CN103362152A - 一种改造辊道基础的方法 - Google Patents
一种改造辊道基础的方法 Download PDFInfo
- Publication number
- CN103362152A CN103362152A CN2012101002151A CN201210100215A CN103362152A CN 103362152 A CN103362152 A CN 103362152A CN 2012101002151 A CN2012101002151 A CN 2012101002151A CN 201210100215 A CN201210100215 A CN 201210100215A CN 103362152 A CN103362152 A CN 103362152A
- Authority
- CN
- China
- Prior art keywords
- roller
- basis
- way
- foundation
- new
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Heat Treatments In General, Especially Conveying And Cooling (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
一种改造辊道基础的方法,其特征在于:先在正常生产状态下对需要改造的旧辊道基础进行临时支护,清除掉所述旧辊道基础下方的地基,完成新地基的浇筑和新辊道基础的预制;然后停产,拆除所述旧辊道基础,取消所述临时支护,吊装预制好的新辊道基础到位,安装设备,恢复生产。本发明在不影响生产正常进行的情况下通过对需要改造的旧辊道基础进行临时支护,利用较长时间完成旧地基的清除、新地基的浇筑和新辊道基础的预制,然后通过短时间的停产完成新旧辊道基础的更换,设备的安装,随即恢复生产,大幅度缩短了停产时间,保证了产量和经济效益,且临时支护结构简单,施工容易,操作性强,成本低廉。
Description
技术领域
本发明涉及一种辊道基础的改造方法,具体涉及一种加热炉辊道基础的改造方法。
背景技术
加热炉装炉辊道基础承担着将板坯送进加热炉内的繁重任务,不仅承受板坯传来的巨大垂直压力同时承受着与辊道中心线方向一致的水平推力,装钢机工作时辊道基础还会受到垂直辊道中心线方向的水平力;辊道基础在承受所有外力的同时并将其通过支墩传给加热炉基坑底板,因此,钢铁领域常需要增建和改造加热炉,但由于停产直接影响到产量和经济效益,因此,停产时间成为增建和改造加热炉的严重制约因素。
对于新建加热炉,考虑到辊道基础对加热炉顶板、底板变形的约束,往往把辊道基础和加热炉炉坑基础进行整体浇筑,但作为改造工程,尤其是辊道基础的改造,整体现浇时间很长,约需要一个月的时间或者更长,无法满足保产的要求,且严重影响到经济效益。如果采用钢构件代替混凝土辊道基础,吊装虽然能够满足,但是钢构件的刚度小、变形大、耐热性差,又无法满足设备安装及运行的要求。
不少钢厂在辊道基础已经严重变形的情况下,为避免影响生产和经济效益,只好采取一些简易处理办法维持生产,不仅增加了生产过程中的安全隐患,还影响了产品的质量。
发明内容
本发明的目的在于提供一种可以快速完成辊道基础改造的方法。
本发明的目的是这样实现的,一种改造辊道基础的方法,其特征在于:先在正常生产情况下对需要改造的旧辊道基础进行临时支护,清除掉所述旧辊道基础下方的地基,完成新地基的浇筑及新辊道基础的预制;然后停产,拆除所述旧辊道基础,取消所述临时支护,吊装预制好的新辊道基础到位,安装设备,恢复生产。
上述新地基包括加热炉底板、侧壁和支墩。
为了不影响正常生产且缩短改造时间,上述新辊道基础为异地预制,现场快速组装。
为了保证结构的可靠性,上述新辊道基础预制时留有螺栓孔,所述新辊道基础之间采用螺栓连接并通过压力灌浆填缝。
为了便于施工加热炉底板时贯通钢筋,保证整体性,上述临时支护包括立柱且下端落于加热炉底板底面以下,所述立柱之间设有斜向支撑和水平杆,来传递板坯运行时产生的水平力。
本发明具有如下有益效果:
本发明先在不影响正常生产的情况下对需要改造的原辊道基础进行临时支护,利用较长时间完成旧地基的清除、新地基的浇筑和新辊道基础的预制,然后停产,在短时间内完成新旧辊道基础的更换,设备的安装,随即恢复生产,大幅度缩短了停产时间,保证了产量和经济效益。
本发明对施工、安装要求不高,新辊道基础之间采用灌浆料进行填补,调整余量大,新辊道基础上预留有螺栓孔以便于相互之间通过螺栓连接,保留了较大的调整空间。
本发明临时支护结构简单,施工容易,利用原厂房吊车吊装预制的新辊道基础到位,操作性强,成本低廉。
附图说明
图1为本发明实施例临时支护结构示意图;
图2为图1侧视图;
图3为本发明支墩结构示意图;
图4为本发明新辊道基础安装示意图;
图5为本发明新辊道基础与支墩连接示意图;
图6为图5侧视图;
图7为本发明预制辊道基础与加热炉侧壁连接示意图;
图8为本发明预制辊道基础之间连接示意图;
图9为图8侧视图。
具体实施方式
实施例,一种改造辊道基础的方法,先在正常生产状态下在原地开挖对需要改造的旧辊道基础1进行临时支护,临时支护未完成时尽量减少对旧辊道基础下1方地基的扰动。临时支护完成后,清除掉旧辊道基础1下方的地基3至设计标高,完成新地基的浇筑,新地基包括加热炉底板4、侧壁8和支墩7,同时在异地预制混凝土新辊道基础9且预留螺栓孔;等到浇筑的加热炉底板4、侧壁8和支墩7、预制的新辊道基础9达到设计强度之后,停产,在短时间内拆除旧辊道基础1,取消临时支护,用厂房内的吊车吊装预制好的新辊道基础9到位,现场快速组装,新辊道基础9之间采用螺栓11连接并通过压力灌浆10填缝,然后安装设备,随即恢复生产。
临时支护包括立柱2且下端落于加热炉底板4底面以下,施工加热炉底板4时贯通钢筋,保证整体性;立柱2之间设有斜向支撑5和水平杆6。
Claims (5)
1.一种改造辊道基础的方法,其特征在于:先在正常生产情况下对需要改造的旧辊道基础(1)进行临时支护,清除掉所述旧辊道基础(1)下方的地基(3),完成新地基的浇筑及新辊道基础(9)的预制;然后停产,拆除所述旧辊道基础(1),取消所述临时支护,吊装预制的新辊道基础(9)到位,安装设备,恢复生产。
2.如权利要求1所述的改造辊道基础的方法,其特征在于:所述新地基包括加热炉底板(4)、侧壁(8)和支墩(7)。
3.如权利要求1或2所述的改造辊道基础的方法,其特征在于:所述新辊道基础(9)为异地预制,现场组装。
4.如权利要求3所述的改造辊道基础的方法,其特征在于:所述新辊道基础(9)预制时留有螺栓孔,所述新辊道基础(9)之间采用螺栓(11)连接并通过压力灌浆(10)填缝。
5.如权利要求1所述的改造辊道基础的方法,其特征在于:所述临时支护包括立柱(2)且下端落于所述加热炉底板(4)底面以下,所述立柱(2)之间设有斜向支撑(5)和水平杆(6)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210100215.1A CN103362152B (zh) | 2012-04-09 | 2012-04-09 | 一种改造辊道基础的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210100215.1A CN103362152B (zh) | 2012-04-09 | 2012-04-09 | 一种改造辊道基础的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103362152A true CN103362152A (zh) | 2013-10-23 |
CN103362152B CN103362152B (zh) | 2015-06-17 |
Family
ID=49364358
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210100215.1A Active CN103362152B (zh) | 2012-04-09 | 2012-04-09 | 一种改造辊道基础的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103362152B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105297796A (zh) * | 2014-07-21 | 2016-02-03 | 五冶集团上海有限公司 | 转鼓式飞剪快速加固改造方法 |
CN110036154A (zh) * | 2016-12-06 | 2019-07-19 | 福伊特专利有限公司 | 改装用于处理纤维料幅的轧辊设备的方法 |
CN110093944A (zh) * | 2019-04-30 | 2019-08-06 | 上海二十冶建设有限公司 | 厚板轧机的在线升级改造施工方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09144049A (ja) * | 1995-11-24 | 1997-06-03 | Mitsui Constr Co Ltd | 構造物の仮受け方法 |
CN102277885A (zh) * | 2011-05-11 | 2011-12-14 | 中铁二院工程集团有限责任公司 | 高速铁路连续刚构桥梁桩基托换方法 |
-
2012
- 2012-04-09 CN CN201210100215.1A patent/CN103362152B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09144049A (ja) * | 1995-11-24 | 1997-06-03 | Mitsui Constr Co Ltd | 構造物の仮受け方法 |
CN102277885A (zh) * | 2011-05-11 | 2011-12-14 | 中铁二院工程集团有限责任公司 | 高速铁路连续刚构桥梁桩基托换方法 |
Non-Patent Citations (1)
Title |
---|
马福义: "轧钢辊道设计和施工中应注意的几个问题", 《轧钢》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105297796A (zh) * | 2014-07-21 | 2016-02-03 | 五冶集团上海有限公司 | 转鼓式飞剪快速加固改造方法 |
CN105297796B (zh) * | 2014-07-21 | 2017-02-15 | 五冶集团上海有限公司 | 转鼓式飞剪快速加固改造方法 |
CN110036154A (zh) * | 2016-12-06 | 2019-07-19 | 福伊特专利有限公司 | 改装用于处理纤维料幅的轧辊设备的方法 |
CN110093944A (zh) * | 2019-04-30 | 2019-08-06 | 上海二十冶建设有限公司 | 厚板轧机的在线升级改造施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103362152B (zh) | 2015-06-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104234385B (zh) | 一种地坪大型钢板预埋件后安装施工方法 | |
CN203188121U (zh) | 中承式及下承式拱桥现浇桥面吊模 | |
CN203462583U (zh) | 一种超高层外露式柱脚 | |
CN101518784B (zh) | 大型轧机牌坊在吊装高度受限下的吊装方法 | |
CN104234723A (zh) | 一种明挖隧道矩形截面自行式移动模板支架台车 | |
CN104895279A (zh) | 预制外墙板与预制梁的干挂连接结构及其施工方法 | |
CN104912320A (zh) | 沉降缝两侧剪力墙的同步施工方法 | |
CN202611258U (zh) | 一种大直径地脚螺栓安装支架 | |
CN108930224A (zh) | 穿心棒法盖梁支撑调节系统施工方法 | |
CN104032969A (zh) | 一种隔震支座预埋板精确定位及过程调控装置 | |
CN104895193A (zh) | 预制外墙板连接盒及连接节点 | |
CN103362152B (zh) | 一种改造辊道基础的方法 | |
CN203546583U (zh) | 一种混凝土箱型截面多梁桥的箱室内部横向加强装置 | |
CN106760014A (zh) | 一种全装配式板式可调阻尼器埋件及安装方法 | |
CN104912231A (zh) | 预制外墙板与剪力墙的干挂连接结构及其施工方法 | |
CN206337668U (zh) | 一种全装配式板式可调阻尼器埋件 | |
CN205669313U (zh) | 一种万向可调式悬挂模板系统 | |
CN105863261A (zh) | 一种万向可调式悬挂模板系统 | |
CN107975064A (zh) | 用于地下工程的整体预制装配式施工工艺 | |
CN205063248U (zh) | 预制外墙板与预制梁的干挂连接结构 | |
CN205421988U (zh) | 混凝土独立柱加固用plc智能同步顶升卸荷施工装置 | |
CN111441513A (zh) | 组合桁架钢筋及钢板的现浇混凝土墙体及施工方法 | |
CN207934054U (zh) | 一种预制装配式筏板基础 | |
CN204173804U (zh) | 一种结构梁承载式的内爬塔吊安装及顶升结构 | |
CN201915420U (zh) | 临时门楼基础 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |