CN112392242A - Multifunctional working platform for closing satellite fairing - Google Patents

Multifunctional working platform for closing satellite fairing Download PDF

Info

Publication number
CN112392242A
CN112392242A CN202011398106.3A CN202011398106A CN112392242A CN 112392242 A CN112392242 A CN 112392242A CN 202011398106 A CN202011398106 A CN 202011398106A CN 112392242 A CN112392242 A CN 112392242A
Authority
CN
China
Prior art keywords
frame body
work platform
auxiliary supporting
leveling auxiliary
working platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011398106.3A
Other languages
Chinese (zh)
Inventor
陈云龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Aerospace Wujiang Electro Mechanical Equipment Co Ltd
Original Assignee
Guizhou Aerospace Wujiang Electro Mechanical Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Aerospace Wujiang Electro Mechanical Equipment Co Ltd filed Critical Guizhou Aerospace Wujiang Electro Mechanical Equipment Co Ltd
Priority to CN202011398106.3A priority Critical patent/CN112392242A/en
Publication of CN112392242A publication Critical patent/CN112392242A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/02Scaffold feet, e.g. with arrangements for adjustment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • E04G2001/157Extensible platforms, e.g. telescopic platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention discloses a multifunctional working platform for a satellite fairing, which comprises a main frame body, wherein more than four layers of fixed working platforms are fixedly arranged on the main frame body, a ladder stand is arranged between the adjacent fixed working platforms, a foldable working platform is movably connected to the outer side of each layer of fixed working platform, walking casters are arranged at the bottom of the main frame body, and meanwhile, a pair of front leveling auxiliary supporting legs and a pair of rear leveling auxiliary supporting legs are hinged to four corners of the bottom of the main frame body respectively. The invention can realize short-distance pushing movement and is convenient for long-distance transportation, and can be used without the limitation of regions and fields, thereby better providing assistance for closing the fairing.

Description

Multifunctional working platform for closing satellite fairing
Technical Field
The invention relates to a multifunctional working platform for closing a satellite fairing, and belongs to the technical field of space equipment.
Background
According to the cover closing requirement of the satellite fairing, two sets of working platforms are required to be configured on two sides. The working platform is mainly used for assisting an operator to close the two half covers of the satellite fairing. During the use, move work platform to the radome fairing both sides and close the cover region, operating personnel climbs up work platform, adjusts the tightener to suitable length, observes radome fairing two half covers gesture, confirms can close the cover after, by the commander send the password that closes the cover, each layer operating personnel of both sides work platform tightens up radome fairing both sides tightener simultaneously, closes the cover operation, and the radome fairing is engaged with completely.
Most of the original working platforms are large and heavy, and are mostly rotary or orbital working platforms, and the requirement of closing the satellite fairing can be met only by utilizing a special workshop. And the original working platform has large appearance and volume and can not be transported for a long distance. And the movement in the factory building is extremely limited, the satellite fairing can only move along a specific orbital path in a linear or rotary mode, and the satellite fairing needs to be installed in a specific operation area to perform operation when closing the fairing, so that the operation is very limited by the use place. However, the satellite fairing can perform various testability tests, and the site is often changed to perform the closing operation. The rotary or orbital working platform cannot be transported for a long distance due to large overall dimension and heavy weight, and cannot provide service for the closing of the satellite fairing. Even if long-distance transportation is carried out by a perfect method, the repeated construction of auxiliary facilities such as the installation of a working platform and a corresponding foundation and the like can cause great cost waste. Because the working platform is basically special equipment for the satellite cowling of the same model, the working platform for closing the satellite cowling of a certain model cannot be prepared in each test site, the cost is wasted, and the site is occupied.
Under such a demand, a new multifunctional work platform needs to be designed to solve the above problems. The multifunctional working platform should be reduced in overall dimension as much as possible and not exceed the requirement of transportation limit of roads and railways, so that the multifunctional working platform meets the requirement of long-distance transportation. Meanwhile, the multifunctional working platform can be integrally shipped as far as possible, secondary assembly of the multifunctional working platform is avoided, repeated labor is reduced, and the cost of manpower and material resources is reduced. The multifunctional working platform is large in size and heavy in weight, and can be hoisted to a working position only by a crane or a crane. The general condition only has a driving in the factory building, but a lot of equipment all need the supplementary of driving to remove, when the driving carries out other auxiliary operation, probably need wait for very long time, just can use the driving handling. In order to ensure the convenience of the multifunctional working platform, the multifunctional working platform is required to be capable of moving in a short distance. When the multifunctional working platform is used, the multifunctional working platform is manually pushed to working positions on two sides of the fairing, and the fairing is closed. After work is completed, the multifunctional working platform can be pushed to be placed at the idle position of the corner of the workshop by utilizing the moving function of the multifunctional working platform, so that work of other equipment is not interfered, and the use space of the workshop is increased.
Disclosure of Invention
The invention aims to: the utility model provides a satellite fairing closes covers and uses multi-functional work platform, but this work platform whole long distance transport, and can realize the short distance and carry out the removal, can not receive the restriction in region, place during the use, can be better close the cover for the fairing and provide supplementary.
In order to solve the technical problems, the invention provides the following technical scheme: the utility model provides a satellite fairing closes cover and uses multi-functional work platform, includes the body frame body, fixed mounting has fixed work platform more than four layers on the body frame body, installs the cat ladder between adjacent fixed work platform, is connected with folded cascade work platform in every layer of fixed work platform's the outside, installs the walking truckle in the bottom of the body frame body, and four corners of body frame body bottom do not hinged joint have a pair of preceding leveling auxiliary supporting leg and a pair of back leveling auxiliary supporting leg simultaneously.
Further, folded cascade work platform's the bottom inboard and body frame body hinged joint, folded cascade work platform's the bottom outside is through two sections connecting rods and body frame body hinged joint, is connected with wire rope in folded cascade work platform's the bottom outside simultaneously, installs hand block on the body frame body, and the fixed pulley is installed to the top that just is located hand block on the body frame body, and wire rope's the other end is walked around behind the fixed pulley and is connected with hand block.
Furthermore, a pull rod is connected between the adjacent foldable working platforms.
Furthermore, the front leveling auxiliary supporting leg and the rear leveling auxiliary supporting leg have the same structure, and the leveling supporting leg and the anti-tipping auxiliary wheel are arranged at the bottom of the front leveling auxiliary supporting leg or the bottom of the rear leveling auxiliary supporting leg.
Compared with the prior art, the invention has the following beneficial effects: the foldable working platform is movably connected to the outer side of each layer of fixed working platform, and a pair of front leveling auxiliary supporting legs and a pair of rear leveling auxiliary supporting legs are hinged to four corners of the bottom of a main frame body respectively; during the use, can launch each layer folded cascade work platform and lock fixedly, make folded cascade work platform front end more be close the radome fairing, personnel stand at each layer folded cascade work platform front end during the operation, more are close the radome fairing, and the personnel of being convenient for operate. When the multifunctional working platform is transported for a long distance, the front leveling auxiliary supporting legs, the rear leveling auxiliary supporting legs and the foldable working platforms at the bottom are retracted into the main frame body and fixed on the side surface of the main frame body through the locking mechanism, so that the whole multifunctional working platform meets the requirement of long-distance transportation; when the foldable working platforms at all layers are pushed and moved in a short distance, the foldable working platforms at all layers are retracted into the main frame body and fixed, so that the gravity center of the whole frame body deviates towards the central line direction of the whole frame body, the pushing is more stable, meanwhile, the front and rear leveling auxiliary supporting legs are adjusted to be consistent with the pushing direction and locked and fixed, and the leveling supporting legs on the front and rear leveling auxiliary supporting legs are retracted to be lifted off, so that the walking casters are supported by contacting with the ground; and the front end anti-tipping auxiliary wheel of the front and rear leveling auxiliary supporting legs is adjusted to ensure that the caster of the auxiliary supporting legs is just away from the ground but is not stressed, so that the multifunctional working platform can be safely and stably pushed and moved in a short distance in a factory building. Therefore, the invention can realize short-distance pushing movement and is convenient for long-distance transportation, and can be used without the limitation of regions and fields, thereby better providing assistance for the fairing closing.
Drawings
FIG. 1 is a schematic structural view of the multifunctional work platform of the present invention in a working state;
FIG. 2 is an enlarged view of a portion of FIG. 1;
FIG. 3 is a top view of FIG. 1;
FIG. 4 is a schematic structural view of the multifunctional work platform of the present invention in a transport state;
FIG. 5 is a top view of FIG. 4;
FIG. 6 is a schematic structural view of the multifunctional working platform of the present invention in a pushing state;
fig. 7 is a top view of fig. 6.
Description of reference numerals: the method comprises the following steps of 1-main frame body, 2-fixed working platform, 3-ladder stand, 4-foldable working platform, 5-walking caster wheels, 6-rear leveling auxiliary supporting legs, 7-leveling supporting legs, 8-anti-tipping auxiliary wheels, 9-pull rod, 10-steel wire rope, 11-manual block, 12-double-section connecting rod, 13-fixed pulley and 14-front leveling auxiliary supporting legs.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 3, the multifunctional working platform for the satellite fairing comprises a main frame body 1, wherein more than four layers of fixed working platforms 2 are fixedly arranged on the main frame body 1, a ladder stand 3 is arranged between the adjacent fixed working platforms 2, a foldable working platform 4 is movably connected to the outer side of each layer of fixed working platform 2, walking casters 5 are arranged at the bottom of the main frame body 1, and a pair of front leveling auxiliary supporting legs 14 and a pair of rear leveling auxiliary supporting legs 6 are hinged to four corners of the bottom of the main frame body 1. The bottom of folded cascade work platform 4 is inboard with the 1 hinged joint of the body frame body, and the bottom outside of folded cascade work platform 4 is through two sections connecting rods 12 and the 1 hinged joint of the body frame body, is connected with wire rope 10 in the bottom outside of folded cascade work platform 4 simultaneously, installs hand block 11 on the body frame body 1, and fixed pulley 13 is installed to the top that just is located hand block 11 on the body frame body 1, and wire rope 10's the other end is walked around behind fixed pulley 13 and is connected with hand block 11. Be connected with pull rod 9 between adjacent folded cascade work platform 4, link together each layer folded cascade work platform 4 through pull rod 9, improve its stability, avoid rocking in the use. The front leveling auxiliary supporting leg 14 and the rear leveling auxiliary supporting leg 6 are identical in structure, and the leveling supporting leg 7 and the anti-tipping auxiliary wheel 8 are mounted at the bottom of the front leveling auxiliary supporting leg 14 or the rear leveling auxiliary supporting leg 6.
Since the satellite cowling has a height of about 12m and a diameter of about 4.5m, the upper end is conical. In order to ensure that the multifunctional working platform can operate all tighteners for closing the cowling, the height of the multifunctional working platform is higher than that of the satellite cowling, and personnel can operate the tightener at the top of the cowling.
As shown in fig. 1 and 3, a pair of front leveling auxiliary supporting legs 14 and a pair of rear leveling auxiliary supporting legs 6 are respectively hinged to four corners of the bottom of the main frame body 1, so that the front leveling auxiliary supporting legs 14 and the rear leveling auxiliary supporting legs 6 can rotate around a mounting point, a locking device is installed at the hinged position, and the front leveling auxiliary supporting legs 14 or the rear leveling auxiliary supporting legs 6 are locked and fixed after rotating to a specified position (a retracted transportation position, an expanded pushing position and an expanded supporting position), so that the stability and reliability of the front leveling auxiliary supporting legs 14 or the rear leveling auxiliary supporting legs 6 at each station are ensured. When the front leveling auxiliary supporting leg 14 and the rear leveling auxiliary supporting leg 6 rotate to the unfolding supporting position, the distance position of the bottom supporting point is increased, so that the multifunctional working platform is more reliable and stable in use.
As shown in fig. 4 and 5, in order to meet the transportation requirements of long distance highways and railways, the front leveling auxiliary supporting legs 14, the rear leveling auxiliary supporting legs 6 and the foldable working platforms 4 at the bottom can be retracted into the main frame body 1 and fixed on the main frame body 1 through the locking mechanism, so that the overall dimension length × width × height of the multifunctional working platform is 2880mm × 2860mm × 12892mm, and the transportation requirements are controlled within the transportation limit range of highways and railways. The multifunctional working platform is laid down and horizontally placed during transportation, and the equipment can be integrally transported in a long distance. When the foldable working platform 4 is retracted, the steel wire rope 10 on the hand-operated hoist 11 can drive the foldable working platform 4 to rotate towards the main frame body 1.
As shown in fig. 6 and 7, in order to ensure that the multifunctional working platform can be pushed in a short distance, four walking casters 5 are designed and installed at the bottom of the main frame body, and can be pushed by an operator to move in a short distance. However, the multifunctional working platform is higher in height, so that the overturning danger may occur in the pushing process, and therefore, the foldable working platforms 4 of all layers are firstly turned upwards and retracted and locked and fixed during pushing, so that the gravity center of the whole frame body deviates towards the center direction of the main frame body 1, and the pushing is more stable. Meanwhile, the bottom parts of the front leveling auxiliary supporting leg 14 and the rear leveling auxiliary supporting leg 6 are respectively provided with an anti-tipping auxiliary wheel 8. When the device is pushed, the front leveling auxiliary supporting leg 14 and the rear leveling auxiliary supporting leg 6 are adjusted to be consistent with the pushing direction and are fixed by a locking device. And retracting the leveling supporting legs 7 on the front leveling auxiliary supporting leg 14 and the rear leveling auxiliary supporting leg 6 to the ground, and supporting the walking caster 5 to touch the ground. And the anti-tipping auxiliary wheels 8 on the front leveling auxiliary supporting legs 14 and the rear leveling auxiliary supporting legs 6 are adjusted to ensure that the anti-tipping auxiliary wheels 8 are grounded but are not stressed, and when the multifunctional working platform is pushed to have a forward-tipping trend, the anti-tipping auxiliary wheels 8 can give a reverse supporting force to return to the right direction, so that the stability of short-distance pushing of the multifunctional working platform in a workshop is improved.

Claims (4)

1. The utility model provides a satellite fairing closes cover and uses multi-functional work platform, includes the body frame body (1), its characterized in that: fixed work platform (2) more than four layers are fixedly installed on the main frame body (1), a ladder (3) is installed between adjacent fixed work platforms (2), the outer side of each layer of fixed work platform (2) is movably connected with a foldable work platform (4), walking casters (5) are installed at the bottom of the main frame body (1), and meanwhile, four corners at the bottom of the main frame body (1) are respectively hinged with a pair of front leveling auxiliary support legs (14) and a pair of rear leveling auxiliary support legs (6).
2. The multifunctional work platform for satellite fairing closures of claim 1, wherein: the bottom inboard and the body frame body (1) hinged joint of folded cascade work platform (4), the bottom outside of folded cascade work platform (4) is through two sections connecting rod (12) and body frame body (1) hinged joint, be connected with wire rope (10) in the bottom outside of folded cascade work platform (4) simultaneously, install manual calabash (11) on body frame body (1), fixed pulley (13) are installed to the top that just is located manual calabash (11) on body frame body (1), the other end of wire rope (10) is connected with manual calabash (11) after bypassing fixed pulley (13).
3. The multifunctional work platform for satellite fairing closures of claim 2, wherein: a pull rod (9) is connected between the adjacent foldable working platforms (4).
4. The multifunctional work platform for satellite fairing closures of claim 1, wherein: the front leveling auxiliary supporting leg (14) and the rear leveling auxiliary supporting leg (6) are identical in structure, and the leveling supporting leg (7) and the anti-tipping auxiliary wheel (8) are mounted at the bottom of the front leveling auxiliary supporting leg (14) or the rear leveling auxiliary supporting leg (6).
CN202011398106.3A 2020-12-03 2020-12-03 Multifunctional working platform for closing satellite fairing Pending CN112392242A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011398106.3A CN112392242A (en) 2020-12-03 2020-12-03 Multifunctional working platform for closing satellite fairing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011398106.3A CN112392242A (en) 2020-12-03 2020-12-03 Multifunctional working platform for closing satellite fairing

Publications (1)

Publication Number Publication Date
CN112392242A true CN112392242A (en) 2021-02-23

Family

ID=74605060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011398106.3A Pending CN112392242A (en) 2020-12-03 2020-12-03 Multifunctional working platform for closing satellite fairing

Country Status (1)

Country Link
CN (1) CN112392242A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2975116A1 (en) * 2011-05-12 2012-11-16 Zhuhai Quan Da Industry & Commerce Folding scaffolding for e.g. painting ceiling, in residential building, has folding plate and stiffener defining median plane in which ladders remain parallel, where plate folds up and stiffener folds between ladders upon folding
CN103277112A (en) * 2013-06-22 2013-09-04 中铁十八局集团第二工程有限公司 Tunnel engineering train type rapid lifting and folding working platform
CN204703746U (en) * 2015-05-14 2015-10-14 三明学院 A kind of removable level-sensing device repairing platform device
CN106088569A (en) * 2016-08-12 2016-11-09 天力博达科技有限公司 Collapsible material platform on construction scaffold
CN108658014A (en) * 2018-02-13 2018-10-16 山西太重北特机械设备制造有限公司 Rocket radome fairing closes the multilayer movable platform of cover
CN208120605U (en) * 2018-03-27 2018-11-20 中国石化江汉油田分公司江汉采油厂 Pumping unit maintenance car
CN110980603A (en) * 2020-02-03 2020-04-10 山东丰汇设备技术有限公司 Foldable maintenance platform and flatting and folding method thereof
CN211396536U (en) * 2019-10-15 2020-09-01 南通市达欣工程股份有限公司 Turnover movable scaffold frame that prevents toppling
CN214220535U (en) * 2020-12-03 2021-09-17 贵州航天乌江机电设备有限责任公司 Multifunctional working platform mechanism for closing satellite fairing

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2975116A1 (en) * 2011-05-12 2012-11-16 Zhuhai Quan Da Industry & Commerce Folding scaffolding for e.g. painting ceiling, in residential building, has folding plate and stiffener defining median plane in which ladders remain parallel, where plate folds up and stiffener folds between ladders upon folding
CN103277112A (en) * 2013-06-22 2013-09-04 中铁十八局集团第二工程有限公司 Tunnel engineering train type rapid lifting and folding working platform
CN204703746U (en) * 2015-05-14 2015-10-14 三明学院 A kind of removable level-sensing device repairing platform device
CN106088569A (en) * 2016-08-12 2016-11-09 天力博达科技有限公司 Collapsible material platform on construction scaffold
CN108658014A (en) * 2018-02-13 2018-10-16 山西太重北特机械设备制造有限公司 Rocket radome fairing closes the multilayer movable platform of cover
CN208120605U (en) * 2018-03-27 2018-11-20 中国石化江汉油田分公司江汉采油厂 Pumping unit maintenance car
CN211396536U (en) * 2019-10-15 2020-09-01 南通市达欣工程股份有限公司 Turnover movable scaffold frame that prevents toppling
CN110980603A (en) * 2020-02-03 2020-04-10 山东丰汇设备技术有限公司 Foldable maintenance platform and flatting and folding method thereof
CN214220535U (en) * 2020-12-03 2021-09-17 贵州航天乌江机电设备有限责任公司 Multifunctional working platform mechanism for closing satellite fairing

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张骏;刘玉梅;刘贝;周煦洁;陈艳;: "大直径柔性整流罩垂直对接平台的设计与验证", 机械工程师, no. 06, 10 June 2020 (2020-06-10), pages 106 - 108 *

Similar Documents

Publication Publication Date Title
CN107013045B (en) Loading platform
US20060219478A1 (en) Construction
CN106194220A (en) Tunnel splash guard installs chassis
AU2019100985B4 (en) Equipment tower
US20220220744A1 (en) System And Method Of Assembling And Installing Commercial Roofing
CN214220535U (en) Multifunctional working platform mechanism for closing satellite fairing
JP2008156047A (en) Self-traveling lifter device
US3045837A (en) Rotary tower crane
WO2022001169A1 (en) Highway-railway dual-purpose track-laying machine for urban rail transit engineering
JP3022988B2 (en) Bridge inspection equipment
CN112392242A (en) Multifunctional working platform for closing satellite fairing
WO2008131638A1 (en) Combined multifunctional crane and hoisting device
CN105600686A (en) Portable mobile crane boom
CN110937555A (en) Track maintenance car
JP2001115555A (en) Shed part, shed structure and constructing method of shed structure
CN210101438U (en) Flexible upset integration is from loading and unloading electric power test moving platform
CN218751494U (en) Vehicle-mounted folding deck system
CN114069469B (en) Vehicle-mounted movable integrated spanning frame and application method thereof
CN215405535U (en) Building site is with scalable device of strideing across barrier
CN110846952B (en) Work apparatus and control method for work apparatus
JP2699146B2 (en) How to build an underground low-temperature storage tank
CN219672174U (en) Non-road walking internal track mechanical system for building assembly
CN112320609B (en) Hoist and mount conveyer in class absorption formula tunnel
JP3718783B2 (en) Horizontal jib crane and traveling horizontal jib crane
JP2587383B2 (en) Underground storage tank construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination