CN110410109A - A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method - Google Patents
A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method Download PDFInfo
- Publication number
- CN110410109A CN110410109A CN201910775486.9A CN201910775486A CN110410109A CN 110410109 A CN110410109 A CN 110410109A CN 201910775486 A CN201910775486 A CN 201910775486A CN 110410109 A CN110410109 A CN 110410109A
- Authority
- CN
- China
- Prior art keywords
- construction
- flat car
- formwork
- mold
- trolley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明涉及一种棚洞衬砌拱部施工用移模台车及施工方法,棚洞衬砌拱部施工用移模台车包括浇筑模板、支撑桁架、移动平车和轨道组件,浇筑模板固定连接于支撑桁架的工作面,支撑桁架安装于移动平车上;在行走状态时,移动平车沿固定安装在地面的轨道组件上行走,在装模、混凝土浇筑时,移动平车与地面之间安装千斤顶,千斤顶通过液压管路与液压站连接,并在移动平车与地面之间设置支撑座。本发明能对半拱柱式棚洞衬砌拱部的模板进行整体安装拆卸、整体吊移,既能省去重复的模板组拼及分拆工作,又能大大省去搭建脚手架防护的繁琐工序,而且模板还能整体向下一施工段转移,省去再拆再装的工序,较大提高施工效率,缩短施工工期;具有施工安全系数高、快速便捷、标准化等特点。
The invention relates to a mold-moving trolley for the construction of a shed-hole lining arch and a construction method. The mold-moving trolley for the construction of the shed-hole lining arch includes a pouring formwork, a supporting truss, a mobile flat car and a track assembly, and the pouring formwork is fixedly connected to the The working surface of the support truss, the support truss is installed on the mobile flat car; in the running state, the mobile flat car walks along the track assembly fixedly installed on the ground, and the mobile flat car is installed between the mobile flat car and the ground during formwork and concrete pouring. The jack is connected to the hydraulic station through the hydraulic pipeline, and a support seat is set between the mobile flat car and the ground. The present invention can integrally install, disassemble, and integrally lift the formwork of the semi-arch-column-type shed tunnel lining arch, which can not only save repeated formwork assembly and disassembly work, but also greatly save the cumbersome process of building scaffold protection. Moreover, the formwork can be transferred to the next construction section as a whole, saving the process of dismantling and reinstalling, greatly improving the construction efficiency and shortening the construction period; it has the characteristics of high construction safety factor, fast and convenient, and standardized.
Description
技术领域technical field
本发明涉及一种建筑施工技术领域,具体为一种棚洞衬砌拱部施工用移模台车及施工方法,适用于棚洞衬砌拱部混凝土施工。The invention relates to the technical field of building construction, in particular to a mold-moving trolley and a construction method for construction of a shed tunnel lining arch, which are suitable for concrete construction of a shed tunnel lining arch.
背景技术Background technique
近年来,我国的公路基础设施发展迅速,大量公路正在施工或计划建设,高等级公路已由平原地区向山区大规模推进。在公路建设中,越来越多的会遇到深挖路段。在这些路段中,对一些边坡不太稳定、坡面较陡的区域,一般的坡面防护很难达到经济、长久的防护效果,棚洞作为一种永久性的防护结构,对比明挖隧道又有施工工艺简单、结构简洁、施工工期短等优点,因此结构相对稳定的半拱柱式棚洞将会越来越多的出现在公路设计当中。这对施工的进度也是提出了新的要求,如何在棚洞衬砌拱部施工中实现高效、经济和安全,是摆在工程技术人员的新问题。In recent years, my country's highway infrastructure has developed rapidly, a large number of highways are under construction or planned to be constructed, and high-grade highways have been promoted from plain areas to mountainous areas on a large scale. In highway construction, more and more road sections will be dug deep. In these road sections, for some areas with unstable slopes and steep slopes, general slope protection is difficult to achieve economical and long-term protection effects. It also has the advantages of simple construction technology, simple structure, and short construction period. Therefore, semi-arch column sheds with relatively stable structures will appear more and more in highway design. This also puts forward new requirements for the progress of the construction. How to achieve high efficiency, economy and safety in the construction of the shed tunnel lining arch is a new problem for engineers and technicians.
目前的半拱柱式棚洞拱部施工大多采用吊装机具辅助,逐节安装钢管支架、模板,浇筑墙体混凝土,再逐节拆除钢管支架、模板,进行模板清理后安装施工下一段落。这种施工方法作业人员劳动强度大,施工效率十分低下,进度缓慢。为了满足施工进度和工期目标要求,往往要加大模板数量,增加作业人员和作业点来实现,使支架、模板用量大幅增加,大幅增加了施工成本。而且模板经反复多次逐块安装拆卸,模板易变形,变形大,板块接头也逐渐变形,使浇筑后的棚洞衬砌拱部在拆模后墙体表面出现凹凸不平,接缝处漏浆产生蜂窝空洞,导致外观差。而且蜂窝空洞部位即使经过二次处理,棚洞衬砌拱部在此部位的防水能力和结构耐久性也受到了很大的削弱。而且在钢管支架结构整体性差,承载能力有限,使用在重荷载的结构中施工安全风险高,不易把控。At present, the construction of the arch part of the semi-arch column type shed is mostly assisted by hoisting equipment. Steel pipe supports and formwork are installed section by section, wall concrete is poured, and then steel pipe support and formwork are removed section by section. After the formwork is cleaned, the next stage of construction is installed. This construction method operator labor intensity is big, and construction efficiency is very low, and progress is slow. In order to meet the requirements of construction progress and construction period objectives, it is often necessary to increase the number of formwork, increase the number of operators and operating points to achieve it, which greatly increases the amount of brackets and formwork, and greatly increases the construction cost. Moreover, the formwork has been repeatedly installed and disassembled piece by piece, the formwork is easily deformed, the deformation is large, and the joints of the plates are gradually deformed, so that the surface of the wall of the shed cave lining arch after pouring will be uneven after the formwork is removed, and the joints will leak. Cellular voids, resulting in poor appearance. Moreover, even if the honeycomb cavity is treated twice, the waterproof ability and structural durability of the shed cavity lining arch at this position will be greatly weakened. Moreover, the integrity of the steel pipe support structure is poor, and the bearing capacity is limited. When used in a heavy-loaded structure, the construction safety risk is high and it is difficult to control.
发明内容Contents of the invention
本发明的目的是提供一种棚洞衬砌拱部施工用移模台车及施工方法;填补了棚洞衬砌拱部施工的空白,能够实现标准化施工,构造轻便,组装和拆除方便,施工便捷,减少其它机械的使用,易周转,缩短施工周期,降低施工成本,整体结构稳定,施工安全性好。The object of the present invention is to provide a mold-moving trolley and construction method for the construction of the shed tunnel lining arch; it fills the gap in the construction of the shed tunnel lining arch, can realize standardized construction, has a light structure, is convenient to assemble and dismantle, and is convenient for construction. Reduce the use of other machinery, easy turnover, shorten the construction period, reduce construction costs, the overall structure is stable, and the construction safety is good.
为了实现上述本发明目的,采用的技术方案为:In order to realize above-mentioned object of the present invention, the technical scheme that adopts is:
一种棚洞衬砌拱部施工用移模台车,棚洞包括上部的棚洞衬砌拱部,棚洞衬砌拱部下方连接棚洞衬砌直墙,棚洞衬砌直墙下方连接棚洞基础,棚洞基础位于地面以下,棚洞衬砌拱部施工用移模台车包括浇筑模板、支撑桁架、移动平车和轨道组件,支撑桁架由长度不一的槽钢或者工字钢通过焊接形成整体,安装于平车横梁上。浇筑模板固定连接于支撑桁架的工作面,支撑桁架安装于移动平车上;在行走状态时,移动平车沿固定安装在地面的轨道组件上行走,在装模、混凝土浇筑时,移动平车与地面之间安装千斤顶,千斤顶通过液压管路与液压站连接,并在移动平车与地面之间设置支撑座。A mold-moving trolley for the construction of a shed hole lining arch. The shed hole includes an upper shed hole lining arch. The lower part of the shed hole lining arch is connected to the shed hole lining straight wall. The foundation of the tunnel is located below the ground. The formwork trolley used for the construction of the arch of the shed tunnel lining includes pouring formwork, supporting trusses, mobile flat cars and track components. The supporting trusses are formed by welding channel steel or I-beams of different lengths. On the beam of the flat car. The pouring formwork is fixedly connected to the working surface of the support truss, and the support truss is installed on the mobile flat car; in the running state, the mobile flat car walks along the track assembly fixedly installed on the ground, and when the formwork is installed and the concrete is poured, the mobile flat car A jack is installed between the ground and the jack, which is connected to the hydraulic station through a hydraulic pipeline, and a support seat is set between the mobile flat car and the ground.
即棚洞衬砌拱部施工用移模台车在行走状态时,台车可在轨道组件上前后自由行走,当走到预定位置,台车停止,在台车下安放若干千斤顶,千斤顶与液压站相连,开启液压站,千斤顶将台车整体顶起至预定高度,然后安装支撑座,使台车固定在施工高度,液压站可卸压,台车重量由支撑座支撑,工人进行装模、混凝土浇筑作业;当施工完毕,液压站开启,千斤顶将台车顶起,移除支撑座,然后千斤顶将台车下降直到行走轮落入轨道,移除千斤顶,台车可继续行走至下一个工作位置,如此往复循环。That is to say, when the mold-moving trolley for the construction of the lining arch of the shed hole is in the walking state, the trolley can walk freely back and forth on the track assembly. When it reaches the predetermined position, the trolley stops, and several jacks are placed under the trolley. The jack and the hydraulic station Connected, open the hydraulic station, the jack lifts the whole trolley to a predetermined height, and then install the support seat to fix the trolley at the construction height, the hydraulic station can relieve pressure, the weight of the trolley is supported by the support seat, and the workers carry out molding, concrete Pouring operation; when the construction is completed, the hydraulic station is turned on, the jack lifts the trolley, removes the support seat, and then the jack lowers the trolley until the traveling wheels fall into the track, removes the jack, and the trolley can continue to walk to the next working position , and so on.
所述支撑座为楔形块、沙筒或升降支座的一种。因地形需要,棚洞下方地面常常不是水平,因此使用可调节高度的支撑座A,可根据地面倾斜的角度,单独调整每个支撑座的高度,使支撑座上方的移动平车可保持水平的姿态。所述砂筒为圆柱形状,钢管焊接成封闭容器作为下方的固定端,在固定端底部或侧面设置带开关的开口,容器中灌入细沙,在细沙上放置外径略小的活动端,当开口打开,细沙流出,则活动端高度下降。The supporting seat is one of wedge block, sand box or lifting support. Due to the needs of the terrain, the ground below the shed is often not level. Therefore, the height-adjustable support base A can be used to adjust the height of each support base individually according to the angle of ground inclination, so that the mobile flat car above the support base can be kept horizontal. attitude. The sand cylinder is in the shape of a cylinder, the steel pipe is welded into a closed container as the fixed end at the bottom, an opening with a switch is set at the bottom or side of the fixed end, fine sand is poured into the container, and a movable end with a slightly smaller outer diameter is placed on the fine sand , when the opening is opened and the fine sand flows out, the height of the active end will drop.
所述轨道组件包括两并排布置的轨道、后横联和前横联;所述前横联、后横联分别安装于轨道的前、后端,前后横联的使两排轨道的平行度得到固定控制,两排轨道不会发生相对位移和偏差,提高台车行走的稳定性,保证棚洞衬砌拱部施工的精度。The track assembly includes two tracks arranged side by side, a rear cross-link and a front cross-link; the front and rear cross-links are respectively installed at the front and rear ends of the track, and the front and rear cross-links make the parallelism of the two rows of tracks obtain Fixed control, the two rows of rails will not have relative displacement and deviation, improve the stability of the trolley, and ensure the construction accuracy of the shed tunnel lining arch.
所述移动平车包括平车横梁、平车纵梁和行走构件;若干平车横梁和平车纵梁搭接构成移动平车平台,行走轮安装于移动平车平台底部。通常横梁位于纵梁的上方,纵梁下方连接行走轮,平车横梁为工字钢,平车纵梁构造为工字钢或双拼工字钢。The mobile flat car includes a flat car beam, a flat car longitudinal beam and a running member; several flat car beams and flat car longitudinal beams are overlapped to form a mobile flat car platform, and the traveling wheels are installed at the bottom of the mobile flat car platform. Usually, the crossbeam is located above the longitudinal beam, and the traveling wheels are connected under the longitudinal beam.
所述移动平车上安装电机,电机通过减速装置与行走轮连接,电机给行走轮的行驶提供动力,电机通过导线连接外部电源。A motor is installed on the mobile flat car, and the motor is connected with the traveling wheels through a speed reduction device. The motor provides power for the running of the traveling wheels, and the motor is connected to an external power supply through wires.
所述支撑桁架由长度不一的槽钢或者工字钢通过焊接形成整体,安装于移动平车上。The supporting truss is formed as a whole by welding channel steel or I-beam with different lengths, and installed on the mobile flat car.
所述浇筑模板包括位于上部的圆弧模A和位于下部的圆弧模B,圆弧模A和圆弧模B通过门轴铰接,圆弧模A与支撑桁架固定连接,圆弧模B通过上下连接杆与移动平车连接;如附图所示,上连接杆一端与移动平车的连接耳铰接,另一端与圆弧模B上部连接;下连接杆一端与移动平车铰接,另一端与圆弧模B下部连接,当解除上下连接杆与圆弧模B的连接,圆弧模B通过门轴向内弯折,以实现拆模台车整体下降时,使模板支架整体下降顺畅、无阻力,防止圆弧模B 段对棚洞的衬砌侧壁发生摩擦,造成侧壁表面的损伤。The pouring formwork includes arc mold A on the upper part and arc mold B on the lower part, the arc mold A and the arc mold B are hinged through door shafts, the arc mold A is fixedly connected to the supporting truss, and the arc mold B passes through The upper and lower connecting rods are connected with the mobile flat car; as shown in the attached figure, one end of the upper connecting rod is hinged with the connecting ear of the mobile flat car, and the other end is connected with the upper part of the arc mold B; one end of the lower connecting rod is hinged with the mobile flat car, and the other end It is connected with the lower part of the arc mold B. When the connection between the upper and lower connecting rods and the arc mold B is released, the arc mold B is bent inward through the door shaft to realize the overall decline of the demoulding trolley, so that the overall decline of the formwork bracket is smooth. There is no resistance to prevent the friction of section B of the circular arc mold against the lining side wall of the shed hole, causing damage to the side wall surface.
所述移动平车与棚洞基础和棚洞衬砌直墙通过若干个水平限位拉杆连接,水平限位拉杆为螺纹钢、工字钢、槽钢或角钢的一种。在棚洞衬砌直墙浇筑时预留孔,水平方向的水平限位拉杆的右端设置螺纹,穿过棚洞衬砌直墙,在右端螺纹处用螺纹紧固件紧固,水平限位拉杆左端与平车横梁连接,可焊接,也可在平车横梁上焊耳板开孔,通过螺纹紧固件连接;硼洞基础在浇注时,预埋斜向的水平限位拉杆,水平限位拉杆与台车焊接相连;当台车走到固定位置时,通过水平限位拉杆的锚固作用,防止在装模、混凝土浇筑时,台车发生位移;当需要拆除水平限位拉杆时,则拆除螺纹紧固件,卸下水平方向的水平限位拉杆,并切断斜向水平限位拉杆。The mobile flat car is connected with the foundation of the shed hole and the straight wall of the shed hole through several horizontal limit rods, and the horizontal limit rods are one of threaded steel, I-beam, channel steel or angle steel. A hole is reserved when pouring the straight wall lining the shed hole, and the right end of the horizontal limit rod in the horizontal direction is provided with a thread, which passes through the straight wall of the shed hole lining, and the thread at the right end is fastened with a threaded fastener, and the left end of the horizontal limit rod is connected to Flat car beam connection, can be welded, and can also be welded on the flat car beam to open the lug plate and connect through threaded fasteners; when the boron hole foundation is poured, the oblique horizontal limit rod is pre-embedded, and the horizontal limit rod and The trolley is welded and connected; when the trolley moves to a fixed position, the anchoring effect of the horizontal limit rod prevents the displacement of the trolley during formwork installation and concrete pouring; when the horizontal limit rod needs to be removed, the screw thread is removed Firmware, remove the horizontal limit tie rod in the horizontal direction, and cut off the oblique horizontal limit tie rod.
其施工方法包括以下步骤:Its construction method includes the following steps:
(1)加工部件:棚洞衬砌拱部施工用移模台车按图纸加工部件,在加工厂内试装后运至施工现场;(1) Processed parts: The mold-moving trolley used for the construction of the shed tunnel lining arch will process the parts according to the drawings, and transport them to the construction site after trial assembly in the processing plant;
(2)轨道铺设:测量人员放样标明左右轨道中心线,沿测量放出的线垂直平铺枕木,要求枕木中心与测量放样相吻合;枕木铺设完成后进行轨道安装;支架行走采用双轨形式,每侧枕木上铺设轨道;沿枕木中心线进行铺设轨道,轨道采用鱼尾板配螺栓的形式进行连接;在两条轨道端部使用槽钢或工字钢作轨道结构的前横联和后横联;(2) Track laying: the surveyors set out to mark the center line of the left and right tracks, and lay the sleepers vertically along the measured line. Lay the track on the sleeper; lay the track along the center line of the sleeper, and connect the track with fishplates and bolts; use channel steel or I-beam as the front and rear cross-links of the track structure at the ends of the two tracks;
(3)移模台车拼装:支撑桁架在工厂进行分块预制,拉运到现场后整体焊接组装,并与平车横梁、平车纵梁通过螺栓或焊接成整体,按纵向每一定长度分成一节,使用吊车吊运至轨道上;浇注模板分块预制后在现场进行组拼,相邻两块浇注模板使用高强螺栓进行拼接,每块浇注模板均与支撑桁架进行焊接;在模板安装过程中使用吊车协助,人工协助微调,保证模板安装的精确度;为了确保混凝土施工过程中支架模板的正常运行,需对台车安装后进行调试。主要调试内容抱括行走、止动、圆弧模B的弯折及台车起降等;(3) Assembling by moving formwork trolley: the support truss is prefabricated in blocks in the factory, and then welded and assembled as a whole after being transported to the site. In the first section, the crane is used to lift it to the track; the pouring formwork is prefabricated in pieces and assembled on site, and two adjacent pouring formworks are spliced with high-strength bolts, and each pouring formwork is welded to the supporting truss; during the formwork installation process Cranes are used to assist in the process, and manual fine-tuning is assisted to ensure the accuracy of the formwork installation; in order to ensure the normal operation of the support formwork during the concrete construction process, it is necessary to debug the trolley after installation. The main debugging content includes walking, stopping, bending of the arc mold B and take-off and landing of the trolley, etc.;
(4)装模:借助电机推动台车往前移动,直到提前标识好的位置;在台车移动过程中,应平稳推进,注意台车的稳定性,不可突然使用较大的推力,防止支撑桁架变形;台车移动到位后,在每个顶升支腿下方安装千斤顶;千斤顶底部设置支撑垫支垫平整,避免出现千斤顶倾斜的情况;千斤顶安装完毕并检查无任何问题后开始往上顶升;千斤顶的顶升速度应同步,根据提前计算好的顶升高度缓慢进行;高度可进行微调,直到达到设计高度;根据计算确定支点数并在在平车纵梁底两边对称布置支撑座,支撑座构造为楔形块、沙筒、升降支座其中一种;安装水平限位拉杆,支撑座安装完毕后拆除千斤顶。(4) Mold loading: Use the motor to push the trolley forward until it reaches the position marked in advance; during the movement of the trolley, it should be pushed forward smoothly, pay attention to the stability of the trolley, and do not use a large thrust suddenly to prevent support The truss is deformed; after the trolley is moved in place, a jack is installed under each lifting leg; the bottom of the jack is provided with a support pad and the pad is flat to avoid the jack tilting; after the jack is installed and checked for any problems, it starts to lift up; The jacking speed of the jack should be synchronized, and it should be carried out slowly according to the jacking height calculated in advance; the height can be fine-tuned until it reaches the design height; The structure is one of wedge-shaped block, sand barrel, and lifting support; the horizontal limit rod is installed, and the jack is removed after the support seat is installed.
(5)浇筑:施工人员戴安全带在模板的施工作业平台上对浇注模板底部进行塞缝处理,塞缝完之后,再进行混凝土浇筑,振捣。(5) Pouring: The construction personnel wear safety belts to cork the bottom of the pouring formwork on the construction work platform of the formwork. After the caulking is completed, the concrete is poured and vibrated.
(6)拆模:待浇筑的混凝土强度达到要求后拆除水平限位拉杆,然后拆模,拆除浇注模板时,先用千斤顶顶伸至平车横梁底部,然后拆除平车纵梁底的支撑座,松开与圆弧模B连接的连接杆,收回圆弧模B,千斤顶回缩同步整体下降台车,直到行走轮落入轨道,拆除千斤顶,台车往前移动进行下一节段的施工。(6) Formwork removal: After the poured concrete reaches the required strength, remove the horizontal limit tie rod, and then remove the formwork. When removing the pouring formwork, first use the jack to extend to the bottom of the flat car beam, and then remove the support seat at the bottom of the flat car longitudinal beam , loosen the connecting rod connected to the arc mold B, retract the arc mold B, the jack retracts synchronously and lowers the trolley as a whole until the traveling wheels fall into the track, remove the jack, and the trolley moves forward for the construction of the next section .
(7)重复步骤(4)至(6)直至整个棚洞浇筑完成。(7) Repeat steps (4) to (6) until the entire shed hole is poured.
(8)按组装顺序相反的过程拆除台车,分类归集整理,装车运输至下一棚洞施工现场或回收到设备堆放场。(8) Dismantle the trolleys in the reverse order of assembly, classify and sort them out, and transport them to the construction site of the next shed or recycle them to the equipment storage yard.
本发明相对于现有技术所具有的突出的实质性特点和显著进步是:The outstanding substantive features and remarkable progress of the present invention relative to the prior art are:
1、本发明中台车可实现整体移动,避免传统支架和模板在浇筑完成后拆散再组装的繁琐施工,能流水作业,流水步距相对固定,流水工期可控;台车组装和拆装方便快捷,从而能较大提高施工进度,有效缩短施工工期。1. The trolley in the present invention can move as a whole, avoiding the cumbersome construction of dismantling and reassembling the traditional support and formwork after the pouring is completed, it can work in flow, the flow step is relatively fixed, and the flow construction period is controllable; the assembly and disassembly of the trolley is convenient Fast, so that the construction progress can be greatly improved and the construction period can be effectively shortened.
2、本发明浇注模板和支撑桁架形成一个稳固的整体,能承受较大的荷载,适用于较大方量混凝土的浇筑,安全系数高,能有效保证施工安全;所施工的棚洞拱部墙体平整,接缝处痕迹小,不会产生蜂窝空洞等缺陷,有效提高了棚洞的防水效果。2. The pouring formwork and supporting trusses of the present invention form a stable whole, which can withstand relatively large loads, and is suitable for pouring large quantities of concrete. It has a high safety factor and can effectively ensure construction safety; It is flat, with small traces at the seams, and will not produce defects such as honeycomb holes, which effectively improves the waterproof effect of the shed.
3、本发明在施工过程中,不需要汽车吊或别的大型机车配合,能有效减少其它机械的使用,机械费的支出有明显的降低,大大降低施工中设备成本;台车中各种部件均易购买、易加工,且可循环拆卸使用,易周转,在施工完成后的转场到新的施工点或回收到设备堆放场都是非常方便快捷的,没有材料的损耗;在装、拆模过程中,利用液压千斤顶装、拆模,无需过多的投入人力,大大减少劳动强度,降低人力成本。3. In the construction process, the present invention does not require the cooperation of truck cranes or other large locomotives, which can effectively reduce the use of other machinery, significantly reduce the expenditure on machinery costs, and greatly reduce the cost of equipment in construction; various components in the trolley All are easy to purchase, easy to process, and can be recycled and disassembled for use, and easy to turn over. After the construction is completed, it is very convenient and fast to transfer to a new construction site or recycle to the equipment storage yard, without material loss; During the molding process, the use of hydraulic jacks to install and remove the mold does not require too much manpower, which greatly reduces labor intensity and labor costs.
附图说明Description of drawings
图1为本发明在在拆装模状态的结构示意图;Fig. 1 is the structural representation of the present invention in dismounting mold state;
图2为图1中Ⅰ处局部放大图;Figure 2 is a partial enlarged view of I in Figure 1;
图3为图1中Ⅱ处局部放大图;Figure 3 is a partial enlarged view of II in Figure 1;
图4为本发明在行走时的结构示意图;Fig. 4 is the structural representation of the present invention when walking;
图5为本发明在拆装模状态的立体结构示意图;Fig. 5 is the three-dimensional structure schematic diagram of the present invention in dismounting mold state;
图中部件名称和序号为:The names and serial numbers of the components in the figure are:
轨道1,支撑座2,行走轮3,平车纵梁4,电机5,支撑垫 6,千斤顶7,平车横梁8,支撑桁架9,圆弧模A 10,棚洞衬砌拱部11,门轴12,圆弧模B 13,连接杆A 14,连接杆B 15,棚洞衬砌直墙16,水平限位拉杆17,棚洞基础18。Track 1, support seat 2, traveling wheel 3, flat car longitudinal beam 4, motor 5, support pad 6, jack 7, flat car beam 8, support truss 9, arc mold A 10, shed hole lining arch 11, door Shaft 12, arc mold B 13, connecting rod A 14, connecting rod B 15, shed hole lining straight wall 16, horizontal limit pull rod 17, shed hole foundation 18.
具体实施方式Detailed ways
实施例1Example 1
一种棚洞衬砌拱部施工用移模台车,棚洞包括上部的棚洞衬砌拱部11,棚洞衬砌拱部11下方连接棚洞衬砌直墙16,棚洞衬砌直墙16下方连接棚洞基础18,棚洞基础18位于地面以下,棚洞衬砌拱部施工用移模台车包括浇筑模板、支撑桁架9、移动平车和轨道组件,浇筑模板固定连接于支撑桁架的工作面,支撑桁架9安装于移动平车上;在行走状态时,移动平车沿固定安装在地面的轨道组件上行走,在装模、混凝土浇筑时,移动平车与地面之间安装千斤顶7,千斤顶7通过液压管路与液压站连接,并在移动平车与地面之间设置沙筒支撑座2;A mold-moving trolley for the construction of a shed hole lining arch. The shed hole includes an upper shed hole lining arch portion 11. The lower part of the shed hole lining arch 11 is connected to the shed hole lining straight wall 16. The lower part of the shed hole lining straight wall 16 is connected to the shed. The hole foundation 18 and the shed hole foundation 18 are located below the ground. The mold transfer trolley used for the construction of the shed hole lining arch includes a pouring formwork, a support truss 9, a mobile flat car and a track assembly, and the pouring formwork is fixedly connected to the working surface of the support truss. The truss 9 is installed on the mobile flat car; in the running state, the mobile flat car walks along the track assembly fixedly installed on the ground. When loading the mold and pouring concrete, a jack 7 is installed between the mobile flat car and the ground, and the jack 7 passes The hydraulic pipeline is connected to the hydraulic station, and a sand drum support seat 2 is set between the mobile flat car and the ground;
所述轨道组件包括两并排布置的轨道1、后横联和前横联;所述前横联、后横联分别安装于轨道1的前、后端;The track assembly includes two track 1 arranged side by side, a rear cross-link and a front cross-link; the front cross-link and the rear cross-link are installed on the front and rear ends of the track 1 respectively;
所述移动平车包括平车横梁8、平车纵梁4和行走构件;若干平车横梁8和平车纵梁4搭接构成移动平车平台,行走轮3安装于移动平车平台底部;The mobile flat car includes a flat car beam 8, a flat car longitudinal beam 4 and a walking member; several flat car beams 8 and flat car longitudinal beams 4 are overlapped to form a mobile flat car platform, and the running wheels 3 are installed at the bottom of the mobile flat car platform;
所述移动平车平台上安装电机5,电机5通过减速装置与行走轮3连接;A motor 5 is installed on the mobile flat car platform, and the motor 5 is connected with the traveling wheels 3 through a reduction gear;
所述支撑桁架9由长度不一的槽钢通过焊接形成整体,安装于移动平车上;The support truss 9 is formed as a whole by welding channel steels of different lengths and installed on a mobile flat car;
所述浇筑模板包括位于上部的圆弧模A10和位于下部的圆弧模B13,圆弧模A10和圆弧模B13通过门轴12铰接,圆弧模A10与支撑桁架9固定连接,圆弧模B13通过连接杆14/15与支撑桁架9连接;The pouring formwork includes the arc mold A10 at the top and the arc mold B13 at the bottom, the arc mold A10 and the arc mold B13 are hinged through the door shaft 12, the arc mold A10 is fixedly connected with the support truss 9, and the arc mold B13 is connected with support truss 9 through connecting rod 14/15;
所述移动平车与棚洞基础18和棚洞衬砌直墙16通过若干个水平限位拉杆17连接,水平限位拉杆17为螺纹钢。The mobile flat car is connected with the shed hole foundation 18 and the shed hole lining straight wall 16 through several horizontal limit pull rods 17, and the horizontal limit pull rods 17 are threaded steel.
棚洞衬砌拱部施工用移模台车,施工方法包括以下步骤:The formwork transfer trolley used for the construction of the arch part of the lining of the shed hole, the construction method includes the following steps:
(1)加工部件:棚洞衬砌拱部施工用移模台车按图纸加工部件,在加工厂内试装后运至施工现场;(1) Processed parts: The mold-moving trolley used for the construction of the shed tunnel lining arch will process the parts according to the drawings, and transport them to the construction site after trial assembly in the processing plant;
(2)轨道铺设:放样标明左右轨道中心线,沿测量放出的线垂直平铺枕木,要求枕木中心与测量放样相吻合;枕木铺设完成后进行轨道安装;台车行走采用双轨形式,每侧枕木上铺设轨道;沿枕木中心线进行铺设轨道;在两条轨道端部使用槽钢或工字钢作轨道结构的前横联和后横联;(2) Track laying: Stake out to mark the center line of the left and right tracks, and lay the sleepers vertically along the measured line. The center of the sleepers is required to match the measurement and lofting; after the sleepers are laid, the track is installed; the trolley travels in the form of double tracks, and the sleepers on each side Lay the track on top; lay the track along the center line of the sleeper; use channel steel or I-beam as the front and rear cross-links of the track structure at the ends of the two tracks;
(3)移模台车拼装:支撑桁架在工厂进行分块预制,拉运到现场后整体焊接组装,并与平车横梁、平车纵梁通过螺栓或焊接成整体,按纵向每一定长度分成一节,使用吊车吊运至轨道上;浇注模板分块预制后在现场进行组拼,相邻两块浇注模板使用高强螺栓进行拼接,每块浇注模板均与支撑桁架进行焊接;(3) Assembling by moving formwork trolley: the support truss is prefabricated in blocks in the factory, and then welded and assembled as a whole after being transported to the site. In the first section, the crane is used to lift it to the track; the pouring formwork is prefabricated in pieces and assembled on site, and two adjacent pouring formworks are spliced with high-strength bolts, and each pouring formwork is welded to the supporting truss;
(4)装模:借助电机推动台车往前移动,直到提前标识好的位置;台车移动到位后,在每个顶升支腿下方安装千斤顶;千斤顶底部设置支撑垫支垫平整;千斤顶安装完毕并检查无任何问题后开始往上顶升;直到达到设计高度;根据计算确定支点数并在在平车纵梁底两边对称布置支撑座,安装水平限位拉杆,支撑座安装完毕后拆除千斤顶;(4) Die loading: Use the motor to push the trolley forward until it reaches the position marked in advance; after the trolley moves in place, install a jack under each lifting leg; set the support pad at the bottom of the jack to make it flat; the jack is installed And check that there is no problem and then start to lift up; until it reaches the design height; determine the number of fulcrums according to the calculation and arrange the support seats symmetrically on both sides of the bottom of the longitudinal beam of the flat car, install the horizontal limit pull rod, and remove the jack after the support seat is installed;
(5)浇筑:在施工作业平台上对浇注模板底部进行塞缝处理,塞缝完之后,再进行混凝土浇筑,振捣;(5) Pouring: The bottom of the pouring formwork is plugged on the construction work platform, and after the plugging is completed, the concrete is poured and vibrated;
(6)拆模:待浇筑的混凝土强度达到要求后拆除水平限位拉杆,然后拆模,拆除浇注模板时,先用千斤顶顶伸至平车横梁底部,然后拆除平车纵梁底的支撑座,松开与圆弧模B连接的连接杆,收回圆弧模B,千斤顶回缩同步整体下降台车,直到行走轮落入轨道,拆除千斤顶,台车往前移动进行下一节段的施工;(6) Formwork removal: After the poured concrete reaches the required strength, remove the horizontal limit tie rod, and then remove the formwork. When removing the pouring formwork, first use the jack to extend to the bottom of the flat car beam, and then remove the support seat at the bottom of the flat car longitudinal beam , loosen the connecting rod connected to the arc mold B, retract the arc mold B, the jack retracts synchronously and lowers the trolley as a whole until the traveling wheels fall into the track, remove the jack, and the trolley moves forward for the construction of the next section ;
(7)重复步骤(4)至(6)直至整个棚洞浇筑完成;(7) Repeat steps (4) to (6) until the entire shed hole is poured;
(8)按组装顺序相反的过程拆除模板台车,分类归集整理,装车运输至下一棚洞施工现场或回收到设备堆放场。(8) Dismantle the formwork trolley in the reverse process of assembly sequence, classify and organize, load and transport to the construction site of the next shed or recycle to the equipment storage yard.
实施例2Example 2
与实施例1的区别在于:所述支撑座2为楔形块;支撑桁架9由长度不一的工字钢通过螺栓紧固件形成整体;水平限位拉杆17为工字钢。The difference from Embodiment 1 is that: the support seat 2 is a wedge; the support truss 9 is formed by I-beams of different lengths through bolt fasteners; the horizontal limit rod 17 is an I-beam.
实施例3Example 3
与实施例1的区别在于:所述水平限位拉杆17为槽钢。The difference from Embodiment 1 is that the horizontal limit rod 17 is a channel steel.
实施例4Example 4
与实施例1的区别在于:所述水平限位拉杆17为角钢。The difference from Embodiment 1 is that the horizontal limit rod 17 is an angle steel.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910775486.9A CN110410109A (en) | 2019-08-21 | 2019-08-21 | A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910775486.9A CN110410109A (en) | 2019-08-21 | 2019-08-21 | A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110410109A true CN110410109A (en) | 2019-11-05 |
Family
ID=68368414
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910775486.9A Pending CN110410109A (en) | 2019-08-21 | 2019-08-21 | A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110410109A (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111719436A (en) * | 2020-07-17 | 2020-09-29 | 温州市铁路与轨道交通投资集团有限公司 | Construction system and construction method of cast-in-place box girder support for urban railway in soft foundation area |
| CN112943301A (en) * | 2021-02-05 | 2021-06-11 | 广西名嘉钢结构工程有限公司 | Shed tunnel construction bearing structure |
| CN113914897A (en) * | 2021-09-27 | 2022-01-11 | 中铁十四局集团建筑工程有限公司 | Movable vault secondary lining template rack and connection cavern rack moving structure |
| WO2022142193A1 (en) * | 2020-12-30 | 2022-07-07 | 中铁六局集团北京铁路建设有限公司 | Construction method for large-span thin-wall concrete sound barrier pouring trolley |
| CN115450656A (en) * | 2020-05-25 | 2022-12-09 | 保利长大海外工程有限公司 | Lining trolley turnover method for underground space engineering |
| CN116356725A (en) * | 2022-12-30 | 2023-06-30 | 保利长大工程有限公司 | Culvert wall construction technology |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201196094Y (en) * | 2008-05-22 | 2009-02-18 | 中铁十一局集团第一工程有限公司 | Hydraulic template trolley for rail tunnel liner concrete |
| CN201212150Y (en) * | 2008-06-06 | 2009-03-25 | 中铁十四局集团有限公司 | Big template lining trolley for subway stationg constructed by open-cut method |
| CN101824994A (en) * | 2010-04-27 | 2010-09-08 | 池州恒毅设备制造有限公司 | Concrete lining steel formwork jumbo |
| CN103089278A (en) * | 2013-02-27 | 2013-05-08 | 中交隧道工程局有限公司 | Continuous operation rolling over docking type tunnel lining formwork trolley |
| CN204126655U (en) * | 2014-08-28 | 2015-01-28 | 中铁十二局集团第三工程有限公司 | The anti-electric lining trolley of double track tunnel newly-built hangar tunnel lining construction |
| CN204163740U (en) * | 2014-08-28 | 2015-02-18 | 中铁十二局集团第三工程有限公司 | The anti-electric bow member chassis of single-track tunnel spreading hangar tunnel lining construction |
| CN104500102A (en) * | 2014-12-26 | 2015-04-08 | 山东铁鹰建设工程有限公司 | Retractable tunnel lining trolley and rapid movement method thereof |
| CN104533456A (en) * | 2014-12-15 | 2015-04-22 | 中铁上海工程局集团有限公司 | Super-large section chamber reinforced concrete modelling construction method |
| CN210370698U (en) * | 2019-08-21 | 2020-04-21 | 广西路建工程集团有限公司 | Mould shifting trolley for shed tunnel lining arch construction |
-
2019
- 2019-08-21 CN CN201910775486.9A patent/CN110410109A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201196094Y (en) * | 2008-05-22 | 2009-02-18 | 中铁十一局集团第一工程有限公司 | Hydraulic template trolley for rail tunnel liner concrete |
| CN201212150Y (en) * | 2008-06-06 | 2009-03-25 | 中铁十四局集团有限公司 | Big template lining trolley for subway stationg constructed by open-cut method |
| CN101824994A (en) * | 2010-04-27 | 2010-09-08 | 池州恒毅设备制造有限公司 | Concrete lining steel formwork jumbo |
| CN103089278A (en) * | 2013-02-27 | 2013-05-08 | 中交隧道工程局有限公司 | Continuous operation rolling over docking type tunnel lining formwork trolley |
| CN204126655U (en) * | 2014-08-28 | 2015-01-28 | 中铁十二局集团第三工程有限公司 | The anti-electric lining trolley of double track tunnel newly-built hangar tunnel lining construction |
| CN204163740U (en) * | 2014-08-28 | 2015-02-18 | 中铁十二局集团第三工程有限公司 | The anti-electric bow member chassis of single-track tunnel spreading hangar tunnel lining construction |
| CN104533456A (en) * | 2014-12-15 | 2015-04-22 | 中铁上海工程局集团有限公司 | Super-large section chamber reinforced concrete modelling construction method |
| CN104500102A (en) * | 2014-12-26 | 2015-04-08 | 山东铁鹰建设工程有限公司 | Retractable tunnel lining trolley and rapid movement method thereof |
| CN210370698U (en) * | 2019-08-21 | 2020-04-21 | 广西路建工程集团有限公司 | Mould shifting trolley for shed tunnel lining arch construction |
Non-Patent Citations (1)
| Title |
|---|
| 周晓陵;于天;杨明;: "老山隧道棚洞段施工工艺", 公路隧道, no. 03, 15 May 2007 (2007-05-15), pages 37 - 41 * |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115450656A (en) * | 2020-05-25 | 2022-12-09 | 保利长大海外工程有限公司 | Lining trolley turnover method for underground space engineering |
| CN111719436A (en) * | 2020-07-17 | 2020-09-29 | 温州市铁路与轨道交通投资集团有限公司 | Construction system and construction method of cast-in-place box girder support for urban railway in soft foundation area |
| WO2022142193A1 (en) * | 2020-12-30 | 2022-07-07 | 中铁六局集团北京铁路建设有限公司 | Construction method for large-span thin-wall concrete sound barrier pouring trolley |
| CN112943301A (en) * | 2021-02-05 | 2021-06-11 | 广西名嘉钢结构工程有限公司 | Shed tunnel construction bearing structure |
| CN113914897A (en) * | 2021-09-27 | 2022-01-11 | 中铁十四局集团建筑工程有限公司 | Movable vault secondary lining template rack and connection cavern rack moving structure |
| CN116356725A (en) * | 2022-12-30 | 2023-06-30 | 保利长大工程有限公司 | Culvert wall construction technology |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110410109A (en) | A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method | |
| CN201982108U (en) | Single-track railway tunnel integral type full-hydraulic lining trolley | |
| CN108442255B (en) | Movable formwork bridge fabrication machine and construction method for cast-in-situ bridge fabrication | |
| CN113235472B (en) | A trolley for pouring concrete for slab culvert | |
| CN202690081U (en) | Sliding type trolley used for vault lining of tunnel with light section | |
| CN111424570A (en) | Assembly type trolley for box culvert construction and construction method thereof | |
| CN102140779A (en) | Movable cast-in-situ support and movable construction method of box girder cast-in-situ support | |
| CN111911194A (en) | Multifunctional two-lining trolley construction equipment and method for long and wide tunnel | |
| CN111594221A (en) | Tunnel secondary lining full-section integrated construction trolley and secondary lining method using same | |
| CN207498754U (en) | A kind of novel track-laying machine of city track traffic engineering | |
| CN100441779C (en) | Bridge construction method with prefabricated translation in place in the air | |
| CN115613478B (en) | Continuous beam cantilever pouring method | |
| CN111455852A (en) | Assembling method of movable formwork for bridge construction | |
| CN210370698U (en) | Mould shifting trolley for shed tunnel lining arch construction | |
| CN114319145B (en) | Bridge erection method using bridge girder erection machine | |
| CN115305952A (en) | Self-propelled steel formwork trolley for construction of comprehensive pipe gallery | |
| CN110656570A (en) | A telescopic pedestrian bridge, construction device and construction method | |
| CN205400753U (en) | Novel self -propelled hydraulic pressure box culvert, tunnel platform truck | |
| CN114657884B (en) | Construction method of descending movable formwork for bridge abutment assembly and sectional propulsion | |
| CN112211112A (en) | Steel box girder installation method adopting double-guide-girder erection machine on existing bridge | |
| CN114277688B (en) | Bridge girder erection machine | |
| CN109355983B (en) | Trackless construction method for urban rail | |
| CN115613398A (en) | Prefabricated track structure and construction method for rail transit built-in pump room | |
| CN118729051B (en) | A method for connecting a large-diameter pipeline in a small-section tunnel | |
| CN221659638U (en) | Movable prefabricated box girder steel pedestal |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20210817 Address after: 530029 9th and 10th floors, Xinfa building, No. 39, Yunjing Road, Qingxiu District, Nanning City, Guangxi Zhuang Autonomous Region Applicant after: Guangxi Navigation Construction Engineering Co.,Ltd. Address before: No.530001, xingyong Road, Nanning, Guangxi Zhuang Autonomous Region Applicant before: GUANGXI ROAD CONSTRUCTION ENGINEERING GROUP Co.,Ltd. |
|
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191105 |