CN103277112A - Tunnel engineering train type rapid lifting and folding working platform - Google Patents

Tunnel engineering train type rapid lifting and folding working platform Download PDF

Info

Publication number
CN103277112A
CN103277112A CN201310249387XA CN201310249387A CN103277112A CN 103277112 A CN103277112 A CN 103277112A CN 201310249387X A CN201310249387X A CN 201310249387XA CN 201310249387 A CN201310249387 A CN 201310249387A CN 103277112 A CN103277112 A CN 103277112A
Authority
CN
China
Prior art keywords
platform
folding
column
main couple
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310249387XA
Other languages
Chinese (zh)
Other versions
CN103277112B (en
Inventor
于长彬
陈国胜
张文卷
马志刚
桑明玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority to CN201310249387.XA priority Critical patent/CN103277112B/en
Publication of CN103277112A publication Critical patent/CN103277112A/en
Application granted granted Critical
Publication of CN103277112B publication Critical patent/CN103277112B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to working platforms for railway tunnel defect treatment, in particular to a tunnel engineering train type rapid lifting and folding working platform. The working platform comprises track flat cars, a platform primary truss, a lifting platform and folding platforms, wherein the platform primary truss is fixed on a bottom plate of the track flat cars, lifting platform columns are sleeved on platform primary truss columns in a telescoping mode, and folding platform brackets are hinged on the platform primary truss columns. The working platform is installed and used with each section of track flat car serving as one unit, large-area construction can be performed within total lengths of trains, effective maintenance time can be fully utilized, the construction process can be accelerated, meanwhile, engineering trains advance and quit wholly, so that timely site removal can be guaranteed, on-schedule and safe operations of existing trains can be guaranteed, repetitive operation time can be reduced substantially, engineering costs can be saved, and the construction safety can be guaranteed.

Description

Construction of tunnel train formula fast lifting folding work platform
Technical field
The present invention relates to railway tunnel disease regulation construction working platform, specifically a kind of construction of tunnel train formula fast lifting folding work platform.
Background technology
Can there be disease in various degree in long railway tunnel of service time, especially for railway electrifing reforming engineering, needs electric power contact net linked network in the tunnel, then must carry out the comprehensive regulation in first tunnel to disease.At present, the general simple and easy working platform of reassembling type that adopts of tunnel regulation, the general structure of platform is: the framework of making a 2m * 2m, 4 trundles are set below the framework to be contacted with rail top face, can slide movement in rail top face, utilize scaffolding steel pipe to set up the square working platform of 1.8m * 1.8m above the framework, podium level is set up according to the operation height needs, usually two job platforms are linked into one group of use, this method generally skylight after track traffic is blocked begins assembly unit in the time, begin operation after near moving to again setting is reinforced again, and need before predetermined track traffic is open, remove all facilities from the track dismounting.Weak point one is that simple rack is in light weight, center of gravity is high, and is not too safe; The 2nd, the interior dismounting activity duration of each track traffic blocking time section is long, and effective engineering time is short, and especially for transporting main line frequently, traffic is precious especially off-period; The 3rd, the cost height, it is a kind of duplication of labour that each operation all will be carried out dismounting to simple and easy working platform, traffic can not get sufficient utilization off-period, causes personnel's work holdup.
Summary of the invention
The present invention is directed to needs long-time problem of interrupting railway operation when present tunnel defect is renovated, and a kind of construction of tunnel train formula fast lifting folding work platform in place fast is provided.
The technical scheme that the present invention solves described problem employing is:
A kind of construction of tunnel train formula fast lifting folding work platform, comprise track flat car, platform main couple, lift platform and folding platform, described platform main couple is fixed on the track flat car base plate, described lift platform column extension type is sleeved on the described platform main couple column, and described folding platform support is hinged on the described platform main couple column.
Further, described platform main couple column and described lift platform column are sleeve type structure, both lock with bearing pin by corresponding pin-and-hole, have vertical chute on the platform main couple column, the upper end is hung with Chain block by the welding otic placode, and the lift platform column lower end is welded with the arm-tie that also can slide for hanging point under the described Chain block in described vertical chute.
Further, described folding platform is positioned at described platform main couple both sides, every side has upper and lower two-layer, the inner of folding platform support is hinged by rotating pin and platform main couple column, fix by the pin-and-hole keying on tractive wire rope and the lift platform column when open the outer end of upper strata folding platform support, lock by movable latch and the draw ring that is welded on the platform main couple column when folding temporarily; Fix by the draw ring drawknot on tractive wire rope and the platform main couple column when open the outer end of lower floor's folding platform support, lock by movable latch and the draw ring that is welded on the platform main couple column when folding temporarily.
Further, be respectively arranged with safety barrier around described lift platform and the described folding platform.
Further, on the truss sheet of described platform main couple and on the athwartship plane of described lift platform cat ladder is housed respectively.
Compared with prior art, the present invention is that the unit is installed and used with every joint track flat car, during the engineering train operation, the job platform liftable partly is down to lowest part, and the both sides foldable portion is packed up locking simultaneously, guarantees not exceed vehicle gauge of the locomotive; Engineering train leaves to the tunnel behind the setting, the working platform foldable portion is opened and is fixed, and promotes working platform to correct position according to single double track tunnel scope of operation position simultaneously; Engineering train can move to the job location fast, and large tracts of land is launched construction in the train length range, blocks and in time returns bus stop before point finishes.Therefore, the present invention can take full advantage of effectively " skylight " time, accelerating construction progress, engineering train is promoted comprehensively and is withdrawed from simultaneously, can guarantee in time to disappear a little, guarantees the safe operation of existing line train running on scheduled time, can reduce the repetition activity duration significantly, joint guarantees construction safety through engineering cost.
Description of drawings
Facad structure schematic diagram when Fig. 1 is in job state for the present invention.
Side structure schematic diagram when Fig. 2 is in job state for the present invention.
Facad structure schematic diagram when Fig. 3 is in non-job state for the present invention.
Among the figure: lift platform 1, lift platform column 2, tractive wire rope 3, folding platform 4, upper strata folding platform support 5, Chain block 6, draw ring 7, platform main couple column 8, rotating pin 9, active pin shaft 10, lower floor's folding platform support 11, vertical chute 12, track flat car base plate 13, cat ladder 14, top rail 15, safety barrier 16, otic placode 17, arm-tie 18, pin-and-hole 19, ridge directional brace 20.
The specific embodiment
The invention will be further described below in conjunction with embodiment, and purpose only is to understand better content of the present invention.
The described construction of tunnel train of present embodiment formula fast lifting folding work platform is mounting seat with track flat car base plate 13, and every joint track flat car is an independently operation unit, can any combination form a plurality of operation units.
Referring to accompanying drawing, the platform main couple is made of forward and backward truss sheet and the ridge directional brace 20 that connects forward and backward truss sheet, the platform main couple by channel-section steel as bottom girder and track flat car base plate 13 bolts, platform main couple column 8 and top rail 15 adopt steel pipe manufacturing, have vertical chute 12 at platform main couple column 8, platform main couple column 8 upper ends are hung with Chain block 6 by welding otic placode 17.Lift platform column 2 by steel pipe manufacturing is sleeved in the platform main couple column 8 of steel pipe manufacturing equally, lift platform column 2 lower ends welding arm-tie 14, and for the following hanging point of Chain block 6, arm-tie 14 can slide up and down in vertical chute 12.Corresponding position on platform main couple column 8 and lift platform column 2, be drilled with pin-and-hole 19 by the same intervals distance, when lift platform 1 needs to rise, tighten up Chain block 6, lift platform column 2 moves upward under the drawing high of arm-tie 14, during to the height that needs, insert the fixedly position of lift platform 1 of pin-and-hole 19 with bearing pin.
Platform main couple both sides arrange upper and lower two-layer folding platform 4 respectively, the inner of upper strata folding platform support 5 and lower floor's folding platform support 11 is hinged by rotating pin 9 and platform main couple column 8, fix by tractive wire rope 3 and pin-and-hole 18 keyings on the lift platform column 2 when open the outer end of upper strata folding platform support 5, when folding by movable latch 10 be welded on tractive wire rope 3 draw rings 7 and lock temporarily; Fix by tractive wire rope 3 and draw ring 7 drawknots on the platform main couple column 8 when open the outer end of lower floor's folding platform support 11, lock by movable latch 10 and the draw ring 7 that is welded on the platform main couple column 8 when folding temporarily.When needs are opened folding platform 4, draw back movable latch 10, manually folding platform 4 is opened, lower floor folding platform support 11 outer ends are by draw ring 7 drawknots on tractive wire rope 3 and the platform main couple column 8, the outer end of upper strata folding platform support 5 by 3 keyings of tractive wire rope on lift platform column 2 pin-and-hole 19 places.
Lift platform 1 and folding platform 4 are completely spread the formation job platform by plank, establish the safety barrier 16 that highly is not less than 1.05m around the platform, during the engineering train operation, lift platform 1 is down to lowest part, both sides folding platform 4 is packed up locking simultaneously, can guarantee not exceed vehicle gauge of the locomotive.

Claims (5)

1. construction of tunnel train formula fast lifting folding work platform, comprise track flat car, platform main couple, lift platform and folding platform, it is characterized in that, described platform main couple is fixed on the track flat car base plate, described lift platform column extension type is sleeved on the described platform main couple column, and described folding platform support is hinged on the described platform main couple column.
2. construction of tunnel train formula fast lifting folding work platform according to claim 1, it is characterized in that, described platform main couple column and described lift platform column are sleeve type structure, both lock with bearing pin by corresponding pin-and-hole, have vertical chute on the platform main couple column, the upper end is hung with Chain block by the welding otic placode, and the lift platform column lower end is welded with the arm-tie that also can slide for hanging point under the described Chain block in described vertical chute.
3. construction of tunnel train formula fast lifting folding work platform according to claim 1, it is characterized in that, described folding platform is positioned at described platform main couple both sides, every side has upper and lower two-layer, the inner of folding platform support is hinged by rotating pin and platform main couple column, fix by the pin-and-hole keying on tractive wire rope and the lift platform column when open the outer end of upper strata folding platform support, lock by movable latch and the draw ring that is welded on the platform main couple column when folding temporarily; Fix by the draw ring drawknot on tractive wire rope and the platform main couple column when open the outer end of lower floor's folding platform support, lock by movable latch and the draw ring that is welded on the platform main couple column when folding temporarily.
4. construction of tunnel train formula fast lifting folding work platform according to claim 1 is characterized in that, is respectively arranged with safety barrier around described lift platform and the described folding platform.
5. construction of tunnel train formula fast lifting folding work platform according to claim 1 is characterized in that, on the truss sheet of described platform main couple and on the athwartship plane of described lift platform cat ladder is housed respectively.
CN201310249387.XA 2013-06-22 2013-06-22 Tunnel Engineering train formula fast lifting folding work platform Active CN103277112B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310249387.XA CN103277112B (en) 2013-06-22 2013-06-22 Tunnel Engineering train formula fast lifting folding work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310249387.XA CN103277112B (en) 2013-06-22 2013-06-22 Tunnel Engineering train formula fast lifting folding work platform

Publications (2)

Publication Number Publication Date
CN103277112A true CN103277112A (en) 2013-09-04
CN103277112B CN103277112B (en) 2016-06-01

Family

ID=49059716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310249387.XA Active CN103277112B (en) 2013-06-22 2013-06-22 Tunnel Engineering train formula fast lifting folding work platform

Country Status (1)

Country Link
CN (1) CN103277112B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106698144A (en) * 2016-12-27 2017-05-24 廖忠民 Maintenance platform and electromagnetic safety brake device for lifting equipment
CN107152289A (en) * 2017-07-25 2017-09-12 重庆交通大学 The vcehicular tunnel maintenance and reinforcement platform and device of low influence traffic
CN107191195A (en) * 2017-07-25 2017-09-22 重庆交通大学 The vcehicular tunnel maintenance and reinforcement platform and device of uninterrupted traffic
CN109467028A (en) * 2018-12-26 2019-03-15 中铁八局集团电务工程有限公司 A kind of installation exercise device of tunnel cable
CN109555534A (en) * 2019-01-09 2019-04-02 华东交通大学 A kind of tunnel rock drilling rack that adjustable moduleization can walk
CN112392242A (en) * 2020-12-03 2021-02-23 贵州航天乌江机电设备有限责任公司 Multifunctional working platform for closing satellite fairing

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201991538U (en) * 2011-02-24 2011-09-28 重庆工程职业技术学院 Mining hydraulic liftable worktable
CN202039857U (en) * 2011-03-16 2011-11-16 中铁隧道集团四处有限公司 Lifting type tunnel excavation support operation rack
CN202039858U (en) * 2011-04-11 2011-11-16 中铁隧道集团四处有限公司 Automatically-folded multifunctional tunnel construction scaffolding
CN202071836U (en) * 2011-06-04 2011-12-14 哈尔滨铁路局工业总公司齐齐哈尔工务机械厂 Flat vehicle for railroad-bridge tunnel-lifting operation
CN202707071U (en) * 2012-07-03 2013-01-30 葛洲坝集团基础工程有限公司 Unfolded type tunnel construction lining trolley
CN202851007U (en) * 2012-10-19 2013-04-03 金诚信矿业管理股份有限公司 Movable type work platform used for laneway drilling and supporting
CN203321529U (en) * 2013-06-22 2013-12-04 中铁十八局集团第二工程有限公司 Train type rapid lifting and folding work platform for tunnel engineering

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201991538U (en) * 2011-02-24 2011-09-28 重庆工程职业技术学院 Mining hydraulic liftable worktable
CN202039857U (en) * 2011-03-16 2011-11-16 中铁隧道集团四处有限公司 Lifting type tunnel excavation support operation rack
CN202039858U (en) * 2011-04-11 2011-11-16 中铁隧道集团四处有限公司 Automatically-folded multifunctional tunnel construction scaffolding
CN202071836U (en) * 2011-06-04 2011-12-14 哈尔滨铁路局工业总公司齐齐哈尔工务机械厂 Flat vehicle for railroad-bridge tunnel-lifting operation
CN202707071U (en) * 2012-07-03 2013-01-30 葛洲坝集团基础工程有限公司 Unfolded type tunnel construction lining trolley
CN202851007U (en) * 2012-10-19 2013-04-03 金诚信矿业管理股份有限公司 Movable type work platform used for laneway drilling and supporting
CN203321529U (en) * 2013-06-22 2013-12-04 中铁十八局集团第二工程有限公司 Train type rapid lifting and folding work platform for tunnel engineering

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106698144A (en) * 2016-12-27 2017-05-24 廖忠民 Maintenance platform and electromagnetic safety brake device for lifting equipment
CN107152289A (en) * 2017-07-25 2017-09-12 重庆交通大学 The vcehicular tunnel maintenance and reinforcement platform and device of low influence traffic
CN107191195A (en) * 2017-07-25 2017-09-22 重庆交通大学 The vcehicular tunnel maintenance and reinforcement platform and device of uninterrupted traffic
CN109467028A (en) * 2018-12-26 2019-03-15 中铁八局集团电务工程有限公司 A kind of installation exercise device of tunnel cable
CN109467028B (en) * 2018-12-26 2023-12-22 中铁八局集团电务工程有限公司 Installation operation device for tunnel cable
CN109555534A (en) * 2019-01-09 2019-04-02 华东交通大学 A kind of tunnel rock drilling rack that adjustable moduleization can walk
CN112392242A (en) * 2020-12-03 2021-02-23 贵州航天乌江机电设备有限责任公司 Multifunctional working platform for closing satellite fairing

Also Published As

Publication number Publication date
CN103277112B (en) 2016-06-01

Similar Documents

Publication Publication Date Title
CN103277112A (en) Tunnel engineering train type rapid lifting and folding working platform
CN104912004B (en) Hold rail-type track transportation bridge evacuation maintenance platform
CN202706503U (en) Electric lifting discharging platform for main building construction
CN208122371U (en) On across the high-speed rail safe guarding shed fast dismounting device of operation line
JP6991017B2 (en) Replacement method and erection machine
CN203321529U (en) Train type rapid lifting and folding work platform for tunnel engineering
CN203639826U (en) Steel truss girder bridge inspection vehicle
CN203173644U (en) Multifunctional lifting shaft working platform system
CN210939226U (en) Overhanging type power-concentrated motor train unit head car maintenance operation platform
CN206157569U (en) Protective platform is construct to portable bridge
CN103132463A (en) Movable hanger operating platform and manufacturing, installing, using and removing methods thereof
CN103654610A (en) Rail type hanging basket
CN208934715U (en) A kind of anchor bar of waterproof plate in tunnels construction platform vehicle
CN205558915U (en) Portable operation device
CN108277994A (en) On across the high ferro safe guarding shed quick method for dismounting of operation line
RU172481U1 (en) Two-level modular overpass for maintenance and current repair of rolling stock
CN210239080U (en) Maintenance platform for space high-position operation
CN204038992U (en) A kind of erecting stage for subway busbar
CN102774624A (en) Overhaul and transport vehicle and method for water-feeding pump motor
CN202865707U (en) Equipment for erecting and constructing beam and vertical beam on existing line
CN202745356U (en) Hydraulic climb material platform
CN204728225U (en) A kind of rail rail traffic bridge of embracing evacuates inspection platform
CN111455854B (en) Semi-automatic protective shed frame used in construction of viaduct crossing railway and erection method
CN107143336A (en) A kind of road constructing structure against the wind with shield synchronous construction rail
CN204825527U (en) Construction structures is moved to whole indulging of this line D roof beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Yu Changbin

Inventor after: Chen Guosheng

Inventor after: Zhang Wenjuan

Inventor after: Ma Zhigang

Inventor after: Sang Mingyu

Inventor after: Sun Zhaohui

Inventor after: Wei Youbo

Inventor after: Shi Yingxin

Inventor after: Hao Junsuo

Inventor before: Yu Changbin

Inventor before: Chen Guosheng

Inventor before: Zhang Wenjuan

Inventor before: Ma Zhigang

Inventor before: Sang Mingyu

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160426

Address after: 064000, 14 District, Fengrun District, Hebei, Tangshan City (Guanghua Road, No. 8)

Applicant after: the 2nd Engineering Co., Ltd. of China Railway 18th Bureau Group Co., Ltd.

Applicant after: the Eighteenth Bureau of China's Railroad Group Co., Ltd.

Address before: 064000, 14 District, Fengrun District, Hebei, Tangshan City (Guanghua Road, No. 8)

Applicant before: the 2nd Engineering Co., Ltd. of China Railway 18th Bureau Group Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant