- CN103352702B CN103352702B CN201310286741.6A CN201310286741A CN103352702B CN 103352702 B CN103352702 B CN 103352702B CN 201310286741 A CN201310286741 A CN 201310286741A CN 103352702 B CN103352702 B CN 103352702B
- Authority
- CN
- China
- Prior art keywords
- shield
- confined chamber
- construction
- shield machine
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses reception construction in a kind of shield structure hole, it is provided with confined chamber at the destination county of shield tunnel, in closed chamber, be full of water or other filler, shield machine is directly advanced into confined chamber from stratum while arrival, in confined chamber, complete shield machine and deviate from shield driving section, and utilize the grouting layer of shield tail to seal underground water, complete slurry shield and receive. When the present invention can prevent from constructing, underground water pours in, and avoids occurring ground subsidence, reduces construction wind, improves efficiency of construction.<!--1-->
Description
Technical field
The present invention relates to shield tunnel construction technology field, refer to that particularly one is applied in slurry shieldIn shield structure hole in machine, receive construction.
Background technology
Slurry shield machine is a kind of conventional tunnel construction machinery, and it is by pressurization mud hydraulic pressure and tunnelThe Water And Earth Pressures balance of road excavation face, and by the muddy water of circulation, the quarrel soil of cutting is carried and appearedOutward. The construction process of slurry shield machine is identical with general shield machine, has shield launching, normally pickEnter and the process such as shield structure reception, wherein to receive be the principal risk point of its construction in the arrival of slurry shieldAnd emphasis.
As shown in Figure 1, existing slurry balance shield arrive receive engineering method be before shield machine reachesThe outer soil mass consolidation 11 that is arranged with of active well 10, goes along with sb. to guard him knot when shield machine tunnels to active well 10When structure, cut the building enclosure at shield machine place, subsequently, shield machine is through being arranged on active well inwallInterim antipriming 12 after, be pushed into active well, in tunneling process simultaneously after segment assembly and wallGrouting layer between profile and the section of jurisdiction outer wall of laying of synchronous grouting filling shield machine excavation.
In use there is following problem in this reception programme:
1, shield machine is got rid of by muddy water after arriving active well building enclosure, because cutterhead excavation is straightFootpath is bigger compared with shield body, and in the larger stratum of permeability, underground water will be along shield machine housing and reinforcing bodyBetween gap pour in, if simultaneously reinforcing body occurs that flaw will also cause underground water to pour in, and thenGround subsidence occurs, and construction risk is large.
2, the interim antipriming waterproof effect that shield machine arrives is poor, constructional difficulties: existing shield structureArrive water-tight device and all adopt clamp plate type water-tight device, this device need be at shield machine shield body through sealingAfter device, manually promote clamp, withstand shield body water-tight device, on the one hand because side space under shield structure is narrowLittle, be manually difficult to enter construction; In addition, because of shield body be one fall capitate, in shield driving process,Clamp cannot clamp, and is difficult to reach purpose of design.
Therefore, need improve prior art.
Summary of the invention
Object of the present invention will provide exactly in a kind of shield structure hole and receive construction, above-mentioned to solveProblem in background technology.
Technical scheme of the present invention is: in a kind of shield structure hole, receives construction, it is characterized in that,It comprises the following steps:
1), shield tunnel destination county arrange confined chamber, in confined chamber, be provided with packing material;
2), when shield machine driving is when at shield tunnel terminal, muddy water enters in confined chamber and fillsMaterial mixes;
3), shield machine continues to tunnel in confined chamber, synchronously to profile and the laying of shield machine excavationSection of jurisdiction outer wall between grouting layer carry out slip casting;
4), shield machine tunnels while arriving shield tunnel terminal to the shield tail of shield machine, grouting layer slip castingComplete;
5), after the slurries in grouting layer solidify, remove confined chamber, shield structure completes.
In such scheme:
Described confined chamber is arranged on the destination county of shield tunnel, is provided with filling material in described confined chamberMaterial, the cross-sectional area of described confined chamber is greater than the cross-sectional area of shield tunnel.
Described packing material is water.
The abutted surface of described confined chamber and shield tunnel is that resin steel bar concrete walls are or/and obliqueThe soil body of support.
When the present invention can prevent from constructing, underground water pours in, and avoids occurring ground subsidence, reduces construction wind,Improve efficiency of construction.
Brief description of the drawings
Fig. 1 receives structural representation in existing shield structure hole;
Fig. 2 receives structural representation in shield structure hole in the present invention;
Fig. 3 is the section structure schematic diagram of Fig. 2;
Fig. 4 receives the structural representation that in construction, shield machine does not enter confined chamber in shield structure holeFigure;
Fig. 5 is the structural representation that receives shield machine in construction in shield structure hole and enter confined chamber;Fig. 6 ties when in shield structure hole, in reception construction, the shield tail of shield machine arrives shield tunnel terminalStructure schematic diagram. Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
In existing shield structure hole, receive as shown in Figure 1 structure, in background technology, done detailed theoryBright, repeat no more in this.
In a kind of shield structure hole as shown in Figure 2 and Figure 3, receive structure, it comprises shield tunnel 2,The destination county of shield tunnel 2 is provided with confined chamber 1, and confined chamber 1 is provided with packing material, confined chamber 1Cross-sectional area be greater than the cross-sectional area of shield tunnel 2, confined chamber 1 section and length should be at leastEnsure that shield machine 6 passes through. Confined chamber 1 is to ensure before shield machine arrival with shield tunnel 2 abutted surfacesStability Analysis of Structures, can adopt resin steel bar concrete walls 4 or/and the soil body 3 of oblique support etc.
Packing material in the present embodiment is water, can be also: in muddy water enters confined chamber, closeIn closed chamber mud hydraulic pressure can with shield tunneling space in ground water pressure dynamic balance or be greater than underground waterThe other materials of pressure.
As shown in Fig. 4, Fig. 5, Fig. 6, a kind of adopt in shield structure hole described above receives structureConstruction, comprise the following steps:
1), shield tunnel 2 destination counties arrange confined chambers 1, in confined chamber 1, be provided with packing material;Wherein confined chamber 1 is connected interface according to interface stratum stability requirement with shield tunnel 2, can adoptBy modes such as soil body step, stratum consolidations, but must not there is the driving that hinders shield machine 6;
2), when shield machine 6 driving is when at shield tunnel 2 terminal, muddy water enters confined chamber 1In mix with packing material; The interior mud hydraulic pressure of confined chamber 1 can excavate the ground in space with shield machine 6Launching stress balance or be greater than groundwater pressure, avoids underground water to gush out; This step has ensured drivingGround water pressure dynamic balance in process, therefore the interim antipriming in existing design needn't be set, has reducedDifficulty of construction and construction risk;
3), shield machine 6 continues to the interior driving of confined chamber 1, the profile synchronously excavating to shield machine 68 and the section of jurisdiction outer wall 9 laid between grouting layer 7 by the mode of synchronous grouting, secondary groutingCarry out slip casting;
4), shield machine 6 tunnels while arriving shield tunnel 2 terminal to the shield tail 5 of shield machine 6, note7 slip casting of slurry layer are complete;
5), after the slurries in grouting layer 7 solidify, underground water seal completely remove confined chamber 1,Shield structure completes.
In the present invention, confined chamber 1, according to its design feature, hangs out shield machine after can directly removing,Also the plug wall that can remove shield structure front, shield machine hangs out shield machine after being advanced active well.
Claims (3)
1. in shield structure hole, receive a construction, it is characterized in that, it comprises the following steps:
1), shield tunnel (2) destination county arrange confined chamber (1), confined chamber is provided with in (1)Packing material, described confined chamber (1) is resin steel bar coagulation with the abutted surface of shield tunnel (2)Cob wall (4) is or/and the soil body (3) of oblique support;
2), when shield machine (6) driving is when at shield tunnel (2) terminal, muddy water enters airtightIn chamber (1), mix with packing material;
3), shield machine (6) continues to the interior driving of confined chamber (1), synchronously to shield machine (6)Grouting layer (7) between the section of jurisdiction outer wall (9) of the profile (8) of excavation and laying carries out slip casting;
4), shield machine (6) tunnels shield tail (5) the arrival shield tunnel (2) to shield machine (6)When terminal, grouting layer (7) slip casting is complete;
5), after the slurries in grouting layer (7) solidify, remove confined chamber (1), shield structure completes.
2. in shield structure according to claim 1 hole, receive construction, it is characterized in that:Described confined chamber (1) is arranged on the destination county of shield tunnel (2), described confined chamber (1)Cross-sectional area is greater than the cross-sectional area of shield tunnel (2).
3. in shield structure according to claim 2 hole, receive construction, it is characterized in that:Described packing material is water.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310286741.6A CN103352702B (en) | 2013-07-09 | 2013-07-09 | A kind of shield structure receives construction in hole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310286741.6A CN103352702B (en) | 2013-07-09 | 2013-07-09 | A kind of shield structure receives construction in hole |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103352702A CN103352702A (en) | 2013-10-16 |
CN103352702B true CN103352702B (en) | 2016-05-04 |
Family
ID=49309107
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310286741.6A Active CN103352702B (en) | 2013-07-09 | 2013-07-09 | A kind of shield structure receives construction in hole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103352702B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103899325B (en) * | 2014-04-23 | 2016-04-13 | 上海隧道工程有限公司 | The construction method that concrete casing shield receives |
CN105422107A (en) * | 2015-12-31 | 2016-03-23 | 北京建工土木工程有限公司 | Method for receiving shield tunneling machine in tunnel |
CN107191197B (en) * | 2017-06-14 | 2023-05-19 | 中铁第四勘察设计院集团有限公司 | Shield segment and construction method thereof in tunnel through mine method by shield air pushing |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1463632A (en) * | 1975-01-10 | 1977-02-02 | Genton J C | Method of positioning and underpass below another roadway by hydraulic drive-through and the constructive work obtained thereby |
DE4409049C1 (en) * | 1994-03-17 | 1995-03-30 | Hochtief Ag Hoch Tiefbauten | Method of replacing the supporting liquid by compressed air and use of a hydraulic shield for carrying out the method |
CN1995701A (en) * | 2006-12-30 | 2007-07-11 | 广东省基础工程公司 | Mechanical breaking construction method for use as shield tunneling machine reached tunnel portal |
CN201424941Y (en) * | 2009-06-15 | 2010-03-17 | 广东华隧建设股份有限公司 | Device for airtight starting and reaching of shield machine |
-
2013
- 2013-07-09 CN CN201310286741.6A patent/CN103352702B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1463632A (en) * | 1975-01-10 | 1977-02-02 | Genton J C | Method of positioning and underpass below another roadway by hydraulic drive-through and the constructive work obtained thereby |
DE4409049C1 (en) * | 1994-03-17 | 1995-03-30 | Hochtief Ag Hoch Tiefbauten | Method of replacing the supporting liquid by compressed air and use of a hydraulic shield for carrying out the method |
CN1995701A (en) * | 2006-12-30 | 2007-07-11 | 广东省基础工程公司 | Mechanical breaking construction method for use as shield tunneling machine reached tunnel portal |
CN201424941Y (en) * | 2009-06-15 | 2010-03-17 | 广东华隧建设股份有限公司 | Device for airtight starting and reaching of shield machine |
Non-Patent Citations (1)
Title |
---|
盾构到达突发涌水处理及水中到达方案分析;于加云;《隧道建设》;20130410;第33卷(第4期);第315-318页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103352702A (en) | 2013-10-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102493822B (en) | Method for performing curtain grouting construction on tunnel by water rich fault influence zone | |
CN111535297A (en) | Method for filling underground cavity of foundation rock stratum by filler grouting and hydraulic filling device | |
CN102352753B (en) | Freezing consolidation and soil-accumulating watering shield arrival method | |
CN107191197A (en) | A kind of shield duct piece and its pushed away in shield sky by the application in Tunneling by mining method | |
CN204253054U (en) | Mountain tunnel stake arch cap excavation method comprehensive support structure | |
CN105114029B (en) | A kind of shutoff method of the bad drilling of mine laneway inner sealing | |
CN111396067B (en) | Comprehensive shield steel sleeve receiving construction method in complex environment | |
CN110107310A (en) | A kind of construction method at tunnel slope hole | |
CN103437339A (en) | Construction method for sealing karst cave near trench wall of underground continuous wall in karst stratum | |
CN109026012A (en) | Vertical shaft surrounding rock supporting structure and its excavation supporting method | |
CN103696416B (en) | A kind of method for processing foundation | |
CN208965598U (en) | The Anti-seeping technology structure of grout curtain and underground chamber intersection area | |
CN102400694A (en) | Reinforcement method for combined part of shield tunnel and mining-method tunnel | |
CN103016027A (en) | Tunnel or roadway excavating method under weak and broken complicated geological conditions | |
CN103352702B (en) | A kind of shield structure receives construction in hole | |
CN102002950B (en) | Liquid division slip casting reinforcing method for subsurface structure construction joints | |
CN105041327B (en) | Bored tunnel is counter to dig shield method of reseptance | |
CN104612722B (en) | Tunnel gate strengthening method for starting and arriving of annular shield or annular pushing pipe | |
CN102022009B (en) | Non-destructive dampproof course repairing method and rear dampproof course | |
CN103572764A (en) | Watertight structure for retaining wall of ultra-deep manually excavated pile and construction method thereof | |
CN113047858B (en) | Chest-closed TBM construction system for water-containing soft rock stratum of crack and construction method thereof | |
CN104988914A (en) | Cast-in-situ bored pile breakage processing method under water area environment | |
RU2485318C1 (en) | Method to construct station tunnels with low subsidence of earth surface | |
CN104453915B (en) | Big cross section vertical shaft pre-pouring grout reinforces Rapid Excavation method | |
CN208982058U (en) | Vertical shaft surrounding rock supporting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |