CN103306209B - The rainproof construction method of precast bridge concreting and device thereof - Google Patents

The rainproof construction method of precast bridge concreting and device thereof Download PDF

Info

Publication number
CN103306209B
CN103306209B CN201310280830.XA CN201310280830A CN103306209B CN 103306209 B CN103306209 B CN 103306209B CN 201310280830 A CN201310280830 A CN 201310280830A CN 103306209 B CN103306209 B CN 103306209B
Authority
CN
China
Prior art keywords
awning
template
rainproof
bridge
hopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310280830.XA
Other languages
Chinese (zh)
Other versions
CN103306209A (en
Inventor
黄林
陈勇
王志强
孙凤栋
闫晓光
程秀茹
李海峰
吴仁友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201310280830.XA priority Critical patent/CN103306209B/en
Publication of CN103306209A publication Critical patent/CN103306209A/en
Application granted granted Critical
Publication of CN103306209B publication Critical patent/CN103306209B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention belongs to the technical field of precast bridge concreting, be specifically related to the rainproof construction method of a kind of precast bridge concreting and device thereof, solving existing prefabricated bridge construction by affecting serious problem rainy season.Described device comprises template awning, hopper and rainproof movement and builds chassis, template awning comprises template awning skeleton and template awning Peng Ding, hopper top arranges hopper rainhat, and rainproof movement is built chassis and comprised running truck, rack platform, receiving hopper, fixed chute and rotating chute.Described method, step is: template awning hides, and with band rainhat hopper transport concrete, chassis concreting is built in rainproof movement.The present invention initiates and utilizes bridge formwork awning, rainproof movement is built the frocks such as chassis and carried out the concrete rainproof pouring construction method of precast bridge, solve the rainy season construction problem of precast bridge concreting, ensure that the precast bridge concrete quality of rainy season construction.

Description

The rainproof construction method of precast bridge concreting and device thereof
Technical field
The invention belongs to the technical field of precast bridge concreting, be specifically related to the rainproof construction method of a kind of precast bridge concreting and device thereof.
Background technology
The general length of precast bridge is longer, and concrete quantity is large, and necessary continuous placing, the time of building is long.In the past when rainy season construction, often ran into and built centre, rained suddenly.Owing to only having the simple measures such as tarpaulin covering, often cause beam body concrete to intake, even concreting is forced to interrupt, and has a strong impact on concrete quality.
Summary of the invention
The present invention, in order to solve existing prefabricated bridge construction by affecting serious problem rainy season, provides the rainproof construction method of a kind of precast bridge concreting and device thereof.
The present invention adopts following technical scheme to realize: the rainproof construction equipment of precast bridge concreting, comprises template awning, hopper and rainproof movement and build chassis,
Described template awning is along the elongated layout of bridge formwork total length, template awning comprises template awning skeleton and template awning Peng Ding, the column lower end of template awning skeleton is connected on bridge formwork, template awning skeleton top arranges template awning Peng Ding, the mono-slope of template awning Peng Ding is arranged, corresponding bridge formwork from-inner-to-outer tilts, and template awning Peng Ding chooses bridge formwork in two ends;
Described hopper top arranges receiving hopper rainhat, and receiving hopper rainhat is taper canopy structure;
Described rainproof movement is built chassis and is comprised running truck, rack platform, receiving hopper, fixed chute and rotating chute,
Rack platform is installed on running truck, and rack platform is provided with operating platform, and rack platform top arranges frame top awning lid,
Receiving hopper is arranged on rack platform top, and receiving hopper top arranges movable receiving hopper rainhat,
Fixed chute is obliquely installed and is fixedly mounted on rack platform, fixed chute suitable for reading under the discharging opening of receiving hopper, and the end opening of fixed chute is on rotating chute is suitable for reading;
Rotating chute is obliquely installed and rotates and is installed on rack platform, and the height of rotating chute end opening is higher than the upper open height of bridge formwork.
Arrange road wheel bottom described running truck, on the track laying of the road wheel rail inside bridge formwork, respective carter place, running truck two ends arranges the rail clamping device of two pincer structure respectively.
The groove body horizontal slope 30 ° of described fixed chute and rotating chute.
Receiving hopper rainhat is the umbrella-shaped structure that type steel skeleton is formed, and receiving hopper rainhat side is provided with an axle sleeve, and be set in and be arranged in rotating shaft that frame top rain-proof fluffied covers, receiving hopper rainhat opposite side is connected with the rainproof overcanopy in frame top by latch.
The cell body upper end of described rotating chute is fixed on rotating shaft, cell body divides into a pole, the upper and lower end of pole is individually fixed in cell body and rotating shaft, the upper and lower end of rotating shaft is arranged in upper and lower bearing support respectively, top chock is installed on rack platform bottom, and step is installed on running truck top.
Described rail clamping device is made up of two clamping plates and an adjusting screw, and there is bolt hole clamping plate upper end, and rail clamping device is arranged on the horizontal rotating shaft of running truck bottom by bolt hole.
The rainproof construction method of precast bridge concreting, complete based on the above-mentioned rainproof construction equipment of precast bridge concreting, its step is as follows:
1), template awning hide,
Template awning skeleton column lower end makes plug by bridge formwork bracket upright post size suitable for reading, grafting suitable for reading with bridge formwork bracket upright post, template awning Peng Ding arranges some joints along the elongated direction of bridge formwork, overlap between adjacent segments, by overlap joint order from bridge formwork one end lifting awning sections;
2), with being with rainhat hopper transport concrete,
Rainhat tipping concrete removed by hopper after entering agitator, fill rainhat on concrete bonnet, to be then transported to by hopper with transport vehicle and to wait to build by concrete beam;
3), rainproof movement builds chassis concreting,
Before running truck moves, pack up rail clamping device, and rotating chute is rotated to groove body and bridge formwork parastate, then start chassis, running truck is moved to the position that bridge formwork needs concreting;
After running truck is in place, putting down rail clamping device is clamped on rail, and rotating chute is rotated to groove body and bridge formwork upright position, start to lift above hopper to receiving hopper, remove receiving hopper rainhat, open hopper bottom valve and unload concrete in receiving hopper, concrete is slipped by fixed chute and rotating chute to be delivered in bridge formwork, carries out concreting.
Hinge structure of the present invention has following beneficial effect:
1, novel, pioneering utilize bridge formwork awning, rainproof movement builds the frocks such as chassis and carry out the concrete rainproof pouring construction method of precast bridge, solve the rainy season construction problem of precast bridge concreting, ensure that the precast bridge concrete quality of rainy season construction.
2, rainproof measure is considered comprehensively.From concrete transportation, enter the concreting overall process such as mould, template protection and adopt an effective measure, rainproof effect is good.The concrete pouring construction of precast bridge can be uninterruptedly carried out on rainy day.Therefore for accelerating construction progress, ensure the construction period, play very important effect.
3, build chassis project organization compact, be skillfully constructed.Fixed chute and rotating chute are set on chassis dexterously, adopt relay mode delivering concrete.And by the rotation of rotating chute, solve chassis and move the contradiction with concrete conveyance two operating modes, achieve the function of expection.
4, frock can have enough to meet the need use.After on a pedestal, bridge concrete builds use, all frocks can be transferred to rapidly another pedestal and install and use.Therefore greatly reduce equipment investment, improve operating efficiency.
5, safety precautions is had.Take that awning column lower end is firmly inserted soldier suitable for reading, adopt storage battery low-voltage electric drive chassis, rail clamping device is set and fixes the measures such as chassis, effectively can ensure construction safety.
Accompanying drawing explanation
Fig. 1 is the structural representation of template awning,
Fig. 2 is the structural representation of hopper rainhat,
Fig. 3 is the I-I sectional drawing of Fig. 2,
Fig. 4 is the structural representation that chassis is built in rainproof movement,
Fig. 5 be rainproof movement build chassis build view,
Fig. 6 is the mobile status schematic diagram that chassis is built in rainproof movement,
Fig. 7 is receiving hopper rainhat structural representation,
Fig. 8 is the I-I sectional drawing of Fig. 7,
Fig. 9 is rail clamping device structure schematic diagram,
Figure 10 is the lateral view of Fig. 6,
In figure: 1-running truck, 2-rail clamping device, 3-rack platform, 4-frame top awning lid, 5-rotating chute, 6-rotating shaft, 7-fixed chute, 8-receiving hopper, 9-receiving hopper rainhat, 10-template awning skeleton column, 11-template awning Peng Ding, 12-bridge formwork, 13-bridge formwork bracket upright post, 14-hopper rainhat type steel skeleton, 15-hopper rainhat color steel top, 16-pole;
9.1-type steel skeleton, 9.2-steel plate top, 9.3-axle sleeve, 9.4-latch, 9.5-handle;
2.1-clamping plate, 2.2-adjusting screw, 2.3-bolt hole.
Detailed description of the invention
By reference to the accompanying drawings the specific embodiment of the present invention is described further.
The rainproof construction equipment of precast bridge concreting, comprises template awning, hopper and rainproof movement and builds chassis,
As shown in Figure 1, described template awning is along the elongated layout of template total length, template awning comprises template awning skeleton and template awning Peng Ding, template awning skeleton lower end is connected in bridge formwork bracket upright post, template awning skeleton top arranges template awning Peng Ding, the mono-slope of template awning Peng Ding is arranged, and corresponding bridge formwork from-inner-to-outer tilts, and template awning Peng Ding chooses template in two ends;
As shown in Figure 2,3, described hopper top arranges hopper rainhat, and hopper rainhat is taper canopy structure,
Rainproof movement is built chassis and is made up of running truck, rack platform, receiving hopper, fixed chute, rotating chute five part.See accompanying drawing 4,5,6.
1, running truck
Running truck is electric track flatcar, is driven by battery.The track of the steel rail laying inside bridge formwork is walked, can to contraposition discharging between each sections of bridge length direction.Chassis two ends are respectively provided with two rail clamping devices.Rail clamping device is a pincer structure.Be made up of two clamping plates and an adjusting screw.There is connecting screw hole clamping plate upper end, to be arranged on by rail clamping device on the horizontal rotating shaft under running truck by screw.Rail clamping device can rotate up and down around axle.During running truck traveling, rail clamping device hook is sling, and leaves rail level.After running truck is in place, put down rail clamping device, outside adjusting screw makes two clamping plate be separated by tread, and when clamping plate head drops down onto rail web, inside adjusting screw, until clamping plate head clamping rail web.Rail clamping device structure is shown in Fig. 9,10.
2, rack platform
Rack platform shaped steel is made, and is arranged on running truck, for miscellaneous equipment provides installing space.Rack platform is provided with operating platform, for operative provides the scope of operation.Rack platform top welded steel plate frame top awning lid, prevents rainwater from entering chute.
3, receiving hopper
Receiving hopper welded steel plate forms, and is arranged on rack platform top, is used for concrete of unloading.Movable steel receiving hopper rainhat is set above receiving hopper, removes during concrete bucket discharging, unsnatch on material bonnet.Receiving hopper rainhat is a umbrella-shaped structure, and its side is provided with an axle sleeve, can be set in rotating shaft that rain-proof fluffied covers.Promote handle during use, just receiving hopper rainhat can be pivoted and remove or cover.Its opposite side is provided with latch, after receiving hopper rainhat covers, receiving hopper rainhat can be fixed on rain-proof fluffied and cover; Receiving hopper rainhat structure is shown in Fig. 7,8.
4, fixed chute
Fixed chute is fixedly mounted on rack platform.Chute groove body horizontal slope 30 °.Fixed chute is suitable for reading under the discharging opening of receiving hopper, and end opening is on rotating chute is suitable for reading.Concrete to be slipped by fixed chute from receiving hopper outlet and delivers to rotating chute.
5, rotating chute
Rotating chute welded steel plate forms, and is obliquely installed and rotates to be installed on rack platform.Cell body upper end is welded on rotating shaft.Cell body divides into a pole, and the upper and lower side of pole is welded in cell body and rotating shaft respectively.The upper and lower end of rotating shaft is arranged in upper and lower bearing support.Top chock is installed on rack platform bottom, and step is installed on running truck top.Therefore, cell body and rotating shaft can together with do 180 ° of rotations.Chute groove body horizontal slope 30 °.The height of rotating chute end opening is higher than the upper open height of bridge formwork, and position can reach in the middle of bridge web.
The rainproof construction method construction sequence of precast bridge concreting:
One), step one: hide template with awning
Intake in template during for preventing rainy, bridge formwork installs awning.
1, awning structure
Awning shaped steel does skeleton, and color steel is Peng Ding, lean-to drainage, outside template.Rainproof canopy is along the elongated layout of template total length.For ease of lifting, be divided into several sections of.Certain overlap joint is had between joint and joint.Template one fixed width chosen by awning top board.Rain shade column lower end makes plug by falsework size suitable for reading.
2, awning is installed
Before beam body concrete is built, by overlap joint order from beam forms one end lifting awning sections, in suitable for reading for awning column lower end plug insert molding timbering, be connected firmly.See accompanying drawing 1.
Two), step 2: with band rainhat hopper transport concrete
During for preventing concrete hopper transport concrete, water inlet in hopper, adopts the hopper transport concrete of band rainhat.
Rainhat is a taper canopy structure.Make skeleton with angle steel, cover color steel top above.See accompanying drawing 2.Rainhat tipping concrete removed by hopper after entering agitator, fill rainhat on concrete bonnet.Then with transport vehicle hopper is transported to and waits to build by concrete beam.
Three), step 3: build chassis concreting with rainproof movement
Concrete owing to having installed awning above bridge formwork, template top hidden, so can not be built from the lifting of template top.Build for solution concrete enters mould, have employed the rainproof movement of developing voluntarily and build chassis from beam sides concreting.
1, trolley structure is built in rainproof movement
Rainproof movement builds chassis by running truck, rack platform, receiving hopper, fixedly slip
Groove, rotating chute five part form.See accompanying drawing 3.
Running truck is electric track flatcar, drives, the track of the steel rail laying inside bridge formwork is walked with battery.Can contraposition discharging between each sections of bridge length direction.Chassis has rail clamping device.
Support shaped steel is made, and is arranged on running truck.Support is provided with operating platform, for operative provides the scope of operation.Frame overhead welding has steel plate awning lid.Support is provided with unload concrete receiving hopper and fixed chute that welded steel plate becomes.The discharging opening of receiving hopper is to suitable for reading at fixed chute, and concrete to be slipped by fixed chute from receiving hopper outlet and delivers to rotating chute.
Receiving hopper is provided with receiving hopper rainhat.Receiving hopper rainhat is rotatable by the rotating shaft being installed on frame top rain-proof fluffied and covering, and can be fixed by latch,
Rotating chute welded steel plate forms.Be arranged in the rotating shaft of being fixed on chassis, rotating 180 deg.
2, chassis use is built in rainproof movement
Before chassis moves, pack up rail clamping device, and rotating chute is rotated to groove body and beam forms parastate, collide to avoid chute and template awning column.Then start chassis, chassis is moved to the position that bridge formwork needs concreting.
After chassis is in place, puts down rail clamping device and be clamped on rail, and rotating chute is rotated to groove body and beam forms upright position.Now, can start to lift above concrete hopper to chassis receiving hopper, remove rainhat on receiving hopper, open concrete hopper bottom valve and unload concrete in receiving hopper.Concrete is slipped by fixed chute and swivel chute to be delivered in bridge formwork, carries out concreting.
Movement is built chassis using state schematic diagram and is seen accompanying drawing 4.

Claims (7)

1. the rainproof construction equipment of precast bridge concreting, is characterized in that comprising template awning, hopper and rainproof movement builds chassis,
Described template awning is along the elongated layout of bridge formwork total length, template awning comprises template awning skeleton and template awning Peng Ding (11), column (10) lower end of template awning skeleton is connected on bridge formwork (12), template awning skeleton top arranges template awning Peng Ding (11), the single slope of template awning Peng Ding (11) is arranged, corresponding bridge formwork (12) from-inner-to-outer tilts, and bridge formwork is chosen at template awning Peng Ding (11) two ends;
Described hopper top arranges receiving hopper rainhat (9), and receiving hopper rainhat (9) is taper canopy structure;
Described rainproof movement is built chassis and is comprised running truck (1), rack platform (3), receiving hopper (8), fixed chute (7) and rotating chute (5),
Rack platform (3) is installed on running truck (1), and (3) are provided with operating platform to rack platform, and rack platform (3) top arranges frame top awning lid (4),
Receiving hopper (8) is arranged on rack platform (3) top, and receiving hopper (8) top arranges movable receiving hopper rainhat (9),
Fixed chute (7) is obliquely installed and is fixedly mounted on rack platform (3), fixed chute (7) suitable for reading under the discharging opening of receiving hopper (8), and the end opening of fixed chute (7) is on rotating chute (5) is suitable for reading;
Rotating chute (5) is obliquely installed and rotates and is installed on rack platform (3), and the height of rotating chute (5) end opening is higher than the upper open height of bridge formwork (12).
2. the rainproof construction equipment of precast bridge concreting according to claim 1, is characterized in that described traveling
Chassis (1) bottom arranges road wheel, and the track laying of road wheel is on the rail of bridge formwork (12) inner side, and respective carter place, running truck (1) two ends arranges the rail clamping device (2) of two pincer structure respectively.
3. the rainproof construction equipment of precast bridge concreting according to claim 2, is characterized in that described fixed chute (7) and the groove body horizontal slope 30 ° of rotating chute (5).
4. the rainproof construction equipment of precast bridge concreting according to claim 3, it is characterized in that the umbrella-shaped structure that receiving hopper rainhat (9) is formed for type steel skeleton (9.1), receiving hopper rainhat (9) side is provided with an axle sleeve (9.3), be set in the rotating shaft that is arranged on the rainproof overcanopy in frame top (4), receiving hopper rainhat (9) opposite side is connected with the rainproof overcanopy in frame top (4) by latch (9.4).
5. the rainproof construction equipment of precast bridge concreting according to claim 4, it is characterized in that the cell body upper end of described rotating chute is fixed on rotating shaft (6), cell body divides into a pole (16), the upper and lower end of pole (16) is individually fixed in cell body and rotating shaft, the upper and lower end of rotating shaft is arranged in upper and lower bearing support respectively, top chock is installed on rack platform (3) bottom, and step is installed on running truck (1) top.
6. the rainproof construction equipment of precast bridge concreting according to claim 5, it is characterized in that described rail clamping device is made up of two clamping plates (2.1) and an adjusting screw (2.2), there is bolt hole (2.3) clamping plate (2.1) upper end, and rail clamping device is arranged on the horizontal rotating shaft of running truck bottom by bolt hole (2.3).
7. the rainproof construction method of precast bridge concreting, complete based on the rainproof construction equipment of precast bridge concreting as claimed in claim 6, its step is as follows:
1), template awning hide,
Plug is made by bridge formwork bracket upright post (13) size suitable for reading in template awning skeleton column (10) lower end, with bridge formwork bracket upright post (13) grafting suitable for reading, template awning Peng Ding (11) arranges some joints along the elongated direction of bridge formwork, overlap between adjacent segments, by overlap joint order from bridge formwork one end lifting awning sections;
2), the hopper transport concrete being with receiving hopper rainhat is used,
Receiving hopper rainhat tipping concrete removed by hopper after entering agitator, fill receiving hopper rainhat on concrete bonnet, to be then transported to by hopper with transport vehicle and to wait to build by concrete beam;
3), rainproof movement builds chassis concreting,
Before running truck (1) is mobile, pack up rail clamping device (2), and rotating chute (5) is rotated to groove body and bridge formwork (12) parastate, then start running truck, running truck is moved to the position that bridge formwork needs concreting;
After running truck (1) is in place, putting down rail clamping device (2) is clamped on rail, and rotating chute (5) is rotated to groove body and bridge formwork (12) upright position, start to lift hopper to receiving hopper (8) top, remove receiving hopper rainhat, open hopper bottom valve and unload concrete in receiving hopper, concrete is slipped by fixed chute (7) and rotating chute (5) and delivers in bridge formwork (12), carries out concreting.
CN201310280830.XA 2013-07-05 2013-07-05 The rainproof construction method of precast bridge concreting and device thereof Active CN103306209B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310280830.XA CN103306209B (en) 2013-07-05 2013-07-05 The rainproof construction method of precast bridge concreting and device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310280830.XA CN103306209B (en) 2013-07-05 2013-07-05 The rainproof construction method of precast bridge concreting and device thereof

Publications (2)

Publication Number Publication Date
CN103306209A CN103306209A (en) 2013-09-18
CN103306209B true CN103306209B (en) 2015-12-23

Family

ID=49131896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310280830.XA Active CN103306209B (en) 2013-07-05 2013-07-05 The rainproof construction method of precast bridge concreting and device thereof

Country Status (1)

Country Link
CN (1) CN103306209B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988262B (en) * 2017-05-12 2019-03-05 孙茂林 Airport runways ice and snow method for quickly eliminating
CN107725075B (en) * 2017-11-09 2024-05-03 洛阳高飞桥隧机械有限公司 Use method of tunnel ditch cable trough trolley walking lining device
CN109203218B (en) * 2018-11-02 2021-02-09 中铁十八局集团第一工程有限公司 Prefabricated T roof beam concrete placement protection canopy of railway
CN109577198B (en) * 2018-11-07 2021-05-11 同济大学 Fastener assembled canopy skeleton suitable for construction bridge is assembled to festival section
CN110306737B (en) * 2019-07-09 2020-08-11 周丽博 Prefabricated bridge concrete placement rain-proof construction equipment
CN113216605A (en) * 2021-05-16 2021-08-06 无锡住信建筑构件有限公司 Assembly type building node based on assembly type building energy-saving component
CN117225838B (en) * 2023-11-13 2024-01-23 中铁三局集团建筑安装工程有限公司 Self-propelled robot for cleaning operation of ultra-long large-diameter heating pipeline

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3254617B2 (en) * 1993-12-22 2002-02-12 清水建設株式会社 Moving roof for concrete casting
JP3177127B2 (en) * 1995-05-16 2001-06-18 照夫 羽取 Precast concrete roadside gutters
JP2006188838A (en) * 2004-12-29 2006-07-20 Koji Yomogihara Form coat
CN201850711U (en) * 2010-09-04 2011-06-01 中铁十一局集团第二工程有限公司 Rainproof sun shelter
CN202594209U (en) * 2012-05-24 2012-12-12 青岛港(集团)有限公司 Automatic rain-proof cover for hoppers
CN102888993A (en) * 2012-09-17 2013-01-23 中国华冶科工集团有限公司 Rotating chute
CN203452006U (en) * 2013-07-05 2014-02-26 中铁三局集团有限公司 Rainproof construction device poured by precast bridge concrete

Also Published As

Publication number Publication date
CN103306209A (en) 2013-09-18

Similar Documents

Publication Publication Date Title
CN103306209B (en) The rainproof construction method of precast bridge concreting and device thereof
CN206719265U (en) A kind of building sand-transport truck for being easy to discharging
CN103302741B (en) Chassis is built in the rainproof movement of precast bridge concrete
CN203331220U (en) Rainproof moving pouring trolley for prefabricated bridge concrete
CN205618174U (en) Box culvert platform truck
CN104060860B (en) A kind of sectional telescopic rain-proof shelter for precast concrete T-beam and using method
CN106050268A (en) Steel mould trolley for concrete lining of rounded rectangle cross section tunnel
CN203452006U (en) Rainproof construction device poured by precast bridge concrete
CN201546176U (en) Curtain board installing trolley
CN207671172U (en) A kind of construction rail mounted dumper
CN111648313A (en) Bailey beam dismantling and transporting device and construction method applying same
CN111188633A (en) Rapid construction method for secondary lining of small-section tunnel
CN216193884U (en) Road jar seam device for municipal construction
CN108275582A (en) A kind of movable fixture and its operating method based on material transportation and lifting
CN108612127A (en) A kind of construction method of pipe gallery construction
CN204186097U (en) A kind of sectional telescopic rain-proof shelter for precast concrete T-beam
CN211368442U (en) Crack filling and reinforcing structure of road and bridge
CN205955750U (en) Rounded rectangle cross -section tunnel steel mould trolley for concrete lining
CN209817447U (en) Concrete pouring device
CN209066247U (en) A kind of good multi-functional all-hydraulic moving trestle of protective performance
CN207630273U (en) A kind of high abrupt slope concrete transportation eliminates the secondary stirring device of isolation
CN206987829U (en) A kind of side wall lining chassis concreting rotates scalable quick feeding device
CN209382022U (en) A kind of bridge construction reinforcing bar push vehicle
CN220882805U (en) Cement prefab processing slip casting equipment
CN111561328A (en) Can realize assembled lining cutting platform truck of quick turnover

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant