CN111561328A - Can realize assembled lining cutting platform truck of quick turnover - Google Patents

Can realize assembled lining cutting platform truck of quick turnover Download PDF

Info

Publication number
CN111561328A
CN111561328A CN202010448168.4A CN202010448168A CN111561328A CN 111561328 A CN111561328 A CN 111561328A CN 202010448168 A CN202010448168 A CN 202010448168A CN 111561328 A CN111561328 A CN 111561328A
Authority
CN
China
Prior art keywords
assembly
portal
heightening
template
gantry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010448168.4A
Other languages
Chinese (zh)
Inventor
卓文泽
许修亮
林波
李彦军
侯士祥
刘磊
张魏魏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Poly Growing Overseas Engineering Co ltd
Original Assignee
Poly Growing Overseas Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Poly Growing Overseas Engineering Co ltd filed Critical Poly Growing Overseas Engineering Co ltd
Priority to CN202210908535.3A priority Critical patent/CN115450656A/en
Priority to CN202010448168.4A priority patent/CN111561328A/en
Publication of CN111561328A publication Critical patent/CN111561328A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses an assembly type lining trolley capable of realizing rapid turnover, which comprises a portal assembly, a template assembly, a hydraulic system, a transverse moving mechanism and a traveling mechanism, wherein the portal assembly is arranged on the framework assembly; the gantry assembly comprises a basic gantry and an assembled heightening gantry; the assembled heightening portal is connected to the basic portal in an overlapping manner; the template assembly comprises a top template assembly and an edge template assembly, and the top template assembly is connected with the edge template assembly in a hinged mode; the gantry assembly is connected with the template assembly through a mechanical screw rod, a top die oil cylinder and a side die oil cylinder respectively; the hydraulic system is arranged between the bottom surface of the middle longitudinal beam and the top surface of the cross sliding machine; the running mechanism is arranged at the bottom of the transverse moving mechanism. The invention relates to the field of tunnel construction equipment, which can finish quick disassembly and assembly in situ, realize lining construction of a plurality of caverns by one set of trolley, ensure the smoothness and safety of construction and greatly shorten the construction period.

Description

Can realize assembled lining cutting platform truck of quick turnover
Technical Field
The invention relates to the field of tunnel construction equipment, in particular to an assembly type lining trolley capable of realizing rapid turnover.
Background
With the increasing needs of national construction and regional development, the scale and variety of underground engineering have been expanded from traditional linear engineering such as railway, highway, subway, ditch, etc., to planar underground engineering with numerous dimensions of caverns such as city underground shopping malls, underground powerhouses, underground caverns, civil air defense works, etc. In the construction of the projects, a plurality of tunnels need to be excavated or built, and the pouring of the concrete by using the lining trolley can ensure the construction quality and the attractiveness of the concrete structure, reduce the labor cost and save the construction period.
For underground engineering with a plurality of caverns and planar distribution, if a conventional trolley is adopted for lining construction, negative effects in two aspects can be brought: firstly, the required number of trolleys is increased sharply, and the construction cost is necessarily doubled; secondly, the quantity of the trolleys is increased, the difficulty of turnover of the trolleys in the holes is increased, the assembling and disassembling time of the trolleys is increased, the transportation of materials and muck is undoubtedly influenced, and therefore the risk of delay of the construction period is greatly increased. The traditional formwork scaffold method is adopted to complete the construction of the lining structure of the engineering, and the repeated disassembly and assembly of the scaffold and the formwork can not be avoided, so that the construction cost is increased due to time and labor consumption, and the construction quality problems of formwork running, slurry leakage, slab staggering and the like can be easily caused.
Disclosure of Invention
The invention aims to solve the technical problem of the prior art, and provides an assembly type lining trolley capable of realizing quick turnover, which can finish quick disassembly and assembly in situ, can realize lining construction of a set of trolley for a plurality of caverns and shortens the construction period.
The technical scheme of the invention is as follows: an assembled lining trolley capable of realizing rapid turnover comprises a portal assembly, a template assembly, a hydraulic system, a transverse moving mechanism and a traveling mechanism; the gantry assembly comprises a basic gantry and an assembled heightening gantry; the assembled heightening portal is connected to the basic portal in an overlapping manner; the template assembly comprises a top template assembly and an edge template assembly, and the top template assembly is connected with the edge template assembly in a hinged mode; the gantry assembly is connected with the template assembly through a mechanical screw rod, a top die oil cylinder and a side die oil cylinder respectively; the hydraulic system is arranged between the bottom surface of the middle longitudinal beam and the top surface of the cross sliding machine; the running mechanism is arranged at the bottom of the transverse moving mechanism.
Further, the basic portal comprises four upright columns, two upper longitudinal beams, two lower longitudinal beams and two cross beams; the assembly heightening portal frame comprises two heightening upright columns, four heightening longitudinal beams, two heightening cross beams and a supporting beam.
Further, the top form assembly includes a base top form and a raised top form; the edge template assembly comprises a basic edge template and a heightened edge template; the top template assembly consists of an upper supporting beam, a lifting beam, a top longitudinal beam and a translation jack; the top template assembly and the portal assembly are connected with the translation jack through ear plates arranged on the cross beam and the top longitudinal beam.
Furthermore, the transverse moving mechanism consists of an upper rotary table, a lower rotary table and a connecting bearing; the upper turntable and the lower turntable are connected through a connecting bearing; the upper turntable and the lower turntable are provided with the same number of preformed holes, and the two ends of the matched bolt are respectively inserted into the preformed holes.
Furthermore, a servo motor and a travelling wheel are further arranged at the bottom of the travelling mechanism; the bottom of the walking wheel is provided with a track.
Compared with the prior art, the invention has the following advantages:
1. according to the assembly type lining trolley capable of achieving rapid turnover, the assembly type concept is introduced, rapid disassembly and assembly can be completed in situ through the assembly type portal assembly and the assembly type template, the assembly and disassembly processes are simpler than those of a traditional trolley, and a large amount of time is saved.
2. According to the fabricated lining trolley capable of achieving rapid turnover, the hydraulic system, the transverse moving mechanism and the travelling mechanism are utilized to achieve rapid transfer of the same trolley among a plurality of caverns, so that lining construction of the caverns is considered, and smoothness and safety of construction are guaranteed.
Drawings
FIG. 1 is a cross-sectional view of the trolley of the present invention;
FIG. 2 is a longitudinal cross-sectional view of the trolley of the present invention;
FIG. 3 is a cross-sliding mechanism of the present invention;
fig. 4 is a basic portal transfer diagram of the present invention.
Wherein: 1-portal assembly, 2-template assembly, 3-hydraulic system, 4-transverse moving mechanism, 5-travelling mechanism, 6-basic portal, 7-assembled heightening portal, 8-top template assembly, 9-edge template assembly, 10-mechanical screw rod, 11-top template cylinder, 12-edge template cylinder, 13-upright post, 14-upper longitudinal beam, 15-lower longitudinal beam, 16-cross beam, 17-heightening upright post, 18-heightening longitudinal beam, 19-heightening cross beam, 20-supporting beam, 21-basic top template, 22-top heightening template, 23-basic edge template, 24-heightening edge template, 25-upper supporting beam, 26-heightening beam, 27-top longitudinal beam, 28-translational jack, transverse moving mechanism, and transverse moving mechanism, 29-ear plate, 30-upper turntable, 31-lower turntable, 32-connecting bearing, 33-preformed hole, 34-matching bolt, 35-servo motor, 36-walking wheel, 37-track, 38-middle longitudinal beam, A-chamber A, B-chamber B, C-chamber C.
Detailed Description
The invention will be further described with reference to specific embodiments shown in the drawings.
Referring to the attached drawings, the assembly type lining trolley capable of achieving rapid turnover comprises a portal assembly 1, a template assembly 2, a hydraulic system 3, a transverse moving mechanism 4 and a traveling mechanism 5. The portal assembly comprises a basic portal 6 and an assembled heightening portal 7, and the assembled heightening portal 7 is connected to the basic portal 6 in an overlapping mode. The formwork assembly 2 comprises a top formwork assembly 8 and an edge formwork assembly 9, and the top formwork assembly 8 and the edge formwork assembly 9 are connected in a hinged mode. The portal assembly 1 and the template assembly 2 are connected through a mechanical screw rod 10, a top mold oil cylinder 11 and a side mold oil cylinder 12 respectively. The hydraulic system 3 is arranged between the bottom surface of the middle longitudinal beam 38 and the top surface of the transverse moving mechanism 4; the traveling mechanism 5 is arranged at the bottom of the transverse moving mechanism 4. The assembled gantry assembly and the assembled template assembly can finish quick disassembly and assembly in situ, the assembly and disassembly process is simpler than that of a traditional trolley, and a large amount of time can be saved.
Preferably, the base mast 6 comprises four uprights 13, two upper longitudinal beams 14, two lower longitudinal beams 15 and two cross beams 16. The heightening portal frame 7 comprises two heightening upright posts 17, four heightening longitudinal beams 18, two heightening cross beams 19 and a supporting beam 20.
Preferably, the top form assembly 8 includes a base top form 21 and a raised top form 22, and the edge form assembly 9 includes a base edge form 23 and a raised edge form 24; the top formwork assembly 8 consists of upper support beams 25, lifting beams 26, top stringers 27 and translation jacks 28. The top formwork assembly 8 and the mast assembly 1 are connected to the translatory jacks 28 by lugs 29 provided on the cross beams 16 and the top longitudinal beams 27.
Preferably, the traversing mechanism 4 consists of an upper turntable 30 and a lower turntable 31 and a connecting bearing 32. The upper rotary table 30 and the lower rotary table 31 are connected through a connecting bearing 32, the upper rotary table 30 and the lower rotary table 31 are provided with the same number of prepared holes 33, and two ends of a matched bolt 34 are respectively inserted into the prepared holes 33.
Preferably, the bottom of the travelling mechanism 5 is also provided with a servo motor 35 and a travelling wheel 36, and the bottom of the travelling wheel 36 is provided with a track 37.
The following is an assembly principle of an assembly type lining trolley capable of realizing rapid turnover:
the trolley can quickly assemble and disassemble between adjacent sections. The assembly principle is divided into two stages: the first stage is the fabricated installation of the heightened portal. The heightening portal frame is assembled on the ground and is overlapped on the basic portal frame through hoisting, and the assembly of the portal frame assembly is completed. The second stage is the assembly installation of the top die plate assembly. The top template assembly is synchronously assembled on the ground, and then is overlapped on the portal assembly through hoisting to complete the second assembly. The method comprises the following steps of carrying out hoisting operation by adopting a digging machine or a mode of arranging pre-buried hoisting points on the top of a tunnel, splitting a top template assembly into a plurality of top template assembly monomers according to hoisting capacity, and completing simple assembly after the top template assembly is hoisted to a portal assembly in a subsection mode.
The trolley can finish rapid transfer between non-adjacent sections, and greatly saves the time that the trolley needs to be disassembled first and then transferred to the next section for re-assembly. The disassembly process of the trolley is opposite to the assembly process, the top template assembly is hoisted and unloaded to the ground, and the whole trolley is transported to the next section to wait for hoisting again. And unloading the heightening portal assembly to the ground by using the same operation, and integrally transferring to the next section to wait for hoisting again. Whether the top template assembly needs to be widened or not is judged according to the size condition of the next section, the side template assembly is heightened, local spare and accessory part replacement or reinforcement is carried out on the heightened portal assembly, a mechanical screw rod is adjusted, and the like.
The turnover principle of the assembled lining trolley capable of realizing quick turnover is as follows:
if the cavern A and the cavern C are non-adjacent caverns of the underground engineering, the cavern A and the cavern C have similar or same section sizes, and the application range of the trolley is met. The two chambers are connected by a main channel B, the spatial relationship of which is shown in fig. 4. After the trolley is used for lining the cavern A, the trolley needs to be quickly transferred to the cavern C for lining construction.
a. If cavern A is the same with cavern C's section size, and cavern B's space is enough again to let the platform truck transport under the condition that does not carry out the dismouting, and that only needs to accomplish according to 3 steps and transports:
step 1: and evacuating the trolley in the chamber A to the chamber B along the track.
Step 2: temporary supporting structures such as pier columns and the like are respectively placed on the bottom surfaces of two ends of each trolley lower longitudinal beam, a trolley hydraulic system is started, so that the hydraulic oil cylinder contracts to drive the transverse moving mechanism and the traveling system to be separated from the track, and the weight of the trolley is born by the temporary supporting structures. And (3) removing a matched bolt in the transverse moving mechanism, rotating the lower turntable and a traveling system connected with the lower turntable by 90 degrees under the assistance of a bearing in the transverse moving mechanism, and fixing the transverse moving mechanism by using the matched bolt. And drawing out the track, moving the track into the chamber B for placing again so as to put the head-on walking wheels down again. And starting the hydraulic system of the trolley again, so that the hydraulic oil cylinder stretches and retracts to drive the transverse moving mechanism and the traveling system to be separated from the contact with the steel rail again, drawing away the temporary supporting mechanism, and applying the weight of the trolley to the rail again through the hydraulic system and the traveling system. And starting the trolley traveling system to allow the trolley to travel to the outlet of the cavern C. The purpose of this step is to allow the wheels of the trolley to rotate 90 degrees in the cavern B while maintaining the orientation of the superstructure of the trolley, and then continue to travel to the intersection with the cavern C.
And step 3: and (3) the trolley is moved to the cavern C only by repeating the operation in the step (2), the walking wheels are rotated by 90 degrees again to restore the walking wheels to the original positions, and the cavern C is pushed to start lining construction.
b. If the cross section sizes of the chamber A and the chamber C are similar, or the space of the chamber B is not enough for the trolley to transfer without disassembly and assembly, the trolley top template assembly, the side template assembly or the heightening portal assembly are unloaded and transferred to the position near the lifting point of the chamber C, and necessary preparation works such as heightening portal adjustment or heightening the top template and the side template are completed. And then, moving the basic portal assembly to the position near the hoisting point of the chamber C by using the operation of the step 1-3, and completing the assembly type assembly of the trolley in the chamber C.
The above is only a preferred embodiment of the present invention, and it should be noted that it is obvious to those skilled in the art that several variations and modifications can be made without departing from the structure of the present invention, which will not affect the effect of the implementation of the present invention and the utility of the patent.

Claims (5)

1. An assembly type lining trolley capable of realizing rapid turnover is characterized by comprising a portal assembly (1), a template assembly (2), a hydraulic system (3), a transverse moving mechanism (4) and a traveling mechanism (5); the gantry assembly comprises a basic gantry (6) and an assembled heightening gantry (7); the assembled heightening portal (7) is connected to the basic portal (6) in an overlapping manner; the formwork assembly (2) comprises a top formwork assembly (8) and an edge formwork assembly (9), wherein the top formwork assembly (8) is connected with the edge formwork assembly (9) in a hinged mode; the gantry assembly (1) is connected with the template assembly (2) through a mechanical screw rod (10), a top die oil cylinder (11) and a side die oil cylinder (12) respectively; the hydraulic system (3) is arranged between the bottom surface of the middle longitudinal beam (38) and the top surface of the transverse moving mechanism (4); the traveling mechanism (5) is arranged at the bottom of the transverse moving mechanism (4).
2. The assembly type lining trolley capable of achieving rapid turnover according to claim 1, wherein the basic portal frame (6) comprises four upright posts (13), two upper longitudinal beams (14), two lower longitudinal beams (15) and two cross beams (16); the assembly heightening portal frame (7) comprises two heightening upright columns (17) with four parts, two heightening longitudinal beams (18), two heightening cross beams (19) and a supporting beam (20).
3. A rapid turnaround achievable fabricated lining jumbo according to claim 1 wherein the roof form assembly (8) comprises a basic roof form (21) and a raised roof form (22); the edge template assembly (9) comprises a basic edge template (23) and a heightened edge template (24); the top formwork assembly (8) consists of an upper supporting beam (25), a lifting beam (26), a top longitudinal beam (27) and a translation jack (28); the top template assembly (8) and the portal assembly (1) are connected with a translation jack (28) through lug plates (29) arranged on the cross beam (16) and the top longitudinal beam (27).
4. The assembly type lining trolley capable of realizing rapid turnover according to the claim 1, characterized in that the traversing mechanism (4) is composed of an upper rotary table (30), a lower rotary table (31) and a connecting bearing (32); the upper rotary table (30) is connected with the lower rotary table (31) through a connecting bearing (32); the upper rotary table (30) and the lower rotary table (31) are provided with preformed holes (33) with the same number, and two ends of a matched bolt (34) are respectively inserted into the preformed holes (33).
5. The assembled lining trolley capable of achieving rapid turnover according to claim 1, wherein a servo motor (35) and a travelling wheel (36) are further arranged at the bottom of the travelling mechanism (5); the bottom of the travelling wheel (36) is provided with a track (37).
CN202010448168.4A 2020-05-25 2020-05-25 Can realize assembled lining cutting platform truck of quick turnover Pending CN111561328A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202210908535.3A CN115450656A (en) 2020-05-25 2020-05-25 Lining trolley turnover method for underground space engineering
CN202010448168.4A CN111561328A (en) 2020-05-25 2020-05-25 Can realize assembled lining cutting platform truck of quick turnover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010448168.4A CN111561328A (en) 2020-05-25 2020-05-25 Can realize assembled lining cutting platform truck of quick turnover

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202210908535.3A Division CN115450656A (en) 2020-05-25 2020-05-25 Lining trolley turnover method for underground space engineering

Publications (1)

Publication Number Publication Date
CN111561328A true CN111561328A (en) 2020-08-21

Family

ID=72072337

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202010448168.4A Pending CN111561328A (en) 2020-05-25 2020-05-25 Can realize assembled lining cutting platform truck of quick turnover
CN202210908535.3A Pending CN115450656A (en) 2020-05-25 2020-05-25 Lining trolley turnover method for underground space engineering

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN202210908535.3A Pending CN115450656A (en) 2020-05-25 2020-05-25 Lining trolley turnover method for underground space engineering

Country Status (1)

Country Link
CN (2) CN111561328A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115450656A (en) * 2020-05-25 2022-12-09 保利长大海外工程有限公司 Lining trolley turnover method for underground space engineering

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202578714U (en) * 2012-05-22 2012-12-05 湖南五新重型装备有限公司 Universal steel die lining trolley for linear and curved section tunnel
CN206419032U (en) * 2016-12-23 2017-08-18 湖南五新隧道智能装备股份有限公司 A kind of side and roof arch band mid-board lining cutting chassis
CN207063995U (en) * 2017-08-02 2018-03-02 中铁二十二局集团第四工程有限公司 Can assembled detachable chassis
CN207620816U (en) * 2017-12-21 2018-07-17 湖南五新隧道智能装备股份有限公司 A kind of template bearing-type lining trolley
CN108386206A (en) * 2018-01-02 2018-08-10 中国建筑第五工程局有限公司 A kind of horizontal hole lining trolley in low damage formula tunnel
CN208122854U (en) * 2018-01-10 2018-11-20 中铁十二局集团有限公司 A kind of tire self-propelled multifunctional tunnel construction trestle
CN208982064U (en) * 2018-11-15 2019-06-14 刘光敏 A kind of seperated trolley device of tunnel lining trolley
CN109989765A (en) * 2019-05-20 2019-07-09 中铁十二局集团第四工程有限公司 A kind of tunnel multifunctional bridge type vehicle
CN209354165U (en) * 2018-11-16 2019-09-06 中建五局土木工程有限公司 The walking portal frame system and Tunnel Second Lining concrete trolley of trolley
CN110513126A (en) * 2019-09-27 2019-11-29 中铁四局集团有限公司 A kind of tunnel double-lining trolley that section-variable can be recycled

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101056249B1 (en) * 2011-03-07 2011-08-11 양현기 A structure for transporting the tunnel steel lining foam
KR101385660B1 (en) * 2012-03-09 2014-04-29 우신기계(주) A moving cart for lining of tunnel
CN106837379B (en) * 2016-12-23 2019-10-01 湖南五新隧道智能装备股份有限公司 A kind of construction method in tunnel and its tunnel lining trolley of use
CN109519197A (en) * 2018-12-25 2019-03-26 中铁四局集团有限公司 A kind of sliding formwork just dual-purpose trolley of lining excavation supporting and its application
CN109869164B (en) * 2019-03-29 2020-11-24 中铁七局集团有限公司 Construction method for pouring porous separation type tunnel by combined type hydraulic template trolley
CN110410109A (en) * 2019-08-21 2019-11-05 广西路建工程集团有限公司 A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method
CN110552720A (en) * 2019-10-15 2019-12-10 湖南五新隧道智能装备股份有限公司 from track laying running gear and tunnel lining platform truck
CN110685718A (en) * 2019-10-30 2020-01-14 中铁二局集团有限公司 Device and method for transferring two-lining trolley of transverse vehicle-driving hole
CN111561328A (en) * 2020-05-25 2020-08-21 保利长大海外工程有限公司 Can realize assembled lining cutting platform truck of quick turnover
WO2021237402A1 (en) * 2020-05-25 2021-12-02 保利长大海外工程有限公司 Assembled lining trolley allowing for rapid turnover
CN111852507B (en) * 2020-06-03 2023-04-11 保利长大海外工程有限公司 Assembled lining trolley capable of being used for various section sizes

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202578714U (en) * 2012-05-22 2012-12-05 湖南五新重型装备有限公司 Universal steel die lining trolley for linear and curved section tunnel
CN206419032U (en) * 2016-12-23 2017-08-18 湖南五新隧道智能装备股份有限公司 A kind of side and roof arch band mid-board lining cutting chassis
CN207063995U (en) * 2017-08-02 2018-03-02 中铁二十二局集团第四工程有限公司 Can assembled detachable chassis
CN207620816U (en) * 2017-12-21 2018-07-17 湖南五新隧道智能装备股份有限公司 A kind of template bearing-type lining trolley
CN108386206A (en) * 2018-01-02 2018-08-10 中国建筑第五工程局有限公司 A kind of horizontal hole lining trolley in low damage formula tunnel
CN208122854U (en) * 2018-01-10 2018-11-20 中铁十二局集团有限公司 A kind of tire self-propelled multifunctional tunnel construction trestle
CN208982064U (en) * 2018-11-15 2019-06-14 刘光敏 A kind of seperated trolley device of tunnel lining trolley
CN209354165U (en) * 2018-11-16 2019-09-06 中建五局土木工程有限公司 The walking portal frame system and Tunnel Second Lining concrete trolley of trolley
CN109989765A (en) * 2019-05-20 2019-07-09 中铁十二局集团第四工程有限公司 A kind of tunnel multifunctional bridge type vehicle
CN110513126A (en) * 2019-09-27 2019-11-29 中铁四局集团有限公司 A kind of tunnel double-lining trolley that section-variable can be recycled

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115450656A (en) * 2020-05-25 2022-12-09 保利长大海外工程有限公司 Lining trolley turnover method for underground space engineering

Also Published As

Publication number Publication date
CN115450656A (en) 2022-12-09

Similar Documents

Publication Publication Date Title
WO2021237402A1 (en) Assembled lining trolley allowing for rapid turnover
CN108442255B (en) Movable formwork bridge fabrication machine and construction method for cast-in-situ bridge fabrication
CN111236085A (en) Mountain area segment beam conveying device and mountain area prefabricated segment beam conveying method
CN106593469A (en) Trolley for construction of inverted arch
CN111455852A (en) Assembling method of movable formwork for bridge construction
US5940916A (en) Bridge span-by-span construction apparatus and method
CN111075480A (en) Self-inclining type side wall formwork trolley, device and using method thereof
CN111561328A (en) Can realize assembled lining cutting platform truck of quick turnover
CN114657884A (en) Descending type movable formwork construction method for abutment assembling and segmented propelling
CN108661670B (en) Construction method for pipe gallery construction by using formwork trolley
US3003219A (en) Method and means for erecting elongated structures of concrete
CN112726442A (en) Construction method of large-span thin-wall concrete sound barrier pouring trolley
KR100565361B1 (en) Bridge construction method is by means of Incremental launching method using lateral launching apparatus
CN103615262A (en) Steel form jumbo with main structure capable of passing conventional sections, and implementation method thereof
US11480054B2 (en) Rapid construction method for secondary lining of small-section tunnel
CN212052347U (en) Mountain area segment beam conveyer
CN210975880U (en) Adjustable open cut tunnel is hydraulic pressure platform truck by oneself
JP2001098512A (en) Method for erecting and removing road striding bridge by frame with jack device
CN111140007A (en) Side wall molding trolley without pull rod and side wall construction method
CN211682710U (en) Movable template system for assembled culvert channel
CN213144480U (en) Telescopic tunnel widening section construction trolley
CN217350424U (en) Walking type gantry crane with vehicle-mounted support
JPH03107098A (en) Travelling type molding frame support
CN219605289U (en) Variable intermediate wall template trolley suitable for bifurcation tunnel multi-arch section
CN211777474U (en) Self-inclining type side wall formwork trolley and device thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200821