CN103352702B - A kind of shield structure receives construction in hole - Google Patents

A kind of shield structure receives construction in hole Download PDF

Info

Publication number
CN103352702B
CN103352702B CN201310286741.6A CN201310286741A CN103352702B CN 103352702 B CN103352702 B CN 103352702B CN 201310286741 A CN201310286741 A CN 201310286741A CN 103352702 B CN103352702 B CN 103352702B
Authority
CN
China
Prior art keywords
shield
confined chamber
construction
shield machine
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310286741.6A
Other languages
Chinese (zh)
Other versions
CN103352702A (en
Inventor
邓朝辉
肖明清
陈建桦
鲁志鹏
蒋超
刘浩
薛光桥
龚擎玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201310286741.6A priority Critical patent/CN103352702B/en
Publication of CN103352702A publication Critical patent/CN103352702A/en
Application granted granted Critical
Publication of CN103352702B publication Critical patent/CN103352702B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses reception construction in a kind of shield structure hole, it is provided with confined chamber at the destination county of shield tunnel, in closed chamber, be full of water or other filler, shield machine is directly advanced into confined chamber from stratum while arrival, in confined chamber, complete shield machine and deviate from shield driving section, and utilize the grouting layer of shield tail to seal underground water, complete slurry shield and receive. When the present invention can prevent from constructing, underground water pours in, and avoids occurring ground subsidence, reduces construction wind, improves efficiency of construction.<!--1-->

Description

A kind of shield structure receives construction in hole
Technical field
The present invention relates to shield tunnel construction technology field, refer to that particularly one is applied in slurry shieldIn shield structure hole in machine, receive construction.
Background technology
Slurry shield machine is a kind of conventional tunnel construction machinery, and it is by pressurization mud hydraulic pressure and tunnelThe Water And Earth Pressures balance of road excavation face, and by the muddy water of circulation, the quarrel soil of cutting is carried and appearedOutward. The construction process of slurry shield machine is identical with general shield machine, has shield launching, normally pickEnter and the process such as shield structure reception, wherein to receive be the principal risk point of its construction in the arrival of slurry shieldAnd emphasis.
As shown in Figure 1, existing slurry balance shield arrive receive engineering method be before shield machine reachesThe outer soil mass consolidation 11 that is arranged with of active well 10, goes along with sb. to guard him knot when shield machine tunnels to active well 10When structure, cut the building enclosure at shield machine place, subsequently, shield machine is through being arranged on active well inwallInterim antipriming 12 after, be pushed into active well, in tunneling process simultaneously after segment assembly and wallGrouting layer between profile and the section of jurisdiction outer wall of laying of synchronous grouting filling shield machine excavation.
In use there is following problem in this reception programme:
1, shield machine is got rid of by muddy water after arriving active well building enclosure, because cutterhead excavation is straightFootpath is bigger compared with shield body, and in the larger stratum of permeability, underground water will be along shield machine housing and reinforcing bodyBetween gap pour in, if simultaneously reinforcing body occurs that flaw will also cause underground water to pour in, and thenGround subsidence occurs, and construction risk is large.
2, the interim antipriming waterproof effect that shield machine arrives is poor, constructional difficulties: existing shield structureArrive water-tight device and all adopt clamp plate type water-tight device, this device need be at shield machine shield body through sealingAfter device, manually promote clamp, withstand shield body water-tight device, on the one hand because side space under shield structure is narrowLittle, be manually difficult to enter construction; In addition, because of shield body be one fall capitate, in shield driving process,Clamp cannot clamp, and is difficult to reach purpose of design.
Therefore, need improve prior art.
Summary of the invention
Object of the present invention will provide exactly in a kind of shield structure hole and receive construction, above-mentioned to solveProblem in background technology.
Technical scheme of the present invention is: in a kind of shield structure hole, receives construction, it is characterized in that,It comprises the following steps:
1), shield tunnel destination county arrange confined chamber, in confined chamber, be provided with packing material;
2), when shield machine driving is when at shield tunnel terminal, muddy water enters in confined chamber and fillsMaterial mixes;
3), shield machine continues to tunnel in confined chamber, synchronously to profile and the laying of shield machine excavationSection of jurisdiction outer wall between grouting layer carry out slip casting;
4), shield machine tunnels while arriving shield tunnel terminal to the shield tail of shield machine, grouting layer slip castingComplete;
5), after the slurries in grouting layer solidify, remove confined chamber, shield structure completes.
In such scheme:
Described confined chamber is arranged on the destination county of shield tunnel, is provided with filling material in described confined chamberMaterial, the cross-sectional area of described confined chamber is greater than the cross-sectional area of shield tunnel.
Described packing material is water.
The abutted surface of described confined chamber and shield tunnel is that resin steel bar concrete walls are or/and obliqueThe soil body of support.
When the present invention can prevent from constructing, underground water pours in, and avoids occurring ground subsidence, reduces construction wind,Improve efficiency of construction.
Brief description of the drawings
Fig. 1 receives structural representation in existing shield structure hole;
Fig. 2 receives structural representation in shield structure hole in the present invention;
Fig. 3 is the section structure schematic diagram of Fig. 2;
Fig. 4 receives the structural representation that in construction, shield machine does not enter confined chamber in shield structure holeFigure;
Fig. 5 is the structural representation that receives shield machine in construction in shield structure hole and enter confined chamber;Fig. 6 ties when in shield structure hole, in reception construction, the shield tail of shield machine arrives shield tunnel terminalStructure schematic diagram. Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
In existing shield structure hole, receive as shown in Figure 1 structure, in background technology, done detailed theoryBright, repeat no more in this.
In a kind of shield structure hole as shown in Figure 2 and Figure 3, receive structure, it comprises shield tunnel 2,The destination county of shield tunnel 2 is provided with confined chamber 1, and confined chamber 1 is provided with packing material, confined chamber 1Cross-sectional area be greater than the cross-sectional area of shield tunnel 2, confined chamber 1 section and length should be at leastEnsure that shield machine 6 passes through. Confined chamber 1 is to ensure before shield machine arrival with shield tunnel 2 abutted surfacesStability Analysis of Structures, can adopt resin steel bar concrete walls 4 or/and the soil body 3 of oblique support etc.
Packing material in the present embodiment is water, can be also: in muddy water enters confined chamber, closeIn closed chamber mud hydraulic pressure can with shield tunneling space in ground water pressure dynamic balance or be greater than underground waterThe other materials of pressure.
As shown in Fig. 4, Fig. 5, Fig. 6, a kind of adopt in shield structure hole described above receives structureConstruction, comprise the following steps:
1), shield tunnel 2 destination counties arrange confined chambers 1, in confined chamber 1, be provided with packing material;Wherein confined chamber 1 is connected interface according to interface stratum stability requirement with shield tunnel 2, can adoptBy modes such as soil body step, stratum consolidations, but must not there is the driving that hinders shield machine 6;
2), when shield machine 6 driving is when at shield tunnel 2 terminal, muddy water enters confined chamber 1In mix with packing material; The interior mud hydraulic pressure of confined chamber 1 can excavate the ground in space with shield machine 6Launching stress balance or be greater than groundwater pressure, avoids underground water to gush out; This step has ensured drivingGround water pressure dynamic balance in process, therefore the interim antipriming in existing design needn't be set, has reducedDifficulty of construction and construction risk;
3), shield machine 6 continues to the interior driving of confined chamber 1, the profile synchronously excavating to shield machine 68 and the section of jurisdiction outer wall 9 laid between grouting layer 7 by the mode of synchronous grouting, secondary groutingCarry out slip casting;
4), shield machine 6 tunnels while arriving shield tunnel 2 terminal to the shield tail 5 of shield machine 6, note7 slip casting of slurry layer are complete;
5), after the slurries in grouting layer 7 solidify, underground water seal completely remove confined chamber 1,Shield structure completes.
In the present invention, confined chamber 1, according to its design feature, hangs out shield machine after can directly removing,Also the plug wall that can remove shield structure front, shield machine hangs out shield machine after being advanced active well.

Claims (3)

1. in shield structure hole, receive a construction, it is characterized in that, it comprises the following steps:
1), shield tunnel (2) destination county arrange confined chamber (1), confined chamber is provided with in (1)Packing material, described confined chamber (1) is resin steel bar coagulation with the abutted surface of shield tunnel (2)Cob wall (4) is or/and the soil body (3) of oblique support;
2), when shield machine (6) driving is when at shield tunnel (2) terminal, muddy water enters airtightIn chamber (1), mix with packing material;
3), shield machine (6) continues to the interior driving of confined chamber (1), synchronously to shield machine (6)Grouting layer (7) between the section of jurisdiction outer wall (9) of the profile (8) of excavation and laying carries out slip casting;
4), shield machine (6) tunnels shield tail (5) the arrival shield tunnel (2) to shield machine (6)When terminal, grouting layer (7) slip casting is complete;
5), after the slurries in grouting layer (7) solidify, remove confined chamber (1), shield structure completes.
2. in shield structure according to claim 1 hole, receive construction, it is characterized in that:Described confined chamber (1) is arranged on the destination county of shield tunnel (2), described confined chamber (1)Cross-sectional area is greater than the cross-sectional area of shield tunnel (2).
3. in shield structure according to claim 2 hole, receive construction, it is characterized in that:Described packing material is water.
CN201310286741.6A 2013-07-09 2013-07-09 A kind of shield structure receives construction in hole Active CN103352702B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310286741.6A CN103352702B (en) 2013-07-09 2013-07-09 A kind of shield structure receives construction in hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310286741.6A CN103352702B (en) 2013-07-09 2013-07-09 A kind of shield structure receives construction in hole

Publications (2)

Publication Number Publication Date
CN103352702A CN103352702A (en) 2013-10-16
CN103352702B true CN103352702B (en) 2016-05-04

Family

ID=49309107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310286741.6A Active CN103352702B (en) 2013-07-09 2013-07-09 A kind of shield structure receives construction in hole

Country Status (1)

Country Link
CN (1) CN103352702B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103899325B (en) * 2014-04-23 2016-04-13 上海隧道工程有限公司 The construction method that concrete casing shield receives
CN105422107A (en) * 2015-12-31 2016-03-23 北京建工土木工程有限公司 Method for receiving shield tunneling machine in tunnel
CN107191197B (en) * 2017-06-14 2023-05-19 中铁第四勘察设计院集团有限公司 Shield segment and construction method thereof in tunnel through mine method by shield air pushing

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1463632A (en) * 1975-01-10 1977-02-02 Genton J C Method of positioning and underpass below another roadway by hydraulic drive-through and the constructive work obtained thereby
DE4409049C1 (en) * 1994-03-17 1995-03-30 Hochtief Ag Hoch Tiefbauten Method of replacing the supporting liquid by compressed air and use of a hydraulic shield for carrying out the method
CN1995701A (en) * 2006-12-30 2007-07-11 广东省基础工程公司 Mechanical breaking construction method for use as shield tunneling machine reached tunnel portal
CN201424941Y (en) * 2009-06-15 2010-03-17 广东华隧建设股份有限公司 Device for airtight starting and reaching of shield machine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1463632A (en) * 1975-01-10 1977-02-02 Genton J C Method of positioning and underpass below another roadway by hydraulic drive-through and the constructive work obtained thereby
DE4409049C1 (en) * 1994-03-17 1995-03-30 Hochtief Ag Hoch Tiefbauten Method of replacing the supporting liquid by compressed air and use of a hydraulic shield for carrying out the method
CN1995701A (en) * 2006-12-30 2007-07-11 广东省基础工程公司 Mechanical breaking construction method for use as shield tunneling machine reached tunnel portal
CN201424941Y (en) * 2009-06-15 2010-03-17 广东华隧建设股份有限公司 Device for airtight starting and reaching of shield machine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
盾构到达突发涌水处理及水中到达方案分析;于加云;《隧道建设》;20130410;第33卷(第4期);第315-318页 *

Also Published As

Publication number Publication date
CN103352702A (en) 2013-10-16

Similar Documents

Publication Publication Date Title
CN102493822B (en) Method for performing curtain grouting construction on tunnel by water rich fault influence zone
CN111535297A (en) Method for filling underground cavity of foundation rock stratum by filler grouting and hydraulic filling device
CN102352753B (en) Freezing consolidation and soil-accumulating watering shield arrival method
CN107191197A (en) A kind of shield duct piece and its pushed away in shield sky by the application in Tunneling by mining method
CN204253054U (en) Mountain tunnel stake arch cap excavation method comprehensive support structure
CN105114029B (en) A kind of shutoff method of the bad drilling of mine laneway inner sealing
CN111396067B (en) Comprehensive shield steel sleeve receiving construction method in complex environment
CN110107310A (en) A kind of construction method at tunnel slope hole
CN103437339A (en) Construction method for sealing karst cave near trench wall of underground continuous wall in karst stratum
CN109026012A (en) Vertical shaft surrounding rock supporting structure and its excavation supporting method
CN103696416B (en) A kind of method for processing foundation
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN102400694A (en) Reinforcement method for combined part of shield tunnel and mining-method tunnel
CN103016027A (en) Tunnel or roadway excavating method under weak and broken complicated geological conditions
CN103352702B (en) A kind of shield structure receives construction in hole
CN102002950B (en) Liquid division slip casting reinforcing method for subsurface structure construction joints
CN105041327B (en) Bored tunnel is counter to dig shield method of reseptance
CN104612722B (en) Tunnel gate strengthening method for starting and arriving of annular shield or annular pushing pipe
CN102022009B (en) Non-destructive dampproof course repairing method and rear dampproof course
CN103572764A (en) Watertight structure for retaining wall of ultra-deep manually excavated pile and construction method thereof
CN113047858B (en) Chest-closed TBM construction system for water-containing soft rock stratum of crack and construction method thereof
CN104988914A (en) Cast-in-situ bored pile breakage processing method under water area environment
RU2485318C1 (en) Method to construct station tunnels with low subsidence of earth surface
CN104453915B (en) Big cross section vertical shaft pre-pouring grout reinforces Rapid Excavation method
CN208982058U (en) Vertical shaft surrounding rock supporting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant