CN103410369A - 玻璃钢烟囱拼接方法及施工连接装置 - Google Patents
玻璃钢烟囱拼接方法及施工连接装置 Download PDFInfo
- Publication number
- CN103410369A CN103410369A CN2013103798057A CN201310379805A CN103410369A CN 103410369 A CN103410369 A CN 103410369A CN 2013103798057 A CN2013103798057 A CN 2013103798057A CN 201310379805 A CN201310379805 A CN 201310379805A CN 103410369 A CN103410369 A CN 103410369A
- Authority
- CN
- China
- Prior art keywords
- steel
- chimney
- support ring
- reinforced plastic
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
本发明公开了玻璃钢烟囱拼接方法及施工连接装置。玻璃钢烟囱由多个烟囱筒段构成。施工连接装置包括钢支承环、钢支承环间的拼接接头,以及沿钢支承环圆周分布的多个联接装置,其中,钢支承环由多个圆弧段通过拼接接头连接成一个完整的圆环并箍在烟囱筒段外侧上,分别箍在两个烟囱筒段外侧上的钢支承环通过联接装置连接,且联接装置能够调整两个烟囱筒段的相对位置。本发明的施工连接装置能够完全满足大型玻璃钢烟囱现场拼接的技术要求,同时克服常规开孔穿钢丝绳的各种缺陷。
Description
技术领域
本发明涉及火力发电领域,具体涉及火力发电厂中的烟囱。
背景技术
目前,发电厂中的烟囱内筒基本上都诸如钢材、混凝土等制成,较少采用玻璃钢烟囱。以往工程案例仅限于部分化工厂、钢铁厂和小型发电厂的小型烟囱,而大型玻璃钢烟囱尚没有工程实例。随着玻璃钢烟囱技术在国内发电工程中的推广,大型玻璃钢烟囱将得到越来越多的应用。
对于玻璃钢烟囱的筒段施工临时连接,小型玻璃钢烟囱的一般做法是在筒段端部开几个孔,在孔洞中穿钢丝绳,利用钢丝绳将上下筒段连接起来。而大型玻璃钢烟囱自重大,安装精度高,接口的要求也更高,开洞穿钢丝绳的方法用在大型烟囱中将无法满足要求。
而且,以往小型玻璃钢烟囱的筒段接口临时施工连接方法存在很多缺陷:①开孔是对筒体的破坏,对筒身强度会造成一定削弱,留下安全隐患;②钢丝绳调节困难,安装误差大,影响接头的精度;③穿钢丝绳的小孔局部受力,局部应力集中,当筒段重量过大时,小孔存在受力破坏的安全隐患;④钢丝绳本身刚度有限,无法保证上下筒段相对位置固定,当施工过程中受到外界扰动,极易产生上下筒段相对位移,影响手糊接头的固化,降低接头强度,并最终影响烟囱整体的安全性。
发明内容
本发明的目的是提供一种可靠的施工连接装置,能够完全满足大型玻璃钢烟囱现场拼接的技术要求,同时克服常规开孔穿钢丝绳的各种缺陷。
为实现上述目的,根据本发明的一方面,提供了一种玻璃钢烟囱拼接的施工连接装置,所述玻璃钢烟囱由多个烟囱筒段构成,其特征在于,所述施工连接装置包括钢支承环、钢支承环间的拼接接头,以及沿所述钢支承环圆周分布的多个联接装置,其中,所述钢支承环由多个圆弧段通过所述拼接接头连接成一个完整的圆环并箍在烟囱筒段外侧上,分别箍在两个烟囱筒段外侧上的钢支承环通过所述联接装置连接,且所述联接装置能够调整两个烟囱筒段的相对位置。
优选地,所述拼接接头由螺栓和法兰构成,所述法兰与所述钢支承环的端部焊接在一起,所述钢支承环安装至所述烟囱筒段时,所述法兰与所述钢支承环的端部焊接在一起,所述钢支承环安装至所述烟囱筒段时,通过所述螺栓将钢支承环端的法兰加以连接来实现将所述钢支承环固定至烟囱筒段。优选地,所述联接装置包括吊耳、U型螺母、销轴、拉杆、以及花篮螺丝,所述吊耳与所述钢支承环成一体并经由所述销轴与所述U型螺母的一端连接,所述拉杆一端与所述U型螺母的另一端连接,当两个烟囱筒段相互靠近时,所述拉杆的另一端与所述花篮螺丝连接,从而通过调节所述花篮螺丝来调整玻璃钢烟囱上下筒段的相对位置。
优选地,所述钢支承环的横截面为箱型,或者“工”字型,或者“][”型。
根据本发明的另一方面,还提供了一种玻璃钢烟囱拼接方法,其特征在于,所述方法包括步骤:
将上下两个钢支承环分别固定在需连接的玻璃钢烟囱上筒段和下筒段上;
将上筒段起吊,将下筒段拖运至上筒段的正下方;
安装由吊耳、U型螺母、销轴、拉杆、以及花篮螺丝构成的联接装置,将上下两个钢支承环连接起来,并将下筒段吊起;
通过花篮螺丝调整上下筒段的相对位置,至垂直度、间隙均满足要求;
对上筒段和下筒段接口进行手糊作业;以及
待手糊接头强度达到要求后,拆除钢支承环和联接装置。
本发明的玻璃钢烟囱拼接方法及施工连接装置无需开孔,对玻璃钢烟囱的筒身无任何损伤。整个装置采用易拆装的紧固件来连接,施工时无需施焊,拆装便利,施工速度快,整个装置能够反复使用。具有调节能力,能够对上下筒段的相对位置做精确调节,提高烟囱的装配精度。各个构件尺寸可以根据具体工程的需要加以调整确定,灵活性好。
附图说明
图1是本发明的施工连接装置安装在玻璃钢烟囱的上筒和下筒时的示意图。
图2是沿图图1的A-A线剖切的示意图。
图3是上筒和下筒之间的连接部分的局部视图。
图4是钢支承环的拼接接头的结构示意剖视图。
具体实施方式
以下将结合附图对本发明的较佳实施例进行详细说明,以便更清楚理解本发明的目的、特点和优点。应理解的是,附图所示的实施例并不是对本发明范围的限制,而只是为了说明本发明技术方案的实质精神。
技术术语解释
玻璃钢烟囱:采用玻璃钢为材料制造的烟囱,玻璃钢烟囱需分段制作,然后现场拼接,最终形成长度很长的排烟筒。一般来说,长度可达200~300米。
玻璃钢烟囱需逐段现场拼接,施工时首先采取措施将需拼接的上、下两个玻璃钢烟囱筒段加以固定,然后对接头做手工糊制作业,最后等到手糊接头固化,强度达到设计要求时拆除临时固定的构件或装置,至此上、下两个筒段就连接成为一个整体。在这个拼接过程中,将上下两个筒段临时固定是一个关键环节,应满足以下要求:(1)不影响手糊作业空间;(2)所采用的装置、工具在现场安装、拆卸方便;(3)具有调节能力,使上下筒段对接时能够调整同心度、间隙、垂直度;(4)具有一定的强度,能承受接头施工期间的荷载;(5)具有一定的刚度,保证上下筒段相对位置固定,避免手糊接头在固化过程中受到扰动。
本发明的玻璃钢烟囱拼接的施工连接装置能够满足上述技术要求。
图1-4示出本发明的玻璃钢烟囱拼接的施工连接装置1的结构示意图。如图1所示,该施工连接装置1由钢支承环2、钢支承环间的拼接接头以及沿钢支承环圆周分布的若干个联接装置(连接装置)20组成。钢支承环2是玻璃钢烟囱的支撑构件,箍在玻璃钢烟囱的上、下筒段5、6的外侧,对玻璃钢烟囱起到固定的作用。钢支承环2采用若干个圆弧段通过拼接接头(参见图4)连接成一个完整的圆环。图1-4所示的实施例中,钢支承环2由二个圆弧段拼接而成,这样能方便地加以拆装。当然,钢支承环2也可由更多个圆弧段组成。钢支承环2主要采用箱型截面,或者其他如“工”字型、“][”型等任何合适的截面形式,这种截面的构件具有较大的抗扭刚度和较强的稳定性,有利于该装置总体的安全可靠。
拼接接头由法兰11和螺栓12构成,如图4所示,法兰11与钢支承环2的端部焊接在一起,钢支承环2安装至烟囱筒段时,通过拧紧螺栓12将钢支承环端部的法兰加以连接来实现将钢支承环2固定至相应的烟囱筒段。
联接装置20包括钢支承环上的吊耳4、U型螺母9、销轴10、拉杆7、以及花篮螺丝8。吊耳与钢支承环成一体并经由销轴与U型螺母的一端连接,拉杆一端与U型螺母的另一端连接,当两个烟囱筒段相互靠近时,拉杆的另一端与花篮螺丝连接,从而通过调节花篮螺丝来调整玻璃钢烟囱上下筒段的相对位置。联接装置20同时用作上筒段5上的钢支承环2和下筒段6上的钢支承环2之间的连接装置,即上筒段5上的钢支承环2和下筒段6上的钢支承环2通过连接装置20连接在一起,进而将上筒段5和下筒段6连接在一起。花篮螺丝8可以调整玻璃钢烟囱上下筒段的相对位置,至垂直度、间隙均满足要求。当然,联接装置也可采用其他形式,只要其能够将上下筒段上的钢支承环连接在一起,进而将玻璃钢烟囱上下筒段连接在一起,并可以调整玻璃钢烟囱上下筒段的相对位置即可。
连接玻璃钢烟囱的上筒段5和下筒段6的施工次序为:
将上下两个(也可以多个)钢支承环分别固定在需连接的玻璃钢烟囱上下筒段上;
将上筒段起吊,将下筒段拖运至上筒段的正下方;
安装联接装置,将上下两个钢支承环连接起来,并将下筒段吊起;
通过花篮螺丝调整上下筒段的相对位置,至垂直度、间隙均满足要求;
对上筒段和下筒段接口进行手糊作业;以及
待手糊接头强度达到要求后,拆除由钢支承环、联接装置以及花篮螺丝等构成的连接装置,转入下一个接头作业。
本发明是玻璃钢烟囱现场拼接的施工连接装置具有如下优点:
(1)无需开孔,对玻璃钢烟囱的筒身无任何损伤;
(2)整个装置采用易拆装的紧固件来连接,施工时无需施焊,拆装便利,施工速度快,整个装置能够反复使用;
(3)可以根据需要确定联接装置数量和位置,使整个装置的强度、刚度满足要求,使上下筒段的相对位置牢固固定,有利于手糊接头的平稳固化;
(4)具有调节能力,能够对上下筒段的相对位置做精确调节,提高烟囱的装配精度;
(5)本装置的各个构件尺寸可以根据具体工程的需要加以调整确定,灵活性好;
(6)本装置的结构形式和特点,保证其比开孔穿钢丝绳等常规做法具有更高的安全性。
以上已详细描述了本发明的较佳实施例,但应理解到,在阅读了本发明的上述讲授内容之后,本领域技术人员可以对本发明作各种改动或修改。这些等价形式同样落于本申请所附权利要求书所限定的范围。
Claims (5)
1.一种玻璃钢烟囱拼接的施工连接装置,所述玻璃钢烟囱由多个烟囱筒段构成,其特征在于,所述施工连接装置包括钢支承环、钢支承环间的拼接接头,以及沿所述钢支承环圆周分布的多个联接装置,其中,所述钢支承环由多个圆弧段通过所述拼接接头连接成一个完整的圆环并箍在烟囱筒段外侧上,分别箍在两个烟囱筒段外侧上的钢支承环通过所述联接装置连接,且所述联接装置能够调整两个烟囱筒段的相对位置。
2.如权利要求1所述的施工连接装置,其特征在于,所述拼接接头由螺栓和法兰构成,所述法兰与所述钢支承环的端部焊接在一起,所述钢支承环安装至所述烟囱筒段时,通过所述螺栓将钢支承环端的法兰加以连接来实现将所述钢支承环固定至烟囱筒段。
3.如权利要求1所述的施工连接装置,其特征在于,所述联接装置包括吊耳、U型螺母、销轴、拉杆、以及花篮螺丝,所述吊耳与所述钢支承环成一体并经由所述销轴与所述U型螺母的一端连接,所述拉杆一端与所述U型螺母的另一端连接,当两个烟囱筒段相互靠近时,所述拉杆的另一端与所述花篮螺丝连接,从而通过调节所述花篮螺丝来调整玻璃钢烟囱上下筒段的相对位置。
4.如权利要求1所述的施工连接装置,其特征在于,所述钢支承环的横截面为箱型,或者“工”字型,或者“][”型。
5.一种玻璃钢烟囱拼接方法,其特征在于,所述方法包括步骤:
将上下两个钢支承环分别固定在需连接的玻璃钢烟囱上筒段和下筒段上;
将上筒段起吊,将下筒段拖运至上筒段的正下方;
安装由吊耳、U型螺母、销轴、拉杆、以及花篮螺丝构成的联接装置,将上下两个钢支承环连接起来,并将下筒段吊起;
通过花篮螺丝调整上下筒段的相对位置,至垂直度、间隙均满足要求;
对上筒段和下筒段接口进行手糊作业;以及
待手糊接头强度达到要求后,拆除钢支承环和联接装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310379805.7A CN103410369B (zh) | 2013-08-27 | 2013-08-27 | 玻璃钢烟囱拼接方法及施工连接装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310379805.7A CN103410369B (zh) | 2013-08-27 | 2013-08-27 | 玻璃钢烟囱拼接方法及施工连接装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103410369A true CN103410369A (zh) | 2013-11-27 |
CN103410369B CN103410369B (zh) | 2016-04-13 |
Family
ID=49603406
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310379805.7A Active CN103410369B (zh) | 2013-08-27 | 2013-08-27 | 玻璃钢烟囱拼接方法及施工连接装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103410369B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652910A (zh) * | 2014-12-26 | 2015-05-27 | 国家电网公司 | 一种水泥电线杆高度调节装置 |
CN104863410A (zh) * | 2015-05-21 | 2015-08-26 | 华电电力科学研究院 | 玻璃钢防腐烟囱 |
CN105822852A (zh) * | 2016-04-27 | 2016-08-03 | 江苏格普新材料有限公司 | 一种玻璃钢组合板 |
CN106869833A (zh) * | 2017-03-07 | 2017-06-20 | 高飞 | 一种泥浆伞紧固件 |
CN107780696A (zh) * | 2016-08-30 | 2018-03-09 | 辽宁埃勒蒙新能源技术有限公司 | 拼接式风力全自动除尘烟囱 |
CN108582811A (zh) * | 2017-11-17 | 2018-09-28 | 河南省第二建设集团有限公司 | 一种快速手糊装置及使用方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3762302A (en) * | 1971-01-28 | 1973-10-02 | J Piot | Non-polluting chimney |
CN1058261A (zh) * | 1990-07-19 | 1992-01-29 | 美明玻璃纤维股份有限公司 | 玻璃纤维增强塑料管垂直接头组件 |
DE4325827A1 (de) * | 1993-07-31 | 1995-02-02 | Theodor Vanck Gmbh & Co Kg | Schornsteinauskleidung und Verfahren zur Innensanierung eines Schornsteins |
JP2008082362A (ja) * | 2006-09-26 | 2008-04-10 | Osaka Gas Co Ltd | 伸縮式排気管 |
CN202627627U (zh) * | 2012-06-27 | 2012-12-26 | 河北可耐特玻璃钢有限公司 | 一种玻璃钢烟囱 |
CN202884307U (zh) * | 2012-09-07 | 2013-04-17 | 天津一能不锈钢制品有限公司 | 新型不锈钢烟囱连接结构 |
CN203430133U (zh) * | 2013-08-27 | 2014-02-12 | 中国电力工程顾问集团华东电力设计院 | 玻璃钢烟囱拼接的施工连接装置 |
-
2013
- 2013-08-27 CN CN201310379805.7A patent/CN103410369B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3762302A (en) * | 1971-01-28 | 1973-10-02 | J Piot | Non-polluting chimney |
CN1058261A (zh) * | 1990-07-19 | 1992-01-29 | 美明玻璃纤维股份有限公司 | 玻璃纤维增强塑料管垂直接头组件 |
DE4325827A1 (de) * | 1993-07-31 | 1995-02-02 | Theodor Vanck Gmbh & Co Kg | Schornsteinauskleidung und Verfahren zur Innensanierung eines Schornsteins |
JP2008082362A (ja) * | 2006-09-26 | 2008-04-10 | Osaka Gas Co Ltd | 伸縮式排気管 |
CN202627627U (zh) * | 2012-06-27 | 2012-12-26 | 河北可耐特玻璃钢有限公司 | 一种玻璃钢烟囱 |
CN202884307U (zh) * | 2012-09-07 | 2013-04-17 | 天津一能不锈钢制品有限公司 | 新型不锈钢烟囱连接结构 |
CN203430133U (zh) * | 2013-08-27 | 2014-02-12 | 中国电力工程顾问集团华东电力设计院 | 玻璃钢烟囱拼接的施工连接装置 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652910A (zh) * | 2014-12-26 | 2015-05-27 | 国家电网公司 | 一种水泥电线杆高度调节装置 |
CN104863410A (zh) * | 2015-05-21 | 2015-08-26 | 华电电力科学研究院 | 玻璃钢防腐烟囱 |
CN105822852A (zh) * | 2016-04-27 | 2016-08-03 | 江苏格普新材料有限公司 | 一种玻璃钢组合板 |
CN107780696A (zh) * | 2016-08-30 | 2018-03-09 | 辽宁埃勒蒙新能源技术有限公司 | 拼接式风力全自动除尘烟囱 |
CN106869833A (zh) * | 2017-03-07 | 2017-06-20 | 高飞 | 一种泥浆伞紧固件 |
CN108582811A (zh) * | 2017-11-17 | 2018-09-28 | 河南省第二建设集团有限公司 | 一种快速手糊装置及使用方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103410369B (zh) | 2016-04-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103410369A (zh) | 玻璃钢烟囱拼接方法及施工连接装置 | |
CN203430133U (zh) | 玻璃钢烟囱拼接的施工连接装置 | |
CN210341645U (zh) | 便于收纳的安全作业环形施工平台 | |
CN201525690U (zh) | 一种可调节起吊杆 | |
CN207314534U (zh) | 钢梁企口抗剪连接装置 | |
CN102635070B (zh) | 斜拉桥钢塔互拉式竖向转体施工方法 | |
CN201809086U (zh) | 管式火炬塔塔架建造施工用抱箍连接架 | |
CN103343639B (zh) | 一种高效调节的滑模系统 | |
CN103791156A (zh) | 大直径玻璃钢管道超高空快速安装方法 | |
CN110395494B (zh) | 拼装式储料罐及其组装方法 | |
CN202219387U (zh) | 便携式拆装台 | |
CN105274940B (zh) | 一种桥梁拱肋整体安装方法 | |
CN218642333U (zh) | 一种片装式活接塔机标准节 | |
CN104098036A (zh) | 伸缩臂架和起重机 | |
CN217401064U (zh) | 一种风力发电机组的转接段结构及塔架 | |
CN203808546U (zh) | 电杆加固器 | |
CN207658924U (zh) | 大直径换热器内套筒装卸工装 | |
CN202744233U (zh) | 塔式起重机的爬梯安装结构 | |
CN107082363A (zh) | 起重机的桥架及起重机 | |
CN215949080U (zh) | 一种便于拆装钢管杆 | |
CN206752318U (zh) | 一种桥梁盖梁模板快速拆除装置 | |
CN210392277U (zh) | 拼装式储料罐 | |
CN105239788B (zh) | 一种用于加固混凝土柱的加固结构及其施工方法 | |
CN207130762U (zh) | 快速拆卸轻便化多用途组装承台模板 | |
CN203946777U (zh) | 一种天窗架吊件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 200063 Wuning Road, Shanghai, No. 409, No. Applicant after: Co., Ltd of Huabei Power Design Inst., China Power Engineering Consulting Group Address before: 200063 Wuning Road, Shanghai, No. 409, No. Applicant before: Huabei Power Design Inst., China Power Engineering Consulting Group |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |