有限公司 膨胀阀开度控制装置
CN105698455B (zh) * 2016-03-14 2024-04-05 宁波松鹰汽车部件有限公司 膨胀阀开度控制装置
CN105841899A (zh) * 2016-03-29 2016-08-10 中国计量学院 F阀静止过热度自动测试装置及测试方法
CN105841899B (zh) * 2016-03-29 2018-04-20 中国计量学院 F阀静止过热度自动测试装置及测试方法
CN106644440A (zh) * 2016-12-12 2017-05-10 浙江春晖智能控制股份有限公司 一种热力膨胀阀的检测方法与装置
CN107884130A (zh) * 2017-12-05 2018-04-06 杭州中溯智能科技有限公司 高压球阀气密性测试装置及测试和校准方法
CN107884130B (zh) * 2017-12-05 2024-02-20 杭州中溯智能科技有限公司 高压球阀气密性测试装置及测试和校准方法
CN109781445A (zh) * 2018-12-28 2019-05-21 大连理工大学 一种确定热力膨胀阀流通面积的方法
CN110553835A (zh) * 2019-09-26 2019-12-10 广州兰石技术开发有限公司 一种膨胀阀性能测试系统及制冷阀件性能测试系统
CN110553835B (zh) * 2019-09-26 2021-08-17 广州兰石技术开发有限公司 一种膨胀阀性能测试系统及制冷阀件性能测试系统

Also Published As

Publication number Publication date
CN103411766B (zh) 2015-09-23

Similar Documents

Publication Publication Date Title
CN103411766A (zh) 热力膨胀阀流量测试装置及测试方法
CN102661859B (zh) 一种瓶装液化石油气调压器性能测试设备及其使用方法
CN201637578U (zh) 一种发动机测试台架的冷却系统
CN105841899B (zh) F阀静止过热度自动测试装置及测试方法
CN203443772U (zh) 一种热力膨胀阀流量测试装置
CN105841940A (zh) 热力膨胀阀时间常数测试装置及测试方法
CN106016866A (zh) 一种空调器冷媒充注方法及系统
CN104713801A (zh) 不同尺寸大岩样气体吸附解吸实验装置及方法
CN106153161B (zh) 一种仪表检测装置
CN114427901A (zh) 一种实现燃气表温度压力动态调控校准的系统及其方法
CN113252340A (zh) 自闭阀智能过流测试设备
CN102174984B (zh) 基于plc的毛细管热力膨胀阀混合充注设备
CN107702864A (zh) 发动机节温器下壳体气密性检测工装
CN109974320B (zh) 一种高温去离子水冷却装置
CN208600687U (zh) 一种用于热成型模具冷却水恒温控制的机边冷却站
CN207487909U (zh) 一种灯具气密性测试装置
CN110726547A (zh) 便携式压力保护器件综合校验装置
CN202522297U (zh) 一种瓶装液化石油气调压器性能测试设备
CN103644456A (zh) 一种音速喷嘴体积自动配气系统及其控制方法
CN210834209U (zh) 一种用于标定水冷电池热管理的测试工装
CN209858153U (zh) 一种单片双极板用气密检测液压机
CN107894068A (zh) 一种空调运行状态调节方法与装置
CN203964940U (zh) 校准工装
CN203908742U (zh) 制冷剂泄漏测试装置
CN207675241U (zh) 一种灶具燃气流量测试系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150923

Termination date: 20160813